Upload
trandung
View
224
Download
1
Embed Size (px)
Citation preview
STRAINER
TEMPERATURE AND PRESSURE TEST PORT
THERMOSTATIC TRAP
STRAINER WITH BLOW OFF VALVE WITH CAP AND CHAIN
PUMP
GLOBE VALVE
BALL VALVE
BUTTERFLY VALVE
EXISTING PIPING
PIPE CONTINUES
RISE OR DROP IN PIPE
UNION
CAP
ELBOW TURNED UP
TEE TURNED DOWN
ELBOW TURNED DOWN
TEE TURNED UP
10x8ø
10x8
FLAT OVAL DUCTWORK
NK=
R/D
NK=
AND VOLUME DAMPER
TRANSITION ON CENTER
FLEXIBLE CONNECTOR
VOLUME DAMPER
SQUARE-THROATED TEE
VOLUME DAMPER
RADIUS ELBOW
RADIUS TEE
ETC TO BE REMOVED
M201
(ER)
1
D.L.
T
POINT OF DISCONNECT
EXISTING TO REMAIN
DOOR LOUVER
SHEET M201
8"ø
RECTANGULAR-TO-ROUND TRANSITION
TAKE-OFF TAP TO RECTANGULAR DUCT
COMBINATION FIRE SMOKE DAMPER (CFSD)
CONICAL TAP TO RECTANGULAR DUCT AND
TRANSITION WITH FLAT SIDE
CHANGE IN ELEVATION WITH RELATION TO AIR FLOW
SQUARE-THROATED ELBOW W/TURNING VANES
RECTANGULAR DUCTWORK (WIDTH X DEPTH)
RECTANGULAR DUCTWORK (WIDTH X DEPTH)
ROUND DUCTWORK (SIZE, DIAMETER)
ACOUSTICALLY LINED DUCTWORK
ROUND CEILING DIFFUSER
TRANSFER GRILLE W/GRILLE ON BOTH SIDES OF WALL
POINT OF CONNECTION BETWEEN NEW AND EXISTING
DEMOLITION SYMBOL FOR
SECTION REFERENCE, SECTION 1
THERMOSTAT/TEMPERATURE SENSORS
DETAIL REFERENCE, DETAIL 1, SHEET NUMBER M301
RECTANGULAR EXHAUST GRILLE
RECTANGULAR RETURN AIR GRILLE
RECTANGULAR CEILING DIFFUSER 4-WAY THROW
EXISTING DUCTWORK TO REMAIN
RETURN GRILLE WITH ACOUSTICALLY LINED BOOT
SIDE WALL REGISTER/GRILLE
EXISTING EQUIPMENT, PIPING, DUCTWORK,
BACKDRAFT DAMPER
BDD
FIRE DAMPER (FD)
EXHAUST DUCT RISER
RETURN DUCT RISER IN PLAN
SUPPLY DUCT RISER IN PLAN
ACCESS REQUIRED FOR EQUIPMENT SERVICE
MECHANICAL LEGEND
COCARBON MONOXIDE SENSOR
1-1/2 HOUR RATED UNLESS OTHERWISE NOTED
1-1/2 HOUR RATED UNLESS OTHERWISE NOTED
EQUIPMENT TAG
X
TU
CONTROLS SYMBOLS
T ROOM THERMOSTAT/TRANSMITTER - WALL MOUNT
TT TEMPERATURE TRANSMITTER
M ROOM HUMIDISTAT (MOISTURE)/TRANSMITTER - WALL MOUNT
MT MOISTURE (HUMIDITY) TRANSMITTER
PT PRESSURE TRANSMITTER
TT TEMPERATURE TRANSMITTER, AVERAGING ELEMENT
FT FLOW TRANSMITTER
IT CURRENT TRANSMITTER
CT CONDUCTIVITY TRANSMITTER
SPS STATIC PRESSURE SENSOR
SD SMOKE DETECTOR
PDT PRESSURE DIFFERENTIAL TRANSMITTER
KR LOCAL RECORDING TIME CLOCK (RUNTIME)
TSL TEMPERATURE SWITCH, LOW (FREEZESTAT)
HS HAND SWITCH (HAND-OFF-AUTO SWITCH)
ZC VALVE OR DAMPER POSITION CONTROLLER
LC LEVEL CONTROLLER
LT LEVEL TRANSMITTER
PDS PRESSURE DIFFERENTIAL SWITCH
TSH TEMPERATURE SWITCH, HIGH (FREEZESTAT)
EPT ELECTRONIC TO PNEUMATIC TRANSDUCER
AT CARBON DIOXIDE TRANSMITTER
CARBON MONOXIDE TRANSMITTER
CO2
AT
CO
OCCUPANCY SENSORAT
OC
LTCP LOCAL TEMPERATURE CONTROL PANEL
HVAC HVAC CONTROL PANEL
ECC
INTEGRATE CONTROL POINT ON REMOTE
GRAPHICS WORKSTATION AT ENERGY
CONTROL CENTER
TC
TEMPERATURE CONTROLLER. SEE
SEQUENCE OF OPERATION
VSMC VARIABLE SPEED MOTOR CONTROLLER
PC
PRESSURE CONTROLLER. SEE
SEQUENCE OF OPERATION
SC
SPEED CONTROLLER. SEE SEQUENCE
OF OPERATION
FC
FLOW CONTROLLER. SEE SEQUENCE OF
OPERATION
PSH PRESSURE SWITCH HIGH
FSH FLOW SWITCH HIGH
PSL PRESSURE SWITCH LOW
KC TIME CLOCK CONTROLLING EQUIPMENT ON A SCHEDULE
FSL FLOW SWITCH LOW
A
MOTOR STARTER
M ELECTRIC OPERATED CONTROL DAMPER/OR VALVE
TEMPERATURE SENSING ELEMENT FOR
TRANSMITTING TEMPERATURE TO EMCS
(PROVIDE 12 INCHES [200mm] MINIMUM
LENGTH IN DUCT WHEN SPACE PERMITS.)
SENSOR WITH AVERAGING ELEMENT TO
TRANSMIT TEMPERATURE TO EMCS
ITEM (TERMINAL UNIT)
MARK
DIFFUSER/REGISTER/GRILLE TAG
TYPE (SD/RG/RR)
200
RG-12
CFM (200)
M301
1
UCD UNDERCUT DOOR
FIN
AL C
ON
ST
RU
CT
IO
N D
OC
UM
EN
TS
18756 Stone Oak Parkway, Suite 200
t: 888.900.3823 www.schwabeng.com
SAN ANTONIO, TX 78258
PROJECT NO.: 02164822.00
FINAL CONSTRUCTION
DOCUMENTS
MECHANICAL LEGEND
D DAMPER - AUTOMATIC
D-1 OUTDOOR AIR DAMPER
D-2 RETURN AIR DAMPER
D-3 RELIEF AIR DAMPER
DB DECIBELS
Db DRY-BULB TEMPERATURE
DD-1 DESIGN DEVELOPMENT
(SUBMISSION1)
DD-2 DESIGN DEVELOPMENT
(SUBMISSION2)
DDC DIRECT DIGITAL CONTROLS
DEG DEGREE
DF DIFFUSER
B BOILER
BD BUTTERFLY DAMPER
BDD BACKDRAFT DAMPER
BDR BASE BOARD RADIATOR
BFP BACKFLOW PREVENTER
BFT BOILER PLANT FIRE TUBE
BG BOTTOM GRILLE
BHP BRAKE HORSEPOWER
BHW HOT WATER HEATING BOILER
BHX BOILER BLOWDOWN HEAT
EXCHANGER
BIW BACKWARD INCLINED WHEEL (FAN)
BMT BONE MARROW TRANSPLANT
BR BOTTOM REGISTER
BSC BIOLOGICAL SAFETY CABINETS
BT BLOWOFF TANK
BTC BLOWOFF TANK CONTROL VALVE
BTU BRITISH THERMAL UNIT
BTUH BRITISH THERMAL UNIT PER HOUR
BWT BOILER PLANT WATER TUBE
A/E ARCHITECT / ENGINEER
AAHX AIR TO AIR HEAT EXCHANGER
AB AIR BLENDER
AAV AUTOMATIC AIR VENT
ACC AIR COOLED CONDENSER
ACCH AIR COOLED CHILLER
ACCU AIR-COOLED CONDENSING UNIT
ACU AIR CONDITIONING UNIT
ACD AUTOMATIC CONTROL
DAMPER,MODULATING
ACD-TP AUTOMATIC CONTROL
DAMPER,TWO POSITION
AD ACCESS DOOR
AF AFTER FILTER
AFCV AIR FLOW CONTROL VALVE
AFF ABOVE FINISHED FLOOR
AFMD AIR FLOW MEASURING DEVICE
AFW AIR FOIL WHEEL (FAN)
AHU AIR-HANDLING UNIT
AMP AMPERGE
AP ACCESS PANEL
APD AIR PRESSURE DROP
ARI AIR CONDITIONING AND
REFRIGERATION INSTITUTE
AS AIR SEPARATOR
ASME AMERICAN SOCIETY OF MECHANICAL
ENGINEERS
AW AIR WASHER
AXF AXIAL FLOW
C CENTIGRADE (CELCIUS)
CC COOLING COIL
CCD COOLING COIL CONDENSATE
DRAIN
CD CEILING DIFFUSER
CD-1 CONSTRUCTION
DOCUMENTS (SUBMISSION1)
CD-2 CONSTRUCTION
DOCUMENTS (SUBMISSION2)
CENT CENTRIFICAL
CFH CUBIC FEET PER HOUR
CFM CUBIC FEET PER MINUTE
CFT CUBIC FEET
CFP CHEMICAL FEED PUMP
CG CEILING GRILLE
CH CHILLER
CHP CHILLED WATER PUMP
CHW CHILLER WATER
CHR CHILLED WATER RETURN
CHS CHILLED WATER SUPPLY
CI CAST IRON
CM CARBON MONOXIDE
CM CUBIC METER
CM/S CUBIC METER PER SECOND
CO CLEAN OUT
CO2 CARBON DIOXODE
COMP COMPRESSOR UNIT
COP COEFFICIENT OF
PERFORMANCE
CP CONDENSATE PUMP
CR CEILING REGISTER
CS CONDENSATE STORAGE TANK
CSG CLEAN STEAM GENERATOR
CT COOLING TOWER
CU CONDENSING UNIT
CUH CABINET UNIT HEATER
CV CONSTANT VOLUME
CW COLD WATER (POTABLE)
CWCC CHILLED WATER COOLING COIL
CWP CONDENSER WATER PUMP
CWR CONDENSER WATER RETURN
(TO COOLING TOWER)
CWS CONDENSER WATER SUPPLY
(FROM COOLING TOWER)
EA EXHAUST AIR
EAT ENTERING AIR TEMPERATURE
EC EVAPORATIVE COOLER
ECC ENGINEERING CONTROL CENTER
ECU EVAPORATIVE CONDENSER UNIT
EDH ELECTRIC DUCT HEATER
EER ENERGY EFFICIENCY RATIO
EF EXHAUST FAN
EG EXHAUST GRILLE
EGS EMERGENCY GAS SHUTOFF
EGT ENTERING GLYCOL TEMPERATURE
EH EXHAUST HOOD
EJ EXPANSION JOINT
EMD END OF MAIN DRIP (STEAM)
ENT ENTERING
ER EXHAUST REGISTER
ERC ELECTRIC REHEAT COIL
ERP ELECTRIC RADIANT PANEL
ESP EXTERNAL STATIC PRESSURE
ET EXPANSION TANK
ETO ETHYLENE OXIDE
EUH ELECTRIC UNIT HEATER
EWC EVAPORATIVE WATER COOLER
EWT ENTERING WATER TEMPERATURE
EX. EXISTING
(E) EXISTING
F FAHRENHEIT
F&T FLOAT AND THERMOSTATIC
F/SDPR COMBINATION FIRE SMOKE
DAMPER
FA FREE AREA
FC FLEXIBLE CONNECTION
FCU FAN COIL UNIT (4 PIPE)
FCUC FAN COIL UNIT COOLING ONLY
FCUH FAN COIL UNIT HEATING ONLY
FCW FORWARD CURVED WHEEL (FAN)
FD FLOOR DRAIN
FD FIRE DAMPER
FF FINAL FILTER
FHX FLUE GAS/FEEDWATER HEAT
EXCHANGER
FM FLOW METER
FOP FUEL OIL PUMP
FOT FUEL OIL TANK
FOHX FUEL OIL HEAT EXCHANGER
FPM FEET PER MINUTE
FPS FEET PER SECOND
FPTU FAN POWERED TERMINAL UNIT
FR FLOOR REGISTER
FRP FIBER REINFORCED POLYESTER
FS FLOW SWITCH
FSTAT FREEZESTAT
FT FEET
FT-LB FOOT-POUND
FTR FIN TUBE RADIATION
FV FACE VELOCITY
GA GAUGE
GAL GALLONS
GH GRAVITY HOOD
GPD GALLONS PER DAY
GPH GALLONS PER HOUR
GPM GALLONS PER MINUTE
GPR GAS PRESSURE REGULATOR
GS GALVANIZED STEEL
H HUMIDIFER
H&CW HOT & COLD WATER
HAC HOUSEKEEPING AID CLOSET
HB HOSE BIBB
HC HEATING COIL
HD HEAD
HD HOOD
HOA HAND/OFF/AUTOMATIC
HP HEAT PUMP
HP HORSEPOWER
HPDT HIGH PRESSURE DRIP TRAP
HPR HIGH PRESSURE RETURN
(STEAM CONDENSATE)
HPS HIGH PRESSURE SUPPLY
(STEAM)
HRC HEAT RECOVERY COIL
HRD HEAT RECOVERY DEVICE
HRP HYDRONIC RADIANT (CEILING)
