McMillan HPRB Buildings 1B Submission Final_Email 2013-05-24

Embed Size (px)

Citation preview

  • 7/28/2019 McMillan HPRB Buildings 1B Submission Final_Email 2013-05-24

    1/31

    HISTORIC PRESERVATIONR EVIEW BOARDCONCEPT SUBMISSION

    BUILDINGS 1B:GROCERY/ MULTIFAMILY BUILDING + PARK & COMMUNITY CENTER

    M AY 24, 2013

    O WNER DISTRICT OF COLUMBIA

    DEVELOPMENTTEAMEYA JAIR LYNCH DEVELOPMENT PARTNERSTRAMMELL CROW COMPANY

    PROJECT DIRECTOR ANNE L. CORBETT

    M ASTER PLAN A RCHITECTEE&K A PERKINS EASTMAN COMPANY

    L ANDSCAPE A RCHITECT

    NELSON BYRD WOLTZ

    HISTORIC PRESERVATIONCONSULTANTEHT TRACERIES, INC.

    CIVILENGINEER BOWMAN CONSULTING

    STRUCTURALENGINEER ROBERT SILMAN ASSOCIATES

    TRAFFICCONSULTANTGOROVE / SLADE

    L AND USE COUNSELHOLLAND & KNIGHT

    BUILDING A RCHITECTSEE&K A PERKINS EASTMAN COMPANYLESSARD DESIGN

    MV+A / DAVID JAMESONSHALOM BARANES ASSOCIATES

    drens osp a

    McMillaneservoir

    Glenwoodemetery

    e er a rs

    ransr

    eM dical Center

    Evarts Street NE

  • 7/28/2019 McMillan HPRB Buildings 1B Submission Final_Email 2013-05-24

    2/31

    VISION MCMILLAN PARTNERS

    Date: May 24, 2013

    To: Historic Preservation Review Board

    Subject:McMillan Sand Filtration Site | JLDP Grocery &Multifamily + Public Park & Community Center Concept Applications

    From: Vision McMillan Partners

    The following information is being provided by Vision McMillan Partners (V MP ) to illustrate the design intentionsfor the second set of new buildings proposed for the McMillan Sand Filtration Site. We respectfully request apresentation before the Historic Preservation Review Board (H PRB ) on June 28, 2013.

    Please find the enclosed images depicting the proposed architectural concepts for JAIR LYNCH Development PartnersGrocery & Multifamily building and the Public Park and Community Center components of VMPs plans to redevelop

    the McMillan Sand Filtration Site. These concepts accompany the concept applications submitted on April 26, 2013for EYAs Row Houses and TCCs Medical Office Buildings.

    We presented all four building concepts at a widely publicized community open house on April 27, 2013 from 12noon to 2 pm at St. Georges Episcopal Church, 160 U Street NW a date, time and location chosen by thecommissioners of 5E, in whose ANC the Sand Filtration Site is located.

    We have distributed the building illustrations to ANCs 5E, 5A and 1B requesting the opportunity to present at their June meetings.

    Please let us know if we may present all four concept applications at the hearing on June 28, 2013 with anyadjustments we may make following community input.

    We appreciate your thoughtful consideration.Respectfully,

    Anne L. CorbettProject Director

    Vision McMillan Partners

  • 7/28/2019 McMillan HPRB Buildings 1B Submission Final_Email 2013-05-24

    3/31

    P ARK & C OMMUNITY C ENTE

    O WNERDISTRICT OF COLUMBIA

    V ISION MCMILLAN P ARTNERS DEVELOPMENT TEAMEYA JAIR LYNCH DEVELOPMENT PARTNERSTRAMMELL CROW COMPANY

    PROJECT DIRECTOR ANNE L. CORBETT

    L ANDSCAPE A RCHITECTNELSON BYRD WOLTZ

    A RCHITECTEE&K A PERKINS EASTMAN COMPANY

  • 7/28/2019 McMillan HPRB Buildings 1B Submission Final_Email 2013-05-24

    4/31

    THIS PAGE IS INTENTIONALLY LEFT BLANK.

