DURING DEMOLITION WORK, ALL MECHANICAL SYSTEMS AND BUILDING SERVICES SERVING
OCCUPIED AREAS. SHALL BE MAINTAINED OPERATIONAL. WHERE SYSTEM OR SERVICE
INTERRUPTIONS ARE REQUIRED, COORDINATE AFTER HOUR ACCESS REQUIREMENTS AND
SECURITY EXECUTE WORK WITH CONSTRUCTION MANAGER.
INSULATE NEW DUCT AND PIPE CAPS.
SUPPLY AIR DUCTWORK AND PIPING NOT SHOWN HATCHED IS TO BE RETAINED, ANY DAMAGE
TO EXISTING INSULATION AND DUCTS TO BE REPAIRED TO MATCH EXISTING.
DEMOLITION OF EXTERIOR AND INTERIOR WALLS, ROOF CEILING AND FLOORS TO BE
SEQUENCED WITH THE OWNER. IN AREAS WHERE ADJACENT OCCUPANCIES ARE
NOT IN THE DEMOLITION AREA BUT AFFECTED BY NOISE OF DEMOLITION, OR WHERE TRADE REQUIRES ACCESS TO EXISTING OCCUPIED SPACES, CONTRACTOR SHALL COORDINATE TIMES OF
WORK THROUGH THE OWNER.
DEMOLISHED WORK SHALL INCLUDE FOR TEMPORARY AND PERMANENT WORK (I.E. SERVICE DIMENSIONS) REQUIRED TO KEEP ACTIVE PREMISES IN OPERATION. COORDINATE TIMES,
ACCESS, TEMPORARY HOARDING, TEMPORARY SCAFFOLDING, TOOL/LIGHT POWER REQUIREMENTS AND
OTHER MISCELLANEOUS ITEMS NEEDED TO COMPLETE WORK WITH GENERAL CONTRACTOR
IN OCCUPIED AREA AT NIGHT OR IN ACCORDANCE WITH THE OWNER APPROVED SCHEDULE.
INCLUDE FOR DISPOSAL (FROM SITE) OF ALL REMOVED EQUIPMENT AND SERVICES,
DUCTWORK, PIPING, PLUMBING, ETC. INCLUDING INSULATION AND HANGERS.
MECHANICAL TRADES BIDDING DEMOLITION WORK SHALL ALLOW FOR A FULL DAY ON SITE TO REVIEW EXISTING MECHANICAL SERVICES AND EQUIPMENT IN DEMOLITION AND RENOVATED
PATCH AND MAKE GOOD (TO BASE BUILDING STANDARDS) MECHANICAL COMPONENTS AND
FINISHES DAMAGED DURING THE RENOVATION. PROVIDE INSULATED CAPPED CURBS EQUAL
TO OR BETTER THAN ROOF R-VALUE FOR FANS, GOOSE NECK OPENINGS AND VENTS BEING
ADDED AND REMOVED.
GENERAL DEMOLITION NOTES:
6.
4.
5.
3.
2.
1.
AREAS. ACCESS WILL BE GIVEN TO ROOF AND EXISTING MECHANICAL AND ELECTRICAL ROOMS
AS REQUIRED. SEE TENDER FORM FOR DATE OF MANDATORY SITE MEETING.
7.
8.
MECHANICAL LEGEND
LIST OF ABBREVIATIONS AND CONTROLS
COMPLETE WITH
EXHAUST AIRE/A
C/W
NOT TO SCALENTS
OUTSIDE AIRO/A
RETURN AIRR/A
RAIN WATER LEADERRWL
SUPPLY AIRS/A
TOP OF DUCTT.O.D.
TOP OF PIPET.O.P.
UNDERSIDE OF DUCTU.O.D.
UNDERSIDE OF PIPEU.O.P.
UNDERSIDEU/S
ABOVE FINISHED FLOORAFF
FROM ABOVE, TO ABOVEF/A, T/A
FROM BELOW, TO BELOWF/B, T/B
DOWNDN
FIRE RESISTANCE RATEDFRR
UNLESS NOTED OTHERWISEU.N.O.
