81
OFFICE TOWER TOWER WORKS BILL No: 1 - ELECTRICAL WORK ELECTRICAL INSTALLATION Supply, install, test and commissioning Transformer comply to BS171 with final termination and all related accessories all in accordance with the drawings and specification. Transformers A Transformer - 1 (1.5MVA, 22KV/0.4KV) No B Transformer - 2 (1.5MVA, 22KV/0.4KV) No C Transformer - 4 (1.5MVA, 22KV/0.4KV) No D Transformer - 5 (1.5MVA, 22KV/0.4KV) No E Transformer - 7 (1.5MVA, 22KV/0.4KV) No F Transformer - 8 (1.5MVA, 22KV/0.4KV) No G Transformer - 9 (1.5MVA, 22KV/0.4KV) No H Transformer - 10 (1.5MVA, 22KV/0.4KV) No Supply, install, test and commissioning of Air circuit breaker complete with all necessary supports and connections; all in accordance with the drawings and specification. Air Circuit Breaker (ACB) for Transformers J ACB - 1 No K ACB - 2 No L ACB - 4 No M ACB - 5 No N ACB - 7 No P ACB - 8 No Q ACB - 9 No R ACB - 10 No Amount in AED Carried to Collection AED Project Item Ref Item Description Rate Unit MEP Tower BOQ-sample.xls - ELECTRICAL WORK Page 1 of 81

MEP Tower BOQ-sample

Embed Size (px)

Citation preview

Page 1: MEP Tower BOQ-sample

OFFICE TOWER

TOWER WORKS

BILL No: 1 - ELECTRICAL WORK

ELECTRICAL INSTALLATION

Supply, install, test and commissioning Transformer

comply to BS171 with final termination and all related

accessories all in accordance with the drawings and

specification.

Transformers

A Transformer - 1 (1.5MVA, 22KV/0.4KV) No

B Transformer - 2 (1.5MVA, 22KV/0.4KV) No

C Transformer - 4 (1.5MVA, 22KV/0.4KV) No

D Transformer - 5 (1.5MVA, 22KV/0.4KV) No

E Transformer - 7 (1.5MVA, 22KV/0.4KV) No

F Transformer - 8 (1.5MVA, 22KV/0.4KV) No

G Transformer - 9 (1.5MVA, 22KV/0.4KV) No

H Transformer - 10 (1.5MVA, 22KV/0.4KV) No

Supply, install, test and commissioning of Air circuit

breaker complete with all necessary supports and

connections; all in accordance with the drawings and

specification.

Air Circuit Breaker (ACB) for Transformers

J ACB - 1 No

K ACB - 2 No

L ACB - 4 No

M ACB - 5 No

N ACB - 7 No

P ACB - 8 No

Q ACB - 9 No

R ACB - 10 No

Amount in AED

Carried to Collection AED

Project

Item

RefItem Description Rate Unit

MEP Tower BOQ-sample.xls - ELECTRICAL WORK Page 1 of 81

Page 2: MEP Tower BOQ-sample

OFFICE TOWER

TOWER WORKS

BILL No: 1 - ELECTRICAL WORK

Amount in AED

Project

Item

RefItem Description Rate Unit

ELECTRICAL INSTALLATIONS (Cont'd)

Main circuits

Supply, install, test and commissioning bus bars

including hangers, elbows, flanges, extensions, fire

barriers, flunged end etc., complete with all necessary

accessories; all in accordance with drawings and

specification.

Bus bar system TPN cast resin insulated copper bus bar

with integral earth low impedance sandwich insulated

type, related supports and final termination.

Busbars

A 800A bus bar m

B 1000A bus bar m

C 1250A bus bar m

D 2500A bus bar m

EAllow for third party supervision, inspection and certification

of busbars including thermography scanning testsItem

Tap off units (IP54) with final termination as per

drawings and specification

Tap Off Units

F 100A TPN MCCB 40KA No

G 250A TPN MCCB 40KA No

Supply and installation of chimney for the following

areas as shown on the drawings and specification.

Chimney

H Pump room at 31 level Item

UPS

Supply, install, test and commissioning UPS comply to

BS5490 (IP22) complete with all supports, earth

continuity strip and all related accessories; all in

accordance with the drawings and specification

Uninterrupted power supply

J UPS for Obstruction light - 10KVA No

Carried to Collection AED

MEP Tower BOQ-sample.xls - ELECTRICAL WORK Page 2 of 81

Page 3: MEP Tower BOQ-sample

OFFICE TOWER

TOWER WORKS

BILL No: 1 - ELECTRICAL WORK

Amount in AED

Project

Item

RefItem Description Rate Unit

ELECTRICAL INSTALLATIONS (Cont'd)

Distribution System

Supply, install, testing, commissioning of LV Main

distribution board complete with circuit breakers,

capacitor bank with harmonic filtration, KWHR meter,

Interlock, CT meter; all in compliance with BSEN 60 439-

1 Form - 4 construction as per per drawings and

specification.

Low Voltage Main Distribution System

A LV MSB - 7 No

B LV MSB - 8 No

C LV MSB - 9 No

D LV MSB - 10 No

E EMSB - 2 No

Supply, install, test and commissioning of sub main

distribution boards comply with BS5486, complete with

circuit breakers; all in accordance with the drawings

and specification.

Sub - Main Distribution Board

F SB-1-0-7 No

G SB-1-0-8 No

H SB-1-0-9 No

J SB-1-0-10 No

K SB-1-0-11 No

L SB-1-0-12 No

M SB-1-0-13 No

N SB-1-0-14 No

P SB-1-0-15 No

Q SB-1-0-16 No

R SB-1-0-17 No

S SB-1-0-18 No

Carried to Collection AED

MEP Tower BOQ-sample.xls - ELECTRICAL WORK Page 3 of 81

Page 4: MEP Tower BOQ-sample

OFFICE TOWER

TOWER WORKS

BILL No: 1 - ELECTRICAL WORK

Amount in AED

Project

Item

RefItem Description Rate Unit

ELECTRICAL INSTALLATIONS (Cont'd)

Distribution System (Cont'd)

A SB-2-0-19 No

B SB-2-0-20 No

C SB-2-0-21 No

D SB-2-0-22 No

E SB-2-0-23 No

F SB-2-0-24 No

G SB-2-0-25 No

H SB-2-0-26 No

J SB-2-0-27 No

K SB-2-0-28 No

L SB-2-0-29 No

M SB-2-0-30 No

N SB-7-0-31 No

P SB-7-0-32 No

Q SB-7-0-33 No

R SB-7-0-34 No

S SB-7-0-35 No

T SB-7-0-36 No

U SB-7-0-37 No

V SB-7-0-38 No

W SB-7-0-39 No

X SB-7-0-40 No

Y SB-7-0-41 No

Z SB-7-0-42 No

Carried to Collection AED

MEP Tower BOQ-sample.xls - ELECTRICAL WORK Page 4 of 81

Page 5: MEP Tower BOQ-sample

OFFICE TOWER

TOWER WORKS

BILL No: 1 - ELECTRICAL WORK

Amount in AED

Project

Item

RefItem Description Rate Unit

ELECTRICAL INSTALLATIONS (Cont'd)

Distribution System (Cont'd)

A SB-7-0-43 No

B SB-7-0-44 No

C SB-7-0-45 No

D SB-7-0-46 No

E SB-8-0-47 No

F SB-8-0-48 No

G SB-8-0-49 No

H SB-8-0-50 No

J SB-8-0-51 No

K SB-8-0-52 No

L SB-8-0-53 No

M SB-8-0-54 No

N SB-8-0-55 No

P SB-8-0-56 No

Q SB-8-0-57 No

R SB-8-0-58 No

S SB-8-0-59 No

T ESB-31-L No

U ESB-31-P No

V ESB-1-0-31-LIFT.1 No

W ESB-1-0-31-LIFT.2 No

X ESB-2-0-60-LIFT.1 No

Y ESB-2-0-60-LIFT.2 No

Z ESB-2-0-60-LIFT.3 No

Carried to Collection AED

MEP Tower BOQ-sample.xls - ELECTRICAL WORK Page 5 of 81

Page 6: MEP Tower BOQ-sample

OFFICE TOWER

TOWER WORKS

BILL No: 1 - ELECTRICAL WORK

Amount in AED

Project

Item

RefItem Description Rate Unit

ELECTRICAL INSTALLATIONS (Cont'd)

Distribution System (Cont'd)

Supply, install, test and commissioning the distribution

boards complete with circuit breakers; all in accordance

with the drawings and specification.

Distribution Boards

A DB-EXTERNAL -1 W/P No

B DB-EXTERNAL -2 W/P No

C DB-EXTERNAL -3 W/P No

D DB-EXTERNAL -4 W/P No

E DB-5-0-7 No

F DB-5-0-7-EXT No

G DB-5-0-9 No

H DB-5-0-9-EXT No

J DB-5-0-11 No

K DB-5-0-11-EXT No

L DB-5-0-13 No

M DB-5-0-13-EXT No

N DB-5-0-15 No

P DB-5-0-15-EXT No

Q DB-5-0-17 No

R DB-5-0-17-EXT No

S DB-5-0-19 No

T DB-5-0-19-EXT No

U DB-5-0-21 No

V DB-5-0-21-EXT No

Carried to Collection AED

MEP Tower BOQ-sample.xls - ELECTRICAL WORK Page 6 of 81

Page 7: MEP Tower BOQ-sample

OFFICE TOWER

TOWER WORKS

BILL No: 1 - ELECTRICAL WORK

Amount in AED

Project

Item

RefItem Description Rate Unit

ELECTRICAL INSTALLATIONS (Cont'd)

Distribution System (Cont'd)

A DB-5-0-23 No

B DB-5-0-23-EXT No

C DB-5-0-25 No

D DB-5-0-25-EXT No

E DB-5-0-27 No

F DB-5-0-27-EXT No

G DB-5-0-29 No

H DB-5-0-29-EXT No

J DB-7-31-1 No

K DB-7-31-2 No

L DB-10-0-32 No

M DB-10-0-32-EXT No

N DB-10-0-34 No

P DB-10-0-34-EXT No

Q DB-10-0-36 No

R DB-10-0-36-EXT No

S DB-10-0-38 No

T DB-10-0-38-EXT No

U DB-10-0-40 No

V DB-10-0-40-EXT No

W DB-10-0-42 No

X DB-10-0-42-EXT No

Carried to Collection AED

MEP Tower BOQ-sample.xls - ELECTRICAL WORK Page 7 of 81

Page 8: MEP Tower BOQ-sample

OFFICE TOWER

TOWER WORKS

BILL No: 1 - ELECTRICAL WORK

Amount in AED

Project

Item

RefItem Description Rate Unit

ELECTRICAL INSTALLATIONS (Cont'd)

Distribution System (Cont'd)

A DB-10-0-44 No

B DB-10-0-44-EXT No

C DB-10-0-46 No

D DB-10-0-46-EXT No

E DB-10-0-48 No

F DB-10-0-48-EXT No

G DB-10-0-50 No

H DB-10-0-50-EXT No

J DB-10-0-52 No

K DB-10-0-52-EXT No

L DB-10-0-54 No

M DB-10-0-54-EXT No

N DB-10-0-56 No

P DB-10-0-56-EXT No

Q DB-10-0-58 No

R DB-10-0-58-EXT No

S DB - 8-O-59 - 1 No

T DB-8-59-KITCHEN No

U DB-8-59-EXT.1 No

V DB-8-59-EXT.2 No

W DB-10-0-60 No

X DB-10-0-60-EXT No

AEDCarried to Collection

MEP Tower BOQ-sample.xls - ELECTRICAL WORK Page 8 of 81

Page 9: MEP Tower BOQ-sample

OFFICE TOWER

TOWER WORKS

BILL No: 1 - ELECTRICAL WORK

Amount in AED

Project

Item

RefItem Description Rate Unit

ELECTRICAL INSTALLATIONS (Cont'd)

Distribution System (Cont'd)

Supply, Install, test and commissioning the motor

control center complete with circuit breakers; all in

accordance with the drawings and specification.

