Method of Statement- Junction Chamber

Embed Size (px)

Citation preview

  • 8/20/2019 Method of Statement- Junction Chamber

    1/9

    Methodology of Construction of the Proposed extended chamber for the land junction chamber at Mu

  • 8/20/2019 Method of Statement- Junction Chamber

    2/9

      ompany Name

    Project: Greater Colombo

    Wastewater Management Project

     Method Statement for Construction

    of Proposed extended chamber for the

    land junction chamber 

    Page :

    Aug 2!"

    Content

     

    Page

    1. Introduction 03

    2. Organization Chart 04

    3. Working Plants & Equi!ent 0"

    4. #esource $chedule 0"

    ". Critical %aterial uantities 0"

    '. Construction Progra! 0"

    (. Construction %ethodolog) 0'

    Page # 2

  • 8/20/2019 Method of Statement- Junction Chamber

    3/9

      ompany Name

    Project: Greater Colombo

    Wastewater Management Project

     Method Statement for Construction

    of Proposed extended chamber for the

    land junction chamber 

    Page :

    Aug 2!"

    1. I*+#O,-C+IO*

     Pl inserts Project Description

    Page # $

  • 8/20/2019 Method of Statement- Junction Chamber

    4/9

    Site Engineer

     Technical

    Ofcer

    Forema

    n -Culverts

    Site QS

      ompany Name

    Project: Greater Colombo

    Wastewater Management Project

     Method Statement for Construction

    of Proposed extended chamber for the

    land junction chamber 

    Page :

    Aug 2!"

    2% Organization Chart

    Page # "

  • 8/20/2019 Method of Statement- Junction Chamber

    5/9

      ompany Name

    Project: Greater Colombo

    Wastewater Management Project

     Method Statement for Construction

    of Proposed extended chamber for the

    land junction chamber 

    Page :

    Aug 2!"

    3. Work Plant and Equi!ent

     

     &os

     

    'tem of e(uipment Capacity

    )C* + Mini ,xca-ator  !  

    Concrete Mixing m+c ! . *ag

    Wac/er + 0ammer  !Water Pumps 2 ! .1

    4. #esource $chedule

    ,E$C#IP+IO* %a

    %ano/er $chedule

    ite ,ngineers !3echnical 4fficers !

    5oreman !

    *ar *ender 2

    Concreting Group !

    6abors 7

    ". Construction Progra!

    #eer **E 01

    Page # 8

  • 8/20/2019 Method of Statement- Junction Chamber

    6/9

      ompany Name

    Project: Greater Colombo

    Wastewater Management Project

     Method Statement for Construction

    of Proposed extended chamber for the

    land junction chamber 

    Page :

    Aug 2!"

    '. Construction %ethodolog)

    3he Construction se(uences of the proposed wor/s are as below9

    '.1. $ure)ing and Preli!inaries

    !% *efore any construction wor/s9 the area will be cleared and le-els M6; are

    established%

    2% 3he construction area will be demarcated by means of warning barricades% 't will /eep!%8mor maximum can be ta/en at closed to the adjacent timber house; buffer from the

    exca-ation lines%

    $% All closed residencies will be noticed regarding the construction wor/s and the time

     period%

    "% 3he nearby coconut tree and other trees will be remo-ed and uprooted% pecial care

    will be ta/en to not to disturbed to the adjacent houses and parapet walls

    '.2. Ecaation /orks and $horing

    !% ,xca-ation line will be mar/ed with !%8mConcrete wall $mm < horing 2mm <

    wor/ing space !mm; offset to the existing structure% 0efer **E 02 = for

    exca-ation lines

    2% ,xca-ation will be commenced from the far end of the gra-el road and proceed to the road

    side%

    $% 3he exca-ation will be carried by *ac/>hoe loader or by mini exca-ator% 3he full depth

    will be exca-ated in one time% 3he suitable material will /ept at stoc/ pile to reuse for

     bac/filling% 3he suitability for bac/filling will be confirmed with the ,ngineer before it

    stoc/ pile% 3he exca-ated unsuitable material will be directly loaded to a ! cube tipper

    and remo-ed from the site

    "% As per the soil report9 the loosed sand a-ailable for 2%m height P3 -alue less than !8;%

    3herefore9 special care will be ta/en to a-oid the collapse the exca-ated walls% #eer

    **E 03 for temporary shoring system%

    8% 3he ground water table expected to meet at !%m depth% 3herefore9 it will be prepared tolower the water table at construction time% 3he remo-ed water will be discharged to the

    Page # ?

