Meridian Davis RefineryPUBLIC MEETING & HEARING FOR THE PROPOSED AIR PERMIT TO CONSTRUCT
Start Time 5:30 PM
Meridian Davis RefineryPUBLIC MEETING FOR THE PROPOSED AIR PERMIT TO CONSTRUCT
Healthy & Safe Communities
Emergency Preparedness & Response
Health Resources
Medical Services
Environmental Health Section
Air Quality
Laboratory Services
Municipal Facilities
Waste Management
Water Quality
WHO WE ARE
THE AIR PERMITIs one of many permits that need to be acquired.
We follow the science and the law.
We administer the established rules and laws that are in our jurisdiction.◦ The Air permit covers the applicable
laws and regulations that are in NDAC 33-15.
AIR QUALITYWe track ACTUAL air quality levels through a state-wide network of ambient monitors.◦ State & Federal Ambient Air Quality
Standards
◦ Health-Based concentrations to protect the most vulnerable of the population.
◦ www.deq.nd.gov
◦ Two within Theodore Roosevelt NP, one at the North Unit and one at the South Unit.
Ambient Monitoring
CompliancePermitting
AIR QUALITYWe protect Air Quality through permits which establishes limits, testing, recordkeeping & reporting requirements.◦ We review test reports, records, and
conduct inspections to ensure compliance.
Ambient Monitoring
CompliancePermitting
THE PROJECT
55,000 barrels per day crude oil processing.
AQ rules require permitting of the full planned facility (both Phases).
They can only operate at the level of the most stringent permit.
Meridian Davis Refinery
Theodor Roosevelt NP (South Unit)
THE PROJECT
0
10
20
30
40
50
60
70
80
90
100
PM PM10 PM2.5 SO2 NOx VOC CO
Ton
s/Ye
ar
Maximum Allowable Emissions Regulatory Threshold
THE PROJECT
0
10
20
30
40
50
60
70
80
90
100
PM PM10 PM2.5 SO2 NOx VOC CO
Ton
s/Ye
ar
Maximum Allowable Emissions Regulatory Threshold
The draft permit establishes enforceable limits that prevent exceeding these amounts.
THE PROJECT
0
100
200
300
400
500
600
700
800
Meridian (PTE) Tesoro-Dickinson (2016Actuals)
Whiting-Belfield GasPlant (2016 Actuals)*
UND (2016 Actuals) Tesoro-Mandan (2016Actuals)
Ton
s/Ye
ar
Relative EmissionsNOx
CO
VOC
SO2
PSD Regulatory Threshold for Refineries (28 Listed Source Categories)
*PSD Regulatory Threshold of all other sources
THE PROJECT
0
100
200
300
400
500
600
700
800
Meridian (PTE) Tesoro-Dickinson (2016Actuals)
Whiting-Belfield GasPlant (2016 Actuals)*
UND (2016 Actuals) Tesoro-Mandan (2016Actuals)
Ton
s/Ye
ar
Relative EmissionsNOx
CO
VOC
SO2
PSD Regulatory Threshold for Refineries (28 Listed Source Categories)
*PSD Regulatory Threshold of all other sources
These facilities are compliant with the air regulations and the ambient air met the health-based standards.
TRUE MINORSYNTHETIC
MINORFuture Title V
(but not PSD)PSD Meridian Davis Refinery
Regulation Applicability Review ✓ ✓ ✓ ✓ ✓
Emission Calculation Review ✓ ✓ ✓ ✓ ✓
Set Emission Limits ✓ ✓ ✓ ✓ ✓
Set Control Equipment Required ✓ ✓ ✓ ✓ ✓
Air Toxics Review ✓ ✓ ✓ ✓ ✓
Ambient Modeling ✓ ✓ ✓
PSD Increment Modeling ✓ ✓ ✓
Public Comment (PC) ✓ ✓ ✓ ✓
EPA Review (concurrent w/ PC) ✓ ✓ ✓ ✓
Federal Land Manager Review ✓ Consulted
Best Available Control Technology ✓ BACT-Like Controls
OUR REVIEW
OUR REVIEWRegulation Applicability Review
Over 30 regulations.
◦ New Source Performance Standards (NSPS)
◦ National Emission Standards for Hazardous Air Pollutants (NESHAP)
◦ Maximum Achievable Control Technology (MACT)
◦ Additional EPA approved State Implementation Plan Regulations
NSPS 9
NESHAPS 3
MACT 5
State 12
NUMBER OF REGULATIONS
OUR REVIEWEmission Calculation Review◦ Reviewed calculations
◦ Verify that emission factors used to calculate PTE are achievable in practice.
Technology◦ Uses Hydrocracking Unit vs. FCCU
◦ Selective Catalytic Reduction
◦ Continuous Emissions Monitors (CEMs)
◦ Optical Gas Imaging (Camera)
◦ Fenceline Benzene Monitors
CONTROLS REQUIRED ON DAY ONEExample Diagram, not Meridian Davis Refinery
OUR REVIEWSet Emission Limits ◦ As required by regulations.
◦ Additional, MORE STRINGENT, limits that Meridian has accepted to take
Set Control Equipment Required◦ As required by regulations.
◦ Additional, MORE STRINGENT, controls that Meridian has accepted to take
OUR REVIEWAir Toxics Review◦ Review calculations and compare
Hazardous Air Pollutant (HAP) levels to heath-based values.
Ambient Modeling◦ Health-Based Values
PSD Increment Modeling◦ Meet the stringent Class I standards
within the park.
OUR REVIEWPublic Comment Period◦December 8, 2017 to January 26,
2018◦ 30-days required, extended
◦ Public Hearing ◦ January 17, 2018
Concurrent EPA review during Public Comment
OUR REVIEWConsulted with Federal Land Managers
◦ Monthly meetings with EPA, NPS, and FWS.
Best Available Control Technology (BACT)◦ Required for PSD projects.
◦ Takes $ into account, control is chosen on a cost per ton reduction ($/tpy reduced).
BACT-Like Control Technologies◦ The focus on emission reductions, not costs.
◦ As good or better controls than those required under BACT.
TRUE MINORSYNTHETIC
MINORFuture Title V
(but not PSD)PSD Meridian Davis Refinery
Regulation Applicability Review ✓ ✓ ✓ ✓ ✓
Emission Calculation Review ✓ ✓ ✓ ✓ ✓
Set Emission Limits ✓ ✓ ✓ ✓ ✓
Set Control Equipment Required ✓ ✓ ✓ ✓ ✓
Air Toxics Review ✓ ✓ ✓ ✓ ✓
Ambient Modeling ✓ ✓ ✓
PSD Increment Modeling ✓ ✓ ✓
Public Comment (PC) ✓ ✓ ✓ ✓
EPA Review (concurrent w/ PC) ✓ ✓ ✓ ✓
Federal Land Manager Review ✓ Consulted
Best Available Control Technology ✓ BACT-Like Controls
OUR REVIEW
NEXT STEPS
Meridian Davis RefineryPUBLIC HEARING FOR THE PROPOSED AIR PERMIT TO CONSTRUCT
PUBLIC HEARINGSign-In (if providing verbal comments)
Use Microphone
State your name
Provide specific comment◦ NDDoH will respond to verbal and written
comments following the public comment period which ends January 26th.
Documents are available◦ www.deq.nd.gov/AQ/PublicCom.aspx#Meridian