Motor Control Center

A MCP-2-0-31-FIRE PUMP No

B MCP-0-7-1 No

C MCP-0-8-1 No

D MCP-0-9-1 No

E MCP-0-10-1 No

F MCP-0-11-1 No

G MCP-0-12-1 No

H MCP-0-13-1 No

J MCP-0-14-1 No

K MCP-0-15-1 No

L MCP-0-16-1 No

M MCP-0-17-1 No

N MCP-0-18-1 No

P MCP-0-19-1 No

Q MCP-0-20-1 No

R MCP-0-21-1 No

S MCP-0-22-1 No

T MCP-0-23-1 No

U MCP-0-24-1 No

V MCP-0-25-1 No

Carried to Collection AED

MEP Tower BOQ-sample.xls - ELECTRICAL WORK Page 9 of 81

Page 10: MEP Tower BOQ-sample

OFFICE TOWER

TOWER WORKS

BILL No: 1 - ELECTRICAL WORK

Amount in AED

Project

Item

RefItem Description Rate Unit

ELECTRICAL INSTALLATIONS (Cont'd)

Distribution System (Cont'd)

A MCP-0-26-1 No

B MCP-0-27-1 No

C MCP-0-28-1 No

D MCP-0-29-1 No

E MCP-0-30-1 No

F MCP-0-31-1 No

G MCP-0-31-2 No

H MCP-0-31-3 No

J MCC-0-31-1 No

K MCC-0-31-2 No

L MCC-0-31-3 No

M MCP-0-32-1 No

N MCP-0-33-1 No

P MCP-0-34-1 No

Q MCP-0-35-1 No

R MCP-0-36-1 No

S MCP-0-37-1 No

T MCP-0-38-1 No

U MCP-0-39-1 No

V MCP-0-40-1 No

W MCP-0-41-1 No

X MCP-0-42-1 No

Y MCP-0-43-1 No

Z MCP-0-44-1 No

Carried to Collection AED

MEP Tower BOQ-sample.xls - ELECTRICAL WORK Page 10 of 81

Page 11: MEP Tower BOQ-sample

OFFICE TOWER

TOWER WORKS

BILL No: 1 - ELECTRICAL WORK

Amount in AED

Project

Item

RefItem Description Rate Unit

ELECTRICAL INSTALLATIONS (Cont'd)

Distribution System (Cont'd)

MCP-0-45-1 No

A MCP-0-46-1 No

B MCP-0-47-1 No

C MCP-0-48-1 No

D MCP-0-49-1 No

E MCP-0-50-1 No

F MCP-0-51-1 No

G MCP-0-52-1 No

H MCP-0-53-1 No

J MCP-0-54-1 No

K MCP-0-55-1 No

L MCP-0-56-1 No

M MCP-0-57-1 No

N MCP-0-58 No

P MCP-0-58-1 No

Q MCP-0-58-2 No

R MCP-0-58-3 No

S MCC-0-58-1 No

T MCC-0-58-2 No

U MCC-0-58-3 No

V MCP-0-59-1 No

W MCP-0-60-1 No

X Allow for miscellaneous control wiring related to other

equipments / systems Item

Carried to Collection AED

MEP Tower BOQ-sample.xls - ELECTRICAL WORK Page 11 of 81

Page 12: MEP Tower BOQ-sample

OFFICE TOWER

TOWER WORKS

BILL No: 1 - ELECTRICAL WORK

Amount in AED

Project

Item

RefItem Description Rate Unit

ELECTRICAL INSTALLATIONS (Cont'd)

Power Cable

Supply, install, test and commissioning of power cable

installation including lugs, glands, terminations and

cable ties; all in accordance with the drawings and

specification.

A 4 sqmm /4C PVC/PVC+4sqmm /1C CPC m

B 6 sqmm /4C PVC/PVC+6sqmm /1C CPC m

C 6X6 sqmm /1C PVC/PVC+6sqmm /1C CPC m

D 10 sqmm /4C PVC/PVC+10sqmm /1C CPC m

E 6X10 sqmm /1C PVC/PVC+10sqmm /1C CPC m

F 16 sqmm /4C PVC/PVC+16sqmm /1C CPC m

G 25 sqmm /4C PVC/PVC + 16 sqmm/1C CPC m

H 25 sqmm /4C XLPE/PVC+ 16sqmm /1C CPC m

J 4X25 sqmm /1C PVC/PVC+16sqmm /1C CPC m

K 6X25 sqmm /1C PVC/PVC+25sqmm /1C CPC m

L 6X25 sqmm /1C XLPE/PVC+16sqmm /1C CPC m

M 6X25 sqmm /4C PVC/PVC+50sqmm /1C CPC m

N 70 sqmm /4C XLPE/PVC+35 sqmm /1C CPC m

P 4 x 70 sqmm /1C XLPE/PVC+ 35sqmm /1C CPC m

Q 6X70 sqmm /1C XLPE/PVC+35sqmm /1C CPC m

R 4 x 95 sqmm /1C XLPE/PVC+ 50 sqmm /1C CPC m

S 4 x 95 sqmm /4C XLPE/PVC+ 50sqmm /1C CPC m

T 4 x 120 sqmm /4C XLPE/PVC+ 70sqmm /1C CPC m

U 4 x 120 sqmm /1C XLPE/PVC+70sqmm /1C CPC m

V 6X300 sqmm /1C XLPE/PVC+240sqmm /1C CPC m

W 8 x 630 sqmm/1C XLPE/PVC+2 x 300 sqmm /1C CPC m

Carried to Collection AED

MEP Tower BOQ-sample.xls - ELECTRICAL WORK Page 12 of 81

Page 13: MEP Tower BOQ-sample

OFFICE TOWER

TOWER WORKS

BILL No: 1 - ELECTRICAL WORK

Amount in AED

Project

Item

RefItem Description Rate Unit

ELECTRICAL INSTALLATIONS (Cont'd)

Power Cable (Fire rated )

Supply, install, test and commissioning power cables

including termination to and from, glands, cable ties,

lugs and related installation accessories; all in

accordance with the drawings and specification.

A 6 sqmm /4C Fire Rated Cable+6 sqmm /1C CPC m

B 16 sqmm /4C Fire Rated Cable+16sqmm /1C CPC m

C 25 sqmm /4C Fire Rated Cable+16sqmm /1C CPC m

D 50 sqmm /4C Fire Rated Cable+25sqmm /1C CPC m

E4 x 95 sqmm /1C Fire Rated Cable+50 sqmm /1C CPC

m

F4 x 150 sqmm/1C Fire Rated Cable+95 sqmm /1C CPC

m

G8 x 300 sqmm/1C Fire Rated Cable+2 x 150 sqmm /1C CPC

m

H4 x 400 sqmm /IC Fire Rated Cable+150 sqmm /1C CPC

m

J4 x 500 sqmm/1C Fire Rated Cable+300 sqmm /1C CPC

m

Carried to Collection AED

MEP Tower BOQ-sample.xls - ELECTRICAL WORK Page 13 of 81

Page 14: MEP Tower BOQ-sample

OFFICE TOWER

TOWER WORKS

BILL No: 1 - ELECTRICAL WORK

Amount in AED

Project

Item

RefItem Description Rate Unit

ELECTRICAL INSTALLATIONS (Cont'd)

Disconnect switches

Supply, install Isolators (IP65) complete with supports,

lugs and other related accessories; all in accordance

with drawings and specification.

Isolators

A 16A, TPN Isolator No

B 16A, TPN Isolator (Weather proof) No

C 16A, TPN Isolator (Explosion proof) No

Containment

Supply and install GI cable tray / Ladder comply with

BS4678 and complete accessoires, supports, earth

continuity strip etc., all in accordance with the drawings

and specification.

Cable Tray

D 100mm HD GI Cable Tray m

E 300mm HD GI Cable Tray m

F 500mm HD GI Cable Tray m

G 600mm HD GI Cable Tray m

H 600 X 100mm HD GI Cable Tray m

J 800 X 100mm HD GI Cable Tray m

Cable Ladder

K 2 X 1000mm HD GI Cable Ladder m

Supply and install GI conduit complete with

accessoires, supports, earth continuity strip etc., all in

accordance with the drawings and specification.

G.I Conduit

L 40mm Dia GI conduit m

M 50mm Dia GI conduit m

AEDCarried to Collection

MEP Tower BOQ-sample.xls - ELECTRICAL WORK Page 14 of 81

Page 15: MEP Tower BOQ-sample

OFFICE TOWER

TOWER WORKS

BILL No: 1 - ELECTRICAL WORK

Amount in AED

Project

Item

RefItem Description Rate Unit

ELECTRICAL INSTALLATIONS (Cont'd)

Small Power System

Supply, install and test all associated works of power

outlets comply with BS1363 including permanent wiring

system and using Logic range finish to the respective

system as per specification.

Power outlets (Logic range)

A 13A, 220V, 1 gang switched socket outlet No

B 13A, 220V, 1 Gang switched socket outlet (W/P - IP65) No

C 13A, 220V, 1 Gang switched socket outlet (for emergency

portable lighting) No

D13A, 220V, 1 Gang switched socket outlet (for Hand dryer)

No

E 13A, 220V, 2 gang switched socket outlet (one gang

mounted at high level / above ceiling) No

F15A, switched fused connection unit mounted above ceiling

No

G 20A, 3P, socket outlet No

H 20A, 3P, socket outlet (W/P) No

J 20A, 3P, socket outlet (explosion proof) No

Supply, install and test all associated works of power

outlets with permanent wiring system using Metal clad

finish to the respective system as per drawings and

specification.

Power outlets (Metal clad range)

K 13A, 220V, 2 Gang switched socket outlet No

Carried to Collection AED

MEP Tower BOQ-sample.xls - ELECTRICAL WORK Page 15 of 81

Page 16: MEP Tower BOQ-sample

OFFICE TOWER

TOWER WORKS

BILL No: 1 - ELECTRICAL WORK

Amount in AED

Project

Item

RefItem Description Rate Unit

ELECTRICAL INSTALLATIONS (Cont'd)

Lighting system

Supply and install the following lighting system comply

with BS88, 1273 & 1461 includes fittings, ceiling rose,

heat resistant flexible cable, lamps, electronic control

gear, suspension, connection to permanent wiring

system; all in accordance with the drawings and

specification.

General Lighting

A Type F1 No

B Type F1 (W/P) No

C Type F2 No

D Type F3 No

E Type F3 EP No

F Type F9 (W/P) No

G Type 'O' No

H Medium intensity red light type C high intensity white light

type A No

J Medium intensity red light type C No

Carried to Collection AED

MEP Tower BOQ-sample.xls - ELECTRICAL WORK Page 16 of 81

Page 17: MEP Tower BOQ-sample

OFFICE TOWER

TOWER WORKS

BILL No: 1 - ELECTRICAL WORK

Amount in AED

Project

Item

RefItem Description Rate Unit

ELECTRICAL INSTALLATIONS (Cont'd)

Interior Decorative Lighting

A Type DL2 No

B Type DL9 No

C Type PR1 No

D Type PR2 No

E LED 1 m

F Type COL1 m

G Type FL14 No

H Type FL21 No

J Type FL28 No

K Exit light No

Switches

Supply, install lighting switches comply to BS36376 with

permanent wiring using Logic range finish to the

respective lighting system as per drawings and

specification.