PANEL
HRW HEAT RECOVERY WHEEL
HSTAT HUMIDISTAT
HTM HUMIDIFIER TERMINAL
HUM HUMIDIFIER UNIT MOUNTED
HVU HEATING AND VENTILATING
UNIT
HW HOT WATER
HWC HOT WATER COIL
HWHC HOT WATER HEATING COIL
HWP HEATING HOT WATER PUMP
HWR HEATING HOT WATER RETURN
HWS HEATING HOT WATER SUPPLY
HWUH HOT WATER UNIT HEATER
OA OUTSIDE AIR
OAG OUTSIDE AIR GRILLE
OAI OUTSIDE AIR INTAKE
OD OUTSIDE DIAMETER
OFM OIL FLOWMETER
OR OPERATING ROOM
NA NOT APPLICABLE
NC NOISE CRITERIA
NC NORMALLY CLOSED
NG NATURAL GAS
NGFM NATURAL GAS FLOWMETER
NO NORMALLY OPEN
NOAA NATIONAL OCEANIC &
ATMOSPHERIC ADMINISTRATION
NOM NOMINAL
NPLV NON-STANDARD PART LOAD VALUE
NPSH NET POSITIVE SUCTION HEAD
NTS NOT TO SCALE
M METER, SI UNIT
M/s METERS PER SECOND
(OR METERS/SECOND)
MA MIXED AIR
MAT MIXED AIR TEMPERATURE
MAU MAKE-UP AIR UNIT
MAV MANUAL AIR VENT
MAX MAXIMUM
MB MIXING BOX
MBH 1000 BTUH
MCA MINIMUM BRANCH CIRCUIT AMPACITY
MER MECHANICAL EQUIPMENT ROOM
MERV MINIMUM EFFICIENCY REPORTING
VALUE
MH MANHOLE
MHP MOTOR HORSEPOWER
MIN MINIMUM
MM MILLIMETER
MOV MOTOR OPERATED VALVE
MPR MEDIUM PRESSURE RETURN
(STEAM CONDENSATE)
MPS MEDIUM PRESSURE STEAM
MRI MAGNETIC RESONANCE IMAGING
MTD MEAN TEMPERATURE DIFFERENCE
MVD MANUAL VOLUME DAMPER
MZ MULTI-ZONE
L LITER
L/h LITERS PER HOUR (OR LITERS/HOUR)
L/m LITERS PER MINUTE (OR LITERS/MINUTE)
L/s LITERS PER SECOND (OR LITERS/SECOND)
LAT LEAVING AIR TEMPERATURE
LBS/HR POUNDS PER HOUR
LF LINEAR FOOT (FEET)
LGT LEAVING GLYCOL TEMPERATURE
LH LATENT HEAT
LPG LIQUID PROPANE GAS
LPR LOW PRESSURE RETURN
(STEAM CONDENSATE)
LPRC LOW PRESSURE STEAM RETURN (CLEAN)
LLHX LIQUID TO LIQUID HEAT EXCHANGER
LPS LOW PRESSURE STEAM
LPSC LOW PRESSURE STEAM (CLEAN)
LSD LINEAR SLOT DIFFUSER
LTCP LOCAL TEMPERATURE CONTROL PANEL
LVG LEAVING
LVR LOUVER
LWT LEAVING WATER TEMPERATURE
kg KILOGRAM
kg/HR KILOGRAM PER HOUR
kPa KILOPASCAL
kW KILOWATT
kWh KILOWATT HOUR
J INTENTIALLY LEFT BLANK
I/O INPUT/OUTPUT
IAQ INDOOR AIR QUALITY
IBT INVERTED BUCKET TRAP
ICF IN-LINE CENTRIFUGAL FAN
ICU INTENSIVE CARE UNIT
ID INSIDE DIAMETER
IFB INTEGRAL FACE AND BYPASS
IN INCHES
IN HG INCHES OF MERCURY
IN WC INCH WATER COLUMN
IN WG INCH WATER GAUGE
IN-LB INCH-POUND
IPLV INTERGRATED PART LOAD VALUE
IRH INTRARED HEATER
IS INSECT SCREEN
IU INDUCTION UNIT
IV INLET VANES
T & PCV TEMPERATURE AND PRESSURE
CONTROL VALVE
TAB TESTING, ADJUSTING, BALANCE
TD TEMPERATURE DIFFERENCE
TDH TOTAL DYNAMIC HEAD
TDS TOTAL DISSOLVED SOLIDS
TG TRANSFER GRILLE
TP TRAP
TR TOP REGISTER
TSP TOTAL STATIC PRESSURE
TSTAT THERMOSTAT
TU TERMINAL UNIT
TWU THRU-WALL UNIT
SA SUPPLY AIR
SAD SOUND ATTENUATING DEVICE
SAT SUPPLY AIR TEMPERATURE
SC SHADING COEFFICIENT
SCFM STANDARD CUBIC FEET PER MINUTE
SCI SPINAL CODE INJURY
SCR SILICON CONTROLLED RECTIFIER
SD SMOKE DETECTOR
SD SUPPLY AIR DIFFUSER
SD-1 SCHEMATIC DESIGN (SUBMISSION1)
SD-2 SCHEMATIC DESIGN (SUBMISSION2)
SDPR SMOKE DAMPER
SDR SMOKE DAMPER (RETURN)
SDS SMOKE DAMPER (SUPPLY)
SEN SENSIBLE HEAT
SF SUPPLY FAN
SG SUPPLY AIR GRILLE
SH STEAM HUMIDIFIER
SHC STEAM HEATING COIL
SI SQUARE INCHES
SP STATIC PRESSURE
SP GR SPECIFIC GRAVITY
SPD SUPPLY PROCESS AND DISTRIBUTION
SPRV STEAM PRESSURE REDUCING VALVE
SPS STATIC PRESSURE SENSOR
SQ FT SQUARE FOOT (FEET)
SR SUPPLY AIR REGISTER
SS STAINLESS STEEL
SSHX STEAM TO STEAM HEAT EXCHANGER
SSR SOLID SEPARATOR
ST STEAM TRAP
SUH STEAM UNIT HEATER
SV STEAM PRESSURE REDUCING VALVE
SVS STEAM VENT SILENCER
SWHX STEAM TO WATER HEAT EXCHANGER
R/E RETURN OR EXHAUST
RA RETURN AIR
RAD REFRIGERANT AIR DRYER
RAF RADIO FREQUENCY
RAHX ROTARY AIR HEAT EXCHANGER
RAT RETURN AIR TEMPERATURE
RCCH REMOTE CONDENSER CHILLER
RCU RECIPROCATING CHILLER UNIT
RD REFRIGERANT DISCHARGE
RDS ROOM DATA SHEETS
REA RELIEF AIR
RF RETURN FAN
RG RETURN GRILLE
RH RELATIVE HUMIDITY
RHC REHEAT COIL
RHG REFRIGERANT HOT GAS
RL REFRIGERANT LIQUID LINE
RLA RUN LOAD AMPERE
RO REVERSE OSMOSIS
RPM REVOLUTIONS PER MINUTE
RR RETURN REGISTER
RS REFRIGERANT SUCTION
RTU ROOF TOP UNIT
RV RELIEF VALVE
P PUMP
PA PASCAL
PC PUMPED CONDENSATE
PCF POUNDS PER CUBIC FOOT (FEET)
PD PRESSURE DROP
PEF PROPELLER (TYPE) EXHAUST FAN
PF PRE-FILTER
PG PRESSURE GAGE
PGW PROPYLENE GLYCOL-WATER (SOLUTION)
PHC PREHEAT COIL
YR YEAR
W WATTS
WAG WASTE ANETHESIA GAS
Wb WET-BULB (TEMPERATURE)
WC WATER COOLED
WCCH WATER COOLED CHILLER
WCCU WATER COOLED CONDENSING UNIT
WCHP WATER COOLED HEAT PUMPS
WCPU WATER COOLED PACKAGED UNIT
WEF WALL EXHAUST FAN
WF WATER FILTER
WFCV WATER FLOW CONTROL VALVE
WFM WATER FLOWMETER
WFMD WATER FLOW MEASURING DEVICE
WG WATER GAGE
WPD WATER SIDE PRESSURE DROP
V VALVE
VAF VANE-AXIAL FAN
VAV VARIABLE AIR VOLUME
VD VOLUME DAMPER (MANUAL OPPOSED BLADE)
VFD VARIABLE FREQUENCY DRIVE
VHA VETERANS HEALTH ADMINISTRATION
VI VIBRATION ISOLATOR
VIV VARIABLE INLET VANES
VP VACUUM PUMP
VPS VARIABLE PRIMARY SYSTEM
VR VACUUM (STEAM CONDENSATE) RETURN
VSD VARIABLE SPEED DRIVE
VUH VERTICAL UNIT HEATER
MECHANICAL ABBREVIATIONS
DF DIFFUSER
DIA DIAMETER
DIW DEIONIZED WATER
DP DEW POINT TEMPERATURE
DP DIFFUSER PLATE
DPA DIFFERENTIAL PRESSURE ASSEMBLY
DPS DIFFERENTIAL PRESSURE SENSOR
DX DIRECT EXPANSION
DXCC DIRECT EXPANSION COOLING COIL
HWUH HOT WATER UNIT HEATER
HVD HOISTWAY VENT DAMPER
HX HEAT EXCHANGER
HZ HERTZ
PPM PARTS PER MILLION
PRS PRESSURE REGULATING (VALVE) STATION
PRV PRESSURE REGULATING VALVE
PSI POUNDS PER SQUARE INCH
PSIA POUNDS PER SQUARE INCH – ABSOLUTE
PSIG POUNDS PER SQUARE INCH – GAGE
PSS PRIMARY SECONDARY SYSTEM
PSV PRESSURE SAFETY VALVE
PTAC PACKAGED TERMINAL AIR CONDITIONER
UC UNDER CUT
UC UNIT COOLER
UH UNIT HEATER
UL UNDERWRITERS LABORATORY
URV UPBLAST UNIT VENTILATOR
UC UNDER CUT
UC UNIT COOLER
UH UNIT HEATER
UL UNDERWRITERS LABORATORY
URV UPBLAST UNIT VENTILATOR
FIN
AL C
ON
ST
RU
CT
IO
N D
OC
UM
EN
TS
18756 Stone Oak Parkway, Suite 200
t: 888.900.3823 www.schwabeng.com
SAN ANTONIO, TX 78258
PROJECT NO.: 02164822.00
FINAL CONSTRUCTION
DOCUMENTS
MECHANICAL ABBREVIATIONS
FIN
AL C
ON
ST
RU
CT
IO
N D
OC
UM
EN
TS
18756 Stone Oak Parkway, Suite 200
t: 888.900.3823 www.schwabeng.com
SAN ANTONIO, TX 78258
PROJECT NO.: 02164822.00
FINAL CONSTRUCTION
DOCUMENTS
MECHANICAL SCHEDULES
FIN
AL C
ON
ST
RU
CT
IO
N D
OC
UM
EN
TS
18756 Stone Oak Parkway, Suite 200
t: 888.900.3823 www.schwabeng.com
SAN ANTONIO, TX 78258
PROJECT NO.: 02164822.00
FINAL CONSTRUCTION
DOCUMENTS
MECHANICAL SCHEDULES
FIN
AL C
ON
ST
RU
CT
IO
N D
OC
UM
EN
TS
18756 Stone Oak Parkway, Suite 200
t: 888.900.3823 www.schwabeng.com
SAN ANTONIO, TX 78258
PROJECT NO.: 02164822.00
FINAL CONSTRUCTION
DOCUMENTS
MECHANICAL SCHEDULES
3-8 3-9 3-10 3-11 3-12 3-13 3-14 3-15 3-17 3-183-16
C-3
3-7
C-4
3-23-1
C-10
C-9
C-2
3-2 3-5.1
3-7
3-6
3-3
3-4
3-5
C-11C-12
C-14
NOTE: REMOVE ALL EXISTING TERMINAL UNITS, AIR DEVICES AND BRANCH
DUCTWORK. ALL DUCTWORK SHOWN, THAT IS NOT HATCHED, IS TO REMAIN.
(E) 30X16
(E
) 38X
20
(E) 28X16
(E) 26X16
(E) 16X10 (E) 14X10
(E) 6X10
(E) 10X10
(E) 32X14(E) 30X14
(E) 25X14
(E) 14X12
(E) 10X6
(E) 8X6 (E) 8X4
(E) 10X5
(E
) 14X
14
(E) 8X8
(E) 8X4
(E) 32X16
(E) 28X16
(E) 24X16
(E) 30X10
(E) 30X10
(E) 18X10
(E) 12X10
(E) 12X10
(E) 10X8
(E) 30X10
(E) 14X12
(E) 14X10
(E
) 30X
18
(E
) 32X
16
(E) 35X22
(E) 25X18 (E) 25X16
(E) 22X16
(E) 16X14(E) 10X8
(E) 22X18
(E) 20X18
(E) 20X14(E) 18X14
(E
) 22X
18
(E) 10X10(E) 12X12
(E) 18X12
(E) 20X18
(E) 20X16
(E
) 14X
12
(E) 14X8(E) 12X8
(E) 8X6
(E) 8X4
(E) 6X12(E) 16X14
(E) 18X16
(E) 20X16
(E) 24X16
(E
) 30X
16
(E) 16X14(E) 14X12(E) 12X12(E) 10X12(E) 8X10
(E) 12X8
(E) 10X6(E) 8X6
(E) 14X12
1
3
NOTE: REMOVE ALL EXISTING TERMINAL UNITS, AIR DEVICES AND BRANCH
DUCTWORK. ALL DUCTWORK SHOWN, THAT IS NOT HATCHED, IS TO REMAIN.
NOTE: REMOVE ALL EXISTING TERMINAL UNITS, AIR DEVICES AND BRANCH
DUCTWORK. ALL DUCTWORK SHOWN, THAT IS NOT HATCHED, IS TO REMAIN.