  • 8/20/2019 Method of Statement- Junction Chamber

    7/9

      ompany Name

    Project: Greater Colombo

    Wastewater Management Project

     Method Statement for Construction

    of Proposed extended chamber for the

    land junction chamber 

    Page :

    Aug 2!"

    adjacent drains% ubmersible water pumps will be used for the purpose% 3wo poc/et will

     be formed below the 2%m depth to /eep the pumps%

    ?% 't will be proposed to ha-e temporary !8mm thic/ G!8 concrete co-ering up to !%"m @

    2%m depth including the construction bed to a-oid water disturbance to the construction

    area% #eer **E 03 for temporary concrete shoring at wor/ing space% ,-en after the

    temporary concrete9 ! pump will be /eep for any emergency purpose%

    '.3 Construction o Proosed Cha!5er

    !% Construction of chamber will plan for two stages

    • $tage 01 = p to ground le-el 2%m height; including the slab o-er the existing chamber 

    • $tage 02 = Abo-e ground le-el $%m height; < Construction of top slab with steel manhole

    co-er 

    2. $tage 01 - to ground leel including the ground leel sla56 2.0! height7

    i% A /ic/er will be formed with the G$8 concrete base to /eep the support the formwor/ at

     bottom%

    ii% 3he reinforcement will be pro-ided as per the construction drawings% 3he reinforcement

    material will be get appro-ed before bring to site%

    iii% All the bending wor/s carried out at close to the site and fixing wor/s done at the location%

    i-% 5rom wor/ will pro-ide up to the ground le-el% All form wor/ materials are smooth

    finished marine plywood% #eer **E 03 = for 5ormwor/ arrangements%

    -% 't will plan to do the infill concrete with the same G$8 concrete% Bence only outer form

    wor/ pro-ided%

    -i% 't will be planned to concrete up to 2%m height at one time up to ground le-el;% 3he

    concrete will be from 0eady mixed G$8 concrete%

    -ii% 't will ta/e special care when placing the Manhole M2 anchor bolts at exact location% A

    temporary plywood template will be fabricated according to the manhole co-er dimensions

    and bolts are placed according to the drawings at this template% 3he template will be /ept

    while concreting and will chec/ soon after the concrete and will carry out necessary

    adjustments immediately%

    Page #

  • 8/20/2019 Method of Statement- Junction Chamber

    8/9

      ompany Name

    Project: Greater Colombo

    Wastewater Management Project

     Method Statement for Construction

    of Proposed extended chamber for the

    land junction chamber 

    Page :

    Aug 2!"

    -iii% A plat from form and chutes will be arranged to place the concrete carefully%

    ix% 3wo 21 po/er -ibrators are arranged for the purpose%

    x% 3he -ertical formwor/s will be remo-ed after 2" hrs and start curing the surfaces% Wet

    gunny bags will be pro-ided for the purpose%

    3. $tage 02 5oe the ground leel 6 3.0! height7

    i% 't will be constructed at two concrete at two steps as each step with !%8m height%

    ii% #eer **E 04 = for inner and outer form wor/ arrangements

    iii% 3he ladder rungs will be pro-ided as per the drawings and specifications% Prior appro-al

    will be ta/en to the samples9 before bring to the site%

    i-% Concrete will be placed by means of concrete buc/ets and it will be raised and positioned

     by )C* or *oom>truc/%

    -% A platform will be arranged at middle core of the chamber to ease the concreting wor/s%

    -i% A polythene layer will be pro-ided to the existing chamber top to a-oid the dirt will fallen

    concrete%

    -ii% *oth formwor/ remo-ed with care and commence curing wor/s after 2" hrs

    -iii% #eer **E 0" = for formwor/ arrangement from !%8m @ $%m height%

    ix% All other concreting wor/s will be carried out as same as concreting on G%6 @ !%8m height%

    "% 8iing o 9andrail and $teel $tair case

    i% All the material will be appro-ed before the fabrication wor/s

    ii% All the fabrication wor/s will be carried out as per the drawing finaliDed with ,ngineer%

    iii% Erilling of concrete wall will be carried out after 2! days of concreting the wall 40 as per

    the instruction by the ,ngineer%

    i-% All steel wor/s will be apply two anti>corrosi-e layers before the painting the same%

    '.4 $aet)

    All labour will be pro-ided with necessary personal protecti-e e(uipmentFs PP,; as per the safety

    manual%

    Page # 7

  • 8/20/2019 Method of Statement- Junction Chamber

    9/9

      ompany Name

    Project: Greater Colombo

    Wastewater Management Project

     Method Statement for Construction

    of Proposed extended chamber for the

    land junction chamber 

    Page :

    Aug 2!"

    ?%" Eniron!ental

    Always follow the project en-ironmental Management plan%

    Page #