UPPER SOUTHWEST RSWMD LANDFILL
Fourth Quarter 2018 Explosive Gas
Monitoring Event
DATE: 12/31/18
MONITORING EQUIPMENT USED: GEM 2000+
MONITORING CONDUCTED BY: Wes Williams
WEATHER CONDITIONS: Overcast, 50°F
Monitoring
Point
Performance
Criteria
Time % LEL
% O²
GP-1 100% LEL 1306 0.0 13.2
GP-2 100% LEL 1314 0.0 0.7
GP-3 100% LEL 1320 >100 2.0
GP-3R 100% LEL 1337 0.0 8.7
GP-4 100% LEL 1352 0.0 3.9
GP-5 100% LEL 1345 0.0 1.5
GP-6 100% LEL 1359 0.0 3.9
Bailer Facility 25% LEL 1410 0.0 20.3
Office Building 25% LEL 1415 0.0 20.3
Note: * Values in BOLD exceed Lower Explosive Limit (LEL)
UPPER SOUTHWEST RSWMD LANDFILL
Fourth Quarter 2018 Groundwater Level Record
DATE: 12/31/2018
MONITORING EQUIPMENT USED: Water Level Meter
MONITORING CONDUCTED BY: Wes Williams
WEATHER CONDITIONS: Overcast, 50° F
Monitoring
Point
Top of
Casing
Elevation *
(FMSL)
Water
Level
(Ft. From
TOC)
Groundwater
Surface
Elevation
(FMSL)
B-1 591.67 6.58 585.09
B-2 614.60 26.25 588.35
B-3 589.71 11.42 578.29
B-4 604.27 33.23 571.04
B-5 609.62 35.80 573.82
B-6R 576.27 24.26 552.01
B-8R 528.95 10.68 518.27
B-9R 546.92 7.68 539.24
B-10R 526.86 8.02 518.84
B-11 533.69 20.89 512.80
B-12 554.21 34.90 519.31
B-13 531.96 19.73 512.23
B-14 545.03 11.39 533.64
B-15 525.13 13.58 511.55
C-1R 527.13 9.21 517.92
* Based on April 2, 2018 Survey
BM1
BM3
BM2
APPROX. PROPERTY BOUNDARY
B-1
B-2B-5B-4
B-3
B-9R
B-10R
B-6R
B-13
B-11
B-12
B-14
ACCESS ROAD
585.09
588.35573.82571.04
C-1R519.31
533.64
552.01
GGP-1
GGP-2
GGP-3
GGP-4
G GP-5
G GP-6
SEDIMENTATION POND
CLASS I LANDFILL
578.29
512.23
512.80
518.84
517.92
B-8R518.27
B-15511.55
539.24
UnderdrainSouth
UnderdrainNorth
DESIGNED BY:
SCALE:APPVD. BY:DRAWN BY:
DATE:
SHEET NO.:
JOB NO.
OF
BY DESCRIPTIONDATEREV.
ACAD NO.25809 I-30 SOUTH BRYANT, AR 72022FAX. (501) 847-9210PH. (501) 847-9292
Consulting Engineers and Scientists
4th QUARTER 2018 - GROUNDWATER MONITORING REPORTUPPER SOUTHWEST REGIONAL SOLID WASTE MANAGEMENT DISTRICT
POTENTIOMETRIC SURFACE MAP - (DECEMBER 31, 2018)
HOWARD COUNTY ARKANSAS
PTGPTGDGJAS SHOWN1/3/2019061-001-35967005055
FIGURE 2
USWRSWMD SANITARY LANDFILL
N
0
SCALE IN FEET
125 250 500
LEGEND:
GROUNDWATER MONITORING WELL
GROUNDWATER POTENTIOMETRICSURFACE CONTOURS (fmsl)GROUNDWATER FLOW DIRECTIONGROUNDWATER SURFACE ELEVATION (fmsl)588.35
B-11
GAS MONITORING PROBEGGP-1
Upper Southwest Underdrain Totals
Year Month North South Total Gallons
January 56,000
February 54,000
March 51,000
April 56,000
May 59,000
June 51,000
July 41,000
August 45,000
September 45,000
October 28,000 23,000 51,000
November 30,000 24,000 54,000
December 30000 26000 56,000
Year Month North South Total Gallons
January 29,000 25,000 54,000
February 33,000 23,000 56,000
March 27,000 25,000 52,000
April 27,000 25,000 52,000
May 27,000 25,000 52,000
June 23,000 21,000 44,000
July 23,000 22,000 45,000
August 22,000 20,000 42,000
September 23,000 21,000 44,000
October 25,000 23,000 48,000
November 27,000 23,000 50,000
December 25,000 23,000 48,000
Year Month North South Total Gallons
January 27,000 25,000 52,000
February 29,000 25,000 54,000
March 27,000 23,000 50,000
April 23,000 21,000 44,000
May 25,000 23,000 48,000
June 23,000 21,000 44,000
July 23,000 21,000 44,000
August 23,000 21,000 44,000
September 27,000 23,000 50,000
October 27,000 25,000 52,000
November 25,000 23,000 48,000
December 23,000 21,000 44,000
USWRSWMD Underdrain Totals
20