CONNECT TO EXISTINGCTE
PLUMBING FIXTURE TAG
SANITARY DRAIN
STORM DRAIN
VENT PIPE
DOMESTIC COLD WATER
DOMESTIC HOT WATER
DOMESTIC HOT WATER RECIRC
FLOOR/ ROOF/ HUB/ AREA DRAIN
CLEAN OUT CO
?
?
RETURN LINE
EXISTING SERVICE
SUPPLY LINE
REMOVED SERVICE
RELOCATED ITEM
LIST OF SYMBOLS AND SERVICES
REMOVE ITEM
XXXS
STW
SAN
V
XXXR
P & T RELIEF VALVE
SHUT OFF VALVE
CHECK VALVE
UNION OR FLANGE
STRAINER -Y OR BASKET
AUTOMATIC AIR VENT
PIPE ELBOW RISER / DROP
CAP OR PLUG
BALANCING VALVE
PLUG VALVE
3-WAY CONTROL VALVE PRESSURE REDUCING VALVE
AUTOFLOW CONTROL VALVE
PRESSURE GAUGE
THERMOMETER
FLEXIBLE CONNECTION
REDUCED PRESSURE BACKFLOWASSEMBLY
PUMP
PIPE ANCHOR
PIPE GUIDE
GLOBE VALVE
SUPERVISED VALVE
2-WAY CONTROL VALVEM
S
DOUBLE CHECK VALVE ASSEMBLY
M
STACK UP/ DOWN
PIPE TEE DOWN
AAV
RPBADCVA
EQUIPMENT TAG
BALANCING DAMPER
SUPPLY OUTLET
RETURN OR EXHAUST INLET
STANDARD BRANCH
-
DUCTWORK
S/A OR O/A DUCTTO OR FROM ABOVE
S/A OR O/A DUCTTO OR FROM BELOW
R/A OR E/A DUCTTO OR FROM ABOVE
R/A OR E/A DUCTTO OR FROM BELOW
BD
ROUND DUCT DROP
ROUND DUCT RISERSINGLE LINE BRANCH
HEATING/COOLING COIL +/-
T 604.687.1800www.integralgroup.com
Vancouver BC Canada V6C 1S4Suite 180 - 200 Granville Street
Project Reference No: 151366.002
DWG. NO. TITLE SCALE
M-01 TITLE SHEET NTS
M-02 PLANT ROOM PLAN - DEMO 1/4"=1'-0"
M-03 PLANT ROOM PLAN - NEW 1/4"=1'-0"
M-04 HYDRONIC SCHEMATIC - DEMO NTS
M-05 HYDRONIC SCHEMATIC - NEW NTS
M-06 SCHEDULES NTS
M-07 DETAILS NTS
XDHWT-1
XP1-3
XP1-4
52"x20" S/A DUCT
XP2-2
XP2-1
XP1-2
XB1-1
XB1-3
RPBP
XDHWT-1
LADDER TO
MEZZANINE
52"x20" S/A DUCT
XF-1
XAHU-1
1
2
3
4
XET2-3
XET2-4
5
6
56
7
56
8
10
9
11
EXISTING 25" x 14"
COMBUSTION AIR
DUCT TO REMAIN
EXISTING R/A
DUCT TO REMAIN
EXISTING E/A
DUCT TO REMAIN
EXISTING 25" x 14"
COMBUSTION AIR
DUCT TO REMAIN
EXISTING R/A
DUCT TO REMAIN
EXISTING E/A
DUCT TO REMAIN
M
8
8
1
DEMOLITION NOTES:
REMOVE EXISTING GAS FIRED BOILER XB1-1 AND ASSOCIATED HEATING
SUPPLY AND RETURN PIPING, PUMPS AND VALVES AS SHOWN. CAP AND
MAKE GOOD FOR RECONNECTION.
2
3 REMOVE EXISTING GAS PIPING GAS SHOWN. CAP AND MAKE GOOD
FOR RECONNECTION.
