5
Michael Pacholock Chief Purchasing Officer Purchasing and Materials Management Division City Hall, 18 th Floor, West Tower 100 Queen Street West Toronto, Ontario M5H 2N2 Sabrina Dipietro Manager Construction Services June 14, 2019 Via Internet Site Posting 2 Pages Addendum No. 2 Tender Call No. 189-2019 Closing Date: 12:00 NOON (LOCAL TIME) June 20, 2019 For: for the supply, delivery, assembly, and installation of The Iron Horse Sculpture and Lighting on the Kay Yonge Beltline bridge within the City of Toronto Please refer to the above Request for Tender (RFT) document in your possession and be advised of the following: I. QUESTIONS & ANSWERS Q1. Please confirm the price schedule quantities for items 1.2, 1.7, 1.8, 1.9, 1.10, 1.11 and 1.12. There may be discrepancies between the drawings and tender form. A1. The price schedule quantities have been revised. Please see attached revised price schedule with revised quantities. In addition, item 1.14 has been added to the scope of work and price schedule for supply and installation of a plaque. Q2. Please confirm if any required tree pruning and related permit will be performed/provided by City staff. A2. No tree pruning is required. Q3. Please confirm if a building permit will be required, and if yes, who is responsible for permit costs. A3. No building permit is required. II. REVISIONS & ADDITIONS 1. Item #1.14 for supply and install of a plaque has been added to the scope of work and revised price schedule. Quantities for items have been updated accordingly. The attached revised price schedule should be referenced on a go forward basis. 2. A higher resolution copy of drawings S01 and S02 have been attached to this addendum to be referenced on a go forward basis. 1 of 5

Michael Pacholock Purchasi Sabrina Dipietro Chief ... · ng and Materials Management Division thCity Hall, 18 Floor, West Tower Toronto, Ontario M5H 2N2 Sabrina Dipietro Manager

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Michael Pacholock Purchasi Sabrina Dipietro Chief ... · ng and Materials Management Division thCity Hall, 18 Floor, West Tower Toronto, Ontario M5H 2N2 Sabrina Dipietro Manager

Michael Pacholock Chief Purchasing Officer

Purchasing and Materials

Management Division City Hall, 18th Floor, West Tower 100 Queen Street West

Toronto, Ontario M5H 2N2

Sabrina Dipietro Manager Construction Services

June 14, 2019 Via Internet Site Posting – 2 Pages

Addendum No. 2

Tender Call No. 189-2019 Closing Date: 12:00 NOON (LOCAL TIME) June 20, 2019

For: for the supply, delivery, assembly, and installation of The Iron Horse Sculpture and Lighting on the Kay Yonge Beltline bridge within the City of Toronto Please refer to the above Request for Tender (RFT) document in your possession and be advised of the following:

I. QUESTIONS & ANSWERS

Q1. Please confirm the price schedule quantities for items 1.2, 1.7, 1.8, 1.9, 1.10, 1.11 and 1.12. There may be discrepancies between the drawings and tender form. A1. The price schedule quantities have been revised. Please see attached revised price

schedule with revised quantities. In addition, item 1.14 has been added to the scope of work and price schedule for supply and installation of a plaque.

Q2. Please confirm if any required tree pruning and related permit will be performed/provided by City staff. A2. No tree pruning is required. Q3. Please confirm if a building permit will be required, and if yes, who is responsible for permit costs. A3. No building permit is required.

II. REVISIONS & ADDITIONS 1. Item #1.14 for supply and install of a plaque has been added to the scope of work and revised price schedule. Quantities for items have been updated accordingly. The attached revised price schedule should be referenced on a go forward basis. 2. A higher resolution copy of drawings S01 and S02 have been attached to this addendum to be referenced on a go forward basis.

1 of 5

Page 2: Michael Pacholock Purchasi Sabrina Dipietro Chief ... · ng and Materials Management Division thCity Hall, 18 Floor, West Tower Toronto, Ontario M5H 2N2 Sabrina Dipietro Manager

2

Note: The attached Revised Price Schedule in addendum 2 must be used for pricing of this Tender. Failure to submit the revised version will render the bid submission non-compliant.