2
2
2
3
2
(E) 38X20
RA UP
(E) 25X30 REA
UP & DOWN
(E) 30X16
RA UP
(E) 30X25 REA
UP & DOWN
(E) 16X18
EA UP
(E) 35X30
SA UP
MA
TC
HLIN
E
1. EXISTING CONDITIONS ARE PER AS-BUILT DRAWINGS AND SITE
SURVEY. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING
CONDITIONS PRIOR TO INSTALLATION OF ANY WORK.
2. ALL EXISTING DUCTWORK TO REMAIN SHALL BE THOROUGHLY
CLEANED AND LEAKS SHALL BE SEALED AIRTIGHT.
3. REMOVE ALL EXISTING TERMINAL UNITS, AIR DEVICES AND
BRANCH DUCTWORK. ALL DUCTWORK SHOWN, THAT IS NOT
HATCHED, IS TO REMAIN.
4. REMOVE ALL EXISTING TEMPERATURE
SENSORS/THERMOSTATS, AND ASSOCIATED CONTROL WIRING
ASSOCIATED WITH TERMINAL UNITS BEING REMOVED.
1 REMOVE EXISTING COMBINATION FIRE SMOKE DAMPER.
EXISTING FIRE DAMPER OR COMBINATION FIRE SMOKE DAMPER TO
REMAIN. PROTECT IN PLACE.
EXISTING EXHAUST DUCT UP TO ATTIC AND DOWN TO CRAWLSPACE
TO BE REMOVED.
2
3
C-5
C-8
C-9
C-12
C-13
C-14
4-114-104-94-8
(E) 25X14
(E
) 2
5X
12
(E) 16X14
LIM
IT
O
F W
OR
K
MA
TC
HL
IN
E
FIRST FLOOR MECHANICAL
DEMOLITION PLAN
FIN
AL C
ON
ST
RU
CT
IO
N D
OC
UM
EN
TS
18756 Stone Oak Parkway, Suite 200
t: 888.900.3823 www.schwabeng.com
SAN ANTONIO, TX 78258
PROJECT NO.: 02164822.00
FINAL CONSTRUCTION
DOCUMENTS
KEY PLAN
GENERAL NOTES
KEY NOTES
1
FIRST FLOOR MECHANICAL DEMOLITION PLAN - C WING
N
2
FIRST FLOOR MECHANICAL DEMOLITION PLAN - C WING
N
1. EXISTING CONDITIONS ARE PER AS-BUILT DRAWINGS AND SITE
SURVEY. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING
CONDITIONS PRIOR TO INSTALLATION OF ANY WORK.
2. ALL EXISTING DUCTWORK TO REMAIN SHALL BE THOROUGHLY
CLEANED AND LEAKS SHALL BE SEALED AIRTIGHT.
3. REMOVE ALL EXISTING TERMINAL UNITS, AIR DEVICES AND
BRANCH DUCTWORK. ALL DUCTWORK SHOWN, THAT IS NOT
HATCHED, IS TO REMAIN.
4. REMOVE ALL EXISTING TEMPERATURE
SENSORS/THERMOSTATS, AND ASSOCIATED CONTROL WIRING
ASSOCIATED WITH TERMINAL UNITS BEING REMOVED.
1 EXISTING EXHAUST DUCT UP TO ATTIC AND DOWN TO CRAWLSPACE
TO BE REMOVED.
C-5
C-8
C-9
C-12
C-13
C-14
3-8 3-9 3-10 3-11 3-12 3-13 3-14 3-15 3-17 3-183-16
C-3
3-7
C-4
3-23-1
3-2 3-5.1
3-7
C-10
C-9
3-6
C-12
C-14
(E) 34X16(E) 32X16
(E) 30X16
(E) 16X12 (E) 12X10
(E) 8X10
(E) 30X14
(E) 28X14(E) 24X18
(E) 18X14
(E
) 16X
14
(E
) 40X
20
(E) 24X18(E) 24X16
(E) 20X16
(E) 18X12
(E) 14X12
(E) 12X8(E) 26X20
(E) 22X20
(E) 22X18
(E) 24X14
(E) 18X14
(E) 14X12
(E) 12X6
(E) 10X6
(E) 8X6
(E
) 14X
14
(E) 12X6(E) 10X6
(E) 8X6
(E
) 24X
16
(E) 22X12
(E) 18X12
(E) 14X12
(E) 26X16(E) 24X12
(E) 18X16(E) 18X14
(E) 10X10
(E) 30X16
(E) 26X16
(E) 24X16
(E) 22X12
(E) 20X12
(E) 18X12
(E) 14X12
(E
) 32X
20
(E) 24X18(E) 24X16
(E) 24X14
(E) 20X14
(E) 12X10
(E) 8X10
(E
) 16X
12
(E) 12X8
(E) 8X6(E) 12X8
(E) 11X8(E) 10X6
(E) 26X14
(E
) 18X
12
(E) 14X10
(E
) 10X
10
(E
) 6X
10
(E) 24X14
(E) 30X14
(E) 10X12
(E
) 10X
12
(E) 6X10
(E) 15X12 NOTE: REMOVE ALL EXISTING TERMINAL UNITS, AIR DEVICES AND BRANCH
DUCTWORK. ALL DUCTWORK SHOWN, THAT IS NOT HATCHED, IS TO REMAIN.
NOTE: REMOVE ALL EXISTING TERMINAL UNITS, AIR DEVICES AND BRANCH
DUCTWORK. ALL DUCTWORK SHOWN, THAT IS NOT HATCHED, IS TO REMAIN.
1
1
(E) 35X30 SA
UP AND DOWN
(E) 16X18 EA
UP AND DOWN
(E) 38X20 RA
UP & DOWN
(E) 25X30 REA
UP & DOWN
(E) 30X25 REA
UP & DOWN
(E) 30X16 RA
UP & DOWN
MA
TC
HLIN
E
D-1
4-114-104-94-8
(E) 18X12
(E) 15X12
LIM
IT
O
F W
OR
K
MA
TC
HL
IN
E
(E) 18X14
(E) 22X12
(E) 18X12(E) 20X9
SECOND FLOOR MECHANICAL
DEMOLITION PLAN
FIN
AL C
ON
ST
RU
CT
IO
N D
OC
UM
EN
TS
18756 Stone Oak Parkway, Suite 200
t: 888.900.3823 www.schwabeng.com
SAN ANTONIO, TX 78258
PROJECT NO.: 02164822.00
FINAL CONSTRUCTION
DOCUMENTS
KEY PLAN
GENERAL NOTES
KEY NOTES
1
SECOND FLOOR MECHANICAL DEMOLITION PLAN - C WING
N
2
SECOND FLOOR MECHANICAL DEMOLITION PLAN - C WING
N
1. EXISTING CONDITIONS ARE PER AS-BUILT DRAWINGS AND SITE
SURVEY. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING
CONDITIONS PRIOR TO INSTALLATION OF ANY WORK.
2. ALL EXISTING DUCTWORK TO REMAIN SHALL BE THOROUGHLY
CLEANED AND LEAKS SHALL BE SEALED AIRTIGHT.
1 REMOVE EXISTING AIR HANDLING UNIT.
REMOVE EXISTING RELIEF AIR FAN.
REMOVE EXISTING SMOKE DETECTOR AND PATCH DUCTWORK AS
REQUIRED.
REMOVE EXISTING MOTORIZED DAMPER AND AIRFLOW MEASURING
DEVICE. PATCH DUCTWORK AS REQUIRED.
REMOVE EXISTING MOTORIZED DAMPER AND PATCH DUCTWORK AS
REQUIRED.
REMOVE EXISTING EXHAUST FAN.
(E) FIRE DAMPERS IN ALL DUCTS AT FLOOR SLAB PENETRATIONS TO
REMAIN. PROTECT IN PLACE.
TEMPORARILY REMOVE EXISTING 8'-0" ROUND LOUVER IN ORDER TO
DELIVER NEW AIR HANDLING UNIT SECTIONS TO MECHANICAL ROOM.
STORE AND PROTECT LOUVER FOR REINSTALLATION. SEAL OPENING
UNTIL AIR HANDLING UNIT SECTIONS ARE DELIVERED.
2
3
4
5
6
7
8
C-9
C-12
(E)28x16SA DN(E)30x20 SA DN.
(E)38x25 OA
(E)40x20 RA
(E)18x18 EA
M
(E)24x18SA(E)22x20SA
M
M
M
(E)16x10EA
(E)52x27SA
(E)25x34 S.A.
(E)42x25 OA
(E)38x25 OA
(E)30x20 RA
(E)30x25 REL
(E)16x25 RA
(E)24x28 RA
(E)30x30 RA
(E)30x30 RA
(E)38x25 RA
(E) 35X22 RA DN
(E)25x16 RA DN
M
M
M
(E)32x32 RA
(E)14x14 E.A.
(E)18x18 EA DN.
(E) 202C-AH-1
(E) 202C -AH-2
1
1
(E) 202C-RAF-12
(E) 202C-RAF-22
SD
SD
3
3
4
4
5
4
SD
SD
3
3
(E) 202C-EF-16
M
(E) 202C-EF-2 6
SD
(E) 8'-0" ROUND
LOUVER
8
7
7
7
7
7
3-8 3-9 3-10 3-11 3-12 3-13 3-14
ATTIC MECHANICAL
DEMOLITION PLAN
FIN
AL C
ON
ST
RU
CT
IO
N D
OC
UM
EN
TS
18756 Stone Oak Parkway, Suite 200
t: 888.900.3823 www.schwabeng.com
SAN ANTONIO, TX 78258
PROJECT NO.: 02164822.00
FINAL CONSTRUCTION
DOCUMENTS
KEY PLAN
GENERAL NOTES
KEY NOTES
1
ATTIC MECHANICAL DEMOLITION PLAN - C WING
N
1. EXISTING CONDITIONS ARE PER AS-BUILT DRAWINGS AND SITE
SURVEY. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING
CONDITIONS PRIOR TO INSTALLATION OF ANY WORK.
1 REMOVE (E) VAV BOX AND ASSOCIATED PIPING. CAP AS SHOWN.
(E) 3/4" HWS & (E)3/4" HWR TO (E) FC-1 IN STAIRS TO REMAIN.
(E) SHUT-OFF VALVES TO REMAIN.
2
3
PATIO
C1-39
3-8 3-9 3-10 3-11 3-12 3-13 3-14 3-15 3-17 3-183-16
C-3
3-7
C-4
3-23-1
C-10
C-9
C-2
3-2 3-5.1
3-7
3-6
3-3
3-4
3-5
C-11C-12
C-14
(E) 2 1/2" HWS/R UP
& (E) 3" HWS/R DN
(E) 5" CHS/R
UP & DN
1 1/4" (E) HWR
1 1/4" (E) HWS
1 1/4" (E) HWR
1 1/4" (E) HWS
1" (E) HWR
1" (E) HWS
11111 1111
1
2
1
111111
1 1/4" (E) HWR
1 1/4" (E) HWS
11 1 1 1 1 1 1 1 1111111
2" (E) HWR
2" (E) HWS
1 1/4" (E) HWR
1 1/4" (E) HWS
1" (E) HWR
1" (E) HWS
1" (E) HWR
1" (E) HWS
1 1/4" (E) HWR
1 1/4" (E) HWS
111
1 1
1" (E) HWR
1" (E) HWS
1 1/4" (E)
3/4" (E) HWR
3/4" (E) HWS
3
3
MA
TC
HLIN
E
1
1 1
4-114-104-94-8
LIM
IT
O
F W
OR
K
MA
TC
HL
IN
E
1 1
1" (E) HWR
1" (E) HWS
11
3/4" (E) HWR
3/4" (E) HWS
FIRST FLOOR MECHANICAL PIPING
DEMOLITION PLAN
FIN
AL C
ON
ST
RU
CT
IO
N D
OC
UM
EN
TS
18756 Stone Oak Parkway, Suite 200
t: 888.900.3823 www.schwabeng.com
SAN ANTONIO, TX 78258
PROJECT NO.: 02164822.00
FINAL CONSTRUCTION
DOCUMENTS
KEY PLAN
GENERAL NOTES
KEY NOTES
1
FIRST FLOOR MECHANICAL PIPING DEMOLITION PLAN - C WING
N
2
FIRST FLOOR MECHANICAL PIPING DEMOLITION PLAN - C WING
N
1. EXISTING CONDITIONS ARE PER AS-BUILT DRAWINGS AND SITE
SURVEY. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING
CONDITIONS PRIOR TO INSTALLATION OF ANY WORK.
1
2
REMOVE (E) VAV BOX AND ASSOCIATED PIPING. CAP AS SHOWN.
(E) SHUT-OFF VALVES TO REMAIN.
3-8 3-9 3-10 3-11 3-12 3-13 3-14 3-15 3-17 3-183-16
C-3
3-7
C-4
3-23-1
3-2 3-5.1
3-7
C-10
C-9
3-6
C-12
C-14
(E) 2" HWS/R UP &
(E) 2 1/2" HWS/R DN
(E) 5" CHS/R
UP & DN
1 1/4" (E) HWR
1 1/4" (E) HWS
1 1/4" (E) HWR
1 1/4" (E) HWS
1" (E) HWR
1" (E) HWS
11111 111
1
11111
1 1/4" (E) HWR
1 1/4" (E) HWS
11 1 1 1 1 1 1111111
2" (E) HWR
2" (E) HWS
1 1/4" (E) HWR
1 1/4" (E) HWS
1" (E) HWR
1" (E) HWS
1 1/4" (E) HWR
1 1/4" (E) HWS
11
1 1
1" (E) HWR
1" (E) HWS
1 1/4" (E)
3/4" (E) HWR
3/4" (E) HWS
1
1
1
1
1
1 1
3/4" (E) HWR
3/4" (E) HWS
1" (E) HWR
1" (E) HWS
3/4" (E) HWR
3/4" (E) HWS
2
2
MA
TC
HLIN
E
1
1" (E) HWR
1" (E) HWS
1 1
3/4" (E) HWR
3/4" (E) HWS
D-1
4-114-104-94-8
LIM
IT
O
F W
OR
K
MA
TC
HL
IN
E
1
3/4" (E) HWR
3/4" (E) HWS
1 1
3/4" (E) HWR
3/4" (E) HWS
1
SECOND FLOOR MECHANICAL PIPING
DEMOLITION PLAN
FIN
AL C
ON
ST
RU
CT
IO
N D
OC
UM
EN
TS
18756 Stone Oak Parkway, Suite 200
t: 888.900.3823 www.schwabeng.com
SAN ANTONIO, TX 78258
PROJECT NO.: 02164822.00
FINAL CONSTRUCTION
DOCUMENTS
KEY PLAN
GENERAL NOTES
KEY NOTES
1
SECOND FLOOR MECHANICAL PIPING DEMOLITION PLAN - C WING
N
2
SECOND FLOOR MECHANICAL PIPING DEMOLITION PLAN - C WING
N
1. EXISTING CONDITIONS ARE PER AS-BUILT DRAWINGS AND SITE
SURVEY. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING
CONDITIONS PRIOR TO INSTALLATION OF ANY WORK.