4
REMOVE EXISTING GAS FIRED BOILER XB1-3 AND ASSOCIATED HEATING
SUPPLY AND RETURN PIPING, PUMPS AND VALVES AS SHOWN. CAP AND
MAKE GOOD FOR RECONNECTION.
5 COMPLETELY REMOVE EXISTING XB1-1 FLUE UP THROUGH ROOF.
CONTRACTOR TO PATCH AND MAKE GOOD ALL EXISTING BASE
BUILDING WALLS AND ROOF TO MATCH BASE BUILDING AS REQUIRED
FOR DEMOLITION OF DUCTWORK.
6 COMPLETELY REMOVE EXISTING XB1-3 AND DHWT-1 & 2 FLUE UP
THROUGH ROOF. CONTRACTOR TO PATCH AND MAKE GOOD ALL
EXISTING BASE BUILDING WALLS AND ROOF TO MATCH BASE
BUILDING AS REQUIRED FOR DEMOLITION OF DUCTWORK.
7 RELOCATE EXISTING AIR COMPRESSOR AND ALL ASSOCIATED
PIPING/ELECTRICAL AS NEEDED TO FIT NEW BOILER LAYOUT.
8 REMOVE AND REPLACE EXISTING RPBP WITH NEW.
9 COMPLETELY REMOVE EXISTING AHU-1. CAP AND MAKE GOOD EXISTING
DUCTWORK CONNECTIONS AND MAKE GOOD FOR RE-CONNECTION.
CONTRACTOR TO COORDINATE DOWN TIME OF AHU WITH CLIENT ON
SITE AND PROVIDE TEMPORARY VENTILATION AS REQUIRED.
CONTRACTOR TO REVISE ELECTRICAL DISCONNECT CONNECTION TO
AHU-1 AS REQUIRED.
10 CUT AND CAP EXISTING HEATING WATER SUPPLY AND RETURN PIPING
AND MAKE GOOD FOR RECONNECTION.
COMPLETELY REMOVE EXISTING 3-WAY VALVE AND REPLACE WITH
NEW. 3-WAY VALVE TO BE WIRED TO EXISTING DDC. UPDATE ALL BMS
GRAPHICS AND CONTROLS AS REQUIRED FOR CONTROL VALVES.
COMPLETELY REMOVE EXISTING XF-1. CAP AND MAKE GOOD EXISTING
DUCTWORK CONNECTIONS AND MAKE GOOD FOR RE-CONNECTION.
CONTRACTOR TO COORDINATE DOWN TIME OF AHU WITH CLIENT ON
SITE AND PROVIDE TEMPORARY VENTILATION AS REQUIRED.
CONTRACTOR TO REVISE ELECTRICAL DISCONNECT CONNECTION TO F-1
AS REQUIRED.
11
T 604.687.1800www.integralgroup.com
Vancouver BC Canada V6C 1S4Suite 180 - 200 Granville Street
Project Reference No: 151366.002
21 80 4
SCALE: 14" = 1'-0"
PLANT ROOM GROUND FLOOR - DEMO21 80 4
SCALE: 14" = 1'-0"
PLANT ROOM MEZZANINE - DEMO
XDHWT-2
XDHWT-1
LADDER TOMEZZANINE
AHU-1
P1-3
P1-4
M
M
S
P1-2
B-1
BP-1
B-2
BP-2
B-5 BP-5
P2-1
P2-2
2
5
5
5
5
B-4 BP-4 5
B-3 BP-3 5
55
5
5
VERTICAL LOW
LOSS HEADER
4
ET2-3
1
1
1
1
1
6
6
6
66
HWS T/B
TYP.
2
TYP.
2
TYP.
5 7
EXISTING R/A
DUCT
EXISTING E/A
DUCT
EXISTING 25" x 14"
COMBUSTION AIR
DUCT
3
8
XDHWT-2
52"x20" S/A DUCT
XDHWT-1
LADDER TO
MEZZANINE
52"x20" S/A DUCT
F-1
AHU-1
2@ NEW 8"ø DHWT FLUE UP THROUGH ROOF.