  • 7/28/2019 McMillan HPRB Buildings 1B Submission Final_Email 2013-05-24

    5/31McMillan Buildings 1b may 24, 20

    P ARK & COMMUNITY CENTER INTRODUCTION

    lrongholdl

    Bloomingdale

    M ic h iga n A v e n u e N W

    E

    South Park

    South Service Court

    Elevated Olmsted Walk

    Informal Play Area

    Community Center

    Stormwater Wetland

    Preserved Cell 28

    Park SouthSouth Service Court = 1.8 Acres

    South Park = 6.2 AcresTotal Public Space = 8 Acres

    Park program includes:

    - Convenient pedestrian and vehicle access, bike parking, and car parking viaSouth Service Court

    - Service access to DC Water access hatch integrated into park design

    - Large informal play areas

    - Elevated Olmsted Walk recreates historic condition

    - Significant preserved portion of below-grade Filter Bed Cell 28 andabove-grade manholes / skylights

    - Spray water jets play area

    - Public community center integrated into park

    - Terraced seating

    - Stormwater wetland

    - Pedestrian access from all surrounding streets- ADA accessibility throughout

    Community Center17,500 gross sf

    Community center program includes:

    - Circulation & gallery spaces with exhibits on the history of the McMillan site

    - 25-yard swimming pool- Multipurpose community meeting room with catering kitchen

    - Outdoor gathering space connected to multipurpose community meeting room

    - Multipurpose fitness studio

    - Locker & shower facilties

    - Reception/security & office

  • 7/28/2019 McMillan HPRB Buildings 1B Submission Final_Email 2013-05-24

    6/31

  • 7/28/2019 McMillan HPRB Buildings 1B Submission Final_Email 2013-05-24

    7/31

    McMillan Buildings 1b may 24, 20

    P ARK CONCEPT PERSPECTIV

  • 7/28/2019 McMillan HPRB Buildings 1B Submission Final_Email 2013-05-24

    8/31

    8 McMillan Bumay 24, 2013

    P a r k &

    C o m m u n i t y

    C e n t e r P ARK CONCEPT PERSPECTIVE

  • 7/28/2019 McMillan HPRB Buildings 1B Submission Final_Email 2013-05-24

    9/31

    McMillan Buildings 1b may 24, 20

    P ARK CONCEPT PERSPECTIV

  • 7/28/2019 McMillan HPRB Buildings 1B Submission Final_Email 2013-05-24

    10/31

    10 McMillan Bumay 24, 2013

    0 16

    +155

    +155

    +155

    +155

    +155

    POOL

    LOCKERS

    MULTIPURPOSEFITNESS

    M E C H

    LOWER LE

    HALL

    PRESERVED CELL 28

    UP

    UP

    P a r k &

    C o m m u n i t y

    C e n t e r COMMUNITY CENTER FLOOR PLAN LOWER LEVEL

  • 7/28/2019 McMillan HPRB Buildings 1B Submission Final_Email 2013-05-24

    11/31

    McMillan Buildings 1b may 24, 20

    0 16 32

    MULTI-PURPOSE

    COMMUNITYROOM

    G A L L E R Y

    GALLERY

    W C

    W C

    RECEPTION

    CATERINGKITCHEN

    OUTDOOR TERRACE

    +165 +165

    UP

    DN

    +165

    +155

    +170

    +170

    +170

    +170

    MAINENTRANCE

    PARK ENTRANCE

    OPEN TO BELOW

    UPPER LEVEL

    UP

    COMMUNITY CENTER FLOOR PLAN UPPER LEVE

  • 7/28/2019 McMillan HPRB Buildings 1B Submission Final_Email 2013-05-24

    12/31

    THIS PAGE IS INTENTIONALLY LEFT BLANK.