1 EXISTING AIR HANDLING UNIT TO BE REMOVED.
C-9
C-12
(E) 5" CHS/R DN (E) 2" HWS/R DN
(E) 3" CHS/R
(E) 1-1/2" HWS/R
(E) 3" CHS/R
(E) 1-1/2" HWS/R
(E) 202C-AH-1 (E) 202C-AH-2
11
3-8 3-9 3-10 3-11 3-12 3-13 3-14
ATTIC MECHANICAL PIPING
DEMOLITION PLAN
FIN
AL C
ON
ST
RU
CT
IO
N D
OC
UM
EN
TS
18756 Stone Oak Parkway, Suite 200
t: 888.900.3823 www.schwabeng.com
SAN ANTONIO, TX 78258
PROJECT NO.: 02164822.00
FINAL CONSTRUCTION
DOCUMENTS
KEY PLAN
GENERAL NOTES
KEY NOTES
1
ATTIC MECHANICAL PIPING DEMOLITION PLAN - C WING
N
C WING
WAITING
344 SF
1C107
CORRIDOR
1,555 SF
1C111
RECEPTION/
ADMIN. AREA
353 SF
1C112
PRIVATE
ADMIN. OFFICE
55 SF
1C112A
PATIENT
IN-TAKE
116 SF
1C113
PATIENT
IN-TAKE
116 SF
1C178
CORRIDOR
109 SF
1C115
SUB-WAITING
102 SF
1C114
PROVIDER
OFFICE
119 SF
1C116
GROUP ROOM 1
292 SF
1C120
PROVIDER
OFFICE
119 SF
1C117
PROVIDER
OFFICE
117 SF
1C118
PROVIDER
OFFICE
120 SF
1C119
IDF ROOM
57 SF
1C122
PROVIDER
OFFICE
117 SF
1C123
PROVIDER
OFFICE
117 SF
1C124
PROVIDER
OFFICE
119 SF
1C125
CORRIDOR
108 SF
1C126
PROVIDER
OFFICE
119 SF
1C129
GROUP ROOM 2
290 SF
1C128
PROVIDER
OFFICE
119 SF
1C130
PROVIDER
OFFICE
117 SF
1C131
PROVIDER
OFFICE
115 SF
1C135
PROVIDER
OFFICE
120 SF
1C132
JANITOR
CLOSET
44 SF
1C133
ELECTRICAL
CLOSET
47 SF
1C134
GROUP ROOM 3
265 SF
1C137
PROVIDER
OFFICE
119 SF
1C161
PROVIDER
OFFICE
117 SF
1C160
PROVIDER
OFFICE
119 SF
1C163
PROVIDER
OFFICE
119 SF
1C164
COPY ROOM
92 SF
1C162
PROVIDER
OFFICE
117 SF
1C165
PROVIDER
OFFICE
115 SF
1C167
PROVIDER
OFFICE
119 SF
1C169
PROVIDER
OFFICE
119 SF
1C168
WOMEN'S
TOILET
65 SF
1C170
MEN'S
TOILET
65 SF
1C171
PROVIDER
OFFICE
119 SF
1C172
PROVIDER
OFFICE
119 SF
1C173
PROVIDER
OFFICE
117 SF
1C174
STUDENT
WORK ROOM
229 SF
1C176
GROUP ROOM 5
225 SF
1C177
PROVIDER
OFFICE
120 SF
1C166
SUB-WAITING
71 SF
1C175
MECHANICAL
SHAFT
136 SF
1C127
ELECTRONICS
CLOSET
31 SF
1C121
C-4
C-12
C-14
C1-112
TU
C1-129
TU
C1-161
TU
C1-172
TU
C1-117
TU
C1-116
TU
C1-118
TU
C1-111
TU
C1-119
TU
C1-123
TU
C1-124
TU
C1-125
TU
C1-128
TU
C1-131
TU
C1-130
TU
C1-144
TU
C1-132
TU
C1-135
C1-137
TU
C1-165
TU
C1-167
TU
C1-175
TU
C1-174
TU
C1-120
TU
C1-178
TU
C1-113
TU
C1-173
TU
C1-169
TU
C1-177
TU
C1-176
TU
C1-168
TU
C1-166
TU
200
RG-23
125
SD-1
175
SD-13
350
RG-25
125
SD-1
275
SD-13
200
SD-12
200
SD-12
200
SD-12
200
SD-12
200
SD-12
125
SD-11
200
RG-23
125
SD-11
125
RG-22
550
RG-26
275
SD-13
125
RG-22
200
RG-23
200
RG-23
200
SD-12
125
RG-22
125
RG-22
200
RG-23
200
RG-23
200
SD-12
200
RG-23
250
SD-13
125
SD-11
125
SD-11
370
RG-25
125
RG-22
125
SD-11
125
RG-22
185
SD-14
350
RG-25
175
SD-13
175
SD-13
225
SD-13
225
SD-13
225
SD-13
225
RG-23
100
SD-11
125
SD-11
125
RG-22
225
RG-23
225
SD-13
125
RG-22
125
SD-11
225
SD-13
225
RG-23
225
SD-13
225
SD-13
225
RG-23
125
SD-11
225
RG-23
225
SD-13
125
SD-11
125
RG-22
225
RG-23
125
SD-11
225
RG-23
225
SD-13
150
SD-12
185
SD-14
100
SD-11
250
SD-15
250
SD-15
C1-134
TU
C1-152
TU
250
SD-13
250
SD-13
200
SD-12
200
RG-23
600
RG-26
(E) 30X16
(E
) 38X
20
(E) 28X16
(E) 32X14(E) 30X14
(
E
)
2
5
X
1
4
(E) 32X16
(E) 28X16
(E
) 32X
16
(E) 35X22
(E) 25X18
(E) 25X16
(E) 22X18
(E) 20X18
(E) 20X14(E) 18X14
10X10
18X12
24X
18
20X16
(E
) 1
4X
12
(E) 14X8
(E) 12X8
(E) 20X16
(E) 24X16
(E
) 30
X1
6
325
SD-13
C1-106
TU
4
8"Ø
10"Ø
8"Ø
10"Ø
12"Ø
125
RG-22
10"Ø
3
125
RG-22
100
EG-1
(TYP 2)
275
SD-13
185
SD-14
10"Ø
185
SD-14
175
SD-13
16X10
16X1216X12
75
EG-1
10X10
18X
14
8X8
3
150
RG-22
350
RG-25
20X14
16X12
14X12
2
1
C1-112A
TU
C1-164
TU
C1-163
TU
C1-162
TU
625
RG-26
C1-121
TU
450
RG-25
5
6
6
6
6
C1-122
FCU
75
SD-11
75
SD-11
7
8
9
10
11
12
MA
TC
HLIN
E 'C
A'
MA
TC
HLIN
E 'C
A'
MA
TC
HLIN
E 'A
B'
MA
TC
HLIN
E 'A
B'
RETURN
RETURN
RETURN
SUPPLY
SUPPLY
SUPPLY
SUPPLY
SUPPLY
RETURN
SUPPLY
EXHAUST
EXHAUST
EXHAUST
SUPPLY
SUPPLY
RETURN
8"Ø
10"Ø
10"Ø
12"Ø
12"Ø
RETURN
12X10
12"Ø
12"Ø
1. EXISTING CONDITIONS ARE PER AS-BUILT DRAWINGS AND SITE
SURVEY. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING
CONDITIONS PRIOR TO INSTALLATION OF ANY WORK.
2. SEE AIR DEVICE AND TERMINAL UNIT SCHEDULES FOR SIZE OF
BRANCH DUCTWORK CONNECTED TO DEVICES.
3. COORDINATE THE DESIGN AND SHOP DRAWINGS OF THE NEW
DUCTWORK SUPPORT AND BRACING SYSTEMS WITH THE EXISTING
STRUCTURE.
MAKE POINT OF CONNECTION TO EXISTING SUPPLY DUCT. PROVIDE AIR
TIGHT CONNECTIONS, ADD INSULATION AS REQUIRED.
MAKE POINT OF CONNECTION TO EXISTING RETURN DUCT. PROVIDE AIR
TIGHT CONNECTIONS, ADD INSULATION AS REQUIRED.
MAKE POINT OF CONNECTION TO EXISTING EXHAUST DUCT. PROVIDE
AIR TIGHT CONNECTIONS, ADD INSULATION AS REQUIRED.
EXISTING 38X20 RETURN AIR DUCT UP.
PROVIDE NEW COMBINATION FIRE SMOKE DAMPER AT NEW DUCT
PENETRATION THROUGH SHAFT WALL.
EXISTING FIRE DAMPER OR COMBINATION FIRE SMOKE DAMPER TO
REMAIN. PROTECT IN PLACE.
CAP (E) DUCT.
EXISTING 25X30 RELIEF AIR DUCT UP AND DOWN.
EXISTING 16X18 EXHAUST AIR DUCT UP.
EXISTING 35X30 SUPPLY AIR DUCT UP.
EXISTING 30X25 RELIEF AIR DUCT UP AND DOWN.
EXISTING 30X16 RETURN AIR DUCT UP.
TEMPORARILY CAP THIS (E) 16x14 SA DUCT. WHEN THE REMODEL
CONSTRUCTION FOR DOM D TAKES PLACE, THIS SA DUCT WILL
CONNECT TO TU-C1-100.
TEMPORARILY CONNECT TU-C1-100 TO THE SUPPLY AIR DUCT FROM
AHU-C1 AS SHOWN. WHEN THE REMODEL CONSTRUCTION FOR DOM D
TAKES PLACE, TU-C1-100 WILL BE CONNECTED TO THE SUPPLY AIR
DUCT FROM AHU-D1.
TEMPORARILY CONNECT RA GRILLE TO THE RETURN AIR DUCT FROM
AHU-C1 AS SHOWN. WHEN THE REMODEL CONSTRUCTION FOR DOM D
TAKES PLACE, THIS RA GRILLE WILL BE CONNECTED TO THE EXHAUST
AIR DUCT FROM EF-D1.
PROVIDE FLEXIBLE DUCT CONNECTION AT EXPANSION JOINT.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
3-8 3-9 3-10 3-11 3-12 3-13 3-14
C-5
C-8
C-9
C-12
C-13
C-14
FIRST FLOOR WEST
MECHANICAL PLAN
FIN
AL C
ON
ST
RU
CT
IO
N D
OC
UM
EN
TS
18756 Stone Oak Parkway, Suite 200
t: 888.900.3823 www.schwabeng.com
SAN ANTONIO, TX 78258
PROJECT NO.: 02164822.00
FINAL CONSTRUCTION
DOCUMENTS
KEY PLAN
GENERAL NOTES
KEY NOTES
1
FIRST FLOOR WEST MECHANICAL PLAN - C WING
ND
C
E
A
B
PROVIDER
OFFICE
117 SF
1C131
PROVIDER
OFFICE
115 SF
1C135
PROVIDER
OFFICE
120 SF
1C132
JANITOR
CLOSET
44 SF
1C133
ELECTRICAL
CLOSET
47 SF
1C134
PROVIDER
OFFICE
119 SF
1C138
PROVIDER
OFFICE
119 SF
1C136
GROUP ROOM 3
265 SF
1C137
GROUP ROOM 4
246 SF
1C139
PROVIDER
OFFICE
119 SF
1C140
PROVIDER
OFFICE
119 SF
1C141
PROVIDER
OFFICE
117 SF
1C142
PROVIDER
OFFICE
116 SF
1C145
STAFF
LOUNGE
263 SF
1C146
TELEHEALTH
ROOM
81 SF
1C147
TELEHEALTH
ROOM
81 SF
1C151
WOMEN'S
TOILET
60 SF
1C149
MEN'S
TOILET
60 SF
1C150
STAIR 6
188 SF
1C153
CONFERENCE
ROOM
256 SF
1C154
PROVIDER
OFFICE
119 SF
1C155
PROVIDER
OFFICE
119 SF
1C156
PROVIDER
OFFICE
117 SF
1C157
PROVIDER
OFFICE
117 SF
1C159
PROVIDER
OFFICE
119 SF
1C161
PROVIDER
OFFICE
117 SF
1C160
PROVIDER
OFFICE
119 SF
1C163
PROVIDER
OFFICE
119 SF
1C164
COPY ROOM
92 SF
1C162
CORRIDOR
109 SF
1C148
PROVIDER
OFFICE
120 SF
1C158
CORRIDOR
1456 SF
1C152
STORAGE
36 SF
1C143
SUB-WAITING
71 SF
1C144
C-5
C-8
C-9
C-12
C-13
C-14
C1-161
TU
C1-144
TU
C1-147
TU
C1-151
TU
C1-146
TU
C1-145
TU
C1-154
TU
C1-132
TU
C1-135
TU
C1-138
TU
C1-141
TU
C1-142
TU
C1-157
TU
C1-158
TU
C1-139
TU
C1-160
TU
C1-137
TU
C1-155
TU
C1-159
TU
C1-136
TU
225
SD-1
150
SD-12
225
RG-23
175
SD-13
C1-156
TU
125
SD-1
175
SD-13
200
SD-12
200
SD-12200
SD-12
200
SD-12
200
SD-12
125
RG-22
200
RG-23
200
RG-23
200
RG-23
200
RG-23
200
SD-12
200
RG-23
200
RG-23
175
SD-13
350
EG-2
100
SD-11
100
SD-11
100
SD-11
100
RG-21
100
RG-21
50
SD-11
250
SD-13
125
SD-11
225
SD-13
125
SD-11
125
SD-11
125
RG-22
225
RG-23
225
SD-13
225
SD-13
125
RG-22
225
RG-23
225
SD-13
125
SD-11
150
SD-12
125
RG-22
300
RG-24
C1-134
TU
500
RG-26
250
SD-13
200
SD-12
200
RG-23
650
RG-26
125
RG-22
125
SD-11
125
RG-22
250
SD-13
250
SD-13
350
RG-25
(E) 26X16
(E) 16X10
(E) 14X10
(E) 10X10
(E) 28X16
(E) 24X16
(E) 30X10
(E) 18X10
(E) 12X10
(E) 12X10
(E) 10X8
(E) 30X10(E) 14X12
(E) 14X10
(E) 22X16
(E) 16X14
(E) 12X8
(E) 8X6
(E) 16X14
(E) 18X16
(E) 20X16
10"Ø
8"Ø
6"Ø
10
"Ø
10
Ø
(TYP.)
