PRESUPUESTO ADICIONAL N°02:VEREDAS,ESTACIONAMIENTO Y PAVIMENTACION
UBICACIÓN:LOCALIDADDISTRITOPROVINCIA DEPARTAMENTO
DIMENSIONES/ELEMENTOS METRADOLONG ANCHO ALTO ESPESOR AREA VOLUMEN
N°PART. DESCRIPCION (m) (m) (m) (m) UNIDAD PARCIAL TOTALHU.1 OBRAS PROVISIONALES,TRABAJOS PRELIMINARES,SEGURIDAD Y SALUDHU.1.1 TRABAJOS PRELIMINARESHU.1.1.1 LIMPIEZA DEL TERRENOHU.1.1.1.1.ELIMINACION DE BASURA Y ELEMENTOS SUELTOS Y LIVIANOS
PAVIMENTO CALLE NAYLAMP(AREA CAD) 1.00 0.40 420.48 168.19 1.00 168.19
ESTACIONAMIENTO(AREA CAD) 1.00 41.15 5.00 0.40 205.75 82.30 1.00 82.30 250.49HU.1.2 DEMOLICIONES
VEREDAS(AREA CAD)
CALLE GRAU-VEREDA 1.00 2.00 0.10 78.65 7.87 1.00 7.87
CALLE SUCRE-VEREDA 1.00 2.00 0.10 115.83 11.58 1.00 11.58PASAJE(AQUÍ NO HAY VEREDA EXISTENTE)
CALLE NAYLAMP-VEREDA 1.00 2.00 0.10 158.22 15.82 1.00 15.82 35.27HU.1.3 TRAZOS,NIVELES Y REPLANTEOHU.1.3.1 TRAZOS,NIVELES Y REPLANTEO PRELIMINAR
VEREDAS(AREA CAD)
CALLE GRAU-VEREDA 1.00 78.65 1.00 78.65
CALLE SUCRE-VEREDA 1.00 115.83 1.00 115.83
PASAJE 1.00 130.24 1.00 130.24
PAVIMENTO CALLE NAYLAMP(AREA CAD) 1.00 420.48 1.00 420.48
ESTACIONAMIENTO(AREA CAD) 1.00 41.15 5.00 205.75 1.00 205.75 950.95HU.1.3.2 REPLANTEO DURANTE EL PROCESO
VEREDAS(AREA CAD)
CALLE GRAU-VEREDA 1.00 78.65 1.00 78.65
CALLE SUCRE-VEREDA 1.00 115.83 1.00 115.83
PASAJE 1.00 130.24 1.00 130.24
PAVIMENTO CALLE NAYLAMP(AREA CAD) 1.00 420.48 1.00 420.48
ESTACIONAMIENTO(AREA CAD) 1.00 41.15 5.00 205.75 1.00 205.75 950.95HU.2 PISTAS Y VEREDASHU.2.1 MOVIMIENTO DE TIERRAHU.2.1.1 CORTE CON ELIMINACION LATERAL
VEREDAS(AREA CAD)
CALLE GRAU-VEREDA 1.00 0.20 78.65 1.00 15.73
CALLE SUCRE-VEREDA 1.00 0.20 115.83 1.00 23.17
PASAJE 1.00 0.20 130.24 1.00 26.05
PAVIMENTO CALLE NAYLAMP(AREA CAD) 1.00 0.40 420.48 1.00 168.19
ESTACIONAMIENTO(AREA CAD) 1.00 41.15 5.00 0.40 205.75 1.00 82.30
JARDINES(MATERIAL) 1.00 0.20 58.44 11.69 1.00 11.69 327.13
HU.2.1.3 ELIMINACION DE MATERIAL EXCEDENTE 1.25 ESP. 327.13 1.00 408.91 408.91
HU.2.2 BASEHU.2.2.1 BASE O AFIRMADO(PAVIMENTO+ESTACIONAMIENTO)
ESTACIONAMIENTO 1.00 0.20 205.75 1.00 205.75
PAVIMENTO 1.00 0.20 420.48 1.00 420.48 626.23
HU.2.3 VEREDASLOSA CALLE GRAU-VEREDA
HU.2.3.1 CONCRETO F´C=175KG/CM2 1.00 0.10 78.65 1.00 7.87HU.2.3.2 ENCOFRADO Y DESENCOFRADO DE VEREDAS
UÑA 32.93 0.40 13.17 1.00 13.17
TRANSVERSALES CADA 3 ML 2.00 0.10 0.20 11.00 2.20 15.37HU.2.3.3 SELLADO DE JUNTAS EN VEREDAS 1.00 32.93 1.00 32.93
HU.2.3.4 PISO FROTACHADO CEMENTO PULIDO EN VEREDAS 1.00 32.93 2.90 95.50 1.00 95.50UÑA CALLE GRAU-VEREDA