ENSURE TERMINATIONS AND MINIMUM DISTANCES
FROM FLUE EXHAUST ARE INSTALLED AS PER CSA
AND MANUFACTURERS REQUIREMENTS
2@ NEW 8"ø BOILER FLUES UP THROUGH ROOF.
ENSURE TERMINATIONS AND MINIMUM DISTANCES
FROM FLUE EXHAUST ARE INSTALLED AS PER CSA
AND MANUFACTURERS REQUIREMENTS
8
8
5
2@ NEW 8"ø DHWT FLUE UP THROUGH ROOF.
ENSURE TERMINATIONS AND MINIMUM DISTANCES
FROM FLUE EXHAUST ARE INSTALLED AS PER CSA
AND MANUFACTURERS REQUIREMENTS
2@ NEW 8"ø BOILER FLUES UP THROUGH ROOF.
ENSURE TERMINATIONS AND MINIMUM DISTANCES
FROM FLUE EXHAUST ARE INSTALLED AS PER CSA
AND MANUFACTURERS REQUIREMENTS
87
EXISTING R/A
DUCT
EXISTING E/A
DUCT
EXISTING 25" x 14"
COMBUSTION AIR
DUCT
EXISTING R/A
DUCT
EXISTING E/A
DUCT
EXISTING 25" x 14"
COMBUSTION AIR
DUCT
10
M
11
9
1
CONSTRUCTION NOTES:
CONNECT NEW PUMP AND ASSOCIATED PIPING/VALVES TO EXISTING
PIPING. ENSURE ALL NEW PUMP TRIM AND VALVES ARE INSTALLED AS
SHOWN ON MECHANICAL DRAWINGS. RE-BALANCE NEW PUMP
2 CONNECT NEW PIPING TO EXISTING.
3 CONNECT GAS TO EXISTING. PIPE NEW 12"ø GAS PIPE TO EACH BOILERCOMPLETE WITH SHUTOFF VALVE AND REGULATOR.
4 PROVIDE NEW GAS SOLENOID WIRED TO EMERGENCY GAS SHUTOFF
BUTTON TO DE-ACTIVATE BOILERS AND GAS SUPPLY TO BOILERS.
5 ALL NEW ELECTRICAL WORK IS THE RESPONSIBILITY OF THE
CONTRACTOR TO DESIGN AND APPLY FOR THE REQUIRED PERMITS.
6 MODIFY EXISTING BOILER HOUSE KEEPING PADS AS REQUIRED TO FIT
NEW BOILERS.
7 INSTALL NEW AHU-1 AS PER MECHANICAL SCHEDULE AND
SPECIFICATION. ADJUST EXISTING DUCTWORK AND HYDRONIC PIPING
TO SUIT NEW AHU-1 CONFIGURATION. CONTRACTOR TO REVISE WORKS
RELATED TO ELECTRICAL CONNECTION TO AHU-2 AS REQUIERD
INCLUDING PERMITS, COORDINATION AND INSTALLATION.
8 CONNECT NEW DUCTWORK TO MATCH EXISTING.
9 MODIFY EXISTING CONCRETE HOUSEKEEPING PAD TO SUIT NEW
CONFIGURATION OF AHU-1.
10 INSTALL NEW F-1 AS PER MECHANICAL SCHEDULE AND SPECIFICATION.
ADJUST EXISTING DUCTWORK TO SUIT NEW F-1 CONFIGURATION.
CONTRACTOR TO REVISE WORKS RELATED TO ELECTRICAL
CONNECTION TO F-1 AS REQUIRED INCLUDING PERMITS, COORDINATION
AND INSTALLATION.
11 PROVIDE NEW ACTUATORS FOR OUTDOOR AIR, EXHAUST AIR AND
MIXING AIR DAMPERS.
