Personal InformationName: MAHMOUD FATHALLAH ABDELMOTALEB MANSOUR Birth Date: 25/01/1990Nationality: EgyptianNational ID: 29001251804651Passport Number: A07792741Marital Status: MarriedMilitary Service Status: ExemptionQualification: BachelorMajor: Mechanical Power EngineeringGraduation Year: 2012
Contact InformationCellphone: +201220453407Email Address: [email protected] Address: Port Said Street, Edku, Beheira, EgyptPostal Code: 22748
CareerPosition: Mechanical EngineerSummary
A very experienced site engineer with over 5 years of all site activities Have a proven ability to complete projects from conception to completion Have a proven ability to find solutions to complex customer problems all to tight work schedules Certified Project Management Professional
Professional Skills Construction, and Piping installation Commissioning, and Pre-commissioning Operation, and Maintenance Warranty, and Punch Listing Mechanical, Electrical, and Instrumentation
Languages Skills Fluent in Arabic, and English
Computer Skills Computer Hardware and Software, MS Office, and AutoCAD
Management Skills Effective Communication, Negotiation, and Conflict Resolution Leadership, team building, and Motivating Problem Solving, Analysis, and Creative Thinking Working under Stresses, Discipline, Active, and Organized
Education Bachelor of Mechanical Power Engineering
Institution: Helwan University, Cairo, EgyptProject of Graduation: Turbines
CoursesProfessional: Gas Turbine Maintenance, and Steam Turbine Operation and MaintenanceLanguages: English (12 Levels), French (3 Levels), and Deutsch (1 Level)Computer: ICDL, Computer Hardware and Software, MS Office, and AutoCADManagement: Project Management Professional, Strategic Planning, Objectives Setting, Stress
Management, Art of Negotiation, Customer Service, Sales Management, Marketing, and E-Marketing
References Mohammed Eltahtawy Position / Company: Commissioning Section Head / ELSWEDY ELECTRIC - PSP Email Address / Cell Phone: [email protected] / +201223475028 Abd ElAziz Abo Raya Position / Company: Abu Qir Plant General Consoler / West Delta Electricity Production Company Email Address / Cellphone: [email protected] / +201024300017
Memberships Egyptian Syndicate of Engineers: Membership Number 65/06576 Federation of Arab Engineers: Membership Number 16/75753
Experiences
Senior Commissioning EngineerProject / Contract: Beni Suef Combined Cycle Power Plant 4X1200 MW ProjectCompany / Date: ELSEWEDY ELECTRIC - PSP / From 06-2016 Till NowLocation / Country: Beni Suef / EgyptResponsibilities:
Provide equipment and P&ID walk down support, review of the final issue of PID’s from point of view of commissioning and start-up, and issuing of PID’s modification
Identify systems and sub-systems by marking up of PID’s system definition Review operating manuals in cooperation with the Process Department, and Vendors Review pre-commissioning & commissioning procedures: air blowing, chemical cleaning, water
flushing, functional tests, steam blowing, etc. Review safety procedures during commissioning activities such as tagging, vessels entry for
inspections, isolation & blind installation procedures and work permit procedures Review of tools and material list for pre-commissioning and commissioning such as sacrificial
valves, quick opening valves, temporary spools, temporary silencers, temporary strainers, etc. Outline and prepare of Ready of Commissioning, Mechanical Completion Certificates and Handover
Package Develop punch list procedure and exception list for handover Prepare Client personnel training Identify operational problems by observing and studying system functioning and performance
results, investigating complaints and suggestions, interviewing process supervisors and operators, completing troubleshooting procedures
Anticipate operational problems by studying operating targets, modes of operation, unit limitations, monitoring unit performance
Warranty and Site ManagerProject / Contract: Abu Qir Steam Power Plant Units 6&7 2X650 MW Project / CP-118Company / Date: ELSEWEDY ELECTRIC - PSP / From 07-2014 Till 07-2016Location / Country: Alexandria / EgyptCP-118 Scope:
Rotating & Static Equipment (Pumps, Compressors, Diesels, Fans, Valves, Heat Exchangers, Strainers, etc.)