150
SD-12
150
SD-12
1
2
(TYP.)
1
(TYP.)
175
SD-13
150
SD-12
225
RG-23
(E) 30X18
75
EG-1
90
EG-1
8X
8
150
RG-22
350
RG-25
14
Ø
C1-164
TU
C1-162
TU
125
SD-11
C1-140
TU
10Ø
MA
TC
HL
IN
E 'A
B'
MA
TC
HL
IN
E 'A
B'
RETURN
RETURN
RETURN
SUPPLY
SUPPLY
EXHAUST
EXHAUST
EXHAUST
12"Ø
12"Ø
10
"Ø
10
"Ø
10
"Ø
(TYP.)
2
3
12X10
10x10
1. EXISTING CONDITIONS ARE PER AS-BUILT DRAWINGS AND SITE
SURVEY. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING
CONDITIONS PRIOR TO INSTALLATION OF ANY WORK.
2. SEE AIR DEVICE AND TERMINAL UNIT SCHEDULES FOR SIZE OF
BRANCH DUCTWORK CONNECTED TO DEVICES.
3. COORDINATE THE DESIGN AND SHOP DRAWINGS OF THE NEW
DUCTWORK SUPPORT AND BRACING SYSTEMS WITH THE EXISTING
STRUCTURE.
MAKE POINT OF CONNECTION TO EXISTING SUPPLY DUCT. PROVIDE AIR
TIGHT CONNECTIONS, ADD INSULATION AS REQUIRED.
MAKE POINT OF CONNECTION TO EXISTING RETURN DUCT. PROVIDE AIR
TIGHT CONNECTIONS, ADD INSULATION AS REQUIRED.
MAKE POINT OF CONNECTION TO EXISTING EXHAUST DUCT. PROVIDE
AIR TIGHT CONNECTIONS, ADD INSULATION AS REQUIRED.
EXISTING 38X20 RETURN AIR DUCT UP.
PROVIDE NEW COMBINATION FIRE SMOKE DAMPER AT NEW DUCT
PENETRATION THROUGH SHAFT WALL.
EXISTING FIRE DAMPER OR COMBINATION FIRE SMOKE DAMPER TO
REMAIN. PROTECT IN PLACE.
CAP (E) DUCT.
EXISTING 25X30 RELIEF AIR DUCT UP AND DOWN.
EXISTING 16X18 EXHAUST AIR DUCT UP.
EXISTING 35X30 SUPPLY AIR DUCT UP.
EXISTING 30X25 RELIEF AIR DUCT UP AND DOWN.
EXISTING 30X16 RETURN AIR DUCT UP.
TEMPORARILY CAP THIS (E) 16x14 SA DUCT. WHEN THE REMODEL
CONSTRUCTION FOR DOM D TAKES PLACE, THIS SA DUCT WILL
CONNECT TO TU-C1-100.
TEMPORARILY CONNECT TU-C1-100 TO THE SUPPLY AIR DUCT FROM
AHU-C1 AS SHOWN. WHEN THE REMODEL CONSTRUCTION FOR DOM D
TAKES PLACE, TU-C1-100 WILL BE CONNECTED TO THE SUPPLY AIR
DUCT FROM AHU-D1.
TEMPORARILY CONNECT RA GRILLE TO THE RETURN AIR DUCT FROM
AHU-C1 AS SHOWN. WHEN THE REMODEL CONSTRUCTION FOR DOM D
TAKES PLACE, THIS RA GRILLE WILL BE CONNECTED TO THE EXHAUST
AIR DUCT FROM EF-D1.
PROVIDE FLEXIBLE DUCT CONNECTION AT EXPANSION JOINT.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
3-14 3-15 3-17 3-183-16
FIRST FLOOR EAST
MECHANICAL PLAN
FIN
AL C
ON
ST
RU
CT
IO
N D
OC
UM
EN
TS
18756 Stone Oak Parkway, Suite 200
t: 888.900.3823 www.schwabeng.com
SAN ANTONIO, TX 78258
PROJECT NO.: 02164822.00
FINAL CONSTRUCTION
DOCUMENTS
KEY PLAN
GENERAL NOTES
KEY NOTES
1
FIRST FLOOR EAST MECHANICAL PLAN - C WING
N D
C
E
A
B
LOBBY &
D WING WAITING
766 SF
1C100
CORRIDOR
332 SF
1C101
RECEPTION
101 SF
1C102
FIRE PROT.
CLOSET
11 SF
1C102A
STAIR 5
208 SF
1C103
ELECTRICAL
CLOSET
50 SF
1C104
ELEVATOR
LOBBY
290 SF
1C106
CORRIDOR
208 SF
1C105
C WING
WAITING
344 SF
1C107
CORRIDOR
243 SF
1C108
PRIVATE
ADMIN. OFFICE
55 SF
1C112A
MEN'S
TOILET
59 SF
1C109
WOMEN'S
TOILET
55 SF
1C110
CORRIDOR
1557 SF
1D100
RECEPTION/
ADMIN. AREA
389 SF
1D101
PRIVATE
ADMIN. OFFICE
58 SF
1D101A
PROVIDER
OFFICE
119 SF
1D105
PATIENT
IN-TAKE
116 SF
1D102
CORRIDOR
109 SF
1D104SUB-WAITING
102 SF
1D103
PROVIDER
OFFICE
119 SF
1D106
PROVIDER
OFFICE
STUDENT
WORK ROOM
229 SF
1D165
GROUP ROOM 5
225 SF
1D166
PATIENT
IN-TAKE
116 SF
1D167
SUB-WAITING
71 SF
1D164
MECH.
73 SF
1C178
3-8
C-3
3-7
C-4
C-10
C-9
D-4
D-6
3-2 3-5.1
3-7
3-3 3-5
C-11
4-114-104-94-8
C-12
125
RG-22
(
E
)
2
5
X
1
4
(E) 16X14
400
SD-54
275
SD-12
300
SD-13
125
SD-11
C1-100
TU
C1-102
TU
C1-104
TU
225
SD-12
350
SD-13
12X12
325
SD-13
325
SD-13
C1-107
TU
C1-106
TU
65
SD-11
(TYP 2)
90
EG-1
(TYP 2)
8"Ø
16X1010X10
8X8
(TYP 2)
18X14
225
RG-23
125
RG-22
445
RG-25
700
RG-26
675
RG-26
D1-101
TU
125
SD-11
125
RG-22
675
RG-26
275
SD-13
(E) 25X14
(E
) 25X
12
(E) 16X14
275
SD-13
500
RG-25
10x10
(E) 12x10
D1-101A
TU
125
SD-11
12X
12
LIM
IT
O
F W
OR
K
MA
TC
HLIN
E 'C
A'
SUPPLY
RETURN
SUPPLY
EXHAUST
RETURN
1
(TYP.)
13
16X12
16X12
SUPPLY
18X12
20x12
16X12
16X12
14
15
15
16
16
1. EXISTING CONDITIONS ARE PER AS-BUILT DRAWINGS AND SITE
SURVEY. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING
CONDITIONS PRIOR TO INSTALLATION OF ANY WORK.
2. SEE AIR DEVICE AND TERMINAL UNIT SCHEDULES FOR SIZE OF
BRANCH DUCTWORK CONNECTED TO DEVICES.
3. COORDINATE THE DESIGN AND SHOP DRAWINGS OF THE NEW
DUCTWORK SUPPORT AND BRACING SYSTEMS WITH THE EXISTING
STRUCTURE.
MAKE POINT OF CONNECTION TO EXISTING SUPPLY DUCT. PROVIDE AIR
TIGHT CONNECTIONS, ADD INSULATION AS REQUIRED.
MAKE POINT OF CONNECTION TO EXISTING RETURN DUCT. PROVIDE AIR
TIGHT CONNECTIONS, ADD INSULATION AS REQUIRED.
MAKE POINT OF CONNECTION TO EXISTING EXHAUST DUCT. PROVIDE
AIR TIGHT CONNECTIONS, ADD INSULATION AS REQUIRED.
EXISTING 38X20 RETURN AIR DUCT UP.
PROVIDE NEW COMBINATION FIRE SMOKE DAMPER AT NEW DUCT
PENETRATION THROUGH SHAFT WALL.
EXISTING FIRE DAMPER OR COMBINATION FIRE SMOKE DAMPER TO
REMAIN. PROTECT IN PLACE.
CAP (E) DUCT.
EXISTING 25X30 RELIEF AIR DUCT UP AND DOWN.
EXISTING 16X18 EXHAUST AIR DUCT UP.
EXISTING 35X30 SUPPLY AIR DUCT UP.
EXISTING 30X25 RELIEF AIR DUCT UP AND DOWN.
EXISTING 30X16 RETURN AIR DUCT UP.
TEMPORARILY CAP THIS (E) 16x14 SA DUCT. WHEN THE REMODEL
CONSTRUCTION FOR DOM D TAKES PLACE, THIS SA DUCT WILL
CONNECT TO TU-C1-100.
TEMPORARILY CONNECT TU-C1-100 TO THE SUPPLY AIR DUCT FROM
AHU-C1 AS SHOWN. WHEN THE REMODEL CONSTRUCTION FOR DOM D
TAKES PLACE, TU-C1-100 WILL BE CONNECTED TO THE SUPPLY AIR
DUCT FROM AHU-D1.
TEMPORARILY CONNECT RA GRILLE TO THE RETURN AIR DUCT FROM
AHU-C1 AS SHOWN. WHEN THE REMODEL CONSTRUCTION FOR DOM D
TAKES PLACE, THIS RA GRILLE WILL BE CONNECTED TO THE EXHAUST
AIR DUCT FROM EF-D1.
PROVIDE FLEXIBLE DUCT CONNECTION AT EXPANSION JOINT.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
FIRST FLOOR CONNECTING LINK
MECHANICAL PLAN
FIN
AL C
ON
ST
RU
CT
IO
N D
OC
UM
EN
TS
18756 Stone Oak Parkway, Suite 200
t: 888.900.3823 www.schwabeng.com
SAN ANTONIO, TX 78258
PROJECT NO.: 02164822.00
FINAL CONSTRUCTION
DOCUMENTS
KEY PLAN
GENERAL NOTES
KEY NOTES
1
FIRST FLOOR CONNECTING LINK MECHANICAL PLAN - C WING
N
D
C
E
A
B
1. EXISTING CONDITIONS ARE PER AS-BUILT DRAWINGS AND SITE
SURVEY. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING
CONDITIONS PRIOR TO INSTALLATION OF ANY WORK.
2. SEE AIR DEVICE AND TERMINAL UNIT SCHEDULES FOR SIZE OF
BRANCH DUCTWORK CONNECTED TO DEVICES.
3. COORDINATE THE DESIGN AND SHOP DRAWINGS OF THE NEW
DUCTWORK SUPPORT AND BRACING SYSTEMS WITH THE
EXISTING STRUCTURE.
1 EXISTING 16X18 EA DUCT UP AND DOWN.
EXISTING 35X30 SA DUCT UP AND DOWN.
EXISTING 38X20 RA DUCT UP AND DOWN.
EXISTING 25X30 REA DUCT UP AND DOWN.
EXISTING 30X25 REA DUCT UP AND DOWN.
EXISTING 30X16 RA DUCT UP AND DOWN.
TEMPORARILY CONNECT THIS 12x12 EA DUCT TO THE (E) 18x12 RA
DUCT AS SHOWN. WHEN THE REMODEL CONSTRUCTION FOR DOM D
TAKES PLACE, THIS EA DUCT WILL CONNECT TO A NEW EA DUCT.
CAP (E) DUCT.