T 604.687.1800www.integralgroup.com
Vancouver BC Canada V6C 1S4Suite 180 - 200 Granville Street
Project Reference No: 151366.002
21 80 4
SCALE: 14" = 1'-0"
HYDRONIC PLANT ROOM GROUND FLOOR - NEW21 80 4
SCALE: 14" = 1'-0"
HYDRONIC PLANT ROOM MEZZANINE - NEW
21 80 4
SCALE: 14" = 1'-0"
HVAC PLANT ROOM GROUND FLOOR - NEW21 80 4
SCALE: 14" = 1'-0"
HVAC PLANT ROOM MEZZANINE - NEW
LWCO
XB1-1
XP1-3
XP1-4
CHEMICAL POT
FEEDER
4"ø HWS
4"ø HWR
XP1-2
LWCO
XB1-3
CHEMICAL POT
FEEDER
XP2-2
XP2-12"ø NG
3"ø HWS
3"ø HWR
2-12"ø NG 2"ø NG TO
DHWT-1 & 2
HWS/R
TO WHIRLPOOL
RPBP
HWS/R
DOWN
HWS/R
DOWN
HWS/R
UP
HWS/R
DOWN
HWS/R
UP
12 3
DEMOLITION NOTES:
2 REMOVE EXISTING GAS FIRED BOILER XB1-3 AND ALL ASSOCIATED
HEATING PIPING, PUMP, AND VALVES SERVING EXISTING DOMESTIC
HOT WATER TANK. CAP AND MAKE GOOD FOR RECONNECTION.
3
1 REMOVE EXISTING GAS FIRED BOILER XB1-1 AND ALL ASSOCIATED
HEATING PIPING, PUMP, AND VALVES SERVING EXISTING DOMESTIC
HOT WATER TANK. CAP AND MAKE GOOD FOR RECONNECTION.
INSTALL NEW CIRCUIT BALANCING VALVE AND HAVE BALANCING
CONTRACTOR CONFIRM FLOWRATE PRIOR TO DEMOLITION OF
MECHANICAL ROOM.
T 604.687.1800www.integralgroup.com
Vancouver BC Canada V6C 1S4Suite 180 - 200 Granville Street
Project Reference No: 151366.002
SCALE: N.T.S.
HYDRONIC SCHEMATIC - DEMO
S R S R S R
T
T
B-3 B-4 B-5
BP-3 BP-4 BP-5
T
T
T
AIR/DIRT
SEPARATOR
S R
B-2
S R
B-1
BP-2BP-1
P2-2
P1-2
P2-1
XHWR
XHWS
XHWR
XHWS
XHWR
XHWS
XHWR
XHWS
EX
PA
NS
ION
TA
NK
2-12" HWS/R CAPPED FOR FUTURE DHWTCONNECTION.
P1-3
P1-4
HWR
HWS
HWR
HWS
HWR
HWS
CHEMICAL
POT FEEDER
FIL
TE
R
TEST COUPON
FLOW
INDICATOR
CORROSION
3
3M
M
S
G
4
G G GG
3 3 3 3 3
2
2
2
2
5
1
1
1
1
1
2
TO EXISTING DHWT-1 & 2
2
4"ø HWR HEADER
4"ø HWS HEADER
2-12"ø HWS(49.5 GPM)
4"ø HWS HEADER
(247.5 GPM)
4"ø HWR HEADER
(247.5 GPM)
6
RPBP
2-12"ø HWS(49.5 GPM)
2-12"ø HWS(49.5 GPM)
2-12"ø HWS(49.5 GPM)
2-12"ø HWS(49.5 GPM)
180°F
160°F
1
CONSTRUCTION NOTES:
CONNECT NEW PUMP AND ASSOCIATED PIPING/VALVES TO EXISTING
PIPING. ENSURE ALL NEW PUMP TRIM AND VALVES ARE INSTALLED AS
SHOWN ON MECHANICAL DRAWINGS. RE-BALANCE EXISTING PUMP TO
EXISTING FLOW NOTED ON MECHANICAL PUMP SCHEDULE. UPDATE ALL
BMS GRAPHICS AND CONTROLS AS REQUIRED FOR NEW PUMPS.
2 CONNECT NEW PIPING TO EXISTING AND MATCH EXISTING PIPE SIZE.
CONTRACTOR TO CONFIRM EXACT PIPE SIZE ON SITE.