  • 7/28/2019 McMillan HPRB Buildings 1B Submission Final_Email 2013-05-24

    13/31

    McMillan Buildings 1b may 24, 20

    GREEN ROOF

    MECHANICALPENTHOUSE

    TRELLIS

    MAINENTRANCE

    0 16 32

    ROOF LEVEL

    COMMUNITY CENTER R OOF PLAN

  • 7/28/2019 McMillan HPRB Buildings 1B Submission Final_Email 2013-05-24

    14/31

    14 McMillan Bumay 24, 2013

    P a r k &

    C o m m u n i t y

    C e n t e r

    165.00

    155.00

    170.00

    Copper sheathing on entrance vestibule,skylights, and mechanical enclosurereferences historic turquoise elements

    High-performace glazingadmits ample daylight to pooland other public spaces

    Lightweight metal exterior trellis shading systemconditions exterior space andshades building

    Slender steel columns supportexterior shading system anddefine public arcade

    Reinforced concrete groin vaults recreate experience of historic below-grade filter beds

    NOTE: Material annotations typical for all elevations

    COMMUNITY CENTER ELEVATION E AST

  • 7/28/2019 McMillan HPRB Buildings 1B Submission Final_Email 2013-05-24

    15/31

    McMillan Buildings 1b may 24, 20

    165.00 170.00

    COMMUNITY CENTER ELEVATION W EST

  • 7/28/2019 McMillan HPRB Buildings 1B Submission Final_Email 2013-05-24

    16/31

    16 McMillan Bumay 24, 2013

    P a r k &

    C o m m u n i t y

    C e n t e r

    165.00 170.00

    COMMUNITY CENTER ELEVATION N ORTH

  • 7/28/2019 McMillan HPRB Buildings 1B Submission Final_Email 2013-05-24

    17/31

    McMillan Buildings 1b may 24, 20

    155.00

    170.00

    COMMUNITY CENTER ELEVATION SOUTH

  • 7/28/2019 McMillan HPRB Buildings 1B Submission Final_Email 2013-05-24

    18/31

    18 McMillan Bumay 24, 2013

    155.00

    165.00

    170.00

    SOUTH SERVICE COURT CIRCULATION AND GALLERY SPACE

    P a r k &

    C o m m u n i t y

    C e n t e r COMMUNITY CENTER SECTION N ORTH-SOUTH

    0 16 32

    MULTI-PURPOSE

    COMMUNITYROOM

    G A L L E R Y

    GALLERY

    W C

    W C

    RECEPTION

    CATERINGKITCHEN

    OUTDOOR TERRACE

    +165 +165

    UP

    DN

    +165

    +155

    +170

    +170

    +170

    +170

    MAINENTRANCE

    PARK ENTRANCE

    OPEN TO BELOW

    UPPER LEVEL

    UP

  • 7/28/2019 McMillan HPRB Buildings 1B Submission Final_Email 2013-05-24

    19/31

    McMillan Buildings 1b may 24, 20

    155.00

    170.00

    165.00

    PARK SOUTHCOMMUNITY MEETING ROOM - UPPER LEVELPOOL AND FITNESS ROOM - LOWER LEVEL

    COMMUNITY CENTER SECTION E AST-W EST

    0 16 32

    MULTI-PURPOSE

    COMMUNITYROOM

    G A L L E R Y

    GALLERY

    W C

    W C

    RECEPTION

    CATERINGKITCHEN

    OUTDOOR TERRACE

    +165 +165

    UP

    DN

    +165

    +155

    +170

    +170

    +170

    +170

    MAINENTRANCE

    PARK ENTRANCE

    OPEN TO BELOW

    UPPER LEVE

    UP

  • 7/28/2019 McMillan HPRB Buildings 1B Submission Final_Email 2013-05-24

    20/31

    20 McMillan Bumay 24, 2013

    P a r k &

    C o m m u n i t y

    C e n t e r O VERALLA ERIALV IEW FROM SOUTHEAST

  • 7/28/2019 McMillan HPRB Buildings 1B Submission Final_Email 2013-05-24

    21/31

    McMillan Buildings 1b may 24, 20

    GROUND-LEVELV IEW FROM SOUTH SERVICECOURT F ACING M AIN ENTRANCE

  • 7/28/2019 McMillan HPRB Buildings 1B Submission Final_Email 2013-05-24

