London City Island Development

Package: Full Logistics

Project Overview:

Mixed-use development 1600 residential units sustainable developmentcontaining offices, retail, workspace, leisure facilities, cafés and restaurantsand cultural facilities 500sq metres of cultural exhibition space 20,000sqmetres of offices Prime site opposite the Millennium Dome Landscapedpublic spaces linked by cycle and pedestrian routes

Page 3: MG - An Introduction

CONTENTS MadiganGill Introduction

Capability / Key Turnover

Company Structure

Management CV’s

Example Logistical Planning

Project Information

Project Experience

Health, Safety, Quality and the Environment

Accreditations

Our Clients

Testimonials

5

6

7

9

12

14

15

17

18

21

22

Page 4: MG - An Introduction

THECOMPANY

“Service provider of Choice”MadiganGill

Page 5: MG - An Introduction

Introduction/Overview

At MadiganGill we specialise in the supply of high quality labour and trades, site management staff,construction logistics and subcontract packages to the construction industry.

Established in 2009, the Company represents the collaboration of two family names, bringing with them awealth of experience gained at Director level, in the site resourcing and project logistics industry.

We are fresh, dynamic and forward-thinking in our attitudes and we continually strive to achieve bestindustry practice. Being a family-owned business that cares about its service, we understand theimportance of working closely and responsively with all our clients.

We are highly regarded, working with many blue chip contractors on various flagship projects acrossLondon and the UK.

We ensure our clients have direct access to the people running their project. This helps us to createworking relationships based on trust, dialogue and collaboration.

ANINTRODUCTION

Why choose MadiganGill

● Full access to the owners of the business

● Workforce of 1400 people

● Strong financial standing with excellent trading accounts

● Sustainable year on year growth to a current level of 40m for 2015

● Hands on organisation which delivers what it says

● Quick response to customer requests and queries

● Good quality workforce with a strong database of candidates

● Very strong customer base

● Ability to deliver flagship projects

● Strict adherence to Health and Safety regulations

● Full involvement with the project team and culture

● We can act as Principal Contractor under CDMC

05

Page 6: MG - An Introduction

ResourceMadiganGill provide high quality personnel throughout theconstruction industry.

Our experienced team works with a wide range of clients acrossthe industry. We take great pride in applying our extensiveknowledge, experience and attention to detail in searching forthe right candidate, tailored to each individual employer’srequirements.

From General Operatives, Plant Operatives, Trades People rightthrough to Site Engineers, Quantity Surveyors, Site Managers,Project Managers and Senior Construction Staff we can provideyou with high calibre personnel at competitive rates.

We are a market leader in recruiting qualified and experiencedresources for temporary and permanent contracts in theconstruction industry. We have over 1400 weekly paid operativeswho have been personally interviewed and reference checked.All of the workforce is CSCS certified.

The main services include:

■ Labour and trades

■ Management

■ Secretarial

■ Cleaners

■ Mechanical & electrical

■ Rail

■ Civil's

Construction / Enabling WorksMadiganGill Construction specialise in the provision of demolition,strip out and enabling work projects on behalf of a number of ourkey clients.

We have an experienced and dedicated management team ofprofessionals who are keenly focused on our clients’ requirements.We frequently provide our clients with early tender stage cost andmethodology advice in an effort to maintain key relationships.Health and Safety are always at the forefront of our thoughts on liveprojects and we constantly strive to maintain our immaculate recordas an incident and injury free contractor.

An experienced team of 18 professional management staff, can actas principal contractor on site either as main contractor orsubcontractor, specialising in enabling works structure alterationsand groundwork packages. We are equally able to provide a fullturnkey service if requested, as we have a reliable supply chain in thefit-out arena.

The main services include:

■ Structural demolition and alterations.

■ Internal soft strip.

■ Site Enabling works

■ Bulk Digs

■ Complete Demolition

LogisticsPre- Planned construction logistics can be vital to the smoothrunning of a construction project.

MadiganGill Logistics is a single source solution for all logisticalneeds. We provide a full logistical cycle from pre planning, siteset up, security, traffic management, delivery management, firemanagement, waste management through to builders clean. Wecan provide these services as a stand alone subcontract or as afull fixed price package.

We offer the complete range of services on site, managing thedelivery and distribution of the workforce, plant and materials.All 23 of our senior management within the logistics arm have aproven track record on delivering projects on time and within settargets. This helps to create a cleaner and safer site to work on,where vehicle movements are controlled and wastage reduced.This environment increases planned reliability and programmecertainty.

The main services include:

■ Security

■ Site Setup/Welfare Management

■ Traffic Management

■ Waste management

■ Material Distribution

■ Delivery Management

■ Fire and Safety Management

Crouch Hill Community Park Harmin House London City Island

Capability / Key Turnover

06

Page 7: MG - An Introduction

07The Team

Page 8: MG - An Introduction

THEMANAGEMENT

Page 9: MG - An Introduction

Management CV’sJohn has developed his own unique management style which has over the years gained the respect of hismanagement team. John has three decades of experience in construction & logistics and has worked onsome of the largest project in the UK .He prides himself on the achievements he has made throughout his career and always gives 100%commitment in everything he does. His management skills and professionalism make him an asset to anyorganisation. Working as a team member and motivating people is the key to his success. He has alwaysdelivered throughout his career and aims to do so in the future.