3 CONNECT GAS TO EXISTING AND MATCH EXISTING PIPE SIZE. PIPE NEW1
2"ø GAS PIPE TO EACH BOILER COMPLETE WITH SHUTOFF VALVE ANDREGULATOR.
4 PROVIDE NEW GAS SOLENOID WIRED TO EMERGENCY GAS SHUTOFF
BUTTON TO DE-ACTIVATE BOILERS AND GAS SUPPLY TO BOILERS.
5 NEW VIESSMANN LOW LOSS HEADER MODEL 400/200.
6 PIPE NEW RPBP DRAIN, C/W AIR GAP TO EXISTING FLOOR DRAIN.
T 604.687.1800www.integralgroup.com
Vancouver BC Canada V6C 1S4Suite 180 - 200 Granville Street
Project Reference No: 151366.002
SCALE: N.T.S.
HYDRONIC SCHEMATIC - NEW
FAN SCHEDULE
Tag No. Description
Design Details Electrical Details Motor Details
NotesDesign
SupplyVolume
(cfm)
Select
SupplyVolume
(cfm)
Resistance
("wg)
SelectExternal AirResistance
("wg)
ElectricalVoltage
(V)
Electrical
SupplyPhase
(1 or 3)
Frequency
(Hz)
AbsorbedPower
(BHP)
MotorRating
(BHP)
Motor
Starting
Method
TotalMinimum
Efficiency
(%)
Motor
Speed
(RPM)
FanType
Manufacturer Model
F-1 AHU-1 Return Fan 4625 5088 0.40 0.48 230 3 60 0.65 1.50 INV 60 1160 Inline Axial Twin City TD30E8 1, 2, 3
Notes
Unit to come complete with:
1 - Vibration Isolators
2 - VFD
3 - Controlled by DDC
BOILER B-1, B-2, B-3, B-4, B-5
Boiler Information
Location Mechanical Room
Manufacturer Viessmann
Model Vitodens B2HA 150
Type Wall Mounted Gas Condensing Boiler
Design Information
Input Gas Requirement MBH 530
Boiler Output Capacity MBH 495
Thermal Efficiency (%) 93.4
Water Flow (gpm) 24.8
Maximum Water Pressure Drop (ft) 8.00
Maximum Operating Pressure (psig) 80.0
Operating Weight (lbs) 332
Burner stages Fully Modulating
Fuel type Natural Gas
Boiler Dimensions (WxDxH) (in) 24x28x45
Boiler Connections
Boiler Supply Connection (in) 2
Boiler Return Connection (in) 2
Safety Valve Connection (in) 3/4
Boiler Drain (in) 3/4
Gas connection (in) 1
Electrical Requirements
Burner Motor MOCP 15 Amps
Electrical Requirements 120/1/60
Notes
1. CPVC flue gas system installed to manufacturer's recommnedations. Flue material is to be certified together with boiler as a constructed
unit.