Lighting Switches (Logic range)

L 10A, 1 gang, 1way DP light switch No

M 10A, 1 gang, 1way SP light switch No

Carried to Collection AED

MEP Tower BOQ-sample.xls - ELECTRICAL WORK Page 17 of 81

Page 18: MEP Tower BOQ-sample

OFFICE TOWER

TOWER WORKS

BILL No: 1 - ELECTRICAL WORK

Amount in AED

Project

Item

RefItem Description Rate Unit

ELECTRICAL INSTALLATIONS (Cont'd)

Distribution System (Cont'd)

Emergency Distribution System

Supply, install, testing and commissioning the

distribution boards complete with circuit breakers, final

connection; all in accordance with the drawings and

specification.

Emergency Distribution Board

A EDB-1-0-7-L No

B EDB-1-0-8-P No

C EDB-1-0-9-L No

D EDB-1-0-10-P No

E EDB-1-0-11-L No

F EDB-1-0-12-P No

G EDB-1-0-13-L No

H EDB-1-0-14-P No

J EDB-1-0-15-L No

K EDB-1-0-16-P No

L EDB-1-0-17-L No

M EDB-1-0-18-P No

N EDB-1-0-19-L No

P EDB-1-0-20-P No

Q EDB-1-0-21-L No

R EDB-1-0-22-P No

S EDB-1-0-23-L No

T EDB-1-0-24-P No

U EDB-1-0-25-L No

Carried to Collection AED

MEP Tower BOQ-sample.xls - ELECTRICAL WORK Page 18 of 81

Page 19: MEP Tower BOQ-sample

OFFICE TOWER

TOWER WORKS

BILL No: 1 - ELECTRICAL WORK

Amount in AED

Project

Item

RefItem Description Rate Unit

ELECTRICAL INSTALLATIONS (Cont'd)

Distribution System (Cont'd)

A EDB-1-0-26-P No

B EDB-1-0-27-L No

C EDB-1-0-28-P No

D EDB-1-0-29-L No

E EDB-1-0-30-P No

F EDB-2-0-31-P No

G EDB-2-0-32-L No

H EDB-2-0-33-P No

J EDB-2-0-34-L No

K EDB-2-0-35-P No

L EDB-2-0-36-L No

M EDB-2-0-37-P No

N EDB-2-0-38-L No

P EDB-2-0-39-P No

Q EDB-2-0-40-L No

R EDB-2-0-41-P No

S EDB-2-0-42-L No

T EDB-2-0-43-P No

U EDB-2-0-44-L No

V EDB-2-0-45-P No

W EDB-2-0-46-L No

Carried to Collection AED

MEP Tower BOQ-sample.xls - ELECTRICAL WORK Page 19 of 81

Page 20: MEP Tower BOQ-sample

OFFICE TOWER

TOWER WORKS

BILL No: 1 - ELECTRICAL WORK

Amount in AED

Project

Item

RefItem Description Rate Unit

ELECTRICAL INSTALLATIONS (Cont'd)

Distribution System (Cont'd)

A EDB-2-0-47-P No

B EDB-2-0-48-L No

C EDB-2-0-49-P No

D EDB-2-0-50-L No

E EDB-2-0-51-P No

F EDB-2-0-52-L No

G EDB-2-0-53-P No

H EDB-2-0-54-L No

J EDB-2-0-55-P No

K EDB-2-0-56-L No

L EDB-2-0-57-P No

M EDB-2-0-58-L No

N EDB-2-0-59-P No

P EDB-2-0-60-L No

Emergency lighting

Supply and install the following emergency lighting

system includes ceiling rose, heat resistant flexible

cable, lamps, control gear, suspension, final connection

, connection to permanent wiring system; all in

accordance with the drawings and specification.

Q Type E1 No

R Type E2 No

S Type E3 No

T Type E3 (W/P) No

U Type E4 No

V Type E5 No

W Type EB No

Carried to Collection AED

MEP Tower BOQ-sample.xls - ELECTRICAL WORK Page 20 of 81

Page 21: MEP Tower BOQ-sample

OFFICE TOWER

TOWER WORKS

BILL No: 1 - ELECTRICAL WORK

Amount in AED

Project

Item

RefItem Description Rate Unit

ELECTRICAL INSTALLATIONS (Cont'd)

LOW CURRENT SYSTEM (Voice / Data system)

Point wiring including permanent wiring system as per

the approval from local authority; all in accordance with

drawings and specification.

A Single gang RJ-45 outlet for voice No

B Single gang RJ-45 outlet for data No

Accessories

Supply, installation of accessories as per the drawings

and specification.

C Single gang RJ-45 outlet for voive No

D Single gang RJ-45 outlet for data No

Equipments Cabinet / Accessories

Supply, install, test and commissioning of Telephone

and data complete system provided approval from local

authority; all in accordance with drawings and

specification.

E Optical network unit No

F Fiber terminal box (FTB) No

G Patch panel c/w Optical converter (PP) No

H Patch panel - 5 pairs No

J Patch panel - 20 pairs No

K Stand alone type 19" equipment cabinet No

L Allow for supply and installtion of MDF, patch panels and all

related cabinets, and installation accessories. Item

Carried to Collection AED

MEP Tower BOQ-sample.xls - ELECTRICAL WORK Page 21 of 81

Page 22: MEP Tower BOQ-sample

OFFICE TOWER

TOWER WORKS

BILL No: 1 - ELECTRICAL WORK

Amount in AED

Project

Item

RefItem Description Rate Unit

ELECTRICAL INSTALLATIONS (Cont'd)

Voice and Data System (Cont'd)

Structured Cabling

Supply and install structure cabling complete with all

terminations; all in accordance with the drawings and

specificaiton.

A 4 x 24mm single core, 62.5um GI TIA/EIA 568-N-3 standard

FIBER OPTIC cable m

B CAT6 UTP cable m

Containment

Supply and install GI cable tray complete with

accessoires, supports, earth continuity strip etc., all in

accordance with the drawings and specification.

Cable Tray

C 200mm HD G.I. cable tray m

D 2 x 600mm HD G.I. cable tray m

E 800mm HD G.I. cable tray m

Carried to Collection AED

MEP Tower BOQ-sample.xls - ELECTRICAL WORK Page 22 of 81

Page 23: MEP Tower BOQ-sample

OFFICE TOWER

TOWER WORKS

BILL No: 1 - ELECTRICAL WORK

Amount in AED

Project

Item

RefItem Description Rate Unit

ELECTRICAL INSTALLATIONS (Cont'd)

SECURITY SYSTEM

Supply, install, test and commissioning of closed circuit

television system c/w permanent wiring system and

other ancillaries; all in accordance with drawings and

specification, but not necessarily limitted to the

following;

Closed Circuit Television System

A CCTV camera - Pan / Tilt / Zoom type, dome type

installation

No

B CCTV camera - Pan / Tilt type, dome type installation No

C Terminal control unit (TCU) No

Supply, install, test and commissioning of Access &

Guard tour monitoring system c/w containment, wiring

and other ancillaries; all in accordance with drawings

and specification.

Guard Tour Monitoring System

D Guard tour (GT) No

AEDCarried to Collection

MEP Tower BOQ-sample.xls - ELECTRICAL WORK Page 23 of 81

Page 24: MEP Tower BOQ-sample

OFFICE TOWER

TOWER WORKS

BILL No: 1 - ELECTRICAL WORK

Amount in AED

Project

Item

RefItem Description Rate Unit

ELECTRICAL INSTALLATIONS (Cont'd)

PUBLIC ADDRESS & BACKGROUND MUSIC SYSTEM

Supply, install, test and commissioning of public

address & background music system c/w permanent

wiring system and other ancillaries; all in accordance

with drawings and specification.

A Box speaker No

B Box speaker (Explotion proof) No

C Ceiling mounted loud speaker (surface type) No

D Column loud speaker No

E Column loud speaker (W/P) No

F Terminal box No

G Overriding relay No

Carried to Collection AED

MEP Tower BOQ-sample.xls - ELECTRICAL WORK Page 24 of 81

Page 25: MEP Tower BOQ-sample

OFFICE TOWER

TOWER WORKS

BILL No: 1 - ELECTRICAL WORK

Amount in AED

Project

Item

RefItem Description Rate Unit

ELECTRICAL INSTALLATIONS (Cont'd)

ANALOGUE ADDRESSIBLE FIRE ALARM SYSTEM

Supply, install, test and commissioning the complete

fire alarm system in compliance with BS5839 and local

authorities (Abdudhabi for code and civil defence

approval) including containment, cabling and other

ancillaries; all in accordance with the drawings and

specification.

A Addressable analogue smoke detector (concealed) No

B Addressable analogue duct smoke detector (concealed) No

C Addressable analogue heat detector with electronic sounder

base (concealed). No

D Addressable analogue break glass unit No

E Addressable analogue sounder unit No

F Indicator lamp No

G Flow switch No

H Gas detector No

J Monitored stop valve No

KAddressable analogue fire alarm sub main control panel

No

L Addressable analogue annunciator panel No

Containment

Supply and install GI cable tray complete with

accessoires, supports, earth continuity strip etc., all in

accordance with the drawings and specification.

Cable Tray

M 200mm GI cable tray m

Fire Telephone Intercom System

Supply, install, test and commissioning the complete

fire intercom system in compliance with local

authorities all including permanent wiring system and

other ancillaries; all in accordance with the drawings

and specification.

N Fire intercom unit with jack No

Carried to Collection AED

MEP Tower BOQ-sample.xls - ELECTRICAL WORK Page 25 of 81

Page 26: MEP Tower BOQ-sample

OFFICE TOWER

TOWER WORKS

BILL No: 1 - ELECTRICAL WORK

Amount in AED

Project

Item

RefItem Description Rate Unit

ELECTRICAL INSTALLATIONS (Cont'd)

EARTHING SYSTEM

Supply, install, test and commissioning and maintain

complete earthing system including equipontential and

supplementary bonding, complete with all tapes, test

links and cross bonding conductors; all in accordance

with the drawings and specification.

A 1C x 70mm2 Cu/PVC earth cable m

B Main earth bars (30mm x 5mm) No

C 40 x 10mm Cu Earth terminal at LV panel 7 to LV 10 & SB -

2No

D 25 x 8mm Cu Earth terminal at LV room (31st Floor) m

E Allow for metal projection earting including masts, aerials,

air condutor units, handrails, external metallic duct works

and all mechanical equipments. Item

LIGHTNING PROTECTION SYSTEM

Supply, install, test and commissioning and maintain

complete lightning protection system comply with BS

6651 including equipontential and supplementary

bonding, complete with all tapes, test links and cross

bonding conductors; all in accordance with the

drawings and specification.

