Curriculum Vitae

Personal Details

Name : Mervyn Anthony Stephens

Citizenship : New Zealand

Address : 4 Novelli ParadePiara WatersPerthWestern Australia

Telephone : +61 8 93932927 (Home)

: 0458994888 (Mobile)

E-mail : [email protected]

1

Page 2: Mervyn_Stephens CV

Skills & Experience

Oil and Gas, Civil Construction, Resource and Marine Industry

Development, management and control of multi-disciplinary Project Plans, defining:Major milestones with the projectKey datesDetailed EngineeringDetailed Procurement / FabricationDetailed Erection and Commissioning SchedulesCritical Path AnalysisResource LoadingCost Loading

Producing a Basis of Schedule that provides the methodology, assumptions and constraints, calendars, resources, key milestones and deliverables for the project.

Producing of S-Curves and Histograms Forward loading of manpower and costs for multi-million dollar projects. The ability to interact and communicate with Engineering, Procurement,

Construction and Senior Management personnel Development of schedules by obtaining input from various heads of

departments Development of Project Plan to the desired level required Progress monitoring and identification of critical path activities Control of vendor interfacing Development of Construction and procurement schedules Work in progress updating Setting up of Work Breakdown Structures (WBS) Compilation of Project budgets in accordance with WBS structure Project management and planning of multi-million dollar contracts within the

Resource, Oil and Gas, Shipbuilding and Super Luxury Yacht Building industries.

Development and maintenance of Project Performance Schedules (Construction Plans) where progress, expended man hours and performances are reflected and reported against.

Analysing Current versus Target Programmes and adjusting Current Schedule to reflect Project delays

Monitoring of Project Milestones in keeping with Contract requirements Aiding in the compilation of detailed Level 4 & 5 schedules in accordance

with main Level 3 schedule for detailed work monitoring.

Career History

2

Page 3: Mervyn_Stephens CV

Company UCJV Maintenance Planner

Period September 2016

Key Tasks Develop resourced Lvl4 project schedules. Establish logic and critical path activities within all schedules.  Update and maintain the project schedules on a daily basis with current and

verified data for all schedule activities. Establish baselined schedules and manage updates / changes to schedules

via approved changes and a robust method for revision management.  Maintain original & current budget hours for each activity within the project

schedules. Review and analyse schedules for any issues and propose solutions. Conduct critical path and schedule trend analysis as required.  

Contribute scheduling content / data to the daily, weekly, monthly and quarterly progress reports or KPI reviews.

Conduct field scoping activities to clarify scope as required. Perform constraint analysis against all works undertaken and develop action

plans to mitigate issues / risks. Develop and update project resources (manpower and equipment)

histograms, across all projects and as a portfolio of projects on a daily, weekly and monthly basis, or as required. 

Evaluate allocation of resources and provide recommendations to maintain required progress.

Rationalise the work scope into the most efficient / logical plan acceptable to the client and site operational requirements. 

Update plan versus actual progress charts (histograms / S curves). Report and analyse deviations from plan and/or baseline schedules. Prepare and update look-ahead schedules for the client required reporting

periods.  Participate in weekly cross discipline coordination meetings.

Project Roles: Responsible for the compilation, maintenance and management of schedules

and associated planning activities for Scaffolding, Painting, Insulation, Fire Proofing, Mechanical and Electrical & Instrumentation scopes of work across a portfolio of projects. Comply with all standards and procedures for the projects planning activities. Ensure all schedules are aligned to the project Norm activities and allow a safe and practical delivery of the work effort. Ensure the planning, progress measurement capture and productivity reporting occurs in a timely manner, within the dates specified by the client or line manager.

Company Clough Offshore Lead Planning Engineer

Period June 2014 to May 2016

3

Page 4: Mervyn_Stephens CV

Key Tasks

To provide technical guidance and direction within the Project on all Planning schedule information to identify trends, risks and opportunities and to allow the project management team and Client to take relevant action to ensure project goals are achieved.• Work closely with Offshore Manager, Supervisors, Hook-up Engineers and Commissioning Engineers develop Level 4 Resource Driven Integrated Schedule based on job cards from Go Plan.• Preparation, administration and updating of a detailed level 4 Offshore Hook-Up Commissioning (HUC) schedule.• Establish manpower requirements for the offshore HUC scope work in conjunction with the onshore and offshore project team based on POB / Bedding limitations.• Determine critical path, based on Commissioning Logic working with all interfaces to ensure the plan is optimised and realistic.• Facilitate weekly planning and change management meetings with Client andClough offshore/onshore team.• Liaise and interface with the HUC Cost Controllers and Subcontracts team to provide relevant information from the schedules for revising cost forecasts where applicable.• Management reporting including the provision of planning input to weekly and monthly reports.• Progress monitoring and reporting.• Develop, monitor and progress performance indicators. 