2. Complete with boiler control with cascade and/or DDC interface.
3. Complete with Viessmann acid neaturalization system.
4. Multiple boiler installation requires detached boiler native cascade control (Vitotronic 300-K MW2C Cascade Control)
5. Vitotronic 200 HO1B Controller
6. Separate 120V/1PH required for boiler and controllers.
7. Viessmann boiler mounting bracket and frame.
8. Contractor resopnsible to register boiler with BC Safety Authority prior to substantial completion.
AHU-1
Supply Air Fan
Manufacturer Engineered Air
Model LM8/C/V
Design Air Volume (cfm) 8050 Fan Speed * (RPM) 1750
Ductwork Leakage (%) 10 Absorbed Power * (BHP) 4.6
Total AHU Volume (cfm) 8855 Motor Rating * (HP) 5.0
Design External Static ("wg) 1.02 Motor Starting Method INV
Static Pressure Spare Capacity (%) 21 Full Load Current * (Amps)
Total External Static ("wg) 1.23 Starting Current * (Amps)
AHU Internal Static ("wg) 0.90 Electrical Supply
Total Static ("wg) 2.13
Inverter Driven (Yes/No) Yes
Fan Type Centrifugal
Total Fan Efficiency * (%) 65
Mixing Section
Fresh Air Volume (cfm) 3763 Outside Winter Temperature DB (°F) 15.8
Return Air Volume (cfm) 5092 Room Temperature DB (°F) 71.6
Percentqage of Air Recirculated (%) 57.5 Room Temperature WB (°F) 60.0
Mixed Winter Temperature DB (°F) 47.9
Supply Filtration
Panel Filter Grade MERV 8
Heating Coil
Air On Coil Temperature (°F) 47.9 Flow Water Temperature (°F) 180.0
Air Off Coil Temperature (°F) 76.0 Return Water Temperature (°F) 160.0
Duty (Btuh) 268875 Glycol Content (%) 0
Specific Heat Capacity Solution (BTU/lbF) 1.00
Water Flow Rate (gpm) 26.9
Supply Fan Sound Power Levels Total 63Hz 125Hz 250Hz 500Hz 1kHz 2kHz 4kHz 8kHz
Case Breakout * (dB(A))
Intake * (dB(A))
Discharge * (dB(A))
Notes
Unit to come complete with:
1) Unit to be variable frequency drive (VFD) compatible. VFD to be supplied by mechanical contractor.
2) Filter compartment, Heating Coil and Fan Compartment. Mixing section of existing unit to be reused.
Expansion Tank Schedule
Bladder Expansion Tank Information ET2-1
Location Mechanical Room
Service Heating Water
Manufacturer Amtrol
Model Extrol
Orientation Horizontal
Material Steel
Working Pressure (psi) 30.0
Maximum Working Pressure (psi) 125.0
Tank Volume (gal) 132
Dimensions (øxL) (Inch) 24x79
Acceptance Volume (gal) 132
Weight (lbs)
Note:
1) All Tanks should be Bladder type, designed and constructed as per ASME Section V111, Division-1
Standards.
PUMP SCHEDULE
TAG No. Description Location
Electrical Details Motor Details
NotesDesign
Capacity
(gpm)
Selected
Capacity
(gpm)
Design
Head
(ft w.g.)
Selected
Head
(ft w.g.)
Electrical
Voltage
(V)
Electrical
Supply
Phase
(1 or 3)
Frequency
(Hz)
Motor
Starting
Method
Total
Minimum
Efficiency
(%)
Absorbed
Power
(BHP)
Motor
Rating
(BHP)
Motor
Speed
(RPM)
Manufacturer Model
BP-1 B-1 Boiler Pump Mechanical Room 49.5 54.5 23.6 28.6 208 1 60 INV 60 0.7 0.3 1750 Grundfos Magna3 1, 2
BP-2 B-2 Boiler Pump Mechanical Room 49.5 54.5 23.6 28.6 208 1 60 INV 60 0.7 0.3 1750 Grundfos Magna3 1, 2
BP-3 B-3 Boiler Pump Mechanical Room 49.5 54.5 23.6 28.6 208 1 60 INV 60 0.7 0.3 1750 Grundfos Magna3 1, 2
BP-4 B-4 Boiler Pump Mechanical Room 49.5 54.5 23.6 28.6 208 1 60 INV 60 0.7 0.3 1750 Grundfos Magna3 1, 2
BP-5 B-5 Boiler Pump Mechanical Room 49.5 54.5 23.6 28.6 208 1 60 INV 60 0.7 0.3 1750 Grundfos Magna3 1, 2
P1-2 Secondary Heating Pump Mechanical Room 49.5 54.5 28.5 34.5 208 1 60 INV 60 0.8 0.5 1750 Grundfos Magna3 1, 2, 4
P1-3 Secondary Heating Pump Mechanical Room 91.0 100.1 60.0 72.6 208 1 60 INV 60 3.1 3.0 1750 Grundfos Magna3 1, 2
P1-4 Secondary Heating Pump Mechanical Room 91.0 100.1 60.0 72.6 208 1 60 INV 60 3.1 3.0 1750 Grundfos Magna3 1, 2
P2-1 Secondary Heating Pump Mechanical Room 8.0 8.8 29.5 35.7 208 1 60 INV 60 0.1 0.3 1750 Grundfos Magna3 1, 2, 3
P2-2 Secondary Heating Pump Mechanical Room 80.0 88.0 20.0 24.2 208 1 60 INV 60 0.9 1.0 1750 Grundfos Magna3 1, 2
Notes
1) Constant speed pumping control c/w BACNET output/input.