F 25mm x 3mm Aluminium tape on roof m

G Earth bonding to reinforcement No

AEDCarried to Collection

MEP Tower BOQ-sample.xls - ELECTRICAL WORK Page 26 of 81

Page 27: MEP Tower BOQ-sample

OFFICE TOWER

TOWER WORKS

BILL No: 1 - ELECTRICAL WORK

Amount in AED

Project

Item

RefItem Description Rate Unit

ELECTRICAL INSTALLATIONS (Cont'd)

SUNDRY / GENERAL ITEMS

A Allow for permits, fees, inspection associated with the

electrical installation by utility and statutory authorities Item

B Allow for testing and commissioning and production of test

certificates all in accordance with specification. Item

C Allow for all identification labels, plates, charts and

identification of cable, trays, switches and the like all in

accordance with specification Item

D Allow for preparing schedule of manufacturers

recommended tools and spare parts for each piece of

equipment. Item

E Allow for fire stopping in accordance with the drawings

specification and local authorities requirements, Item

F Allow for instructing selected employer's personnel on all

aspects of the operation of systems and equipment Item

G Allow for the provision of operating / maintenance manuals

Item

H Allow for providing shop, co-ordination and "as-built"

drawings Item

J Allow for mock-up installation of Electrical accessories such

as light fittings, switches, sockets etc., at Lift lobby, toilet &

office area as per specification section 2 and drawings.

Item

K Option for contractor to provide two (2) years maintenance

to all electrical systems. Item

L The contractor shall list here other items not included above

but included in the Specifications and/or drawings and

necessary for the complete and satisfactory completion of

this section of the Works. Such items shall be deemed to be

included unless specified.

Item

………………………………………….

Carried to Collection AED

MEP Tower BOQ-sample.xls - ELECTRICAL WORK Page 27 of 81

Page 28: MEP Tower BOQ-sample

OFFICE TOWER

TOWER WORKS

BILL No: 1 - ELECTRICAL WORK

Amount in AED

Project

Item

RefItem Description Rate Unit

ELECTRICAL INSTALLATIONS (Cont'd)

Collection from

Page 01

Page 02

Page 03

Page 04

Page 05

Page 06

Page 07

Page 08

Page 09

Page 10

Page 11

Page 12

Page 13

Page 14

Page 15

Page 16

Page 17

Page 18

Page 19

Page 20

AED CARRIED FORWARD

MEP Tower BOQ-sample.xls - ELECTRICAL WORK Page 28 of 81

Page 29: MEP Tower BOQ-sample

OFFICE TOWER

TOWER WORKS

BILL No: 1 - ELECTRICAL WORK

Amount in AED

Project

Item

RefItem Description Rate Unit

ELECTRICAL INSTALLATIONS (Cont'd)

Collection

Brought forward Page 28

Page 21

Page 22

Page 23

Page 24

Page 25

Page 26

Page 27

AED CARRIED TO SUMMARY

MEP Tower BOQ-sample.xls - ELECTRICAL WORK Page 29 of 81

Page 30: MEP Tower BOQ-sample

OFFICE TOWER

TOWER WORKS

BILL No: 2 - MECHANICAL WORK

MECHANICAL INSTALLATIONS

DOMESTIC COLD WATER SYSTEM

Water Meters

A Water meters for individual operation including gate valves,

non return valve, union couplings including hangers,

stariner, supports and accessories; all in accordance with

the drawings and specification. No

Cold Water Pipe Works

Cold water pipe using polypropylene pipe works

including fitting, hangers, supports and related

accessories; all in accordance with the detailed

drawings and specification.

For raw water

B 15mm Diameter m

C 20mm Diameter m

D 25mm Diameter m

E 32mm Diameter m

F 40mm Diameter m

G 50mm Diameter m

H 65mm Diameter m

J 80mm Diameter m

K 100mm Diameter m

Amount in AED

Project

Item

RefItem Description Unit Rate

Carried to Collection AED

MEP Tower BOQ-sample.xls - MECHANICAL WORK Page 30 of 81

Page 31: MEP Tower BOQ-sample

OFFICE TOWER

TOWER WORKS

BILL No: 2 - MECHANICAL WORK

Amount in AED

Project

Item

RefItem Description Unit Rate

MECHANICAL INSTALLATIONS (Cont'd)

Domestic Cold Water System (Cont'd)

For filtered water

A 15mm Diameter m

B 20mm Diameter m

C 25mm Diameter m

D 32mm Diameter m

E 50mm Diameter m

F 65mm Diameter m

G 80mm Diameter m

Cold water transfer pipe using high density

polypropylene pipe works including fitting, hangers,

supports and related accessories; all in accordance with

the detailed drawings and specification.

Cold water transfer pipe

H 100mm Diameter m

J 150mm Diameter m

Boosted cold water supply

K 40mm Diameter m

L 50mm Diameter m

M 65mm Diameter m

AEDCarried to Collection

MEP Tower BOQ-sample.xls - MECHANICAL WORK Page 31 of 81

Page 32: MEP Tower BOQ-sample

OFFICE TOWER

TOWER WORKS

BILL No: 2 - MECHANICAL WORK

Amount in AED

Project

Item

RefItem Description Unit Rate

MECHANICAL INSTALLATIONS (Cont'd)

Accessories / Fittings

Supply, install accessories / fittings using

polypropylene pipe fittings with thermal fusion joints in

connection with piping; all in accordance with drawings

and specificaiton.

Bends

A 65mm Diameter No

B 80mm Diameter No

C 100mm Diameter No

D 150mm Diameter No

Couplers (PPR)

E 65mm Diameter No

F 80mm Diameter No

G 100mm Diameter No

Couplers (HDPE)

H 65mm Diameter No

J 100mm Diameter No

K 150mm Diameter No

Pex pipe with flexible hose and other related

accessories all in accordance with the drawings and

specification.

Pex pipe

L 15mm Diameter m

M 20mm Diameter m

Carried to Collection AED

MEP Tower BOQ-sample.xls - MECHANICAL WORK Page 32 of 81

Page 33: MEP Tower BOQ-sample

OFFICE TOWER

TOWER WORKS

BILL No: 2 - MECHANICAL WORK

Amount in AED

Project

Item

RefItem Description Unit Rate

MECHANICAL INSTALLATIONS (Cont'd)

Domestic Cold Water System (Cont'd)

Interior hose bib shall be brass body complete with

shutt off valves in stainless steel box as per

specification.

Hose bib

A 15mm Diameter No

B 20mm Diameter No

Install sanitaryware mixers complete with all related

accessories and final connection, angle valve, flexible

connection, support etc.; all in accordance with the

drawings and specification.

Sanitaryware mixers

C Wash basin mixer No

D Water closet hand sprayor No

E Urinal mixer No

F Kitchen sink No

G Janitor sink No

Carried to Collection AED

MEP Tower BOQ-sample.xls - MECHANICAL WORK Page 33 of 81

Page 34: MEP Tower BOQ-sample

OFFICE TOWER

TOWER WORKS

BILL No: 2 - MECHANICAL WORK

Amount in AED

Project

Item

RefItem Description Unit Rate

MECHANICAL INSTALLATIONS

Valves

Supply and install valves including all related

accessories and supports; all in accordance with the

drawings and specification.

Gate valve shall be copper alloy body comply to BS5154

A 15mm Diameter No

B 20mm Diameter No

C 25mm Diameter No

D 32mm Diameter No

E 40mm Diameter No

Gate valve shall be iron body comply to BS5154

F 50mm Diameter No

G 65mm Diameter No

H 80mm Diameter No

J 100mm Diameter No

K 150mm Diameter No

Float valve shall be of bronze body compy to BS1212.

L 80mm Diameter No

M 100mm Diameter No

Foot valve

N 80mm Diameter No

Carried to Collection AED

MEP Tower BOQ-sample.xls - MECHANICAL WORK Page 34 of 81

Page 35: MEP Tower BOQ-sample

OFFICE TOWER

TOWER WORKS

BILL No: 2 - MECHANICAL WORK

Amount in AED

Project

Item

RefItem Description Unit Rate

MECHANICAL INSTALLATIONS

Valves (Cont'd)

Check valve shall be DZR brass body

A 20mm Diameter No

B 50mm Diameter No

C 100mm Diameter No

Blanked off connection with Isolating valve

D 25mm Diameter No

E 32mm Diameter No

F 40mm Diameter No

Pressure reducing valve station

Supply and installation of pressure reducing valve

station complete with all related accessories and final

connection; all in accordance with the drawings and

specification.

For Raw water

G 65mm Diameter No

H 80mm Diameter No

J 100mm Diameter No

For Filter water

K 25mm Diameter No

L 32mm Diameter No

M 50mm Diameter No

N 65mm Diameter No

Carried to Collection AED

MEP Tower BOQ-sample.xls - MECHANICAL WORK Page 35 of 81

Page 36: MEP Tower BOQ-sample

OFFICE TOWER

TOWER WORKS

BILL No: 2 - MECHANICAL WORK

Amount in AED

Project

Item

RefItem Description Unit Rate

MECHANICAL INSTALLATIONS

Water Storage Tank

Supply, install test and commissioning multimedia

water tank including water filter with water multimedia

filters, activated carbon, filter AG with overflow

discharge connection, drain valves, internal piping and

supports all in accordance with the drawings and

specification.

Multimedia water filter tank

A MMF-0-31-1 & 2 (1.3 - 8.6 bars) No

B MMF-0-58-1 & 2 (1.3 - 8.6 bars) No

Supply, install test and commissioning water tank using

Fiber glass reinforced plastic (FRP) including overflow

discharge connection, drain with valves, vent pipe and

internal piping; all in accordance with the drawings and

specification

Insulated filter water tank

C 30m3 capacity water tank No

Raw type water tank

D 60m3 water tank No

E125m3 water tank (80m3 for fire & 45m3 for domestic)

No

F240m3 water tank (150m3 for fire & 90m3 for domestic)

No

Carried to Collection AED

MEP Tower BOQ-sample.xls - MECHANICAL WORK Page 36 of 81

Page 37: MEP Tower BOQ-sample

OFFICE TOWER

TOWER WORKS

BILL No: 2 - MECHANICAL WORK

Amount in AED

Project

Item

RefItem Description Unit Rate

MECHANICAL INSTALLATIONS (Cont'd)

Pumps for Water Supply Installations.

Pumps complete with starter control panel, wiring,

connecting pipes, valves, pressure vessel, VSD, non

return valves, strainer, flexible connection, pressure

gauges, puddle flange, anti-vibration isolators & starters

etc.; all in accordance with relevant drawings and

specification.

A Domestic water transfer pump set - DTP-O-31-1 to 3 (2

duty,1 standby) pump with standard accessories 7.5l/s @

1260kpa head

Set

B Domestic water transfer pump set - DTP-O-31-4 & 5 (1

duty,1 standby) pump with standard accessories 5l/s @

150kpa head

Set

C Domestic water transfer pump set - DTP-O-58-1 & 2 (2

duty,1 standby) pump with standard accessories 5l/s @

150kpa head each

Set

D Water booster pump set- DBP-O-58-1&2 (1duty, 1standby)

pump with standard accessories 1.3l/s @ 300kpa head with

1 no of hydro pnematic tank

Set

E Water booster pump set- DBP-O-58-3 & 4 (1duty, 1standby)

pump with standard accessories 2.8l/s @ 300kpa head with

1 no of hydro pheumatic tank.

Set

Heat exchanger pumps

Supply, install, test and commissioning heat exchanger

pumps with all related valves and final connection; all in

accordance with the drawings and specification.