HU.2.3.1 CONCRETO F´C=175KG/CM2 1.00 32.93 0.20 0.30 1.98 1.00 1.98LOSA CALLE SUCRE-VEREDA
HU.2.3.1 CONCRETO F´C=175KG/CM2 1.00 0.10 115.83 11.58 1.00 11.58HU.2.3.2 ENCOFRADO Y DESENCOFRADO DE VEREDAS
UÑA 52.70 0.40 21.08 1.00 21.08
TRANSVERSALES CADA 3 ML 2.13 0.10 0.21 17.57 3.69 24.77
HU.2.3.3 PISO FROTACHADO CEMENTO PULIDO EN VEREDAS 1.00 52.70 2.13 112.25 1.00 112.25HU.2.3.4 SELLADO DE JUNTAS EN VEREDAS 1.00 52.70 1.00 52.70
UÑA CALLE SUCRE-VEREDA
N° REPET.ELEMFACTOR
CANT. (m2) (m3)
(m3)
(m3)
(m3)
(m3)
(m3)
(m2)
(m2)
(m2)
(m2)
(m2)
(m2)
(m2)
(m2)
(m2)
(m2)
(m3)
(m3)
(m3)
(m3)
(m3)
(m3)
(m3)
(m2)
(m2)
(m3)
(m2)
(m2)(m)
(m2)
(m3)
(m3)
(m2)
(m2)
(m2)(m)
PRESUPUESTO ADICIONAL N°02:VEREDAS,ESTACIONAMIENTO Y PAVIMENTACION
HU.2.3.1 CONCRETO F´C=175KG/CM2 1.00 52.70 0.20 0.30 3.16 1.00 3.16LOSA PASAJE
HU.2.3.1 CONCRETO F´C=175KG/CM2 1.00 0.10 130.24 13.02 1.00 13.02HU.2.3.2 ENCOFRADO Y DESENCOFRADO DE VEREDAS
UÑA 33.41 0.40 13.36 1.00 13.36
TRANSVERSALES CADA 3 ML 3.00 0.10 0.30 11.14 3.34 16.70
HU.2.3.3 PISO FROTACHADO CEMENTO PULIDO EN VEREDAS 1.00 33.41 3.00 100.23 1.00 100.23HU.2.3.4 SELLADO DE JUNTAS EN VEREDAS 1.00 33.41 1.00 33.41
UÑA PASAJE
HU.2.3.1 CONCRETO F´C=175KG/CM2 1.00 33.41 0.20 0.10 0.67 1.00 0.67
RESUMEN CONCRETO F´C=175KG/CM2 38.28
ENCOFRADO Y DESENCOFRADO DE VEREDAS 56.84
PISO FROTACHADO CEMENTO PULIDO EN VEREDAS 307.98SELLADO DE JUNTAS EN VEREDAS 119.04
HU.2.4 PISTASHU.2.4.1 PAVIMENTO DE CONCRETO+ESTACIONAMIENTO
HU.2.2.3 CONCRETO F'C=210KG/CM2 PARA PAVIMENTO+ESTACIONAMIENTO 1.00 626.23 1.00 626.23 626.23
HU.2.2.4 ENCOFRADO Y DESENCOFRADO PAÑOS PAVIMENTO+ESTACIONAMIENTO 1.00 459.25 0.20 91.85 1.00 91.85 91.85HU.2.4.2 SELLADO DE JUNTAS EN PAVIMENTO+ESTACIONAMIENTO 1.00 459.25 1.00 459.25 459.25
HU.2.5 SARDINELES
HU.2.5.1 CONCRETO PARA SARDINEL 1.00 153.63 0.15 0.30 6.91 1.00 6.91 6.91
HU.2.5.2 ENCOFRADO PARA SARDINEL 1.00 153.63 0.20 30.73 1.00 30.73 30.73
HU.2.5.3 TARRAJEO EN CARA INTERIOR Y EXTERIOR DE SARDINELES 1.00 153.63 0.15 23.04 1.00 23.04 23.04HU.2.5.3 SELLADO DE JUNTAS EN SARDINEL 1.00 153.63 1.00 153.63 153.63
HU.2.6 BARANDAS DE ESCALERAS DE TUBERIA DE 3" 1.00 25.48 1.00 25.48 25.48
HU.2.7 RAMPAS
HU.2.7.1 CONCRETO F'C=175KG/CM2 EN RAMPAS
RAMPA CALLE SUCRE P=10% 1.00 1.50 2.90 0.15 0.33 1.00 0.33
RAMPA CALLE SUCRE P=12%(MARTILLO) 1.00 1.25 1.00 0.15 0.09 1.00 0.09
RAMPA CALLE GRAU P=10% 1.00 1.50 2.90 0.15 0.33 1.00 0.33
RAMPA CALLE GRAU P=10% 1.00 5.20 2.29 0.43 2.54 1.00 2.54