2) Complete with Magna Integrated Variable Speed Drive (VFD)
3) Existing flow rate not available. Contractor install circuit balancing valve in system and have balancing contractor confirm flow and pressures of existing pump prior to demolition. Contractor to carry costs for supply and installation of a new Grundfos Magna Pump as specified.
4) Existing flow rate not available. Contractor engage balancing contractor prior to demolition to confirm flows and pressures of existing pump. Existing Pump model is B&G Series 60 1.25 x 5.25. Contractor to carry costs for that supply and installation of a new Grundfos Magna pump that is equipavelent to the existing pump.
T 604.687.1800www.integralgroup.com
Vancouver BC Canada V6C 1S4Suite 180 - 200 Granville Street
Project Reference No: 151366.002
T 604.687.1800www.integralgroup.com
Vancouver BC Canada V6C 1S4Suite 180 - 200 Granville Street
Project Reference No: 151366.002
NOTES:
P
VERTICAL IN LINE PUMP INSTALLATION
SUPPORT FOOT BOLTED
TO PUMP FLANGE
SUPPORT FOOT
CONSTRUCTED FROM 10mm
[3/8"] THICK STEEL PLATE.
VIBRATION ISOLATORS
AS SPECIFIED.
SEISMIC SPRING
ISOLATORS
PIPE SIZE AS
SHOWN ON PLAN
GATE VALVE
COMBINATION BALANCING/
CHECK VALVE OR LONG
SWEEP ELBOW &
INDIVIDUAL CHECK W/
BALANCE VALVES.
MAX. 250mm [10"]
100mm [4"]CONC. PAD
VIBRATION ISOLATORS
(SEE SPECIFICATION)
SUCTION GUIDE
STRAINER
GATE VALVE
SUPPORT FOOT TO BE BOLTED TO THE FLOOR SLAB, THROUGH THE
CONC. PAD USING NEOPRENE WASHERS AND BUSHINGS ON THE BOLTS
(MIN. 2 BOLTS).
NOTES:
FRONT VIEW
SCALE NTS
END VIEW
PUMP
CHEMICAL
POT FEEDER
CHEMICAL POT FEEDER
DRAIN VALVE
ISOLATION BALL
VALVEUNION
ISOLATION
BALL VALVE
BALANCE LINE
UNION
ISOLATION
BALL VALVE
300 Min.
SCALE NTS
HANGER ROD
CLEVIS HANGER
REFER TO SPEC.
VAPOUR SEAL
PREFORMED PIPE
INSULATION. REFER TO
SPEC.
CLEVIS HANGER
REFER TO SPEC.
PREFORMED PIPE
INSULATION IF
REQ''D. REFER TO
SPEC.
HANGER DETAIL FOR PIPING WITH VAPOUR SEALED INSULATION
(FOR COLD PIPING 10°C [50°F] OR LESS)
HANGER DETAIL FOR INSULATED HOT PIPING UP TO NPS
3 (75mm) OR ALL SIZES OF BARE PIPE
PIPE HANGERS
FOR NPS 2-1/2 PIPE AND
LARGER. REFER TO SPEC.
FOR INSERTS OR HIGH
DENSITY INSULATION AT
INSULATION PROTECTION
SHIELDS.LOCKING NUT
SUPPORT NUT
PIPE
INSULATION
PROTECTION SHIELD AT
HANGER. REFER TO
SPEC.
HANGER ROD
LOCKING NUT
SUPPORT NUT
PIPE
SCALE NTS
M-01M-02M-03M-04M-05M-06M-07