Company Clough Lead Planning Engineer

Period August 2011 to May 2014

Key Tasks

Creation of an EPC Project Schedule for the construction of the Ammonium Nitrate Plant (NAAN3) for CSBP from Engineering through Procurement, Subcontracts, Off-Site Fabrication, Construction and Pre-commissioning including resource loading. Creation of Rules of Credit monitoring spreadsheets. Ensuring that the programmeis representative of the Contract as well as to conforming with Project requirements i.e. Constraints, Resource Loading, Working Calendars, Work Breakdown Structure, Project Objectives, Key Milestones, Control Measures and Client Reports. Creation and formalisation of the Basis of Schedule.

1. Contract Value ($200 million AUD)

Company Leighton ContractorsLead Planning Engineer

Period February 2010 – July 2011

4

Page 5: Mervyn_Stephens CV

Key Tasks

Creation of Work Breakdown Structure and formalisation of Tender Schedules for the construction of various projects for the Infrastructure, Oil and Gas and Resource industries including resource loadings and costs which is then handed over to a Planner once the contract has been awarded. Auditing of all programmes prepared within Leighton Contractors (Western Australia) to ensure that the programmes are representative of the Contract as well as to conforming with Project requirements i.e. Resource and Cost Loading, Calendars, Work Breakdown Structure, Project Objectives, Key Milestones, Control Measures and Client Reports in essence the Basis of Schedule.

Projects to date:1. Great Eastern – Roe Highway Interchange ($280 million AUD)2. Dampier Highway Upgrade ($160 million AUD)3. Ord Irrigation Expansion ($195 million AUD)4. Roy Hill Process Plant and Utilities ($9 billion AUD)5. FMG Solomon Crushers and Ore Processing Plants ($1.2 billion AUD)

Company VDM Group Senior Project Planner

Period May 2009 – December 2009

Key Tasks

Creation of Work Breakdown Structure and formalisation of Project Schedule for the construction of 700 man Accommodation Camp at CapePreston. Weekly updating of schedule and maintaining of Baseline, creation and maintenance of Project EV Curve, Weekly Tangible Quantity Update for Finance Department to assist with claims, Weekly Project Report outlining current issues identified within the schedule and presenting alternative scenarios to assist Project Manager in Project decisions, highlighting risks and opportunities.

Company Monadelphous Engineering Senior Project Planner

Period November 2008 – April 2009

Key Tasks

Creation of Work Breakdown Structure and formalisation of Project Schedule in keeping with Client Master Programme for Pluto LNG Project (Offsites and Utilities Package) down to level 5 (work packs) for Structural, Mechanical and Piping disciplines. Creation of Tangible Quantity Spreadsheet for the monitoring of installed quantities. Creation of Project Resource Curves and histograms, creation of EV curves

Company Leighton Contractors (New Zealand)

5

Page 6: Mervyn_Stephens CV

Senior Project PlannerPeriod November 2006 – October 2008

Key Tasks

Creation of project plan for SH1/SH20 Manukau Extension, formalising and maintaining of Project Budget, creating of Work Breakdown Structure, ensuring plan is adhered to and Equipment and Labour are kept within budgets and prescribed time lines from design through to construction. Project Value $210 million NZD.

Creation and formalising of project programme for tender submission on Tauranga Contract. Project Value $185 million NZD.

Creation and formalisation of project programme for Newmarket Viaduct (NGA) Contract Project Value $190 million NZD.

Creation and formalisation of project programme for tender submission on Hobsonville Contract Project Value $220 million NZD.

Company Sensation Yachts Limited (New Zealand) Planning Manager (New Tri-deck 50m – 5 boat build) Project Value $160million USD

Period October 2002 – October 2006

Key Tasks

Management of all aspects of Project – from creating project plan, formalising and maintaining of Project Budget, creating of Work Breakdown Structure, ensuring plan is adhered to and Equipment, Labour, Materials, Consumables and Sub-contractors are within budgets and prescribed time lines from design through to construction.