RAMPA CALLE NAYLAMP P=10%(MARTILLO) 1.00 2.30 1.00 0.23 0.26 1.00 0.26
RAMPA CALLE NAYLAMP P=10% 1.00 1.70 1.00 0.25 0.21 1.00 0.21
RAMPA CALLE NAYLAMP P=10% 1.00 3.40 1.00 0.49 0.84 1.00 0.84
RAMPA PASAJE P=6.3% 1.00 3.00 10.00 0.63 9.45 1.00 9.45 14.05
HU.2.7.2 ENCOFRADO PARA RAMPAS
RAMPA CALLE SUCRE P=10% 1.00 1.49 0.15 0.11 2.00 0.22
RAMPA CALLE SUCRE P=12%(MARTILLO) 1.00 1.24 0.15 0.09 2.00 0.18
RAMPA CALLE GRAU P=10% 1.00 1.49 0.15 0.11 2.00 0.22
RAMPA CALLE GRAU P=10% 1.00 5.18 0.15 0.40 2.00 0.80
RAMPA CALLE NAYLAMP P=10%(MARTILLO) 1.00 2.29 0.23 0.26 2.00 0.52
RAMPA CALLE NAYLAMP P=10% 1.00 1.68 0.25 0.21 2.00 0.42
RAMPA CALLE NAYLAMP P=10% 1.00 3.36 0.49 0.82 2.00 1.64
RAMPA PASAJE P=6.3% 1.00 9.98 0.63 3.14 2.00 6.28 10.28
HU.2.7.3 BRUÑAS DE 2CM CADA 0.15M1.00 2.90 5.00 14.501.00 1.00 4.17 4.171.00 2.90 5.00 14.501.00 2.29 17.33 39.691.00 1.00 7.67 7.671.00 1.00 5.67 5.671.00 1.00 11.33 11.331.00 10.00 10.00 100.00 197.53
HU2.8 JARDINES(MATERIAL) 1.00 0.20 58.44 11.69 1.00 11.69 11.69
HU3.0. GRADAS
HU3.0.1 CONCRETO F'C=175KG/CM2 EN GRADAS 1.00 11.85 0.25 0.08 0.24 1.00 0.24
1.00 2.37 1.50 0.15 0.53 1.00 0.53
1.00 9.68 0.25 0.08 0.19 1.00 0.19
1.00 2.42 1.20 0.15 0.44 1.00 0.44
1.00 6.48 0.50 0.23 0.75 1.00 0.75
1.00 3.24 1.10 0.15 0.53 1.00 0.53 2.68
(m3)
(m3)
(m2)
(m2)
(m2)(m)
(m3)
(m3)
(m2)
(m2)(m)
(m2)
(m2)(m)
(m3)
(m2)
(m2)(m)
(m)
(m3)
(m3)
(m3)
(m3)
(m3)
(m3)
(m3)
(m3)
(m2)
(m2)
(m2)
(m2)
(m2)
(m2)
(m2)
(m2)
(m)(m)(m)(m)(m)(m)(m)(m)
(m3)
(m3)
(m3)
(m3)
(m3)
(m3)
(m3)
PRESUPUESTO ADICIONAL N°02:VEREDAS,ESTACIONAMIENTO Y PAVIMENTACION
HU3.0.2 ENCOFRADO PARA GRADAS
1.00 1.50 2.37 3.56 1.00 3.56
1.00 1.20 2.42 2.90 1.00 2.90
1.00 1.10 3.24 3.56 2.00 7.12 13.58
HU4.0 PINTURAHU4.0.1 PINTURA PARA VEREDAS
VEREDAS
CALLE GRAU-VEREDA 1.00 32.93 0.45 14.82 1.00 14.82
CALLE SUCRE-VEREDA 1.00 52.70 0.45 23.72 1.00 23.72
PASAJE 1.00 33.41 0.45 15.03 1.00 15.03 53.57
HU4.0.2 MARCAS EN EL PAVIMENTO
PAVIMENTO CALLE NAYLAMP 1.00 38.10 0.10 3.81 1.00 3.81
ESTACIONAMIENTO 1.00 167.00 0.10 16.70 1.00 16.70 20.51
(m2)
(m2)
(m2)
(m2)
(m2)
(m2)
(m2)
(m2)
METRADO
N°PART. DESCRIPCION UNIDAD TOTALHU.1 OBRAS PROVISIONALES,TRABAJOS PRELIMINARES,SEGURIDAD Y SALUDHU.1.1 TRABAJOS PRELIMINARESHU.1.1.1 LIMPIEZA DEL TERRENO
HU.1.1.1.1.ELIMINACION DE BASURA Y ELEMENTOS SUELTOS Y LIVIANOS 250.49
HU.1.2 DEMOLICIONES 35.27HU.1.3 TRAZOS,NIVELES Y REPLANTEO
HU.1.3.1 TRAZOS,NIVELES Y REPLANTEO PRELIMINAR 950.95
HU.1.3.2 REPLANTEO DURANTE EL PROCESO 950.95HU.2 PISTAS Y VEREDASHU.2.1 MOVIMIENTO DE TIERRA