F HE-0-31-1 & 2 (4l/s @ 220Kpa) Set

G HE-0-58-3 & 4 (4l/s @ 220Kpa) Set

Carried to Collection AED

MEP Tower BOQ-sample.xls - MECHANICAL WORK Page 37 of 81

Page 38: MEP Tower BOQ-sample

OFFICE TOWER

TOWER WORKS

BILL No: 2 - MECHANICAL WORK

Amount in AED

Project

Item

RefItem Description Unit Rate

MECHANICAL INSTALLATIONS (Cont'd)

SANITARY DRAINAGE

Above ground drainage pipe to uPVC pipe comply as

BS5255, BS4514 and fittings including supports,

brackets, hangers; all in accordance with the drawings

and specification.

Above Ground Pipes

A 32mm Diameter m

B 40mm Diameter m

C 50mm Diameter m

D 80mm Diameter m

E 100mm Diameter m

F 150mm Diameter m

G 200mm Diameter m

Kitchen waste pipe shall be cast iron hubless pipe

including supports, brackets, hangers; all in accordance

with the drawings and specification.

H 100mm Diameter m

J 150mm Diameter m

Install sanitarywares complete with all related fittings,

flexible and final support etc.; all in accordance with the

drawings and specification.

Sanitaryware Installation

K Wash basin mixer No

L Water closet hand sprayor No

M Urinal mixer No

N Kitchen sink No

P Janitor sink No

Carried to Collection AED

MEP Tower BOQ-sample.xls - MECHANICAL WORK Page 38 of 81

Page 39: MEP Tower BOQ-sample

OFFICE TOWER

TOWER WORKS

BILL No: 2 - MECHANICAL WORK

Amount in AED

Project

Item

RefItem Description Unit Rate

MECHANICAL INSTALLATIONS (Cont'd)

Fittings

Supply and installation of drainage fittings using cast

iron hubless including connection to pipe lines comply

to CSA B70 with all related accessories; all in

accordance with the drawings and specification.

Bends / Elbows

A 80mm Diameter No

B 100mm Diameter No

C 150mm Diameter No

D 200mm Diameter No

Tees / Reducers

E 80 x 80 x 80mm No

F 100 x 100 x 80mm No

G 100 x 100 x 100mm No

H 150 x 150 x 100mm No

J 150 x 150 x 150mm No

K 200 x 200 x 200mm No

Reducers

L 150 x 100mm No

Couplers

M 80mm Diameter No

N 100mm Diameter No

P 150mm Diameter No

Q 200mm Diameter No

Carried to Collection AED

MEP Tower BOQ-sample.xls - MECHANICAL WORK Page 39 of 81

Page 40: MEP Tower BOQ-sample

OFFICE TOWER

TOWER WORKS

BILL No: 2 - MECHANICAL WORK

Amount in AED

Project

Item

RefItem Description Unit Rate

MECHANICAL INSTALLATIONS (Cont'd)

Sanitary Drainage (Cont'd)

Drainage accessories

Sanitary drainage accessories complete with strainers

and all related accessories; all in accordance with the

drawings and specification.

Floor drains are stainless steel with cover

A 80mm Diameter No

B 100mm Diameter No

Floor traps are hopper top with heavy duty hinged

stainless steel cover & frame.

C 50mm Diameter No

Velocity breaker

D 80mm Diameter No

E 100mm Diameter No

F 150mm Diameter No

G 200mm Diameter No

Rodding Eye

H 80mm Diameter No

J 100mm Diameter No

K 150mm Diameter No

L 200mm Diameter No

Vent cowl

M 100mm Diameter No

N 200mm Diameter No

AEDCarried to Collection

MEP Tower BOQ-sample.xls - MECHANICAL WORK Page 40 of 81

Page 41: MEP Tower BOQ-sample

OFFICE TOWER

TOWER WORKS

BILL No: 2 - MECHANICAL WORK

Amount in AED

Project

Item

RefItem Description Unit Rate

MECHANICAL INSTALLATIONS (Cont'd)

Rain Water Pipe Works

Rain water pipe using Polypropylene of high density

polyethylene pipe inclduing supports, brackets,

hangers; all in accordance with the detailed drawings

and specification.

Pipe works

A 50mm Diameter m

B 100mm Diameter m

C 150mm Diameter m

D 200mm Diameter m

Fittings

Supply and installation of rain water pipe fittings using

polypropylene pipe fitting thermal fusion joint with all

related accessories; all in accordance with the drawings

and specification.

Bends

E 100mm Diameter No

F 150mm Diameter No

G 200mm Diameter No

Tees / Reducers

H 100 x 100 x 50mm No

J 150 x 150 x 50mm No

K 150 x 150 x 150mm No

L 200 x 200 x 50mm No

M 200 x 200 x 100mm No

N 200 x 200 x 200mm No

Carried to Collection AED

MEP Tower BOQ-sample.xls - MECHANICAL WORK Page 41 of 81

Page 42: MEP Tower BOQ-sample

OFFICE TOWER

TOWER WORKS

BILL No: 2 - MECHANICAL WORK

Amount in AED

Project

Item

RefItem Description Unit Rate

MECHANICAL INSTALLATIONS (Cont'd)

Rain water pipe fittings (Cont'd)

Couplers

A 100mm Diameter No

B 150mm Diameter No

C 200mm Diameter No

Rodding Eye

D 100mm Diameter No

E 150mm Diameter No

F 200mm Diameter No

Planter drain

G 50mm Diameter No

Rain water outlet / Roof drain

Final connection & testing and commissioning to rain

water pipe / roof drain incoordination with the rain water

contractor.

H 100mm Diameter No

J 150mm Diameter No

Carried to Collection AED

MEP Tower BOQ-sample.xls - MECHANICAL WORK Page 42 of 81

Page 43: MEP Tower BOQ-sample

OFFICE TOWER

TOWER WORKS

BILL No: 2 - MECHANICAL WORK

Amount in AED

Project

Item

RefItem Description Unit Rate

MECHANICAL INSTALLATIONS (Cont'd)

FIRE FIGHTING SYSTEM

Sprinkler Pipes

Fire fighting system pipe work with hot dip galvanized

steel comply to ASTM A 53 grade A & B for wet risers,

sprinkler risers including Abudhabi local defence

approval and civil defence approvals etc. with pipe and

fittings, suitable for working pressure; all in accordance

with the detailed drawings and specification.

A 25mm Diameter m

B 32mm Diameter m

C 40mm Diameter m

D 50mm Diameter m

E 65mm Diameter m

F 80mm Diameter m

G 100mm Diameter m

H 100mm Diameter (Drain pipe) m

J 150mm Diameter m

K 200mm Diameter m

L 250mm Diameter m

Carried to Collection AED

MEP Tower BOQ-sample.xls - MECHANICAL WORK Page 43 of 81

Page 44: MEP Tower BOQ-sample

OFFICE TOWER

TOWER WORKS

BILL No: 2 - MECHANICAL WORK

Amount in AED

Project

Item

RefItem Description Unit Rate

MECHANICAL INSTALLATIONS (Cont'd)

Fire Fighting System (Cont'd)

Fittings

Supply, install pipe fittings all in accordance with the

drawings and specification

Bends

A 100mm Diameter No

B 150mm Diameter No

Tees / Reducers

C 65 x 50 x 25mm No

D 65 x 50 x 32mm No

E 65 x 50 x 40mm No

F 65 x 50 x 50mm No

G 65 x 65 x 25mm No

H 65 x 65 x 32mm No

J 65 x 65 x 40mm No

K 65 x 65 x 50mm No

L 80 x 50 x 40mm No

M 80 x 65 x 25mm No

N 80 x 65 x 32mm No

P 80 x 65 x 40mm No

Q 80 x 65 x 50mm No

R 80 x 80 x 25mm No

S 80 x 80 x 32mm No

T 80 x 80 x 40mm No

U 80 x 80 x 50mm No

Carried to Collection AED

MEP Tower BOQ-sample.xls - MECHANICAL WORK Page 44 of 81

Page 45: MEP Tower BOQ-sample

OFFICE TOWER

TOWER WORKS

BILL No: 2 - MECHANICAL WORK

Amount in AED

Project

Item

RefItem Description Unit Rate

MECHANICAL INSTALLATIONS (Cont'd)

Fire Fighting System (Cont'd)

A 100 x 80 x 25mm No

B 100 x 80 x 32mm No

C 100 x 80 x 40mm No

D 100 x 80 x 50mm No

E 100 x 80 x 80mm No

F 100 x 100 x 25mm No

G 100 x 100 x 32mm No

H 100 x 100 x 40mm No

J 100 x 100 x 50mm No

K 100 x 100 x 80mm No

L 100 x 100 x 100mm No

M 100 x 100 x 150mm No

N 150 x 100 x 32mm No

P 150 x 100 x 40mm No

Q 150 x 150 x 25mm No

R 150 x 150 x 50mm No

S 150 x 150 x 65mm No

T 150 x 150 x 100mm No

U 150 x 150 x 150mm No

V 200 x 150 x 150mm No

W 200 x 200 x 150mm No

Carried to Collection AED

MEP Tower BOQ-sample.xls - MECHANICAL WORK Page 45 of 81

Page 46: MEP Tower BOQ-sample

OFFICE TOWER

TOWER WORKS

BILL No: 2 - MECHANICAL WORK

Amount in AED

Project

Item

RefItem Description Unit Rate

MECHANICAL INSTALLATIONS (Cont'd)

Fire Fighting System (Cont'd)

Sprinkler head quick response accessories

Sprinkler heads shall be of NFPA 13 and UL listed

A Exposed sprinkler head No

B Concealed sprinkler head No

C Royal flush sprinkler head No

D Cut-off sprinkler head No

Carried to Collection AED

MEP Tower BOQ-sample.xls - MECHANICAL WORK Page 46 of 81

Page 47: MEP Tower BOQ-sample

OFFICE TOWER

TOWER WORKS

BILL No: 2 - MECHANICAL WORK

Amount in AED

Project

Item

RefItem Description Unit Rate

MECHANICAL INSTALLATIONS (Cont'd)

Fire Fighting System (Cont'd)

Valves and Accessories

Supply, install valves and accessories with all supports,

with Iron gate bronze trim, rising stem, outside and yoke

and victaulic coupling etc., all in compliance with NFPA

and civil defence and shall be UL listed; all in

accordance with the drawings and specification.

Zone control Valve

A Flow switch No

Motorized stop valve

B 150mm Diameter No

Gate valve

C 32mm Diameter No

D 100mm Diameter No

E 150mm Diameter No

F 200mm Diameter No

Automatic air relief valve

G 100mm Diameter No

H 150mm Diameter No

J 200mm Diameter No

Sprinkler control valve

K 32mm Diameter No

L 100mm Diameter No

M 150mm Diameter No

N 200mm Diameter No

P 250mm Diameter No

Carried to Collection AED

MEP Tower BOQ-sample.xls - MECHANICAL WORK Page 47 of 81

Page 48: MEP Tower BOQ-sample

OFFICE TOWER

TOWER WORKS

BILL No: 2 - MECHANICAL WORK

Amount in AED

Project

Item

RefItem Description Unit Rate

MECHANICAL INSTALLATIONS (Cont'd)

Fire Fighting System (Cont'd)

Valves

A 200mm Diameter (Isolating valve) No

B 200mm Diameter (Throtting valve) No

Strainer

C 200mm Diameter No

D FLV No

Supply, install pressure reducing station and

accessories with all supports and PRV pressure gauge,

strainer, double regulating valve etc., all in accordance

with the drawings and specification.

