Allan DeMello Lawrence Berkeley National Laboratory. MICE Coupling Coil Cryostat Update. MICE CM37 at RAL, UK November 6, 2013. Status of Coupling Coil Cryostat. Cryostat Vacuum Vessel LBNL mechanical shop is fabricating the first cryostat vacuum vessel - PowerPoint PPT Presentation
Citation preview
MICE Coupling Coil Cryostat Update
Allan DeMelloLawrence Berkeley National Laboratory
MICE CM37 at RAL, UK November 6, 2013
MICE RFCC Module – MICE Schedule Review at RAL, UK
Page 2Derun Li - Lawrence Berkeley National Lab – May 24, 2011
MICE CM37 Coupling Coil Cryostat Update
Page 2Allan DeMello- Lawrence Berkeley National Lab – November 6, 2013
Status of Coupling Coil Cryostat
• Cryostat Vacuum Vessel• LBNL mechanical shop is fabricating the first cryostat vacuum
vessel• Scheduled to finish the 2nd week of December
• Thermal Shield• Drawings have been finished at LBNL and need to be
reviewed by the LBNL superconductor group• LBNL mechanical shops will fabricate the first thermal shield
• Cooling Circuit• Drawings will be generated by LBNL• LBNL mechanical shops will fabricate the cooling circuit parts• LBNL will assemble components into sub-assemblies
MICE CM37 Coupling Coil Cryostat Update
Page 3Allan DeMello- Lawrence Berkeley National Lab – November 6, 2013
Coupling Coil
Coupling coil magnet integrated into the RFCC
RFCC Module
MICE CM37 Coupling Coil Cryostat Update
Page 4Allan DeMello- Lawrence Berkeley National Lab – November 6, 2013
Coupling Coil Sub-assemblies
MICE CM37 Coupling Coil Cryostat Update
Page 5Allan DeMello- Lawrence Berkeley National Lab – November 6, 2013
Coupling Coil Cryostat Vacuum Vessel• LBNL mechanical shop is in the
process of fabricating the first cryostat vacuum vessel• Estimated completion early
December 2013• Drawings will be updated to reflect
the “as built” cryostat
MICE CM37 Coupling Coil Cryostat Update
Page 6Allan DeMello- Lawrence Berkeley National Lab – November 6, 2013
Coupling Coil Thermal Shield
Remaining Tasks • Thermal shield design is nearly
complete• SINAP drawings are finished and will
be reviewed by the LBNL superconductor group
• LBNL shops will fabricate the first thermal shield
MICE CM37 Coupling Coil Cryostat Update
Page 7Allan DeMello- Lawrence Berkeley National Lab – November 6, 2013
Cooling Circuit Assembly
Remaining Tasks • LBNL superconductor group will finalize
the cooling circuit design • Create detail fabrication drawings • Fabrication of component parts at LBNL• Assemble components into sub-
assemblies for shipment to Fermilab