  1. 1. Melvyn Bolus JP DipEngPrac BE(Mech)Hons MBA CPEng PMP NPER RPEQ MIEAust Professional Portfolio
  2. 2. High speed Inter-Urban Driverless Metro Light Rail Monorail Locomotive
  3. 3. Project Responsibilities: Project Engineer Rolling Stock C-Train, MTR WIL Hong Kong S-Train, MTR SIL(E) Hong Kong Test & Commissioning Engineer Waratah Train, Sydney Validation & Verification Manager Millennium Train, Sydney Metro Trains, Melbourne Namma Metro, Bangalore Yarra Trams, Melbourne Warranty Engineer QR IMU, Brisbane QR and PN Locos, Jilalan Rapid KL Metro, Malaysia Skytrain, Vancouver Las Vegas Monorail Istanbul and Manila LRT Tehran Bus Rapid Transit Brazil SuperVia Project Design Manager MetroLink, Los Angeles Project Engineer Class 395 Javelin, UK Mechanical Design Engineer Hunter Valley Locomotive Taipei and Delhi Metro MTR TCL Hong Kong Bushmaster, Iraq Rolling Stock Engineer Trainee OSCARs, New South Wales Tangara, New South Wales XPT and Xplorer, New South Wales Currently Delivering the S-Train: Hong Kongs First Fully Automatic Operation (FAO) Driverless Train Initiating Planning Executing Monitoring Closing
  4. 4. Test & Commissioning Engineer 78 Trains AUD 3.6B total value My Accomplishments: Initiated, Planned, Executed, Monitored, Controlled and Closed the Re-Qualification Type Test program on time Co-ordinated T&C, Production, Operations and Client activities during the Re-Qualification Type Test Achieved Static Vehicle and Vehicle-Vehicle Swing compliance Achieved Ride Performance and Dynamic Kinematic compliance Tested and Commissioned Set A80 the final set of the Waratah Train Project on time Dynamic Testing on the Sydney Network Manage the Re-Qualification Type Tests
  5. 5. $1m total asset worth 8-week Schedule Restricted budget of $400K My Accomplishments: Developed Project Integration with all Sigma and Knorr- Bremse stakeholders Managed 30 contractors during the dismantle, relocation and re-construction of R&D Centre Established management plans for Quality, Safety, Environment and Risk Achieved ZERO injuries during Relocation project Finalised the Relocation Project on time and within budget Technical Procurement Project Management
  6. 6. Supervised Contractors on Construction Site Defined Project Scope with all Stakeholders Conducted Technical Procurement Activities Established Plans for Quality, Environment, Safety and Risk Developed and Monitored Timing and Budget Developed Project Integration Relocation Management
  7. 7. Warranty Engineer 288 saloon HVACs AUD 10M total value My Accomplishments: Supported our customer to deliver 35 new trains into revenue service Managed retrofit activities in a dynamic rail depot environment Worked autonomously in Kuala Lumpur, Malaysia Created new OHS procedures for train and HVAC lock-out Established new partnership of warranty provider in Malaysia Product Life Cycle Management Safety Focus
  8. 8. Mobilised subcontractors Responded to customers issue Performed Root Cause Analysis and determined immediate solution Devised cost effective engineering solutions Manage costs, procurement and program Monitored and Tracked progress Retrofit Management
  9. 9. Project Design Manager 218 saloon HVACs US9M total value My Accomplishments: Innovated the design of 1.6m tall HVAC Unit Achieved supply airflow and noise requirements against a duct static pressure of 370Pa Managed two separate project teams in Sydney and Milwaukee Supervised construction of a 400m3 1:1 mock-up of the MetroLink Train Established new partnership of serial production subcontractor in the US Project Design Management Team Leadership
  10. 10. Developed project integration and managed people Scoped Project and managed Contract
  11. 11. Managed cost and procurement Managed time and progress Managed risk Managed quality Managed environmental activity
  12. 12. Developed tender specifications Commissioned water test facility 1:1 Wooden Scale HVAC Mock-up 1:1 Wooden Scale Train Mock-up Replicated customer duct design Construction Management
  13. 13. Project Engineer 53 drivers cabin HVACs 1.2M total value My Accomplishments: Innovated the climate control of the drivers cab to max. vehicle speed of 225 km/h Designed a rugged rail-worthy 5 kW air conditioning Unit no greater than 0.4 m3 and complying to stringent International Standards Achieved fresh air flow to the cabin at 1200Pa below atmospheric pressure Overcame pressure pulses of up to 4000Pa created by entering tunnels and passing trains Major Component Selection Engineering Design
  14. 14. Prototype Development Type Testing Shock & Vibration Electromagnetic CompatibilityNoise Testing End of Line Testing Full Car Climate Testing Validation and Verification
  15. 15. Identified excessive negative pressure @ fresh air intake Drew Conclusions Made Recommendations Devised Test Plan Designed Scale Model Supervised ConstructionLed the First Article InspectionDeveloped Test System Research & Development
  16. 16. Melvyn Bolus Email: [email protected] LinkedIn: au.linkedin.com/in/melvynbolus/ Twitter: @MelvynBolus