Since joining MadiganGill, John has brought vast experience as a Projects Director. He is responsiblefor commercial and operational activities for our logistics division ensuring that we provide a profes-sional and quality service to all our projects.

Project Experience2012 Olympic Games - LO COG Security Fencing – Contract sum 30 millionHeaded up delivery of a £30m, security fencing contract for the Olympic games; fencing was erectedacross the majority of all of the venues (about 82 in total). Due to the locations across the UK and timeframes given, an additional 20 contract managers and 30 site mangers were employed for the durationof the project. About 120 thousand linear metres of fencing was installed in a 7 month period.

The Shard London Bridge - Contract sum £16 million (Mace)Carried out various builders’ works and enabling works packages including the overall logistics packagefor the project. Responsibilities included the provision of security, traffic management, wastemanagement, multi service teams, and delivery management.

London Eye – Contact Value: £2.1mProject Description: Fit out of County hall to create a ticket hall for the London eye and welfare facilitiesfor the London eye staff including a link bridge and fit out of Kiosks. Works included the following: Drylining, Ceilings, Joinery, M&E, Decorations, Various floor finishes, General builders works, laminates,External stone façade works, Structural glazed partitions/glazing, Architectural & Structural steel work

• London Bridge Place – Contract sum £3.8 million (Mace)

• Westfield Shopping centre – Stratford – Contract sum 17.5 million (Westfield)

• Velodrome – Olympic Park – Contract sum – 2.1million (ISG)

• Media Hub – Olympic Park – Contract sum – 16.5 million (Carillion)

• Brent Cross Shopping Centre – Contract sum – 7 million (Cyril Sweet)

• Westfield London – White city – Contract sum - 22 million (Westfield)

Tate Modern – Project Value: £2.3m

9

John Kearns

Projects DirectorJohn has been an integral part of MadiganGill since joining as Projects

Director overseeing all projects through to completion

Page 10: MG - An Introduction

Warren specialises in the complete management of allmajor projects from tender bidding through to client handover

Warren Crane

Operations Director

10Management CV’sWarren is a highly experienced and successful Project / Construction Manager who specialises in the end-to-end management of major projects from tender bidding, drafting work programmes, execution of theworks through to client handover.

Warren is able to work flexibly and effectively on his own initiative to ensure that projects are completed ontime, within budget and in accordance with client specifications, ensuring all projects are compliant with allcurrent health and safety regulations and company procedures. He is adept in identifying strengths andweaknesses within project team with the ability to focus team and individuals on job specific targets andachievements. He has demonstrated a proven resilience and strength of character to succeed within theconstruction industry as a Senior Manager with diverse construction and delivery experience.

Project ExperienceProject Manager of successful tender submission, through to base build and fit out and completion tohandover of traditional JCT D&B contract works for external client (Aspers Casino- £9.2m). WestfieldStratford City.

Construction Manager for successful tendering, procurement and build execution through to Client handover for Holiday Inn / Stay Bridge Suite (IHG - £25M) and Premier Inn Hotels (Whitbread - £15M) atWestfield Stratford City as per JCT contract works.

Project Manager for successful106 & 278 adopted infrastructure works to West field London, which includedconstruction of new highways as well as A3220 subway refurbishment and new level crossing construction.

Project Manager responsible for successful construction and handover to Transport for London of two mainbus terminals at Westfield London.

Considerate Constructors Gold award winner. CCS Silver Award Winner on two occasions.

Successful completion and handover of Aviva, One Southampton Street project within constructionprogramme and achieving BREEAM Excellent rating. Project only 3 marks fro achieving Outstanding rating.

● Construction Manager – Stratford City Project (£1.2Bn)

● Project Manager – Westfield London Project (£1.5B)

● Canary Wharf Contractors, London

Page 11: MG - An Introduction

11Management CV’sDarren has the experience of over 27 years in the construction industry including 15 years specialising inDemolition and Structural Alterations.

The early part of Darren’s career was spent as a Quantity Surveyor working for Main Contractors includingover 10 years with Mowlem Construction (now part of Carillion Construction).

His career path lead onto providing a specialised Commercial Consultancy service to theDemolition Industry progressing on to Commercial Management/Directorship roles for some of theindustries leading Demolition Companies.

Darren’s wealth of experience in Construction and Demolition has proven to be one of our key factors forproviding a professional and competitive service to our clients.