HU.2.1.1 CORTE CON ELIMINACION LATERAL 327.13
HU.2.1.3 ELIMINACION DE MATERIAL EXCEDENTE 408.91
HU.2.2 BASE
HU.2.2.1 BASE O AFIRMADO(PAVIMENTO+ESTACIONAMIENTO) 626.23HU.2.3 VEREDAS
CONCRETO F´C=175KG/CM2 38.28
ENCOFRADO Y DESENCOFRADO DE VEREDAS 56.84
PISO FROTACHADO CEMENTO PULIDO EN VEREDAS 307.98SELLADO DE JUNTAS EN VEREDAS 119.04
HU.2.4 PISTASHU.2.4.1 PAVIMENTO DE CONCRETO+ESTACIONAMIENTO
HU.2.2.3 CONCRETO F'C=210KG/CM2 PARA PAVIMENTO+ESTACIONAMIENTO 626.23
HU.2.2.4 ENCOFRADO Y DESENCOFRADO PAÑOS PAVIMENTO+ESTACIONAMIENTO 91.85HU.2.4.2 SELLADO DE JUNTAS EN PAVIMENTO+ESTACIONAMIENTO 459.25
HU.2.5 SARDINELES
HU.2.5.1 CONCRETO PARA SARDINEL 6.91
HU.2.5.2 ENCOFRADO PARA SARDINEL 30.73
HU.2.5.3 TARRAJEO EN CARA INTERIOR Y EXTERIOR DE SARDINELES 23.04HU.2.5.3 SELLADO DE JUNTAS EN SARDINEL 153.63
(m3)
(m3)
(m2)
(m2)
(m3)
(m3)
(m2)
(m2)
(m2)
(m2)(m)
(m2)
(m2)(m)
(m3)
(m2)
(m2)(m)
HU.2.6 BARANDAS DE ESCALERAS DE TUBERIA DE 3" 25.48
HU.2.7 RAMPAS
HU.2.7.1 CONCRETO F'C=175KG/CM2 EN RAMPAS 14.05
HU.2.7.2 ENCOFRADO PARA RAMPAS 10.28HU.2.7.3 BRUÑAS DE 2CM CADA 0.15M 197.53
HU2.8 JARDINES(MATERIAL) 11.69
HU3.0. GRADAS
HU3.0.1 CONCRETO F'C=175KG/CM2 EN GRADAS 2.68
HU3.0.2 ENCOFRADO PARA GRADAS 13.58
HU4.0 PINTURA
HU4.0.1 PINTURA PARA VEREDAS 53.57
HU4.0.2 MARCAS EN EL PAVIMENTO 20.51
(m)
(m3)
(m2)(m)
(m3)
(m3)
(m2)
(m2)
(m2)
PRESUPUESTO ADICIONAL N° 02 : COMPATIBILIZACION DE NIVELES OBRA: CREACION DEL MERCADO DE ABASTOS DEL PUEBLO JVEN SAN MARTINCONTRATISTA: CONSORCIO SAN GABRIELSUPERVISOR: CONSORCIO SAN MARTINLUGAR: DISTRITO, PROVINCIA Y REGION LAMBAYEQUEFECHA: 19.02.2015
METRADOPRECIO TOTAL
N°PART. DESCRIPCION UNIDAD TOTALHU.1 OBRAS PROVISIONALES,TRABAJOS PRELIMINARES,SEGURIDAD Y SALUDHU.1.1 TRABAJOS PRELIMINARESHU.1.1.1 LIMPIEZA DEL TERRENO
HU.1.1.1.1. ELIMINACION DE BASURA Y ELEMENTOS SUELTOS Y LIVIANOS 250.49 20.52 5,140.05
HU.1.2 DEMOLICIONES 35.27 17.14 604.53HU.1.3 TRAZOS,NIVELES Y REPLANTEO
HU.1.3.1 TRAZOS,NIVELES Y REPLANTEO PRELIMINAR 950.95 2.04 1,939.94
HU.1.3.2 REPLANTEO DURANTE EL PROCESO 950.95 0.75 713.21HU.2 PISTAS Y VEREDASHU.2.1 MOVIMIENTO DE TIERRA
HU.2.1.1 CORTE CON ELIMINACION LATERAL 327.13 15.71 5,139.21
HU.2.1.3 ELIMINACION DE MATERIAL EXCEDENTE 408.91 20.52 8,390.83
HU.2.2 BASE
HU.2.2.1 BASE O AFIRMADO(PAVIMENTO+ESTACIONAMIENTO) 626.23 15.48 9,694.04HU.2.3 VEREDAS
HU.2.3.1 CONCRETO F´C=175KG/CM2 38.28 52.65 2,015.44
HU.2.3.2 ENCOFRADO Y DESENCOFRADO DE VEREDAS 56.84 34.82 1,979.17