Pressure reducing station

E 100mm Diameter No

F 150mm Diameter No

Carried to Collection AED

MEP Tower BOQ-sample.xls - MECHANICAL WORK Page 48 of 81

Page 49: MEP Tower BOQ-sample

OFFICE TOWER

TOWER WORKS

BILL No: 2 - MECHANICAL WORK

Amount in AED

Project

Item

RefItem Description Unit Rate

MECHANICAL INSTALLATIONS (Cont'd)

Fire Fighting System (Cont'd)

Accessories

A Wet riser landing valve, 150mm Diameter No

B Drain off valve, 100mm Diameter No

C Drain off valve, 150mm Diameter No

D Capped for tenant fitout No

Fire Extinguisher

E CO2 fire extinguisher capacity - 5Kg No

F Dry powder fire extinguisher capacity - 4Kg No

Fire hose cabinet

Fire hose cabinet includes landing valve with PRV, 40mm

Dia, 40m length hose shut-off type nozzle, set of portable

dry powder and CO2 fire extinguishers, automatic hose reel

with lock shield valve, PRV (typical) with stainless steel back

box and architrave suitable for surface mounting; all in

accordance with the drawings and specification

G Internal fire hose cabinet No

H External fire hose cabinet with extinguisher No

Carried to Collection AED

MEP Tower BOQ-sample.xls - MECHANICAL WORK Page 49 of 81

Page 50: MEP Tower BOQ-sample

OFFICE TOWER

TOWER WORKS

BILL No: 2 - MECHANICAL WORK

Amount in AED

Project

Item

RefItem Description Unit Rate

MECHANICAL INSTALLATIONS (Cont'd)

Fire Fighting System (Cont'd)

Fire Pump Set

Fire pump set complete with all piping, control panel

inter connections, controls, emergency stop push

button, and related accessories; all in accordance with

NFPA standard, detailed drawings and specification.

A Fire electric pump (FWP-O-31-1), flow 63l/s, head 2050kpa,

2950rpm, 245KW (duty pump) No

B Fire disel pump (FWP-O-31-2), flow 63l/s, head 2050kpa,

2950rpm, (standby pump) No

C Fire Jockey pump (FWP-O-31-1), flow 1.2l/s, head 2100kpa,

1450rpm, 5.5kw. No

D Allow for other miscellaneous work in connection with other

systems Item

Carried to Collection AED

MEP Tower BOQ-sample.xls - MECHANICAL WORK Page 50 of 81

Page 51: MEP Tower BOQ-sample

OFFICE TOWER

TOWER WORKS

BILL No: 2 - MECHANICAL WORK

Amount in AED

Project

Item

RefItem Description Unit Rate

MECHANICAL INSTALLATIONS (Cont'd)

Clean Agent Fire Suppression System (FM200)

Supply, Install, test and commissioning clean agent fire

suppression system complete with piping, control valve,

cylinders including all necessary fittings, supports, all

related accessories and fixing supports in compliance

with NFPA and civil defence approval; all in accordance

with the detailed drawings and specification.

A LV room at 31st floor level Item

B Allow for other miscellaneous work in connection with other

systems Item

Carried to Collection AED

MEP Tower BOQ-sample.xls - MECHANICAL WORK Page 51 of 81

Page 52: MEP Tower BOQ-sample

OFFICE TOWER

TOWER WORKS

BILL No: 2 - MECHANICAL WORK

Amount in AED

Project

Item

RefItem Description Unit Rate

MECHANICAL INSTALLATIONS (Cont'd)

HEATING AND VENTILATION AIR CONDITIONING

SYSTEM

Duct Work

Supply, install, test and commissioning galvanized steel

(1.2mm thick) comply with DW/142 & 144 and SMACNA

standard complete including supply of necessary

supports, accoustic linings & tubing vanes, flexible

connection, access doors and accessories; all in

accordance with the drawings and specification

A Fresh air duct m2

B Supply air duct m2

C Return air duct m2

D Exhaust duct m2

E Toilet exhaust air duct m2

F Stair pressurization duct m2

G Flexible duct - 250mm Dia m

Supply, install non inflamable layer of fiberglass

filament reinforced aluminium foil-backed blanket

including all necessary fixing material; all in accordance

with the drawings and specification

H Fresh air duct m2

J Supply air duct m2

K Return air duct m2

L Exhaust duct m2

M Toilet exhaust air duct m2

N Stair pressurization duct m2

Carried to Collection AED

MEP Tower BOQ-sample.xls - MECHANICAL WORK Page 52 of 81

Page 53: MEP Tower BOQ-sample

OFFICE TOWER

TOWER WORKS

BILL No: 2 - MECHANICAL WORK

Amount in AED

Project

Item

RefItem Description Unit Rate

MECHANICAL INSTALLATIONS (Cont'd)

HVAC system (Cont'd)

Supply, install, test and commissioning galvanized steel

(1.6mm thick) comply with DW/142 & 144 and SMACNA

standard complete including supply of necessary

supports, accoustic linings & tubing vanes, flexible

connection, access doors and accessories; all in

accordance with the drawings and specification.

A Fresh air duct (fire rated) m2

B Supply air duct (fire rated) m2

C Smoke exhaust duct m2

D stair case pressurization duct (fire rated) m2

E Kitchen exhaust air duct m2

Supply, install non inflamable layer of fiberglass

filament reinforced aluminium foil-backed blanket

including all necessary fixing material; all in accordance

with the drawings and specification.

F Fresh air duct (fire rated) m2

G Supply air duct (fire rated) m2

H Smoke exhaust duct m2

J stair case pressurization duct (fire rated) m2

K Kitchen exhaust air duct m2

Carried to Collection AED

MEP Tower BOQ-sample.xls - MECHANICAL WORK Page 53 of 81

Page 54: MEP Tower BOQ-sample

OFFICE TOWER

TOWER WORKS

BILL No: 2 - MECHANICAL WORK

Amount in AED

Project

Item

RefItem Description Unit Rate

MECHANICAL INSTALLATIONS (Cont'd)

HVAC system (Cont'd)

Fan coil units

Supply and install, testing and commissioning of fan

coil units with air vent, drain valve, test point, valves,

gauges, flexible connections, motorized ON/OFF valves,

thermostat, drain pan and related installation

accessories; all in accordance with drawings and

specification

FCU's

A FCU-0-7 to 30-1 No

B FCU-0-31-1 No

C FCU-0-32 to 57-1 No

D FCU-0-58-1 No

E FCU-0-59-1 No

F FCU-0-59-2 No

G FCU-0-59-3 No

H FCU-0-59-4 No

J FCU-0-59-5 No

K FCU-0-59-6 No

L FCU-0-59-7 No

M FCU-0-59-8 No

N FCU-0-59-9 No

P FCU-0-59-10 No

Q FCU-0-59-11 No

Carried to Collection AED

MEP Tower BOQ-sample.xls - MECHANICAL WORK Page 54 of 81

Page 55: MEP Tower BOQ-sample

OFFICE TOWER

TOWER WORKS

BILL No: 2 - MECHANICAL WORK

Amount in AED

Project

Item

RefItem Description Unit Rate

MECHANICAL INSTALLATIONS (Cont'd)

HVAC system (Cont'd)

Split Units

Supply and install, testing and commissioning of Split

units complete with outdoor units, air vent, drain valve,

test point, flexible connections, thermostat, drain pan

and related installation accessories; all in accordance

with drawings and specification.

A IU/OU-O-31-1 No

B IU/OU-O-31-2 No

C IU/OU-O-31-3 No

D IU/OU-O-60-1 No

E IU/OU-O-60-2 No

F IU/OU-O-60-3 No

Air handling units

Supply, install, test and commissioning of Air handling

units including manual air vent, test points, valves,

flexible connection, motiorized modulation valve and

themometer, drain pan, viberation isolator and related

installation accessories; all in accordance with the

drawings and specification.

AHU's

G AHU-O-7 to 29-1 No

H AHU-O-7 to 29-2 No

J AHU-O-30-1 No

K AHU-O-30-2 No

L AHU-O-31-1 No

M AHU-O-31-2 No

N AHU-O-31-3 No

P AHU-O-31-4 No

Q AHU-O-31-5 No

Carried to Collection AED

MEP Tower BOQ-sample.xls - MECHANICAL WORK Page 55 of 81

Page 56: MEP Tower BOQ-sample

OFFICE TOWER

TOWER WORKS

BILL No: 2 - MECHANICAL WORK

Amount in AED

Project

Item

RefItem Description Unit Rate

MECHANICAL INSTALLATIONS (Cont'd)

HVAC system (Cont'd)

Air handling units (Cont'd)

A AHU-O-31-6 No

B AHU-O-31-7 No

C AHU(HR)-O-31-1 No

D AHU(HR)-O-31-2 No

E AHU-O-32-1 No

F AHU-O-32-2 No

G AHU-O-33 to 56-1 No

H AHU-O-33 to 56-2 No

J AHU-O-57-1 No

K AHU-O-57-2 No

L AHU-O-58-1 No

M AHU-O-58-2 No

N AHU-O-58-3 No

P AHU-O-58-4 No

Q AHU-O-58-5 No

R AHU(HR)-O-58-1 No

S AHU-O-60-1 No

T AHU-O-60-2 No

U AHU-O-60-3 No

AEDCarried to Collection

MEP Tower BOQ-sample.xls - MECHANICAL WORK Page 56 of 81

Page 57: MEP Tower BOQ-sample

OFFICE TOWER

TOWER WORKS

BILL No: 2 - MECHANICAL WORK

Amount in AED

Project

Item

RefItem Description Unit Rate

MECHANICAL INSTALLATIONS (Cont'd)

HVAC system (Cont'd)

Pre-cool air handling units

Supply, install, test and commissioning of pre-cool air

handling units including manual air vent, test points,

valves, flexible connection, motiorized modulation valve

and themometer, drain pan, viberation isolator and

related installation accessories; all in accordance with

the drawings and specification.

A PAHU-O-31-1 No

B PAHU-O-31-2 No

C PAHU-O-31-3 No

D PAHU-O-31-4 No

E PAHU-O-31-5 No

F PAHU-O-58-1 No

G PAHU-O-58-2 No

H PAHU-O-58-3 No

Carried to Collection AED

MEP Tower BOQ-sample.xls - MECHANICAL WORK Page 57 of 81

Page 58: MEP Tower BOQ-sample

OFFICE TOWER

TOWER WORKS

BILL No: 2 - MECHANICAL WORK

Amount in AED

Project

Item

RefItem Description Unit Rate

MECHANICAL INSTALLATIONS (Cont'd)

HVAC system (Cont'd)

Fans

Supply, install, test and commissioning fans complete

with silencer, bell mouth, wire mesh; all in accordance

with the drawings and specification.

Extract air fan

A EAF-O-31-1 No

B EAF-O-31-2 No

C EAF-O-58-1 No

D EAF-O-58-2 No

Toilet Extract fan

E TEAF-O-31-1 No

F TEAF-O-31-2 No

G TEAF-O-58-1 No

Supply air fan

H SAF-O-31-1 No

J SAF-O-31-2 No

K SAF-O-31-3 No

L SAF-O-31-4 No

M SAF-O-58-1 No

N SAF-O-58-2 No

P SAF-O-58-3 No

Q SAF-O-58-4 No

Smoke extract fan

R SEF-O-31-1 No

S SEF-O-31-2 No

T SEF-O-58-1 No

U SEF-O-58-2 No

Carried to Collection AED

MEP Tower BOQ-sample.xls - MECHANICAL WORK Page 58 of 81

Page 59: MEP Tower BOQ-sample

OFFICE TOWER

TOWER WORKS

BILL No: 2 - MECHANICAL WORK

Amount in AED

Project

Item

RefItem Description Unit Rate

MECHANICAL INSTALLATIONS (Cont'd)

HVAC system (Cont'd)

Stair case pressurization fan

Supply, install, test and commissioning stair

pressurization fan all in accordance with civil defence

approval complete with silencer, bellmouth, wire mesh;

all in accordance with the detailed drawings and

specification.