2
3
4
5
6
7
8
RECEPTION/
ADMIN. AREA
353 SF
2C211
PROVIDER
OFFICE
119 SF
2C262
C WING
WAITING
344 SF
2C206
CORRIDOR
1,555 SF
2C210
PRIVATE
ADMIN. OFFICE
55 SF
2C211A
PATIENT
IN-TAKE
120 SF
2C270
STAIR 10
113 SF
2C213
CORRIDOR
109 SF
2C214
SUB-WAITING
102 SF
2C216
PROVIDER
OFFICE
119 SF
2C215
GROUP ROOM 1
336 SF
2C212
PROVIDER
OFFICE
119 SF
2C217
PROVIDER
OFFICE
117 SF
2C223
PROVIDER
OFFICE
119 SF
2C224
CORRIDOR
108 SF
2C225
PROVIDER
OFFICE
119 SF
2C227
2C226
GROUP ROOM 2
290 SF
2C226
PROVIDER
OFFICE
119 SF
2C228
JANITOR
CLOSET
44 SF
2C231
ELECTRICAL
CLOSET
47 SF
2C232
GROUP ROOM 3
265 SF
2C233
PROVIDER
OFFICE
119 SF
2C259
PROVIDER
OFFICE
117 SF
2C258
PROVIDER
OFFICE
119 SF
2C261
COPY ROOM
92 SF
2C260
PROVIDER
OFFICE
119 SF
2C267
PROVIDER
OFFICE
119 SF
2C266
WOMEN'S
TOILET
65 SF
2C268
MEN'S
TOILET
65 SF
2C269
PROVIDER
OFFICE
119 SF
2C271
PROVIDER
OFFICE
119 SF
2C272
STUDENT
WORK ROOM
229 SF
2C275
GROUP ROOM 5
225 SF
2C276
PROVIDER
OFFICE
117 SF
2C218
PROVIDER
OFFICE
117 SF
2C222
PROVIDER
OFFICE
117 SF
2C229
PROVIDER
OFFICE
115 SF
2C234
PROVIDER
OFFICE
117 SF
2C263
PROVIDER
OFFICE
115 SF
2C265
PROVIDER
OFFICE
117 SF
2C273
SUB-WAITING
71 SF
2C274
PROVIDER
OFFICE
120 SF
2C264
PROVIDER
OFFICE
120 SF
2C219
PROVIDER
OFFICE
120 SF
2C230
IDF ROOM
57 SF
2C221
ELECTRONICS
CLOSET
31 SF
2C220
C-4
C-12
C-14
C2-259
TU
C2-261
TU
C2-262
TU
C2-263
TU
C2-264
TU
C2-260
TU
C2-226
TU
C2-265
TU
C2-266
TU
C2-267
TU
C2-272
TU
C2-271
TU
C2-273
TU
C2-275
TU
C2-276
TU
C2-212
TU
C2-211
TU
C2-211A
TU
C2-270
TU
C2-234
TU
C2-230
TU
C2-229
TU
C2-228
TU
C2-227
TU
C2-223
TU
C2-224
TU
C2-210
TU
C2-222
TU
C2-219
TU
C2-218
TU
C2-217
TU
C2-215
TU
C2-200
TU
(E)34X16
(E)32X16
(E) 30X14
(E) 28X14
(E) 24X18
(E) 18X14
(E
) 40X
20
(E) 24X18
(E) 26X20
(E) 22X20
(E) 22X18
(E) 24X14
(E) 18X14
20X
14
12X8
(E) 26X16
(E) 30X16
(E) 26X16
(E) 24X16
(E) 22X12
(E) 20X12(E) 18X12
(E) 14X12
(E
) 32
X2
0
(E) 24X18
(E) 24X16
(E
) 16
X1
2
(E) 12X8
(E) 12X8
(E) 26X14
(E
) 1
8X
12
(E) 14X10
(E
) 1
0X
10
(E) 24X14
(E) 30X14
6"Ø
6"Ø
6"Ø
6"Ø
200
RG-23
200
SD-12
200
SD-12
200
RG-23
125
RG-22
200
RG-23
125
RG-22
200
SD-12
200
SD-12
200
RG-23
200
RG-23
125
SD-11
200
SD-12
200
SD-12
200
RG-23
200
RG-23
125
SD-11
125
RG-22
125
RG-22
200
SD-12
8"Ø
6"Ø
6"Ø
8"Ø
8"Ø
8"Ø
8"Ø
250
SD-13
125
SD-11
550
RG-26
275
SD-13
125
RG-22
12"Ø
225
SD-13
125
SD-11
225
SD-13
225
RG-23
225
RG-23
225
SD-13
125
SD-11
225
RG-23
125
RG-22
225
SD-13
6"Ø
8"Ø
225
SD-13
8"Ø
225
RG-23
125
SD-11
125
SD-11
225
SD-13
225
RG-23
125
RG-22
8"Ø
6"Ø
125
RG-22
250
SD-13
150
SD-12
6"Ø
350
RG-24
8"Ø
150
RG-23
175
SD-12
200
SD-12
250
SD-13
450
RG-25
200
RG-23
250
SD-13
125
SD-11
125
SD-11
250
RG-23
225
SD-13
225
SD-13
125
SD-11
250
SD-13
125
RG-22
100
SD-11
250
RG-24
12"Ø
10"Ø
6"Ø
190
SD-12
380
RG-24190
SD-12
200
SD-12
250
SD-13
225
RG-23
100
SD-11
275
SD-13
8"Ø
250
SD-13
250
RG-24
175
SD-12
8"Ø
750
RG-26
125
RG-22
250
SD-13
500
RG-26
125
RG-22
250
SD-16
225
RG-23
C2-233
TU
18X10
18X14
100
EG-1
(TYP 2)
8Ø
75
EG-1
C2-220
TU
C2-232
TU
C2-274
TU
C2-221
FCU
75
SD-11
75
SD-11
125
SD-11
125
SD-11
125
SD-11
1
2
3
4
5
6
MA
TC
HLIN
E 'C
A'
MA
TC
HLIN
E 'C
A'
MA
TC
HLIN
E 'A
B'
MA
TC
HLIN
E 'A
B'
SUPPLY
SUPPLY
SUPPLY
SUPPLY
SUPPLY
RETURN
EXHAUST
EXHAUSTEXHAUST
RETURN
RETURN
12X12
8"Ø
8"Ø
6"Ø
12"Ø
12"Ø
8"Ø
8"Ø
8
(TYP)
(TYP)
RETURN
RETURN
10Ø
3-8 3-9 3-10 3-11 3-12 3-13 3-14
C-5
C-8
C-9
C-12
C-13
C-14
SECOND FLOOR WEST
MECHANICAL PLAN
FIN
AL C
ON
ST
RU
CT
IO
N D
OC
UM
EN
TS
18756 Stone Oak Parkway, Suite 200
t: 888.900.3823 www.schwabeng.com
SAN ANTONIO, TX 78258
PROJECT NO.: 02164822.00
FINAL CONSTRUCTION
DOCUMENTS
KEY PLAN
GENERAL NOTES
KEY NOTES
1
SECOND FLOOR WEST MECHANICAL PLAN - C WING
N
1. EXISTING CONDITIONS ARE PER AS-BUILT DRAWINGS AND SITE
SURVEY. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING
CONDITIONS PRIOR TO INSTALLATION OF ANY WORK.
2. SEE AIR DEVICE AND TERMINAL UNIT SCHEDULES FOR SIZE OF
BRANCH DUCTWORK CONNECTED TO DEVICES.
3. COORDINATE THE DESIGN AND SHOP DRAWINGS OF THE NEW
DUCTWORK SUPPORT AND BRACING SYSTEMS WITH THE
EXISTING STRUCTURE.
1 EXISTING 16X18 EA DUCT UP AND DOWN.
EXISTING 35X30 SA DUCT UP AND DOWN.
EXISTING 38X20 RA DUCT UP AND DOWN.
EXISTING 25X30 REA DUCT UP AND DOWN.
EXISTING 30X25 REA DUCT UP AND DOWN.
EXISTING 30X16 RA DUCT UP AND DOWN.
TEMPORARILY CONNECT THIS 12x12 EA DUCT TO THE (E) 18x12 RA
DUCT AS SHOWN. WHEN THE REMODEL CONSTRUCTION FOR DOM D
TAKES PLACE, THIS EA DUCT WILL CONNECT TO A NEW EA DUCT.
CAP (E) DUCT.
2
3
4
5
6
7
8
PROVIDER
OFFICE
119 SF
2C262
JANITOR
CLOSET
44 SF
2C231
ELECTRICAL
CLOSET
47 SF
2C232
PROVIDER
OFFICE
119 SF
2C236
PROVIDER
OFFICE
119 SF
2C235
GROUP ROOM 3
265 SF
2C233
GROUP ROOM 4
246 SF
2C237
PROVIDER
OFFICE
119 SF
2C238
PROVIDER
OFFICE
119 SF
2C239
STAFF
LOUNGE
263 SF
2C244
TELEHEALTH
ROOM
81 SF
2C245
TELEHEALTH
ROOM
81 SF
2C249
WOMEN'S
TOILET
60 SF
2C247
MEN'S
TOILET
60 SF
2C248
STAIR 6
188 SF
2C251
CONFERENCE
ROOM
256 SF
2C252
PROVIDER
OFFICE
119 SF
2C253
PROVIDER
OFFICE
119 SF
2C254
PROVIDER
OFFICE
119 SF
2C259
PROVIDER
OFFICE
117 SF
2C258
PROVIDER
OFFICE
119 SF
2C261
COPY ROOM
92 SF
2C260
CORRIDOR
108 SF
2C246
CORRIDOR
1433 SF
2C250
PROVIDER
OFFICE
117 SF
2C229
PROVIDER
OFFICE
115 SF
2C234
PROVIDER
OFFICE
117 SF
2C240
PROVIDER
OFFICE
116 SF
2C243
STORAGE
36 SF
2C241
SUB-WAITING
71 SF
2C242
PROVIDER
OFFICE
117 SF
2C255
PROVIDER
OFFICE
117 SF
2C257
PROVIDER
OFFICE
120 SF
2C256
PROVIDER
OFFICE
120 SF
2C230
C-5
C-8
C-9
C-12
C-13
C-14
C2-244
TUC2-243
TU
C2-245
TU
C2-252
TU
C2-240
TU
C2-239
TU
C2-238
TU
C2-236
TU
C2-242
TU
C2-254
TU
C2-253
TU
C2-255
TU
C2-256
TU
C2-257
TU
C2-258
TU
C2-259
TU
C2-237
TU
C2-261
TU
C2-235
TU
C2-234
TU
C2-230
TU
C2-229
TU
(E)32X16
(E)30X16
(E) 16X12
(E) 24X18 (E) 24X16 (E) 14X12(E) 12X8
(E) 26X20
20
X1
4
12X8
(E
) 2
4X
16
(E) 18X12
(E) 26X16
(E) 24X12
(E) 18X16
(E) 18X14
(E) 10X10
(E) 24X16
(E) 24X14
(E) 20X14
(E) 12X10
(E) 8X10
(E
) 1
6X
12
(E) 12X8
10
"Ø
8"Ø
8"Ø
6"Ø
6"Ø
100
SD-11
200
SD-12
200
SD-12
200
SD-12
200
RG-23
C2-249
TU
200
RG-23
200
RG-23
200
SD-12
200
SD-12
125
SD-11
125
RG-22
200
RG-23
125
SD-11
125
RG-22
200
SD-12
200
RG-23
200
SD-12
8"Ø
200
SD-12
200
RG-23
125
RG-22
8"Ø
8"Ø
8"Ø
8"Ø
100
SD-11
100
RG-21
100
RG-21
150
SD-12
300
RG-24
225
RG-23
125
SD-11
125
RG-22
225
SD-13
C2-250
TU
8"Ø
8"Ø
8"Ø
225
SD-13
225
RG-23
225
RG-23
125
SD-11
225
SD-13
125
RG-22
225
RG-23
225
SD-13
125
SD-11
125
RG-22
225
SD-13
8"Ø
250
SD-13
150
SD-12
300
RG-24
150
SD-12
6"Ø
350
RG-24
150
RG-23
175
SD-12
200
SD-12
250
SD-13
200
RG-23
8"Ø
(TYP)
6"Ø
100
SD-11
150
SD-12
150
SD-12
175
SD-12
400
RG-25
125
RG-22
250
SD-16
250
SD-16
500
RG-25
C2-233
TU
12X8
18X14
600
RG-26
24X16
12X12
90
EG-1
(TYP 2)
50
SD-11
125
SD-11
MA
TC
HL
IN
E 'A
B'
MA
TC
HL
IN
E 'A
B'
SUPPLY
SUPPLY
RETURN
EXHAUST
EXHAUST
RETURN
10"Ø
8"Ø
8"Ø
8"Ø
8"Ø
10"Ø
(TYP)
8
RETURN
3-14 3-15 3-17 3-183-16
SECOND FLOOR EAST
MECHANICAL PLAN
FIN
AL C
ON
ST
RU
CT
IO
N D
OC
UM
EN
TS
18756 Stone Oak Parkway, Suite 200
t: 888.900.3823 www.schwabeng.com
SAN ANTONIO, TX 78258
PROJECT NO.: 02164822.00
FINAL CONSTRUCTION
DOCUMENTS
KEY PLAN
GENERAL NOTES
KEY NOTES
1
SECOND FLOOR EAST MECHANICAL PLAN - C WING
N
1. EXISTING CONDITIONS ARE PER AS-BUILT DRAWINGS AND SITE
SURVEY. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING
CONDITIONS PRIOR TO INSTALLATION OF ANY WORK.
2. SEE AIR DEVICE AND TERMINAL UNIT SCHEDULES FOR SIZE OF
BRANCH DUCTWORK CONNECTED TO DEVICES.
3. COORDINATE THE DESIGN AND SHOP DRAWINGS OF THE NEW
DUCTWORK SUPPORT AND BRACING SYSTEMS WITH THE
EXISTING STRUCTURE.
1 EXISTING 16X18 EA DUCT UP AND DOWN.
EXISTING 35X30 SA DUCT UP AND DOWN.
EXISTING 38X20 RA DUCT UP AND DOWN.
EXISTING 25X30 REA DUCT UP AND DOWN.
EXISTING 30X25 REA DUCT UP AND DOWN.
EXISTING 30X16 RA DUCT UP AND DOWN.
TEMPORARILY CONNECT THIS 12x12 EA DUCT TO THE (E) 18x12 RA
DUCT AS SHOWN. WHEN THE REMODEL CONSTRUCTION FOR DOM D
TAKES PLACE, THIS EA DUCT WILL CONNECT TO A NEW EA DUCT.