HU.2.3.3 PISO FROTACHADO CEMENTO PULIDO EN VEREDAS 307.98 36.36 11,198.15HU.2.3.4 SELLADO DE JUNTAS EN VEREDAS 119.04 3.44 409.50
HU.2.4 PISTASHU.2.4.1 PAVIMENTO DE CONCRETO+ESTACIONAMIENTO
HU.2.4.1.1 CONCRETO F'C=210KG/CM2 PARA PAVIMENTO+ESTACIONAMIENTO 626.23 70.00 43,836.10
HU.2.4.2.2 ENCOFRADO Y DESENCOFRADO PAÑOS PAVIMENTO+ESTACIONAMIENTO 91.85 50.37 4,626.48HU.2.4.2.3 SELLADO DE JUNTAS EN PAVIMENTO+ESTACIONAMIENTO 459.25 3.44 1,579.82
HU.2.5 SARDINELES
HU.2.5.1 CONCRETO PARA SARDINEL 6.91 367.01 2,536.04
HU.2.5.2 ENCOFRADO PARA SARDINEL 30.73 31.94 981.52
HU.2.5.3 TARRAJEO EN CARA INTERIOR Y EXTERIOR DE SARDINELES 23.04 60.24 1,387.93HU.2.5.4 SELLADO DE JUNTAS EN SARDINEL 153.63 3.44 528.49
HU.2.6 BARANDAS DE ESCALERAS DE TUBERIA DE 3" 25.48 100.00 2,548.00
HU.2.7 RAMPAS
HU.2.7.1 CONCRETO F'C=175KG/CM2 EN RAMPAS 14.05 367.01 5,156.49
HU.2.7.2 ENCOFRADO PARA RAMPAS 10.28 50.37 517.80HU.2.7.3 BRUÑAS DE 2CM CADA 0.15M 197.53 11.06 2,184.68
HU2.8 JARDINES(MATERIAL) 11.69 20.00 233.80
HU3.0. GRADAS
HU3.0.1 CONCRETO F'C=175KG/CM2 EN GRADAS 2.68 367.01 983.59
HU3.0.2 ENCOFRADO PARA GRADAS 13.58 50.37 684.02
HU4.0 PINTURA
HU4.0.1 PINTURA PARA VEREDAS 53.57 4.68 250.71
HU4.0.2 MARCAS EN EL PAVIMENTO 20.51 16.00 328.16CD 115,008.83GG 11,500.88U 5,750.44
(m3)
(m3)
(m2)
(m2)
(m3)
(m3)
(m2)
(m2)
(m2)
(m2)(m)
(m2)
(m2)(m)
(m3)
(m2)
(m2)(m)
(m)
(m3)
(m2)(m)
(m3)
(m3)
(m2)
(m2)
(m2)
SUBTOTAL 132,260.152.40% IGV 23,806.83
CD TOTAL 4,784,691.44 TOTAL 156,066.98
UBICACIÓN:LOCALIDADDISTRITOPROVINCIA DEPARTAMENTO
DIMENSIONES/ELEMENTOSLONG ANCHO
N°PART. DESCRIPCION (m) (m)HU.1 OBRAS PROVISIONALES,TRABAJOS PRELIMINARES,SEGURIDAD Y SALUDHU.1.2 DEMOLICIONES
VEREDAS(AREA CAD)
CALLE GRAU-VEREDA 1.00 2.00
CALLE SUCRE-VEREDA 1.00 2.00PASAJE(AQUÍ NO HAY VEREDA EXISTENTE)
CALLE NAYLAMP-VEREDA 1.00 2.00HU.1.3 TRAZOS,NIVELES Y REPLANTEOHU.1.3.1 TRAZOS,NIVELES Y REPLANTEO PRELIMINAR
VEREDAS(AREA CAD)
CALLE GRAU-VEREDA 1.00
CALLE SUCRE-VEREDA 1.00
PASAJE 1.00HU.1.3.2 REPLANTEO DURANTE EL PROCESO
VEREDAS(AREA CAD)
CALLE GRAU-VEREDA 1.00
CALLE SUCRE-VEREDA 1.00
PASAJE 1.00HU.2 PISTAS Y VEREDASHU.2.1 MOVIMIENTO DE TIERRAHU.2.1.1 CORTE CON ELIMINACION LATERAL
VEREDAS(AREA CAD)
CALLE GRAU-VEREDA 1.00
CALLE SUCRE-VEREDA 1.00
PASAJE 1.00
JARDINES(MATERIAL) 1.00
HU.2.1.3 ELIMINACION DE MATERIAL EXCEDENTE 1.25 ESP.
HU.2.3 VEREDASLOSA CALLE GRAU-VEREDA
HU.2.3.1 CONCRETO F´C=175KG/CM2 1.00HU.2.3.2 ENCOFRADO Y DESENCOFRADO DE VEREDAS
UÑA 32.93
TRANSVERSALES CADA 3 ML 2.00HU.2.3.3 SELLADO DE JUNTAS EN VEREDAS 1.00 32.93
FACTOR CANT.
