MET Tower Installation Techniques in Alaska Alaska Energy Authority Alternative Energy and Energy Efficiency Mia Devine Reuben Loewen

MET Tower Installation Slideshow

Embed Size (px)

Citation preview

Page 1: MET Tower Installation Slideshow

MET Tower Installation Techniques in Alaska

Alaska Energy AuthorityAlternative Energy and Energy Efficiency

Mia DevineReuben Loewen

Page 2: MET Tower Installation Slideshow

Presentation Overview• Introduction• General Installation Steps• Difficult Conditions• Summary

Page 3: MET Tower Installation Slideshow

Introduction• Site selection and approval

– Local governments, FWS, FAA, topography, vegetation, etc.

• Preparation, logistics, and planning– Limited resources at site? – Shipping the materials? – Time of year?

Page 4: MET Tower Installation Slideshow

General Installation Steps• Clear the site and measure anchor points

If you’re fortunate… If you’re not…

Page 5: MET Tower Installation Slideshow

General Installation Steps• Drive the anchor

Page 6: MET Tower Installation Slideshow

General Installation Steps• Lay out main tower:

sections attachments base plate

• Paint tower sections

Page 7: MET Tower Installation Slideshow

General Installation Steps• Horizontally assemble

tower sectionscollarsguy wiresgin pole

• Mount booms, sensors, sensor and ground wires

Page 8: MET Tower Installation Slideshow

General Installation Steps• Support and raise gin pole

Page 9: MET Tower Installation Slideshow

General Installation Steps• Final arrangement of booms and sensors

Page 10: MET Tower Installation Slideshow

General Installation Steps• Erect tower while controlling side guy wires

Page 11: MET Tower Installation Slideshow

General Installation Steps• Attach gin pole wires to anchor, and straighten

tower by adjusting guy wire tension

Page 12: MET Tower Installation Slideshow

General Installation Steps• Attach, wire, and configure data logger

Page 13: MET Tower Installation Slideshow

General Installation Steps• Clean-up and final check of site

Page 14: MET Tower Installation Slideshow

Difficult Conditions• Permafrost and anchors

– Drive anchors during summer– Contract a backhoe to bury them manually

Page 15: MET Tower Installation Slideshow

Difficult Conditions• Winter daylight hours shortened• Winter temperatures, protective clothing

complicate efforts

Page 16: MET Tower Installation Slideshow

Difficult Conditions• Broken or missing winch components• Expensive transportation of tools and

materials to job sites

Page 17: MET Tower Installation Slideshow

Summary• Installation of 30 m MET tower with instruments• Lack of resources, difficult locations require extensive

planning prior to installation

Photos Courtesy of Doug Vaught (V3 Energy, LLC), Hannah Manser, Mia Devine, and Zach Adam