Participation in Senior Management decisions with regards to the running of the various operations utilising the critical path within the project plans

Setting up of Planning Standards and procedures Setting up of construction budgets Participation in setting up of standard materials and equipment Research and development of yard capabilities

Major Achievements Being involved in the largest hull infusion process in the world Implementing the process of modular building Setting up and implementation of Planning procedures

Company Oceanco Southern African Shipyards (South Africa)OceancoAlblasserdam (Holland)Planning ManagerProject Values $60 - $145 million USD

6

Page 7: Mervyn_Stephens CV

Period June 1998 – September 2002

Key Tasks

Overseeing of 4 Project Planners and 6 Production Planners Setting up of initial Project Plans from design through to handover, utilising the

budget, build specification and general arrangement drawings of the vessels Participation in management decisions with regards to the company and the labour

requirements Participation in getting the company ISO9002 rated Training of staff with regards to Planning and the use of P3 (Prima-vera) Participation in the control of project budgets with regards to cash flow and hours

usage Support of health and safety policy and procedures

Major Achievements Changing the culture and standards of the Planning process Progressing from Planner to Planning Manager Setting up of planning procedures and build processes

Company Group 5 Projects (South Africa) Project PlannerProject Values $30 - $40 million USD

Period February 1994 – June 1998

Key Tasks

Setting up of initial Project Plans from design through to handover, utilising the budget, specifications and drawings for the construction of all disciplines on various projects (Aluminium Smelter, AECI Chemical Plant, Oil Refinery upgrades and Wax Plant) Participation in the management of the construction of the various projects with regards to deadlines and the process and labour requirements to achieve this

Monitoring, analysing and updating of project plans using progress reports Attending of on site Project meetings between the various contractors Integrating of the various project plans from on site subcontractors

Major Achievements The successful completion of the projects I was involved in Creation of project plans Creation of Work Breakdown Structures

Company Dorbyl Marine (South Africa)PeriodFebruary 1989 – January 1994 – Project PlannerJune 1987 – January 1989 - Piping Draughtsman

7

Page 8: Mervyn_Stephens CV

January 1984 – June 1987 - Supervisor PipefittingFebruary 1980 – December 1984 - Pipefitter PlumberFebruary 1975 – January 1980 - Apprentice Marine Plumber

I began my career as an apprentice Marine Plumber and Engineer with the above company and over the years progressed through to the design department and ultimately ending up in the planning department of the organisation.Below is a listing of my key functions and achievements as a Project Planner

Major Achievements Advancing from an apprentice to project planner with 6 years Learning the techniques of creating of Project Plans for the optimisation of

labour and budgets Setting up of planning procedures and build processes

Referees

Robert S Miller Clough

8

Page 9: Mervyn_Stephens CV

Wheatstone Hook-Up and Commissioning Project DirectorNAAN3 (Ammonium Nitrate Plant) Project Director+61 408 884 [email protected]

Adrian Hopkins CloughBusiness Services Manager+61 438 953 [email protected]

Frank Chila CloughWheatstone Hook-Up and Commissioning Manager+61 408 286 [email protected]

Jaco Stadler CloughProject Controls Manager+61 415 372 [email protected]

Alex Henry AECOMPCM Construction Manager+61 [email protected]

Deon Lochner Leighton ContractorsControls and Planning Manager (WA)+61 [email protected]

Ernie Tan Monadelphous Group LimitedManager Special Projects+61 407 382 093+61 8 9316 [email protected]

Glenn Houpapa Leighton ContractorsProject Manager+64 274 910 925+641 9 [email protected]

Personal Attributes

9

Page 10: Mervyn_Stephens CV

Enthusiastic and quick learner Ability to work independently Confident and decisive under stressful conditions Team player who sincerely enjoys working with others and helping others Thrive on challenges and new opportunities for accomplishment Highly reliable self starter, can be counted on to complete assignments without

supervision and on time Self motivated, conscientious and professional in my approach Excellent writing, communication and organisational skills Professional and confident with both Senior management and support staff Willing to assume responsibility Ability to prioritise, delegate and motivate support staff to achieve set goals

Computer Literacy

Primavera Risk Management 8.6 Primavera version 8.2 Primavera version 6 Primavera version 4 (Contractor) Primavera version 3.1 Artemis (Planning package) Excel (Spreadsheet) Microsoft Word

Extra Curricular

National Technical Certificate Level 5 (Mathematics, Technical Drawings, Mechanics and Applied Science)

Primavera Courses Participative Management and Supervision Primavera Risk Management (Oracle University)

Interests / Hobbies Reading Music Travelling