HU.2.3.4 PISO FROTACHADO CEMENTO PULIDO EN VEREDAS 1.00 32.93 2.90UÑA CALLE GRAU-VEREDA
HU.2.3.1 CONCRETO F´C=175KG/CM2 1.00 32.93 0.20LOSA CALLE SUCRE-VEREDA
HU.2.3.1 CONCRETO F´C=175KG/CM2 1.00HU.2.3.2 ENCOFRADO Y DESENCOFRADO DE VEREDAS
UÑA 52.70
TRANSVERSALES CADA 3 ML 2.13
HU.2.3.3 PISO FROTACHADO CEMENTO PULIDO EN VEREDAS 1.00 52.70 2.13HU.2.3.4 SELLADO DE JUNTAS EN VEREDAS 1.00 52.70
UÑA CALLE SUCRE-VEREDA
HU.2.3.1 CONCRETO F´C=175KG/CM2 1.00 52.70 0.20LOSA PASAJE
HU.2.3.1 CONCRETO F´C=175KG/CM2 1.00HU.2.3.2 ENCOFRADO Y DESENCOFRADO DE VEREDAS
UÑA 33.41
TRANSVERSALES CADA 3 ML 3.00
HU.2.3.3 PISO FROTACHADO CEMENTO PULIDO EN VEREDAS 1.00 33.41 3.00HU.2.3.4 SELLADO DE JUNTAS EN VEREDAS 1.00 33.41
UÑA PASAJE
HU.2.3.1 CONCRETO F´C=175KG/CM2 1.00 33.41 0.20
RESUMEN CONCRETO F´C=175KG/CM2
ENCOFRADO Y DESENCOFRADO DE VEREDAS
PISO FROTACHADO CEMENTO PULIDO EN VEREDASSELLADO DE JUNTAS EN VEREDAS
HU.2.5 SARDINELES
HU.2.5.1 CONCRETO PARA SARDINEL 1.00 153.63 0.15
HU.2.5.2 ENCOFRADO PARA SARDINEL 1.00 153.63
HU.2.5.3 TARRAJEO EN CARA INTERIOR Y EXTERIOR DE SARDINELES 1.00 153.63 0.15HU.2.5.3 SELLADO DE JUNTAS EN SARDINEL 1.00 153.63
HU.2.6 BARANDAS DE ESCALERAS DE TUBERIA DE 3" 1.00 25.48
HU.2.7 RAMPAS
HU.2.7.1 CONCRETO F'C=175KG/CM2 EN RAMPAS
RAMPA CALLE SUCRE P=10% 1.00 1.50 2.90
RAMPA CALLE SUCRE P=12%(MARTILLO) 1.00 1.25 1.00
RAMPA CALLE GRAU P=10% 1.00 1.50 2.90
RAMPA CALLE GRAU P=10% 1.00 5.20 2.29
RAMPA CALLE NAYLAMP P=10%(MARTILLO) 1.00 2.30 1.00
RAMPA CALLE NAYLAMP P=10% 1.00 1.70 1.00
RAMPA CALLE NAYLAMP P=10% 1.00 3.40 1.00
RAMPA PASAJE P=6.3% 1.00 3.00 10.00
HU.2.7.2 ENCOFRADO PARA RAMPAS
RAMPA CALLE SUCRE P=10% 1.00 1.49
RAMPA CALLE SUCRE P=12%(MARTILLO) 1.00 1.24
RAMPA CALLE GRAU P=10% 1.00 1.49
RAMPA CALLE GRAU P=10% 1.00 5.18
RAMPA CALLE NAYLAMP P=10%(MARTILLO) 1.00 2.29
RAMPA CALLE NAYLAMP P=10% 1.00 1.68
RAMPA CALLE NAYLAMP P=10% 1.00 3.36
RAMPA PASAJE P=6.3% 1.00 9.98
HU.2.7.3 BRUÑAS DE 2CM CADA 0.15M1.00 2.901.00 1.001.00 2.901.00 2.291.00 1.001.00 1.001.00 1.001.00 10.00
HU2.8 JARDINES(MATERIAL) 1.00
HU3.0. GRADAS
HU3.0.1 CONCRETO F'C=175KG/CM2 EN GRADAS 1.00 11.85 0.25
1.00 2.37 1.50
1.00 9.68 0.25
1.00 2.42 1.20
1.00 6.48 0.50
1.00 3.24 1.10
HU3.0.2 ENCOFRADO PARA GRADAS
1.00 1.50 2.37
1.00 1.20 2.42
1.00 1.10 3.24
HU4.0 PINTURAHU4.0.1 PINTURA PARA VEREDAS
VEREDAS
CALLE GRAU-VEREDA 1.00 32.93 0.45
CALLE SUCRE-VEREDA 1.00 52.70 0.45
PASAJE 1.00 33.41 0.45
DIMENSIONES/ELEMENTOS METRADOALTO ESPESOR AREA VOLUMEN
(m) (m) UNIDAD PARCIAL TOTAL
0.10 78.65 7.87 1.00 7.87
0.10 115.83 11.58 1.00 11.58