Water Systems (Waste Water, Sea Water, Potable Water, Desalinated Water, Demineralized Water) Fuel Systems (Heavy Fuel Oil-Mazout, Light Fuel Oil-Solar, Natural Gas) Air Systems (Compressors, Dyers, Pneumatic valves) Electrolytic Hydrogen Generation Plant (15 Nm3/h) Firefighting Systems (Water, Foam, Inergen, etc.) HVAC Systems
Responsibilities: Execute, and monitor all remaining Construction works, and Piping installation at site Ensure all site works are done according to all applicable quality standards Directly responsible for the safety of all groups personnel of the project Develop site reports, work progress, Punch list, Warranty log, change notices, and professional staff
reports Work closely with the Project Manager to plan the project effectively Have a commercial understanding of the project Liaise with client departments and customers Monitor progress to ensure scheduling milestones are understood and are being met Ensure equipment and manpower resources are being used efficiently Review technical specification and other engineering documents and drawings and communicating
with procurement and design teams in order to avoid abortive works Identify operational problems by observing and studying system functioning and performance
results, investigating complaints and suggestions, interviewing process supervisors and operators, completing troubleshooting procedures
Anticipate operational problems by studying operating targets, modes of operation, unit limitations, monitoring unit performance
Perform root cause failure analysis and recommend corrective actions Develop maintenance strategies, procedures and methods Manage break down activities and provide technical support for the purchase of spare parts and
writing of maintenance procedures for equipment Monitor and control maintenance cost, tools, and equipment Deal with emergency and unplanned problems and repairs Asset maintenance skills required for efficient maintenance of equipment Plan and schedule planned and unplanned work
Commissioning and Maintenance EngineerProject / Contract: Abu Qir Steam Power Plant Units 6&7 2X650 MW Project / CP-118
Company / Date: ELSEWEDY ELECTRIC - PSP / From 12-2012 Till 07-2014Location / Country: Alexandria / EgyptScope:
Rotating & Static Equipment (Pumps, Compressors, Diesels, Fans, Valves, Heat Exchangers, Strainers, etc.)
Water Systems (Waste Water, Sea Water, Potable Water, Desalinated Water, Demineralized Water) Fuel Systems (Heavy Fuel Oil-Mazout, Light Fuel Oil-Solar, Natural Gas) Air Systems (Compressors, Dyers, Pneumatic valves) MED-Desalination Plants (5000 m3/day per unit) Electrolytic Hydrogen Generation Plant (15 Nm3/h) Firefighting Systems (Water, Foam, Inergen, etc.) HVAC Systems
Responsibilities: Provide equipment and P&ID walk down support, review of the final issue of PID’s from point of
view of commissioning and start-up, and issuing of PID’s modification Identify systems and sub-systems by marking up of PID’s system definition Review operating manuals in cooperation with the Process Department, and Vendors Review pre-commissioning & commissioning procedures: air blowing, chemical cleaning, water
flushing, functional tests, steam blowing, etc. Review safety procedures during commissioning activities such as tagging, vessels entry for
inspections, isolation & blind installation procedures and work permit procedures Review of tools and material list for pre-commissioning and commissioning such as sacrificial
valves, quick opening valves, temporary spools, temporary silencers, temporary strainers, etc. Outline and prepare of Ready of Commissioning, Mechanical Completion Certificates and Handover
Package Develop punch list procedure and exception list for handover Prepare Client personnel training Identify operational problems by observing and studying system functioning and performance
results, investigating complaints and suggestions, interviewing process supervisors and operators, completing troubleshooting procedures
Anticipate operational problems by studying operating targets, modes of operation, unit limitations, monitoring unit performance
Perform root cause failure analysis and recommend corrective actions Develop maintenance strategies, procedures and methods Manage break down activities and provide technical support for the purchase of spare parts and
writing of maintenance procedures for equipment
Operation EngineerProject / Contract: Abu Qir Steam Power Plant Units 6&7 2X650 MW Project / CP-118Company / Date: ELSEWEDY ELECTRIC - PSP / From 07-2012 Till 12-2012Location / Country: Alexandria / EgyptScope:
MED Sea Water Desalination Plants 5000 m3/day per unit (Steam Systems, Sea Water Systems, Vacuum Systems)
Electrolytic Hydrogen Generation Plant 15 Nm3/h (Electrical Rectifier System, Hydrogen System, Demineralized Water System, Oxygen System)
Responsibilities: Identify operational problems by observing and studying system functioning and performance
results, investigating complaints and suggestions, interviewing process supervisors and operators, completing troubleshooting procedures
Anticipate operational problems by studying operating targets, modes of operation, unit limitations, monitoring unit performance
Improve operational quality results by studying, evaluating, and recommending process re-design, implementing changes, contributing information and opinion to unit design and modification teams
Provide operational management information by collecting, analyzing, and summarizing operating and engineering data and trends