Project Experience

150 New Bond Street, London(Prudential) £750k

Tudor Street, London £1.2m

National Audit Office, London £800kComplex façade retention, temporary support and demolition works at 155-171 Tooley Street, LondonBridge, one of the last remaining plots awaiting development at MoreLondon, a new business communityclose to Tower Bridge £350k

Soft stripping, asbestos removal, temporary support installation and demolition works for Chorus Group forThe £60m refurbishment of the Connaught Hotel in London’s Mayfair, one of the finest hotels in the world-£550k

Darren’s wealth of experience in Construction and Demolition has proven tobe one of our key factors for providing a professional and competitive service

Darren Elkin

Commercial Director

Page 12: MG - An Introduction

EXAMPLELOGISTICAL PLANNING12

Page 13: MG - An Introduction

13LOGISTICAL PLANNING:Vehicle Swept Path Analysis

Page 14: MG - An Introduction

PROJECT INFORMATIONConstruction Logistics Plans

& Handbooks14

Page 15: MG - An Introduction

PROJECT EXPERIENCE:Logistics

V&A MuseumWates

Clarges, MayfairLaing O'Rourke

London City IslandBallymore

Stapleton HouseBalfour Beatty

30 Broadwick StreetBAM

15

Maiden LaneJon Sisk & Sons

Athletes VillageGalliford Try

ShepherdsBerners Hotel

Page 16: MG - An Introduction

Exton StreetLondon

Henry Wood HouseOffice Group

Amazon Properties

14 Park CrescentCobham HouseBlackfriars Lane

Richmond AcademyCarillion

Aviva BrightonWates

Caledonian RoadSisk

16

Athletes VillageGalliford Try

PROJECT EXPERIENCE:Construction | Enabling Works

Page 17: MG - An Introduction

Health, Safety, Quality and theEnvironment 17Health & Safety

MadiganGill are committed to the active promotion and implementation of the highest standards of Health,Safety, Welfare and the Environment

We fully accept our obligations to operate in accordance with the requirements of all current legislation andcodes of practice relating to Health and Safety

We maintain our corporate, social and moral responsibilities towards our employees and the community atlarge

Our company Health and Safety policy which is communicated by our Managing Director confirms itscommitment to the prevention of injury and ill health and continual improvement in Health and Safetymanagement and performance

We feel there is a clear correlation between improved safety performance and project conditions.

Our aim is to deliver this by maintaining clean, tidy and well organised sites at all times.

Training

MadiganGill are fully committed to the development of our people.

We try to identify individual development needs of all personnel performing activities affecting the quality ofour service.

All of our operatives and staff are CSCS accredited.

We feel by continually running training courses it benefits the personal development of all our team.

Quality

MadiganGills’ main aim is to achieve sustained growth by providing quality services that consistently satisfythe needs and demands of our clients.

Achievement of this involves all our staff, who are individually responsible for the quality of their work,resulting in a continually improving working environment for all.

We are ISO 9001: 2008, ISO 14001: 2004 accredited and continually strive to achieve high standards.

To achieve and maintain the required level of quality assurance, the Managing Director retains responsibilityfor the quality system with assistance from all our team.

The objectives of our quality system are:

● To ensure a high level quality system, established through good communications of our client’s needs.

● To set standards and instigate procedures that makes the company leaders in its field.

● To continually improve the system by self-critique, audit and the following up of customer complaints.

● To promote training and to verify and optimise employee knowledge at all levels of function in thepursuit of quality.

Environmental

MadiganGill fully support sustainable construction. In this regard we are totally committed to:

● Reducing energy consumption and carbon emissions

● Reducing waste

● Reducing the carbon footprint of projects

● Reducing the total amount of waste sent to landfill and commit to recognised waste reduction schemes,including water use reduction

● Strive to minimise pollution from operations and comply with all relevant legislation and standards

● Actively support the CIRIA guidance on sustainable procurement in construction

● Reduce motor vehicle emissions

● Influence design and materials and their specification

● Work with suppliers to source and provide sustainable materials

● Understanding the use of local labour and suppliers to develop the local economy wherever possible

● Ensure all timber is procured meeting FSC requirements

Page 18: MG - An Introduction

ACCREDITATIONS18

Page 19: MG - An Introduction

ACCREDITATIONS 19

Page 20: MG - An Introduction

ACCREDITATIONS

20

Page 21: MG - An Introduction

OUR CLIENTS 21

Page 22: MG - An Introduction

Testimonials

Yours sincerely,

Kevin Kerr

Contract Director

GallifordTry

Yours sincerely,

Eamon Shanahan

Project Manager

Wates Living Space

Yours faithfully

J A Gaffney

Construction Director

Berkeley Homes

Yours sincerely

Terry O'Neil

Construction Manager

Willmott Dixon

22

Page 23: MG - An Introduction
Page 24: MG - An Introduction

London T - 0207 256 6222 F - 0207 256 2444 E - [email protected]

120 Morgate, London EC2M 6UR

South

T - 0203 356 923 F - 01293 531 640 E - [email protected]

Crawley Business Centre, Stephenson Way, Threebridges,

Manchester

T - 0161 233 7117 F - 01612 478 448 E - [email protected]

53 Fountain Street, Manchester, M2 2AN

Cambridge

T - 0122 359 7809 F - 0122 359 8001 E - [email protected]

1010 Cambourne Business Park, Cambridge,CB23 6DP

“Service provider of Choice” MadiganGill