    22/31

    22

    N a m e o f

    S e c t i o n

    McMillan Bumay 24, 2013

    GROUND-LEVELV IEW FROM TERRACEDSEATING A REA F ACING NORTH

  • 7/28/2019 McMillan HPRB Buildings 1B Submission Final_Email 2013-05-24

    23/31

    M ULTIFAMILY /G ROCERY BUILDIN

    DEVELOPERJAIR LYNCH DEVELOPMENT PARTNERS

    PROJECT DIRECTOR ANNE L. CORBETT

    A RCHITECTSMV+A ARCHITECTS / DAVID JAMESON ARCHITECT

  • 7/28/2019 McMillan HPRB Buildings 1B Submission Final_Email 2013-05-24

    24/31

    McMillan Buildings 1b may 24, 20

    O r e re e the p th tr ter t te ove the North Serv e Co rt. T

    e t re ow the e e o the to re thepr r te to re o the North Serv e Co rt.

    G o w o t the o rete re o theor f tr t o e e e ew o t ro er ret e v ro e t. A ove the ro er , the exter or

    w o the t ho w re the orp rpo e o the M M te: f tr t o w ter.

    M t ho h ee o e ve other tor the ro er te w th r e ope o rt. We e eve

    r h te t re t t root q e t t o e thetor e the pre re o p e. C re o er t o

    o the e o e h or row ho e o NorthC p to Street ew M M row ho e o t ,o w th the e re to r t r ht to the

    North Serv e Co rt, t v te o r e r h or ettere o t o .

    Te r o the M M p th o tr x prov e o r th t j xt po e to the

    e r q t o the North So th Serv e Co rt .Te p th or o tr te w o t o e

    to o o pe ve e . Te p th othero tr t o r p rpo e o t the M Mte: , re tor ho e , f tr t o e ;

    e e the DNA o o r e ve t t o .

    O r e o e ve to e e tor tto ether the v r o e exp

    j e t to the M M te. Row htow ho e to the e t o th o o r te

    th the ro er p th o o r propo . Te re the o t r h te t r e e e t North Serv e Co rt.

    Te t pe t o o r e or e thew r pre re o the e h or row ho e

    the t te w th the North Serv e Co rt.Te re t t p t o th t prov e

    re th p e ope terr e o the ro er p th. For , the ho retre t ro the wo the p th, the e e to the k re e e the

    ver e o the ope per pe t ve o the top .

    INSPIRATION & PROCESS

    M C

  • 7/28/2019 McMillan HPRB Buildings 1B Submission Final_Email 2013-05-24

    25/31

    McMillan Buildings 1b may 24, 20

    M ATERIALSCONCEPT

    S P

  • 7/28/2019 McMillan HPRB Buildings 1B Submission Final_Email 2013-05-24

    26/31

    McMillan Buildings 1b may 24, 20

    0 100 200

    SITE PLAN

    GROCERY / RETAILPLAN

  • 7/28/2019 McMillan HPRB Buildings 1B Submission Final_Email 2013-05-24

    27/31

    McMillan Buildings 1b may 24, 20

    0 50 100

    GROCERY / R ETAILPLAN

    TYPICALRESIDENTIALPLAN

  • 7/28/2019 McMillan HPRB Buildings 1B Submission Final_Email 2013-05-24

    28/31

    McMillan Buildings 1b may 24, 20

    0 50 100

    TYPICALR ESIDENTIALPLAN

    VIEW LOOKING SOUTH INTO THE NORTH SERVICECOURT

  • 7/28/2019 McMillan HPRB Buildings 1B Submission Final_Email 2013-05-24

    29/31

    McMillan Buildings 1b may 24, 20

    V IEW LOOKING SOUTH INTO THE NORTH SERVICECOURT

    LONGITUDINAL BUILDING SECTION

  • 7/28/2019 McMillan HPRB Buildings 1B Submission Final_Email 2013-05-24

    30/31

    McMillan Buildings 1b may 24, 200 25 50

    LONGITUDINAL BUILDING SECTION

    VIEW LOOKING NORTH UP NORTH CAPITOL STREE

  • 7/28/2019 McMillan HPRB Buildings 1B Submission Final_Email 2013-05-24

    31/31

    McMillan Buildings 1b may 24, 20

    V IEW LOOKING NORTH UP NORTH C APITOL STREE