A SPF-O-31-1 No

B SPF-O-31-2 No

C SPF-O-31-3 No

D SPF-O-31-4 No

E SPF-O-58-1 No

F SPF-O-58-2 No

G SPF-O-58-3 No

H SPF-O-58-4 No

Variable air volume

J VAV-O-7 to 30-1 (250x200) No

K VAV-O-7 to 30-2 (300x250) No

L VAV-O-7 to 30-3 (350x300) No

M VAV-O-32 to 57-1 (250x200) No

N VAV-O-32 to 57-2 (300x250) No

P VAV-O-32 to 57-3 (350x300) No

Q VAV-O-58-1 (250x200) No

R VAV-O-58-2 (250x200) No

Carried to Collection AED

MEP Tower BOQ-sample.xls - MECHANICAL WORK Page 59 of 81

Page 60: MEP Tower BOQ-sample

OFFICE TOWER

TOWER WORKS

BILL No: 2 - MECHANICAL WORK

Amount in AED

Project

Item

RefItem Description Unit Rate

MECHANICAL INSTALLATIONS (Cont'd)

HVAC system (Cont'd)

Grills

Supply and Installation of duct grills comply with

BS5750 and BS476 complete with installation

accessories; all in accordance with the drawings and

specification.

Supply grille (Double deflection)

A 200 x 200mm No

B 400 x 200mm No

C 900 x 350mm No

D 1000 x 500mm No

Supply grille (Fixed blade)

E 250 x 200mm No

F 500 x 750mm No

G 1000 x 500mm No

H 1250 x 1750mm No

Eggcrate grille

J 125 x 125 mm No

K 150 x 150 mm No

L 200 x 200 mm No

M 450 x 450 mm No

N 1000 x 350 mm No

P 1250 x 400 mm No

Q 1500 x 500 mm No

R 2400 x 900 mm No

Carried to Collection AED

MEP Tower BOQ-sample.xls - MECHANICAL WORK Page 60 of 81

Page 61: MEP Tower BOQ-sample

OFFICE TOWER

TOWER WORKS

BILL No: 2 - MECHANICAL WORK

Amount in AED

Project

Item

RefItem Description Unit Rate

MECHANICAL INSTALLATIONS (Cont'd)

HVAC system (Cont'd)

Diffuser

Supply, install test and commissioning the supply and

return air diffusers with dampers and of aluminium

construction and related installation accessories; all in

accordance with the schedule and specification.

Supply air diffuser with four way throw, square louvered

A 450 x 450mm No

1200mm length and 25mm each slot linear diffuser

B One slot diffuser No

C Three slot diffuser No

Return air intake louvres

D 4000 x 425mm No

Dampers

Supply, install, test and commissioning dampers

consist of Galvanized steel complete with all related

supports and accessories; all inaccordance with

detailed drawings and specification

Volume control dampers

E 150 x 150mm No

F 200 x 200mm No

G 250 x 200 mm No

H 300 x 300mm No

J 500 x 500mm No

K 500 x 750mm No

L 1700 x 1000mm No

M 200mm dia No

Carried to Collection AED

MEP Tower BOQ-sample.xls - MECHANICAL WORK Page 61 of 81

Page 62: MEP Tower BOQ-sample

OFFICE TOWER

TOWER WORKS

BILL No: 2 - MECHANICAL WORK

Amount in AED

Project

Item

RefItem Description Unit Rate

MECHANICAL INSTALLATIONS (Cont'd)

HVAC system (Cont'd)

Dampers

Supply, install, test and commissioning dampers

consist of Galvanized steel complete with all related

supports and accessories; all inaccordance with

detailed drawings and specification

Fire dampers

A 125 x 125 mm No

B 150 x 100mm No

C 200 x 200 mm No

D 250 x 200 mm No

E 300 x 250 mm No

F 350 x 300 mm No

G 400 x 200 mm No

H 450 x 450mm No

J 800 x 500 mm No

K 1000 x 500 mm No

L 1500 x 400 mm No

M 1900 x 1100 mm No

N 2000 x 1000 mm No

P 2400 x 500 mm No

Q 2500 x 1250 mm No

R 2500 x 1500 mm No

Carried to Collection AED

MEP Tower BOQ-sample.xls - MECHANICAL WORK Page 62 of 81

Page 63: MEP Tower BOQ-sample

OFFICE TOWER

TOWER WORKS

BILL No: 2 - MECHANICAL WORK

Amount in AED

Project

Item

RefItem Description Unit Rate

MECHANICAL INSTALLATIONS (Cont'd)

HVAC system (Cont'd)

Motorized damper

A 300 x 300 mm No

B 500 x 500 mm No

C 800 x 500 mm No

D 1000 x 450 mm No

E 1000 x 500 mm No

F 1200 x 1000 mm No

G 1250 x 450 mm No

H 1500 x 400 mm No

J 1500 x 1250 mm No

K 1600 x 1100 mm No

L 1700 x 1000 mm No

M 1750 x 1250 mm No

N 2000 x 800 mm No

P 2000 x 1000 mm No

Q 2400 x 500 mm No

R 2500 x 1500 mm No

Carried to Collection AED

MEP Tower BOQ-sample.xls - MECHANICAL WORK Page 63 of 81

Page 64: MEP Tower BOQ-sample

OFFICE TOWER

TOWER WORKS

BILL No: 2 - MECHANICAL WORK

Amount in AED

Project

Item

RefItem Description Unit Rate

MECHANICAL INSTALLATIONS (Cont'd)

HVAC system (Cont'd)

Motorized fire smoke damper

A 1000 x 300 mm No

B 1100 x 900 mm No

C 1700 x 350 mm No

D 2000 x 800 mm No

E 2750 x 1250 mm No

Sound Attenuator / Silencer of stainless steel

construction

F 3475 x 525mm No

Constant air volume

G Constant air volume box (1200 l/s) No

H Constant air volume box (1600 l/s) No

J Constant air volume box (2100 l/s) No

K Constant air volume box (2300 l/s) No

Duct detector

Supply and installation of duct smoke detectors

complete with all related accessories; all in accordance

with the drawings and specification

L Duct smoke detector No

Carried to Collection AED

MEP Tower BOQ-sample.xls - MECHANICAL WORK Page 64 of 81

Page 65: MEP Tower BOQ-sample

OFFICE TOWER

TOWER WORKS

BILL No: 2 - MECHANICAL WORK

Amount in AED

Project

Item

RefItem Description Unit Rate

MECHANICAL INSTALLATIONS (Cont'd)

HVAC system (Cont'd)

Chilled Water Pipe Work

Supply, install, test and commissioning chilled water

pipe work, schedule 40, black mild steel pipe to BS 1387

: 1985 complete with finishes, jacketing, fittings, test

points, supports, hangers and related accessories; all in

accordance with the drawings and specification.

Piping to BS1387 steel heavy grade black, screwed

taper threads

A 25mm Diameter m

B 32mm Diameter m

C 40mm Diameter m

D 50mm Diameter m

Piping to BS1387 steel heavy grade black, welded joints,

bevelled ends.

E 65mm Diameter m

F 80mm Diameter m

G 100mm Diameter m

H 125mm Diameter m

J 150mm Diameter m

K 200mm Diameter m

L 250mm Diameter m

M 300mm Diameter m

N 350mm Diameter m

P 400mm Diameter m

Q 450mm Diameter m

Carried to Collection AED

MEP Tower BOQ-sample.xls - MECHANICAL WORK Page 65 of 81

Page 66: MEP Tower BOQ-sample

OFFICE TOWER

TOWER WORKS

BILL No: 2 - MECHANICAL WORK

Amount in AED

Project

Item

RefItem Description Unit Rate

MECHANICAL INSTALLATIONS (Cont'd)

HVAC system (Cont'd)

Chilled water pipe work insulation

Supply, install, test and commissioning chilled water

pipe work insulation complete with phenolic foam

including finishes and fastening, vapour barriers,

sheating, adhesives and related accessories; all in

accordance with the drawings and specification.

A 450mm Diameter m

Fittings

Supply and install chilled water pipe fittings comply

with BS143 and BS1246 including flanged welded to

black steel and related accessories; all in accordance

with the drawings and specification.

Bends

B 65mm Diameter No

C 80mm Diameter No

D 100mm Diameter No

E 125mm Diameter No

F 150mm Diameter No

G 200mm Diameter No

H 250mm Diameter No

J 450mm Diameter No

Carried to Collection AED

MEP Tower BOQ-sample.xls - MECHANICAL WORK Page 66 of 81

Page 67: MEP Tower BOQ-sample

OFFICE TOWER

TOWER WORKS

BILL No: 2 - MECHANICAL WORK

Amount in AED

Project

Item

RefItem Description Unit Rate

MECHANICAL INSTALLATIONS (Cont'd)

HVAC system (Cont'd)

Tee / Reducers

A 80 x 80 x 65mm No

B 80 x 80 x 50mm No

C 100 x 65 x 65mm No

D 125 x 80 x 65mm No

E 125 x 80 x 100mm No

F 150 x 150 x 65mm No

G 150 x 80 x 80mm No

H 150 x 150 x 65mm No

J 100 x 80 x 50mm No

K 100 x 100 x 40mm No

L 100 x 100 x 80mm No

M 150 x 150 x 25mm No

N 150 x 150 x 40mm No

P 150 x 150 x 50mm No

Q 150 x 150 x 65mm No

R 150 x 150 x 80mm No

S 150 x 150 x 125mm No

T 150 x 150 x 150mm No

U 200 x 150 x 150mm No

V 200 x 200 x 125mm No

W 200 x 200 x 150mm No

X 250 x 250 x 200mm No

Y 450 x 450 x 150mm No

Z 450 x 450 x 200mm No

Carried to Collection AED

MEP Tower BOQ-sample.xls - MECHANICAL WORK Page 67 of 81

Page 68: MEP Tower BOQ-sample

OFFICE TOWER

TOWER WORKS

BILL No: 2 - MECHANICAL WORK

Amount in AED

Project

Item

RefItem Description Unit Rate

MECHANICAL INSTALLATIONS (Cont'd)

HVAC system (Cont'd)

Reducers

A 100 x 80mm No

B 80 x 40mm No

C 80 x 50mm No

D 200 x 80mm No

E 200 x 125mm No

F 250 x 80mm No

G 250 x 100mm No

H 250 x 125mm No

J 250 x 200mm No

Coupling

K 65mm dia No

L 80mm dia No

M 100mm dia No

N 125mm dia No

P 150mm dia No

Q 200mm dia No

R 250mm dia No

S 300mm dia No

T 350mm dia No

U 400mm dia No

V 450mm dia No

Carried to Collection AED

MEP Tower BOQ-sample.xls - MECHANICAL WORK Page 68 of 81

Page 69: MEP Tower BOQ-sample

OFFICE TOWER

TOWER WORKS

BILL No: 2 - MECHANICAL WORK

Amount in AED

Project

Item

RefItem Description Unit Rate

MECHANICAL INSTALLATIONS (Cont'd)

HVAC system (Cont'd)

Condensate drain pipe

Supply and install condensate drain pipe with insulation

comply with BS2871 complete with all related

accessories and supports; all in accordance with the

drawings and specification.