0.10 158.22 15.82 1.00 15.82 35.27
78.65 1.00 78.65
115.83 1.00 115.83
130.24 1.00 130.24 324.72
78.65 1.00 78.65
115.83 1.00 115.83
130.24 1.00 130.24 324.72
0.20 78.65 1.00 15.73
0.20 115.83 1.00 23.17
0.20 130.24 1.00 26.05
0.20 58.44 11.69 1.00 11.69 76.64
76.64 1.00 95.80 95.80
0.10 78.65 1.00 7.87
0.40 13.17 1.00 13.17
0.10 0.20 11.00 2.20 15.371.00 32.93
N° REPET.ELEM
(m2) (m3)
(m3)
(m3)
(m3)
(m2)
(m2)
(m2)
(m2)
(m2)
(m2)
(m3)
(m3)
(m3)
(m3)
(m3)
(m3)
(m2)
(m2)(m)
95.50 1.00 95.50
0.30 1.98 1.00 1.98
0.10 115.83 11.58 1.00 11.58
0.40 21.08 1.00 21.08
0.10 0.21 17.57 3.69 24.77
112.25 1.00 112.251.00 52.70
0.30 3.16 1.00 3.16
0.10 130.24 13.02 1.00 13.02
0.40 13.36 1.00 13.36
0.10 0.30 11.14 3.34 16.70
100.23 1.00 100.231.00 33.41
0.10 0.67 1.00 0.67
38.28
56.84
307.98119.04
0.30 6.91 1.00 6.91 6.91
0.20 30.73 1.00 30.73 30.73
23.04 1.00 23.04 23.041.00 153.63 153.63
1.00 25.48 25.48
0.15 0.33 1.00 0.33
0.15 0.09 1.00 0.09
0.15 0.33 1.00 0.33
0.43 2.54 1.00 2.54
0.23 0.26 1.00 0.26
0.25 0.21 1.00 0.21
0.49 0.84 1.00 0.84
0.63 9.45 1.00 9.45 14.05
(m2)
(m3)
(m3)
(m2)
(m2)
(m2)(m)
(m3)
(m3)
(m2)
(m2)
(m2)(m)
(m3)
(m3)
(m2)
(m2)(m)
(m3)
(m2)
(m2)(m)
(m)
(m3)
(m3)
(m3)
(m3)
(m3)
(m3)
(m3)
(m3)
0.15 0.11 2.00 0.22
0.15 0.09 2.00 0.18
0.15 0.11 2.00 0.22
0.15 0.40 2.00 0.80
0.23 0.26 2.00 0.52
0.25 0.21 2.00 0.42
0.49 0.82 2.00 1.64
0.63 3.14 2.00 6.28 10.28
5.00 14.504.17 4.175.00 14.50
17.33 39.697.67 7.675.67 5.67
11.33 11.3310.00 100.00 197.53
0.20 58.44 11.69 1.00 11.69 11.69
0.08 0.24 1.00 0.24
0.15 0.53 1.00 0.53
0.08 0.19 1.00 0.19
0.15 0.44 1.00 0.44
0.23 0.75 1.00 0.75
0.15 0.53 1.00 0.53 2.68
3.56 1.00 3.56
2.90 1.00 2.90
3.56 2.00 7.12 13.58
14.82 1.00 14.82
23.72 1.00 23.72
15.03 1.00 15.03 53.57
(m2)
(m2)
(m2)
(m2)
(m2)
(m2)
(m2)
(m2)
(m)(m)(m)(m)(m)(m)(m)(m)
(m3)
(m3)
(m3)
(m3)
(m3)
(m3)
(m3)
(m2)
(m2)
(m2)
(m2)
(m2)
(m2)
UBICACIÓN:LOCALIDADDISTRITOPROVINCIA DEPARTAMENTO
DIMENSIONES/ELEMENTOSLONG ANCHO
N°PART. DESCRIPCION (m) (m)HU.1 OBRAS PROVISIONALES,TRABAJOS PRELIMINARES,SEGURIDAD Y SALUDHU.1.1 TRABAJOS PRELIMINARESHU.1.1.1 LIMPIEZA DEL TERRENOHU.1.1.1.1.ELIMINACION DE BASURA Y ELEMENTOS SUELTOS Y LIVIANOS
ESTACIONAMIENTO(AREA CAD) 1.00 41.15 5.00HU.1.3 TRAZOS,NIVELES Y REPLANTEOHU.1.3.1 TRAZOS,NIVELES Y REPLANTEO PRELIMINAR
ESTACIONAMIENTO(AREA CAD) 1.00 41.15 5.00
HU.1.3.2 REPLANTEO DURANTE EL PROCESO
ESTACIONAMIENTO(AREA CAD) 1.00 41.15 5.00HU.2 PISTAS Y VEREDASHU.2.1 MOVIMIENTO DE TIERRAHU.2.1.1 CORTE CON ELIMINACION LATERAL
ESTACIONAMIENTO(AREA CAD) 1.00 41.15 5.00
HU.2.1.3 ELIMINACION DE MATERIAL EXCEDENTE 1.25 ESP.