CAP (E) DUCT.
2
3
4
5
6
7
8
D WING
WAITING
265 SF
2C202
STORAGE
142 SF
2C203
STAIR 5
206 SF
2C204
ELECTRICAL
CLOSET
51 SF
2C205
ELEVATOR
LOBBY
389 SF
2C200
CORRIDOR
208 SF
2C201
C WING
WAITING
344 SF
2C206
CORRIDOR
243 SF
2C207
PRIVATE
ADMIN. OFFICE
55 SF
2C211A
MEN'S
TOILET
59 SF
2C208
WOMEN'S
TOILET
55 SF
2C209
CORRIDOR
1043 SF
2D200
RECEPTION/
ADMIN. AREA
389 SF
2D201
PRIVATE
ADMIN. OFFICE
58 SF
2D201A
PROVIDER
OFFICE
119 SF
2D205
CORRIDOR
109 SF
2D204
PROVIDER
OFFICE
119 SF
2D207
STAIR 9
113 SF
2D203
STUDENT
WORK ROOM
229 SF
2D267
GROUP ROOM 4
225 SF
2D268
GROUP ROOM 1
336 SF
2D202
PROVIDER
SUB-WAITING
71 SF
2D266
3-8
C-3
3-7
C-4
3-2 3-5.1
3-7
C-10
C-9
D-4
D-6
D-1
4-114-104-94-8
C-12
C2-211A
TU
C2-200
TU
125
SD-11
125
RG-22
225
SD-13
200
SD-12
250
SD-13
150
SD-11
250
SD-53
150
SD-11
C2-206
TU
200
SD-12
(E) 15X12
(E) 20X9
C2-202
TU
(TYP 4)
175
SD-12
12X
12
350
RG-26
14X12
250
SD-53
10Ø
14X
10
225
RG-23
225
SD-13
C2-205
TU
12X12
65
SD-11
90
EG-1
(TYP 2)
(TYP 2)
18X10
625
RG-26
8X
8
625
RG-26
12X12
LIM
IT
O
F W
OR
K
(E) 18X14
(E) 22X12
(E) 18X12
D2-201
TU
D2-201A
TU
125
SD-11
275
SD-12
275
SD-12
550
RG-26
125
RG-22
(E) 18X12
7
MA
TC
HLIN
E 'C
A'
RETURN
SUPPLY
SUPPLY
EXHAUST
10"Ø
8"Ø
(TYP)
(TYP)
350
RG-26
150
RG-23
10Ø
6Ø
RETURN
SECOND FLOOR CONNECTING LINK
MECHANICAL PLAN
FIN
AL C
ON
ST
RU
CT
IO
N D
OC
UM
EN
TS
18756 Stone Oak Parkway, Suite 200
t: 888.900.3823 www.schwabeng.com
SAN ANTONIO, TX 78258
PROJECT NO.: 02164822.00
FINAL CONSTRUCTION
DOCUMENTS
KEY PLAN
GENERAL NOTES
KEY NOTES
1
SECOND FLOOR CONNECTING LINK MECHANICAL PLAN - C WING
N
C-9
C-12
C1
AHU
C2
AHU
(E)28x16SA DN(E)30x20 SA DN.
(E)38x25 OA
(E)40x20 RA
(E)24x18SA(E)22x20SA
(E)16x10EA
(E)52x27SA
(E)25x34 SA ABOVE
(E)42x25 OA
(E)38x25 OA
(E)30x20 RA
(E)16x30 RA
(E)30x30 RA
(E)38x25 RA
(E)38X20 RA DN
(E)30x16 RA DN
(E)32x32 RA
20x14 EA BELOW
25x42 OA DN
TO AHU-C2
25x42 EA DN
TO AHU-C2
80x18 RA
1
2
C2
EF
16x16 EA
3
C1
EF
16x16 EA
25x38 REA DN
TO AHU-C1
25x38 OA DN
TO AHU-C1
80x18 RA
(E) 30x30 RA
16x16 EA
16x16 EA
4
A
A
(E) 18X18 EA
(E) 8'-0" ROUND
LOUVER
72x24
DUCT SMOKE
DETECTOR (TYP)
SD
SD
AFMD
AFMD
AFMD
C1-RA-1
AFMD
C1-RA-2
AFMD
(E)24x28 RA
C1-OA
AFMD
5
5
5
AFMD
C2-RA
AFMD
6
AFMD
C2-OA
AFMD
6
(E) 30x24 REA DN
42x25 REA DN
8
1. EXISTING CONDITIONS ARE PER AS-BUILT DRAWINGS AND SITE
SURVEY. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING
CONDITIONS PRIOR TO INSTALLATION OF ANY WORK.
2. COORDINATE THE DESIGN AND SHOP DRAWINGS OF THE NEW
DUCTWORK SUPPORT AND BRACING SYSTEMS WITH THE EXISTING
STRUCTURE.
1 EXTEND CONCRETE CURB 92" TO THE WEST.
EXTEND CONCRETE CURB 4" TO THE NORTH AND 64" TO THE WEST.
CONNECT 16x18 EA TO (E) DUCT AT FLOOR LEVEL. EXISTING FIRE
DAMPER TO REMAIN IN PLACE.
CONNECT 30x30 EA TO (E) LOUVER. PROVIDE SHEETMETAL FLANGE
AROUND CONNECTION.
INSTALL NEW AIRFLOW MEASURING DEVICE (AFMD) IN EXISTING
DUCT.
INSTALL NEW AIRFLOW MEASURING DEVICE (AFMD) IN NEW DUCT.
(E) FIRE DAMPERS IN ALL DUCTS AT FLOOR SLAB PENETRATIONS TO
REMAIN. PROTECT IN PLACE.
REINSTALL EXISTING 8'-0" ROUND LOUVER ONCE AIR HANDLING UNIT
SECTIONS HAVE BEEN DELIVERED TO THE MECHANICAL ROOM.
2
3
4
5
6
7
8
3-8 3-9 3-10 3-11 3-12 3-13 3-14
C2
AHU
C1
AHU
C2
EF
C1
EF
(E)38x25 OA
25x42 OA
25x42 REA
(E)27x52SA
24x72 SA
16x16 EA
16x16 EA
25x38 REA DN
(BEYOND)
18x80 RA18x80 RA
(E)28x24 RA
(E)32x32RA
(E)38x25RA
2 1
25x42 OA DN
SD
SD
AFMD
C1-SA
AFMD
5
AFMD
C2-SA
AFMD
6
4
(E) 8'-0" ROUND
LOUVER
7
7
24x72 SA
35x30 SA
SD
SD
3-8 3-9 3-10 3-11 3-12 3-13 3-14
ATTIC MECHANICAL PLAN
FIN
AL C
ON
ST
RU
CT
IO
N D
OC
UM
EN
TS
18756 Stone Oak Parkway, Suite 200
t: 888.900.3823 www.schwabeng.com
SAN ANTONIO, TX 78258
PROJECT NO.: 02164822.00
FINAL CONSTRUCTION
DOCUMENTS
KEY PLAN
GENERAL NOTES
KEY NOTES
1
ATTIC MECHANICAL PLAN - C WING
N
2
SECTION 'A'
1. EXISTING CONDITIONS ARE PER AS-BUILT DRAWINGS AND SITE
SURVEY. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING
CONDITIONS PRIOR TO INSTALLATION OF ANY WORK.
1 3/4" HWS/R TO (E) FAN COIL FC-1 IN STAIRWELL.
INSTALL 3-WAY CONTROL VALVE FOR TU C1-146 PIPING IN LIEU OF
TYPICAL 2-WAY CONTROL VALVE FOR END OF LINE BYPASS.
2
C WING
WAITING
344 SF
1C107
CORRIDOR
1,555 SF
1C111
RECEPTION/
ADMIN. AREA
353 SF
1C112
PRIVATE
ADMIN. OFFICE
55 SF
1C112A
PATIENT
IN-TAKE
116 SF
1C113
PATIENT
IN-TAKE
116 SF
1C178
CORRIDOR
109 SF
1C115
SUB-WAITING
102 SF
1C114
PROVIDER
OFFICE
119 SF
1C116
GROUP ROOM 1
292 SF
1C120
PROVIDER
OFFICE
119 SF
1C117
PROVIDER
OFFICE
117 SF
1C118
PROVIDER
OFFICE
120 SF
1C119
IDF ROOM
57 SF
1C122
PROVIDER
OFFICE
117 SF
1C123
PROVIDER
OFFICE
117 SF
1C124
PROVIDER
OFFICE
119 SF
1C125
CORRIDOR
108 SF
1C126
PROVIDER
OFFICE
119 SF
1C129
GROUP ROOM 2
290 SF
1C128
PROVIDER
OFFICE
119 SF
1C130
PROVIDER
OFFICE
117 SF
1C131
PROVIDER
OFFICE
115 SF
1C135
PROVIDER
OFFICE
120 SF
1C132
JANITOR
CLOSET
44 SF
1C133
ELECTRICAL
CLOSET
47 SF
1C134
GROUP ROOM 3
265 SF
1C137
PROVIDER
OFFICE
119 SF
1C161
PROVIDER
OFFICE
117 SF
1C160
PROVIDER
OFFICE
119 SF
1C163
PROVIDER
OFFICE
119 SF
1C164
COPY ROOM
92 SF
1C162
PROVIDER
OFFICE
117 SF
1C165
PROVIDER
OFFICE
115 SF
1C167
PROVIDER
OFFICE
119 SF
1C169
PROVIDER
OFFICE
119 SF
1C168
WOMEN'S
TOILET
65 SF
1C170
MEN'S
TOILET
65 SF
1C171
PROVIDER
OFFICE
119 SF
1C172
PROVIDER
OFFICE
119 SF
1C173
PROVIDER
OFFICE
117 SF
1C174
STUDENT
WORK ROOM
229 SF
1C176
GROUP ROOM 5
225 SF
1C177
PROVIDER
OFFICE
120 SF
1C166
SUB-WAITING
71 SF
1C175
MECHANICAL
SHAFT
136 SF
1C127
ELECTRONICS
CLOSET
31 SF
1C121
C-4
C-12
C-14
C1-112
TU
C1-129
TU
C1-161
TU
C1-172
TU
C1-117
TU
C1-116
TU
C1-118
TU
C1-111
TU
C1-119
TU
C1-123
TU
C1-124
TU
C1-125
TU
C1-128
TU
C1-130
TU
C1-131
TU
C1-144
TU
C1-132
TU
C1-135
TU
C1-137
TU
C1-165
TU
C1-167
TU
C1-175
TU
C1-174
TU
C1-120
TU
C1-178
TU
C1-113
TU
C1-173
TU
C1-169
TU
C1-177
TU
C1-176
TU
C1-168
TU
C1-166
TU
C1-134
TU
C1-152
TU
C1-107
TU
C1-106
TU
C1-112A
TU
C1-164
TU
C1-163
TU
C1-162
TU
(E) 1" HWS/R
(E) 1-1/4" HWS/R
(E) 1" HWS/R
(E) 2-1/2" HWS/R UP
& (E) 3" HWS/R DN
(E) 5" CHS/R
UP & DN
(E) 2" HWS/R
(E)1-1/4" HWS/R
(E) 1-1/4" HWS/R
(E) 1-1/4" HWS/R
(E) 1" HWS/R(E) 1" HWS/R
(E) 3/4" HWS/R
3/4" HWS/R
T
T
T
T
T
T
T
T
T
T
T
T
T T
T
T
T
T
T
T
T
T T
T
T
T T
T
T
T
T
T
T T
T
C1-121
TU
T
D1-111
FCU
3/4" CHS/R
MA
TC
HLIN
E 'C
A'
MA
TC
HLIN
E 'C
A'
MA
TC
HLIN
E 'A
B'
MA
TC
HLIN
E 'A
B'
(TYP)(TYP)
3-8 3-9 3-10 3-11 3-12 3-13 3-14
C-5
C-8
C-9
C-12
C-13
C-14
FIRST FLOOR WEST
MECHANICAL PIPING PLAN
FIN
AL C
ON
ST
RU
CT
IO
N D
OC
UM
EN
TS
18756 Stone Oak Parkway, Suite 200
t: 888.900.3823 www.schwabeng.com
SAN ANTONIO, TX 78258
PROJECT NO.: 02164822.00
FINAL CONSTRUCTION
DOCUMENTS
KEY PLAN
GENERAL NOTES
KEY NOTES
1
FIRST FLOOR WEST MECHANICAL PIPING PLAN - C WING
N
1. EXISTING CONDITIONS ARE PER AS-BUILT DRAWINGS AND SITE
SURVEY. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING
CONDITIONS PRIOR TO INSTALLATION OF ANY WORK.
1 3/4" HWS/R TO (E) FAN COIL FC-1 IN STAIRWELL.
INSTALL 3-WAY CONTROL VALVE FOR TU C1-146 PIPING IN LIEU OF
TYPICAL 2-WAY CONTROL VALVE FOR END OF LINE BYPASS.
