Upload
ansarisaeed
View
648
Download
118
Embed Size (px)
DESCRIPTION
Detail of HDPE Wielding. This covers only Butt Fusion. it includes manpower required, the type of machine used, a very detailed process of butt fusion including precaution that need to be taken. It also contain technical manual of the machine itself.