HU.2.2 BASEHU.2.2.1 BASE O AFIRMADO(ESTACIONAMIENTO)
ESTACIONAMIENTO 1.00
HU.2.4 PISTASHU.2.4.1 ESTACIONAMIENTO
HU.2.2.3 CONCRETO F'C=210KG/CM2 PARA ESTACIONAMIENTO 1.00
HU.2.2.4 ENCOFRADO Y DESENCOFRADO PAÑOS ESTACIONAMIENTO 1.00 185.03HU.2.4.2 SELLADO DE JUNTAS EN PAVIMENTO 1.00 185.03
HU4.0 PINTURA
HU4.0.2 MARCAS EN EL PAVIMENTO
ESTACIONAMIENTO 1.00 167.00 0.10
FACTOR CANT.
DIMENSIONES/ELEMENTOS METRADOALTO ESPESOR AREA VOLUMEN
(m) (m) UNIDAD PARCIAL TOTAL
0.40 205.75 82.30 1.00 82.30 82.30
205.75 1.00 205.75 205.75
1.00
205.75 1.00 205.75 205.75
0.40 205.75 1.00 82.30
82.30 1.00 102.88 102.88
0.20 205.75 1.00 205.75
205.75 1.00 205.75 205.75
0.20 37.01 1.00 37.01 37.011.00 185.03 185.03
16.70 1.00 16.70 16.70
N° REPET.ELEM
(m2) (m3)
(m3)
(m2)
(m2)
(m2)
(m3)
(m3)
(m2)
(m2)
(m2)(m)
(m2)
UBICACIÓN:LOCALIDADDISTRITOPROVINCIA DEPARTAMENTO
DIMENSIONES/ELEMENTOSLONG ANCHO
N°PART. DESCRIPCION (m) (m)HU.1 OBRAS PROVISIONALES,TRABAJOS PRELIMINARES,SEGURIDAD Y SALUDHU.1.1 TRABAJOS PRELIMINARESHU.1.1.1 LIMPIEZA DEL TERRENOHU.1.1.1.1.ELIMINACION DE BASURA Y ELEMENTOS SUELTOS Y LIVIANOS
PAVIMENTO CALLE NAYLAMP(AREA CAD) 1.00HU.1.3 TRAZOS,NIVELES Y REPLANTEOHU.1.3.1 TRAZOS,NIVELES Y REPLANTEO PRELIMINAR
PAVIMENTO CALLE NAYLAMP(AREA CAD) 1.00
HU.1.3.2 REPLANTEO DURANTE EL PROCESO 1.00
PAVIMENTO CALLE NAYLAMP(AREA CAD) 1.00HU.2 PISTAS Y VEREDASHU.2.1 MOVIMIENTO DE TIERRAHU.2.1.1 CORTE CON ELIMINACION LATERAL
PAVIMENTO CALLE NAYLAMP(AREA CAD) 1.00
HU.2.1.3 ELIMINACION DE MATERIAL EXCEDENTE 1.25 ESP.
HU.2.2 BASEHU.2.2.1 BASE O AFIRMADO(PAVIMENTO)
PAVIMENTO 1.00
HU.2.4 PISTASHU.2.4.1 PAVIMENTO DE CONCRETO
HU.2.2.3 CONCRETO F'C=210KG/CM2 PARA PAVIMENTO+ESTACIONAMIENTO 1.00
HU.2.2.4 ENCOFRADO Y DESENCOFRADO PAÑOS PAVIMENTO 1.00 274.22HU.2.4.2 SELLADO DE JUNTAS EN PAVIMENTO 1.00 274.22
HU4.0 PINTURA
HU4.0.2 MARCAS EN EL PAVIMENTO
PAVIMENTO CALLE NAYLAMP 1.00 38.10 0.10
FACTOR CANT.
DIMENSIONES/ELEMENTOS METRADOALTO ESPESOR AREA VOLUMEN
(m) (m) UNIDAD PARCIAL TOTAL
0.40 420.48 168.19 1.00 168.19
420.48 1.00 420.48
1.00
420.48 1.00 420.48
0.40 420.48 1.00 168.19
168.19 1.00 210.24 210.24
0.20 420.48 1.00 420.48 420.48
420.48 1.00 420.48 420.48
0.20 54.84 1.00 54.84 54.841.00 274.22 274.22
3.81 1.00 3.81
N° REPET.ELEM
(m2) (m3)
(m3)
(m2)
(m2)
(m2)
(m3)
(m3)
(m2)
(m2)
(m2)(m)
(m2)