Copper pipe

A 15mm Diameter m

B 25mm Diameter m

C 32mm Diameter m

uPVC pipe

D 100mm Diameter m

E Allow for condensate drain insulation which necessary to

prevent condensation m

Fittings

Supply and install condensate drain pipe fittings uPVC

and all related accessories; all in accordance with the

drawings and specification.

Couplings

F 100mm Diameter No

Tee / Reducers

G 100 x 100 x 25mm No

H 100 x 100 x 32mm No

Carried to Collection AED

MEP Tower BOQ-sample.xls - MECHANICAL WORK Page 69 of 81

Page 70: MEP Tower BOQ-sample

OFFICE TOWER

TOWER WORKS

BILL No: 2 - MECHANICAL WORK

Amount in AED

Project

Item

RefItem Description Unit Rate

MECHANICAL INSTALLATIONS (Cont'd)

HVAC system (Cont'd)

Valves and Accessories

Supply, install valves and accessories with all supports,

fixing and fittings; all in accordance with the detailed

drawings and specification.

Isolating Valves shall be bronze body comply with BS

5154

A 40mm Diameter No

Isolating Valves shall be cast iron body comply with

BS5150

B 100mm Diameter No

C 250mm Diameter No

Automatic air vent shall be bronze type

D 32mm Diameter No

450mm Diameter at 31st floor level

E Butterfly valve No

F Isolating valve No

G Temerature gauge No

H Pressure gauge No

J Y - Strainer No

Carried to Collection AED

MEP Tower BOQ-sample.xls - MECHANICAL WORK Page 70 of 81

Page 71: MEP Tower BOQ-sample

OFFICE TOWER

TOWER WORKS

BILL No: 2 - MECHANICAL WORK

Amount in AED

Project

Item

RefItem Description Unit Rate

MECHANICAL INSTALLATIONS (Cont'd)

HVAC system (Cont'd)

Plate heat exchanger

Supply, install liquid plate exchanger comply with

ASHRAE, NEC standards and complete with necessary

connection piping, valves, gauges, thermometers,

strainers and accessories including supports, controls

as per detailed drawings, schedule and specification.

A HE - O - 31 - 1 (3050KW) No

B HE - O - 31 - 2 (3050KW) No

C HE - O - 31 - 3 (3050KW) No

D HE - O - 31 - 4 (302KW) No

E HE - O - 31 - 5 (302KW) No

F HE - O - 58 - 1 (302KW) No

G HE - O - 58 - 2 (302KW) No

Heat Recovery Pump

Supply and installation of the heat recovery pumps

complete with all necessary supports, compounents

and accessories etc., all in accordance with the

drawings and specification.

H HRP-O-31-1 of 4.5l/s @ 200kpa head No

J HRP-O-31-2 of 4.6l/s @ 200kpa head No

K HRP-O-58-1 of 5.9l/s @ 200kpa head No

Carried to Collection AED

MEP Tower BOQ-sample.xls - MECHANICAL WORK Page 71 of 81

Page 72: MEP Tower BOQ-sample

OFFICE TOWER

TOWER WORKS

BILL No: 2 - MECHANICAL WORK

Amount in AED

Project

Item

RefItem Description Unit Rate

MECHANICAL INSTALLATIONS (Cont'd)

HVAC system (Cont'd)

Chilled water pumps

Supply, install, test and commissioning chilled water

pumps complete with control panel valves, instruments,

gauges, strainers etc., all in accordance with the

drawings and specification.

Secondary chilled water pump of 89l/s @ 350kPa head at

31st floor level

A SCHWP-O-31-1 (Duty) No

B SCHWP-O-31-2 (Duty) No

C SCHWP-O-31-3 (Standby) No

Carried to Collection AED

MEP Tower BOQ-sample.xls - MECHANICAL WORK Page 72 of 81

Page 73: MEP Tower BOQ-sample

OFFICE TOWER

TOWER WORKS

BILL No: 2 - MECHANICAL WORK

Amount in AED

Project

Item

RefItem Description Unit Rate

MECHANICAL INSTALLATIONS (Cont'd)

GAS Installation

NOTE: The LPG gas distribution network including

pipes,fittings and accessories shall be in accordance with

standard specificaiton

The contractor is to include with in his pipe work rates

for pipe-fittings and for providing tee connections with a

standard intervals and end caps; all in accordance with

the drawings and specificaiton.

Pipes & fittings

Supply and installation of Copper gas pipe including

supply and installation of fittings.

A 100mm Diameter m

Gate valve shall be iron body comply with BS5154

B 100mm Diameter No

Meters

C Gas meter No

Blanked off connection with Isolating valve

D 100mm Diameter No

Accessories / Fittings

Supply and installation of accessories / fittings all in

accordance witih the drawings and specification.

Bends

E 150mm Diameter No

Couplers

F 100mm Diameter No

Carried to Collection AED

MEP Tower BOQ-sample.xls - MECHANICAL WORK Page 73 of 81

Page 74: MEP Tower BOQ-sample

OFFICE TOWER

TOWER WORKS

BILL No: 2 - MECHANICAL WORK

Amount in AED

Project

Item

RefItem Description Unit Rate

MECHANICAL INSTALLATIONS (Cont'd)

Building Management System

Supply, install permanent wiring system complete with

termination and all related accessories; all in

accordance with the schedule, drawings and

specification.

Containment and cabling

Electrical

A MSB & EMSB No

B SD & ESB No

C MCP & MCC No

D DB & EDB No

Control panels

E Sub alarm panel No

Pumps

F Transfer water pumps No

G Booster pump No

H Fire fighting pump No

J Chilled water pumps No

K Heat recovery pumps No

L Plate heat exchanger No

M Water tank No

N Cold water meter No

P Gas system meter No

Carried to Collection AED

MEP Tower BOQ-sample.xls - MECHANICAL WORK Page 74 of 81

Page 75: MEP Tower BOQ-sample

OFFICE TOWER

TOWER WORKS

BILL No: 2 - MECHANICAL WORK

Amount in AED

Project

Item

RefItem Description Unit Rate

MECHANICAL INSTALLATIONS (Cont'd)

Building Management System (Cont'd)

HVAC system

A Exhaust air fan No

B Toilet extract fans No

C Supply air fans No

D Smoke extract fans No

E Constant volume box No

F Staircase pressurization fans No

G Variable air volume units No

H AHU's No

J PAHU's No

K FCU's No

Carried to Collection AED

MEP Tower BOQ-sample.xls - MECHANICAL WORK Page 75 of 81

Page 76: MEP Tower BOQ-sample

OFFICE TOWER

TOWER WORKS

BILL No: 2 - MECHANICAL WORK

Amount in AED

Project

Item

RefItem Description Unit Rate

MECHANICAL INSTALLATIONS (Cont'd)

Building Management System (cont'd)

Supply, install accessories as per the BMS point

schedule complete with testing and commissioning of

the system and all related accessories; all in

accordance with the drawings and specification.

Accessories / Equipments

Electrical

A MSB & EMSB No

B SD & ESB No

C MCP & MCC No

D DB & EDB No

Control panels

E Sub alarm panel No

Pumps

F Transfer water pumps No

G Booster pump No

H Fire fighting pump No

J Chilled water pumps No

K Heat recovery pumps No

L Plate heat exchanger No

M Water tank No

N Cold water meter No

P Gas system meter No

Carried to Collection AED

MEP Tower BOQ-sample.xls - MECHANICAL WORK Page 76 of 81

Page 77: MEP Tower BOQ-sample

OFFICE TOWER

TOWER WORKS

BILL No: 2 - MECHANICAL WORK

Amount in AED

Project

Item

RefItem Description Unit Rate

MECHANICAL INSTALLATIONS (Cont'd)

Building Management System (Cont'd)

HVAC system

A Exhaust air fan No

B Toilet extract fans No

C Supply air fans No

D Smoke extract fans No

E Constant volume box No

F Staircase pressurization fans No

G Variable air volume units No

H AHU's No

J PAHU's No

K FCU's No

HVAC system Equipments

L Remote programmable unit No

M Allow for soft ware, field sensors, actuators, net controller,

Management station central equipment and all related

accessories etc., all in accordance with the specification and

drawings. Item

Carried to Collection AED

MEP Tower BOQ-sample.xls - MECHANICAL WORK Page 77 of 81

Page 78: MEP Tower BOQ-sample

OFFICE TOWER

TOWER WORKS

BILL No: 2 - MECHANICAL WORK

Amount in AED

Project

Item

RefItem Description Unit Rate

MECHANICAL INSTALLATIONS (Cont'd)

SUNDRY / GENERAL ITEMS

A Allow for permits, fees, inspection associated with the

electrical installation by utility and statutory authorities Item

B Allow for testing and commissioning and production of third

party test certificates Item

C Allow for all identification labels, plates, charts and

identification of plant, equipment, pipes and the like all in

accordance with specification Item

D Allow for preparing schedule of manufacturers

recommended tools and spare parts for each piece of

equipment. Item

E Allow for fire stopping in accordance with the drawings

specification and local authorities requirements, Item

F Allow for instructing selected employer's personnel on all

aspects of the operation of systems and equipment Item

GAllow for the provision of operating / maintenance manuals

Item

H Allow for providing shop, co-ordination and "as-built"

drawings Item

J Option for contractor to provide two (2) years maintenance

to all electrical systems. Item

KThe contractor shall list here other items not included above

but included in the Specifications and/or drawings and

necessary for the complete and satisfactory completion of

this section of the Works. Such items shall be deemed to be

included unless specified.Item

………………………………………….

Carried to Collection AED

MEP Tower BOQ-sample.xls - MECHANICAL WORK Page 78 of 81

Page 79: MEP Tower BOQ-sample

OFFICE TOWER

TOWER WORKS

BILL No: 2 - MECHANICAL WORK

Amount in AED

Project

Item

RefItem Description Unit Rate

MECHANICAL INSTALLATIONS (Cont'd)

Collection

Page 01

Page 02

Page 03

Page 04

Page 05

Page 06

Page 07

Page 08

Page 09

Page 10

Page 11

Page 12

Page 13

Page 14

Page 15

Page 16

Page 17

Page 18

Page 19

Page 20

Page 21

Page 22

Page 23

Page 24

Page 25

CARRIED FORWARD AED

MEP Tower BOQ-sample.xls - MECHANICAL WORK Page 79 of 81

Page 80: MEP Tower BOQ-sample

OFFICE TOWER

TOWER WORKS

BILL No: 2 - MECHANICAL WORK

Amount in AED

Project

Item

RefItem Description Unit Rate

MECHANICAL INSTALLATIONS (Cont'd)

Collection

Brought forward Page 50

Page 26

Page 27

Page 28

Page 29

Page 30

Page 31

Page 32

Page 33

Page 34

Page 35

Page 36

Page 37

Page 38

Page 39

Page 40

Page 41

Page 42

Page 43

Page 44

Page 45

Page 46

Page 47

Page 48

Page 49

AED CARRIED TO SUMMARY

MEP Tower BOQ-sample.xls - MECHANICAL WORK Page 80 of 81

Page 81: MEP Tower BOQ-sample

1 Bill 1 - ELECTRICAL WORK

2 Bill 2 - MECHANICAL WORK

TOTAL CARRIED TO FINAL SUMMARY AED

OFFICE TOWER - Tower Works

Description

PODIUMS SUMMARY

SectionAmount

(AED)

MEP Tower BOQ-sample.xls - SUMMARY Page 81 of 81