MidAmerican Energy CompanyEnergy Isolation Program

August 8, 2012Tom Daft ([email protected])

Manager, Wind Development and Administration

Page 2: MidAmerican Energy Company Energy Isolation Program · PDF fileMidAmerican Energy Company Energy Isolation Program August 8, 2012 ... Energy Isolation Programs need to: ... • 575

Overview

Energy Isolation Programs need to:Energy Isolation Programs need to:– Be compliant– Be usableBe usable– Above all, KEEP PEOPLE SAFE!

Page 3: MidAmerican Energy Company Energy Isolation Program · PDF fileMidAmerican Energy Company Energy Isolation Program August 8, 2012 ... Energy Isolation Programs need to: ... • 575

Compliance

OSHA Perception of a Successful Program

Detailed Energy Control Procedures

Extensive Employee Training ProgramsExtensive Employee Training Programs

Periodic Reinforcement of Training

S ffi i Di i li R di I l iSufficient Discipline Regarding Implementation

Page 4: MidAmerican Energy Company Energy Isolation Program · PDF fileMidAmerican Energy Company Energy Isolation Program August 8, 2012 ... Energy Isolation Programs need to: ... • 575

MidAmerican Approach

MidAmerican ApproachWind has a separate program from other generation facilities– Wind has a separate program from other generation facilities

– Program development was led by an experienced wind supervisor – A consultant supported and fine‐tuned the programpp p g– Separate and specific procedures each turbine type:

• GE “S” turbines, GE SLE turbines, Mitsubishi turbines and Siemens turbines.

Procedures posted on wind only portal site with printed copies at– Procedures posted on wind‐only portal site with printed copies at each reporting center– Lock out / tag out devices that fit the equipment

Page 5: MidAmerican Energy Company Energy Isolation Program · PDF fileMidAmerican Energy Company Energy Isolation Program August 8, 2012 ... Energy Isolation Programs need to: ... • 575

Procedure Requirements:

• Statement of Intended Use• Steps for Shut-Down and Energy Control• Steps for LOTO Device Placement, Transfer and

Removal• Determination of Responsibilityete at o o espo s b ty• Steps for Testing LOTO

Page 6: MidAmerican Energy Company Energy Isolation Program · PDF fileMidAmerican Energy Company Energy Isolation Program August 8, 2012 ... Energy Isolation Programs need to: ... • 575

Typical MidAmerican Procedure

Page 7: MidAmerican Energy Company Energy Isolation Program · PDF fileMidAmerican Energy Company Energy Isolation Program August 8, 2012 ... Energy Isolation Programs need to: ... • 575

MidAmerican GE SLE Wind Turbine Procedures

• Main Tower AC Tower Breaker• 575 VAC to LVMD; Control Voltage• 575 VAC to LVMD; Control Voltage• 50 kVa Transformer• ConverterConverter• Pitch Slip Ring• Gearbox Lubrication PumpGearbox Lubrication Pump• Gear Box Cooler Fan• Yaw Drive Systemy• Hydraulic Brake UnitAnd 10 other systems…

Page 8: MidAmerican Energy Company Energy Isolation Program · PDF fileMidAmerican Energy Company Energy Isolation Program August 8, 2012 ... Energy Isolation Programs need to: ... • 575

Ensure remote actions are prevented

Switch in MAINTENANCE / REPAIR / LOCAL

Page 9: MidAmerican Energy Company Energy Isolation Program · PDF fileMidAmerican Energy Company Energy Isolation Program August 8, 2012 ... Energy Isolation Programs need to: ... • 575

LOTO Devices

Page 10: MidAmerican Energy Company Energy Isolation Program · PDF fileMidAmerican Energy Company Energy Isolation Program August 8, 2012 ... Energy Isolation Programs need to: ... • 575

LOTO Devices

Page 11: MidAmerican Energy Company Energy Isolation Program · PDF fileMidAmerican Energy Company Energy Isolation Program August 8, 2012 ... Energy Isolation Programs need to: ... • 575

LOTO Devices