Should you have any questions regarding this addendum, please contact Sunney D'Souza at 416-338-5579. email: [email protected].

Please attach this addendum to your RFT document and be governed accordingly. Bidders must acknowledge receipt of all addenda on the space provided on the Tender Call Cover Page as per the Process Terms and Conditions, Section 1, Item 9 - Addenda, of the Tender Call document. All other aspects of the Tender remain the same.

Yours truly,

Sabrina Dipietro Manager, Construction Services Purchasing and Materials Management

2 of 5

Page 3: Michael Pacholock Purchasi Sabrina Dipietro Chief ... · ng and Materials Management Division thCity Hall, 18 Floor, West Tower Toronto, Ontario M5H 2N2 Sabrina Dipietro Manager

MIDTOWN KAY YONGE BRIDGE

PROJECT NUMBER: 134A 19 003

DATE: June 14, 2019

Addendum No. 2

ITEM DESCRIPTION UNIT QTY RATE COST

1.1SUPPLY AND INSTALL IRON HORSES ON BRIDGE

(PLASTIGLAS INDUSTRIES, OR APPROVED EQUIVALENT)L.M. 12 $ $

1.2SUPPLY TRENCHING, BACKFILL, AND COMPACTION TO

95% S.P.D.L.M. 17 $ $

1.3

SUPPLY AND INSTALL SOLAR POLE ASSEMBLY: POLE,

SOLAR PANELS, NANOGRID CABINET, DC BATTERY,

SMART OFF-GRID CONTROLLER, AND DC-AC CONVERTER

BY CLEARBLUE TECHNOLOGIES

EA. 1 $ $

1.4SUPPLY AND INSTALL 2W LUMENPULE (LUMENFACADE

NANO) LIGHTEA. 23 $ $

1.5 SUPPLY & INSTALL LUMENPULSE CONTROL BOX EA. 2 $ $

1.6SUPPLY CORE DRILLING THROUGH CONCRETE WALL

FOR 50mm DUCTL.M. 1 $ $

1.7 SUPPLY 50mm PVC TYPE DB2 DUCT L.M. 90 $ $

1.8INSTALL 50mm DUCT VIA DIRECT BURIAL IN OPEN

TRENCHL.M. 30 $ $

1.9

INSTALL 50mm DUCT VIA SURFACE MOUNTING ON

BRIDGE DECK C/W SUPPORTS AS PER OESC 12-1114 AND

OPSD 2302.020

L.M. 60 $ $

1.10SUPPLY AND INSTALL LUMENFACADE MASTER JUMPER

CABLEL.M. 15 $ $

1.11SUPPLY AND INSTALL LUMENFACADE STANDARD

JUMPER CABLEL.M. 40 $ $

1.12SUPPLY AND INSTALL 3-#12 AWG RWU90 XLPEI 600V

PVCJ CABLEL.M. 40 $ $

1.13 SUPPLY TRAFFIC CONTROL L.S. 1 $ $

1.14

SUPPLY AND INSTALL 2 feet x 2 feet PLAQUE ON

CONCRETE WALL. PLAQUE TO BE MADE OF FIBERGLASS

REINFORCED PLASTIC (sImiliar to the Iron Horses), Lettering

and Log's to be Etched (Text and Logo will be provide by the CIty),

INSTALLED USING TAMPER PROOF SCREWS ON

CONCRETE WALL

EA. 1 $ $

$

$

$

TENDER FORM - IRON HORSES AND LIGHTING INSTALLATION

SUBTOTAL

CONTINGENCY - 10%

GRAND TOTAL

3 of 5

Page 4: Michael Pacholock Purchasi Sabrina Dipietro Chief ... · ng and Materials Management Division thCity Hall, 18 Floor, West Tower Toronto, Ontario M5H 2N2 Sabrina Dipietro Manager

4 of 5

Page 5: Michael Pacholock Purchasi Sabrina Dipietro Chief ... · ng and Materials Management Division thCity Hall, 18 Floor, West Tower Toronto, Ontario M5H 2N2 Sabrina Dipietro Manager

5 of 5