2
PROVIDER
OFFICE
117 SF
1C131
PROVIDER
OFFICE
115 SF
1C135
PROVIDER
OFFICE
120 SF
1C132
JANITOR
CLOSET
44 SF
1C133
ELECTRICAL
CLOSET
47 SF
1C134
PROVIDER
OFFICE
119 SF
1C138
PROVIDER
OFFICE
119 SF
1C136
GROUP ROOM 3
265 SF
1C137
GROUP ROOM 4
246 SF
1C139
PROVIDER
OFFICE
119 SF
1C140
PROVIDER
OFFICE
119 SF
1C141
PROVIDER
OFFICE
117 SF
1C142
PROVIDER
OFFICE
116 SF
1C145
STAFF
LOUNGE
263 SF
1C146
TELEHEALTH
ROOM
81 SF
1C147
TELEHEALTH
ROOM
81 SF
1C151
WOMEN'S
TOILET
60 SF
1C149
MEN'S
TOILET
60 SF
1C150
STAIR 6
188 SF
1C153
CONFERENCE
ROOM
256 SF
1C154
PROVIDER
OFFICE
119 SF
1C155
PROVIDER
OFFICE
119 SF
1C156
PROVIDER
OFFICE
117 SF
1C157
PROVIDER
OFFICE
117 SF
1C159
PROVIDER
OFFICE
119 SF
1C161
PROVIDER
OFFICE
117 SF
1C160
PROVIDER
OFFICE
119 SF
1C163
PROVIDER
OFFICE
119 SF
1C164
COPY ROOM
92 SF
1C162
CORRIDOR
109 SF
1C148
PROVIDER
OFFICE
120 SF
1C158
CORRIDOR
1456 SF
1C152
STORAGE
36 SF
1C143
SUB-WAITING
71 SF
1C144
C-5
C-8
C-9
C-12
C-13
C-14
(TYP)
C1-161
TU
C1-130
C1-131
TU
C1-144
TU
C1-147
TU
C1-151
TU
C1-146
TU
C1-145
TU
C1-154
TU
C1-132
TU
C1-135
TU
C1-138
TU
C1-141
TU
C1-142
TU
C1-157
TU
C1-158
TU
C1-139
TU
C1-160
TU
C1-137
TU
C1-155
TU
C1-159
TU
C1-136
TU
C1-156
TU
C1-164
TU
C1-163
TU
C1-162
TU
(E) 1" HWS/R
(E) 1-1/4" HWS/R
(E) 1" HWS/R
(E)1-1/4" HWS/R
(E) 1" HWS/R
(E) 3/4" HWS/R
T
T T
T
T
T
T
T
T
T
T
T
TT
T
T
T T
T
T T
T
T
T
T
T
T
C1-140
TU
1
MA
TC
HL
IN
E 'A
B'
MA
TC
HL
IN
E 'A
B'
2
3-14 3-15 3-17 3-183-16
FIRST FLOOR EAST
MECHANICAL PIPING PLAN
FIN
AL C
ON
ST
RU
CT
IO
N D
OC
UM
EN
TS
18756 Stone Oak Parkway, Suite 200
t: 888.900.3823 www.schwabeng.com
SAN ANTONIO, TX 78258
PROJECT NO.: 02164822.00
FINAL CONSTRUCTION
DOCUMENTS
KEY PLAN
GENERAL NOTES
KEY NOTES
1
FIRST FLOOR EAST MECHANICAL PIPING PLAN - C WING
N
1. EXISTING CONDITIONS ARE PER AS-BUILT DRAWINGS AND SITE
SURVEY. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING
CONDITIONS PRIOR TO INSTALLATION OF ANY WORK.
1 3/4" HWS/R TO (E) FAN COIL FC-1 IN STAIRWELL.
INSTALL 3-WAY CONTROL VALVE FOR TU C1-146 PIPING IN LIEU OF
TYPICAL 2-WAY CONTROL VALVE FOR END OF LINE BYPASS.
2
LOBBY &
D WING WAITING
766 SF
1C100
CORRIDOR
332 SF
1C101
RECEPTION
101 SF
1C102
FIRE PROT.
CLOSET
11 SF
1C102A
STAIR 5
208 SF
1C103
ELECTRICAL
CLOSET
50 SF
1C104
ELEVATOR
LOBBY
290 SF
1C106
CORRIDOR
208 SF
1C105
C WING
WAITING
344 SF
1C107
CORRIDOR
243 SF
1C108
PRIVATE
ADMIN. OFFICE
55 SF
1C112A
MEN'S
TOILET
59 SF
1C109
WOMEN'S
TOILET
55 SF
1C110
CORRIDOR
1557 SF
1D100
RECEPTION/
ADMIN. AREA
389 SF
1D101
PRIVATE
ADMIN. OFFICE
58 SF
1D101A
PROVIDER
OFFICE
119 SF
1D105
PATIENT
IN-TAKE
116 SF
1D102
CORRIDOR
109 SF
1D104SUB-WAITING
102 SF
1D103
PROVIDER
OFFICE
119 SF
1D106
PROVIDER
OFFICE
STUDENT
WORK ROOM
229 SF
1D165
GROUP ROOM 5
225 SF
1D166
PATIENT
IN-TAKE
116 SF
1D167
SUB-WAITING
71 SF
1D164
MECH.
73 SF
1C178
3-8
C-3
3-7
C-4
C-10
C-9
D-4
D-6
3-2 3-5.1
3-7
3-3 3-5
C-11
4-114-104-94-8
C-12
C1-178
TU
C1-100
TU
C1-102
TU
C1-104
TU
C1-107
TU
C1-106
TU
(E) 1" HWS/R
3/4" HWS/R
(E) 3/4" HWS/R
T
T
T
T
T
LIM
IT
O
F W
OR
K
D1-101
TU
D1-101A
TU
(E) 1" HWS/R
T
T
MA
TC
HLIN
E 'C
A'
(TYP)
FIRST FLOOR CONNECTING LINK
MECHANICAL PIPING PLAN
FIN
AL C
ON
ST
RU
CT
IO
N D
OC
UM
EN
TS
18756 Stone Oak Parkway, Suite 200
t: 888.900.3823 www.schwabeng.com
SAN ANTONIO, TX 78258
PROJECT NO.: 02164822.00
FINAL CONSTRUCTION
DOCUMENTS
KEY PLAN
GENERAL NOTES
KEY NOTES
1
FIRST FLOOR CONNECTING LINK MECHANICAL PIPING PLAN - C WING
N
1. EXISTING CONDITIONS ARE PER AS-BUILT DRAWINGS AND SITE
SURVEY. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING
CONDITIONS PRIOR TO INSTALLATION OF ANY WORK.
RECEPTION/
ADMIN. AREA
353 SF
2C211
PROVIDER
OFFICE
119 SF
2C262
C WING
WAITING
344 SF
2C206
CORRIDOR
1,555 SF
2C210
PRIVATE
ADMIN. OFFICE
55 SF
2C211A
PATIENT
IN-TAKE
120 SF
2C270
STAIR 10
113 SF
2C213
CORRIDOR
109 SF
2C214
SUB-WAITING
102 SF
2C216
PROVIDER
OFFICE
119 SF
2C215
GROUP ROOM 1
336 SF
2C212
PROVIDER
OFFICE
119 SF
2C217
PROVIDER
OFFICE
117 SF
2C223
PROVIDER
OFFICE
119 SF
2C224
CORRIDOR
108 SF
2C225
PROVIDER
OFFICE
119 SF
2C227
2C226
GROUP ROOM 2
290 SF
2C226
PROVIDER
OFFICE
119 SF
2C228
JANITOR
CLOSET
44 SF
2C231
ELECTRICAL
CLOSET
47 SF
2C232
GROUP ROOM 3
265 SF
2C233
PROVIDER
OFFICE
119 SF
2C259
PROVIDER
OFFICE
117 SF
2C258
PROVIDER
OFFICE
119 SF
2C261
COPY ROOM
92 SF
2C260
PROVIDER
OFFICE
119 SF
2C267
PROVIDER
OFFICE
119 SF
2C266
WOMEN'S
TOILET
65 SF
2C268
MEN'S
TOILET
65 SF
2C269
PROVIDER
OFFICE
119 SF
2C271
PROVIDER
OFFICE
119 SF
2C272
STUDENT
WORK ROOM
229 SF
2C275
GROUP ROOM 5
225 SF
2C276
PROVIDER
OFFICE
117 SF
2C218
PROVIDER
OFFICE
117 SF
2C222
PROVIDER
OFFICE
117 SF
2C229
PROVIDER
OFFICE
115 SF
2C234
PROVIDER
OFFICE
117 SF
2C263
PROVIDER
OFFICE
115 SF
2C265
PROVIDER
OFFICE
117 SF
2C273
SUB-WAITING
71 SF
2C274
PROVIDER
OFFICE
120 SF
2C264
PROVIDER
OFFICE
120 SF
2C219
PROVIDER
OFFICE
120 SF
2C230
IDF ROOM
57 SF
2C221
ELECTRONICS
CLOSET
31 SF
2C220
C-4
C-12
C-14
(E) 2" HWS/R UP
& (E) 2 1/2" DN
(E) 5" CHS/R
UP & DN
C2-242
C2-261
TU
C2-262
TU
C2-263
TU
C2-264
TU
C2-260
TU
C2-226
TU
C2-265
TU
C2-266
TU
C2-267
TU
C2-272
TU
C2-271
TU
C2-273
TU
C2-275
TU
C2-276
TU
C2-212
TU
C2-211
TU
C2-211A
TU
C2-270
TU
C2-234
TU
C2-230
TU
C2-229
TU
C2-228
TU
C2-227
TU
C2-223
TU
C2-224
TU
C2-210
TU
C2-222
TU
C2-219
TU
C2-218
TU
C2-217
TU
C2-215
TU
C2-200
TU
C2-206
TU
C2-274
TU
(E) 1-1/4" HWS/R
(E) 2" HWS/R
(E) 1-1/4" HWS/R
(E) 1-1/4" HWS/R
(E) 1-1/4" HWS/R
(E) 1" HWS/R
(E) 1" HWS/R
(E) 1-1/4" HWS/R
(E) 1-1/4" HWS/R
T
T
T
T
T
T
T
T
T T
T T
T
T
T
TT
T
TT
T
TT
T
T
T
TT
T
T
T
TT
T
T
T
C2-232
TU
C2-221
FCU
3/4" CHS/R
C2-220
TU
(E) 3/4" HWS/R
MA
TC
HLIN
E 'C
A'
MA
TC
HLIN
E 'C
A'
MA
TC
HLIN
E 'A
B'
MA
TC
HLIN
E 'A
B'
3-8 3-9 3-10 3-11 3-12 3-13 3-14
C-5
C-8
C-9
C-12
C-13
C-14
SECOND FLOOR WEST
MECHANICAL PIPING PLAN
FIN
AL C
ON
ST
RU
CT
IO
N D
OC
UM
EN
TS
18756 Stone Oak Parkway, Suite 200
t: 888.900.3823 www.schwabeng.com
SAN ANTONIO, TX 78258
PROJECT NO.: 02164822.00
FINAL CONSTRUCTION
DOCUMENTS
KEY PLAN
GENERAL NOTES
KEY NOTES
1
SECOND FLOOR WEST MECHANICAL PIPING PLAN - C WING
N
1. EXISTING CONDITIONS ARE PER AS-BUILT DRAWINGS AND SITE
SURVEY. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING
CONDITIONS PRIOR TO INSTALLATION OF ANY WORK.
PROVIDER
OFFICE
119 SF
2C262
JANITOR
CLOSET
44 SF
2C231
ELECTRICAL
CLOSET
47 SF
2C232
PROVIDER
OFFICE
119 SF
2C236
PROVIDER
OFFICE
119 SF
2C235
GROUP ROOM 3
265 SF
2C233
GROUP ROOM 4
246 SF
2C237
PROVIDER
OFFICE
119 SF
2C238
PROVIDER
OFFICE
119 SF
2C239
STAFF
LOUNGE
263 SF
2C244
TELEHEALTH
ROOM
81 SF
2C245
TELEHEALTH
ROOM
81 SF
2C249
WOMEN'S
TOILET
60 SF
2C247
MEN'S
TOILET
60 SF
2C248
STAIR 6
188 SF
2C251
CONFERENCE
ROOM
256 SF
2C252
PROVIDER
OFFICE
119 SF
2C253
PROVIDER
OFFICE
119 SF
2C254
PROVIDER
OFFICE
119 SF
2C259
PROVIDER
OFFICE
117 SF
2C258
PROVIDER
OFFICE
119 SF
2C261
COPY ROOM
92 SF
2C260
CORRIDOR
108 SF
2C246
CORRIDOR
1433 SF
2C250
PROVIDER
OFFICE
117 SF
2C229
PROVIDER
OFFICE
115 SF
2C234
PROVIDER
OFFICE
117 SF
2C240
PROVIDER
OFFICE
116 SF
2C243
STORAGE
36 SF
2C241
SUB-WAITING
71 SF
2C242
PROVIDER
OFFICE
117 SF
2C255
PROVIDER
OFFICE
117 SF
2C257
PROVIDER
OFFICE
120 SF
2C256
PROVIDER
OFFICE
120 SF
2C230
C-5
C-8
C-9
C-12
C-13
C-14
1 1/4" (E)
(TYP)
C2-244
TUC2-243
TU
C2-245
TU
C2-252
TU
C2-240
TU
C2-239
TU
C2-238
TU
C2-236
TU
C2-242
TU
C2-254
TU
C2-253
TU
C2-255
TU
C2-256
TU
C2-257
TU
C2-258
TU
C2-259
TU
C2-237
TU
C2-261
TU
C2-235
TU
C2-234
TU
C2-230
TU
C2-229
TU
C2-249
TU
C2-250
TU
C2-233
TU
(E) 3/4" HWS/R(E) 1" HWS/R(E) 1-1/4" HWS/R
(E) 1" HWS/R (E) 3/4" HWS/R
T
T
T
T
T T
T
T
T
T
T
T
T
T
T
T
TT
T
TT
T
T
T
T T
C2-232
TU
MA
TC
HL
IN
E 'A
B'
MA
TC
HL
IN
E 'A
B'
3-14 3-15 3-17 3-183-16
SECOND FLOOR EAST
MECHANICAL PIPING PLAN
FIN
AL C
ON
ST
RU
CT
IO
N D
OC
UM
EN
TS
18756 Stone Oak Parkway, Suite 200
t: 888.900.3823 www.schwabeng.com
SAN ANTONIO, TX 78258
PROJECT NO.: 02164822.00
FINAL CONSTRUCTION
DOCUMENTS
KEY PLAN
GENERAL NOTES
KEY NOTES
1
SECOND FLOOR EAST MECHANICAL PIPING PLAN - C WING
N