Here's a breakdown of the construction projects Metra is working on in and around Chicago in 2016.

Citation preview

Page 1: Metra Construction in Chicago 2016

Waukegan

Ravinia

CHICAGO

Northbrook

Glenview

N. Glenview

Mayfair

Grayland

Mt. ProspectCumberland

Big Timber

Win

field

Villa

Par

k

Rive

rsid

e

LemontPrairie

123rd St.

103rd St.

Calumet

27th St.

111th St. (Pullman)115th St. (Kensington)

59th

W. P

ullma

nSt

ewar

t Ridg

e

UP-N

MD-NUP-NW

MD-W

UP-W

BNSF

HC

RI

SWS

LAKEMcHENRY

COOK

DU PAGE

ILLINOIS / WISCONSIN STATE LINE

ILLI

NO

IS /

IND

IAN

A S

TATE

LIN

E

ME

SSWILL

Buffalo Grove

NCS

Downtown

20161

23

7

4

568

27

9

10

11

12

13

14

15

16

17

1819

20

21

2322

24

25

26

28 29

31

32

33

34

35

36

37

38

39

40

41

42 43

44

45

46

4748

49

50

51

52

5354

55

5657

58

59

60

61 6263

6465

66

Metra Construction Program

34

36

66

30

38

32

Lake Michigan

35

37

Page 2: Metra Construction in Chicago 2016

STATION IMPROVEMENTS Metra Electric Line1 Calumet – complete station renovation.2 111th Street/Pullman – replace/repair platform, stairs & warming shelter3 115th Street/Kensington – repairs & painting.4 27th Street – replace platform deck.5 Stewart Ridge – replace/repair platform, stairs, warming shelter,

lighting & fence.6 West Pullman – replace/repair platform, stairs, warming shelter, & lighting 7 59th Street – replace platform deck.

Heritage Corridor8 Lemont Station – replace platforms.

Milwaukee North Line9 Northbrook – new roof, windows, doors & floors as well as concrete repair.10 Grayland – add 75 parking spaces.11 Glenview – replace doors & air conditioner.12 North Glenview – replace doors.13 Mayfair – replace lighting & construct new warming shelters.

Milwaukee West Line14 Big Timber – replace platforms.

North Central Service15 Buffalo Grove – resurface platforms.

Rock Island Line16 LaSalle Street – replace platform pavers & structural supports.17 103rd Street/Washington Heights – replace platforms.18 123rd Street – install test of heated platform technology.19 Prairie Street – replace platforms.

UnionPacific(UP)NorthLine20 Ravinia – replace roof & perform lead paint abatement.21 Waukegan – rehab bathrooms & replace concrete.

UP Northwest Line22 Mount Prospect – replace doors, windows & lighting, paint, repair roof & tuck point.23 Cumberland – replace platforms.

UP West Line 24 Villa Park – replace platforms.25 Winfield – replace platforms.

Burlington Northern Santa Fe 26 Riverside – replace tile roof.

Chicago Union Station27 Chicago Union Station – rehab Madison Street entrance.

TRACK IMPROVEMENTS28 A-2 – replace ten switches.29 Chicago Union Station – rebuild/replace turnouts & switches on the south side.30 Metra Electric – replace ties Kensington to University Park. 31 Milwaukee North – replace rail Wilson Avenue in Chicago to Morton Grove. 32 Rock Island – replace ties Gresham to Blue Island & New Lenox to Joliet.33 UP North – replace ties Lake Bluff to Kenosha. 34 UP West – replace/repair ties & rail West Chicago Station to Elburn.35 UP Northwest – replace ties from Des Plaines to Barrington & the McHenry branch line.36 UP West – build additional track River Forest to Melrose Park & West Chicago to Geneva. 37 BNSF – replace/repair ties & rail Chicago to Lisle; switch work near Aurora.

BRIDGE IMPROVEMENTS38 Rock Island – replace/repair bridges Morgan, 37th, 39th, 51st, 57th Streets in Chicago & 96th Avenue Bridge in Mokena.39 UP North – replace bridges Grace, Irving Park, Berteau, Montrose, Sunnyside, Wilson, Leland, Lawrence, Winnemac, Foster & Balmoral in Chicago & complete Ravenswood Station.40 BNSF – repair four bridges just west of Western Avenue station.

ROAD CROSSING IMPROVEMENTS Metra Electric 41 Ashland Avenue in Chicago – replace crossing. 42 70th Street in Chicago – replace crossing. 43 Stony Island Avenue in Chicago – replace crossing.

Milwaukee West 44 Irving Park Road in Wood Dale – replace crossing. 45 Highland Avenue in Elgin – replace crossing. 46 York Road in Bensenville – replace crossing. 47 Roselle Road in Roselle – replace crossing. 48 Spaulding Road in Bartlett – replace crossing.

Milwaukee North 49 Overlook Drive in Golf – replace crossing. 50 Dundee Road in Northbrook – replace crossing. 51 Fairfield Road in Long Lake – replace crossing.

Rock Island 52 Cedar Road in New Lenox – replace crossing. 53 Vermont Street in Blue Island – replace crossing. 54 139th Street in Robbins – replace crossing. 55 Vincennes Avenue in Blue Island – replace crossing. 56 191st St. in Mokena – replace crossing.

SouthWest Service 57 Francis Road near New Lenox – replace crossing. 58 Route 52 in Manhattan – replace crossing.

UP North59 Washington Avenue in Highwood – replace crossing.

UP West60 Finley Road in Lombard – replace crossing.

BNSF 61 Kensington Road in LaGrange – replace crossing. 62 Longcommon Drive in Riverside – replace crossing. 63 Maple Avenue in Brookfield – replace crossing. 64 East Avenue in Berwyn – replace crossing.

OTHER IMPROVEMENTS65 BNSF – replace retaining walls at Hamlin Avenue in Chicago & replace the grade crossing warning device at Cass Avenue in Westmont.66 Metra Electric – upgrade electrical facilities at 51st Street in Chicago & Riverdale.

2016Metra Construction Program