Data Reported as of October 1, 2015 Date Signed Department Contractor Value Purpose 2008Apr08 Aboriginal and Northern Affairs M.O. Harvey & Associates Ltd. $23,250.00 Concept Marketing & Initial Agreement: initial round of contacts to MB Hydro, Vale Inco, Hudbay Minerals and Crow Flight Resources to explore the concept of operations and seek initial agreements to participate in the development of the commuter program. Costing and Logistics: Based on outcomes of Phase I work above, a detailed costing & logistics analysis will be carried out. 2009May26 Aboriginal and Northern Affairs Doug Smith $2,600.00 To research and review documentation that has been produced to date and write a comprehensive report on the status of Closing the Gap in Manitoba. The purpose of the written report is to capture the progress and or results achieved to date and written in a maneer that the document may be used by the government to inform the public on the status of Closing the Gap. 2010Sep16 Aboriginal and Northern Affairs Eugene Kostyra $40,000.00 TLE Manto Sipi Cree Nation to explore the option for accessing funds from the Third Party Interest Account as described in 1997 TLE Framework Agreement (Article 20). Canada provided a contributin to TLEC toward the cost of discharging, replacing or accommodating Third Party Interests affected land Selected or Acquired by Entitlement First Nations. 2011Mar21 Aboriginal and Northern Affairs Epitome Business Advisors Inc. $18,000.00 Compiling a Master Database that will allow ANA to manage assets from a financial and accounting perspective. Phase I: Project Planning, System Design, Data Specification, Data Preparation & Testing, Process Documentation, TAC Information Update; Phase II: System Setup and Configuration, Databases Setup, 2011 Update, plus preapproved travel arrangements. 2011Mar23 Aboriginal and Northern Affairs Cunningham Business Interiors $4,361.75 Office Furniture 2011Mar31 Aboriginal and Northern Affairs Dauphin Recreation Services $1,369.43 NC Regional Workshop 2011Apr01 Aboriginal and Northern Affairs Bruce & Voivin Consulting Group Inc. $60,300.00 Plan, coordinate, promote and manage the Summit on Missung & Murdered Aboriginal women and girls for 100 120 participants 2011Apr01 Aboriginal and Northern Affairs Herb Arpin $15,000.00 Salt Point community road maintenance 2011Apr01 Aboriginal and Northern Affairs Positive Solutions $19,800.00 To provide assistance & advice to staff in the Administration & Finance Branch of ANA on financial and administrative matters on an as needed basis until such a time as a Director of Finance starts working in the office. To mentor and provide advice and support to the new Director of Finance for ANA on matters relating to Government processes, departmental financial matters and policies on and as needed basis. Plus any preapproved outofpocket expenses. 2011Apr08 Aboriginal and Northern Affairs Dalco Cleanflow Supply Company $1,248.24 Meadow Portage Water Treatment Plan supplies for emergency repair of drinking water disinfection system 2011Apr08 Aboriginal and Northern Affairs Oasis Originals $3,664.77 Backpacks/screen art 2011Apr14 Aboriginal and Northern Affairs Healy's Gods Lake Narrows Lodge $2,022.30 Hotel/lodging/meals only accommodation in God's Lake 2011Apr14 Aboriginal and Northern Affairs Oasis Originals $1,310.75 Jackets, purchased by Dauphin Office 2011Apr14 Aboriginal and Northern Affairs TNT Plumbing & Heating $1,896.61 Red Sucker lake water treatment plant emergency repairs TNT is the only plumber willing to go to the community 2011Apr15 Aboriginal and Northern Affairs Dr. Bruce Stanfeld $25,000.00 Manto Sipi's independent review of o/s issues arising from MB's extension of mining claim W45426 and MB's issurance of Mineral Exploration Licence 395A 2011Apr18 Aboriginal and Northern Affairs Janico Investments Ltd. $2,788.30 Gas/Diesel for Loon Straits recurring requirement Manitoba Untendered Contracts Report as of April 1, 2008 Page 1 of 663

MB Untendered Contracts Report April 1, 2008 to October 1 ... · Plan, coordinate, promote and manage the Summit on Missing & Murdered Aboriginal Women and girls for 100 ‐ 120 participants

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

  • Data Reported as of October 1, 2015Date Signed Department Contractor Value Purpose

    2008‐Apr‐08Aboriginal and Northern Affairs M.O. Harvey & Associates Ltd. $23,250.00

    Concept Marketing & Initial Agreement:  initial round of contacts to MB Hydro, Vale Inco, Hudbay Minerals and Crow Flight Resources to explore the concept of operations and seek initial agreements to participate in the development of the commuter program.  Costing and Logistics:  Based on outcomes of Phase I work above, a detailed costing & logistics analysis will be carried out.

    2009‐May‐26Aboriginal and Northern Affairs Doug Smith $2,600.00

    To research and review documentation that has been produced to date and write a comprehensive report on the status of Closing the Gap in Manitoba.  The purpose of the written report is to capture the progress and or results achieved to date and written in a maneer that the document may be used by the government to inform the public on the status of Closing the Gap.

    2010‐Sep‐16Aboriginal and Northern Affairs Eugene Kostyra $40,000.00

    TLE ‐ Manto Sipi Cree Nation ‐ to explore the option for accessing funds from the Third Party Interest Account as described in 1997 TLE Framework Agreement (Article 20). Canada provided a contributin to TLEC toward the cost of discharging, replacing or accommodating Third Party Interests affected land Selected or Acquired by Entitlement First Nations.

    2011‐Mar‐21Aboriginal and Northern Affairs Epitome Business Advisors Inc. $18,000.00

    Compiling a Master Database that will allow ANA to manage assets from a financial and accounting perspective.  Phase I: Project Planning, System Design, Data Specification, Data Preparation & Testing, Process Documentation, TAC Information Update;  Phase II: System Set‐up and Configuration, Databases Set‐up, 2011 Update,  plus pre‐approved travel arrangements.

    2011‐Mar‐23Aboriginal and Northern Affairs Cunningham Business Interiors $4,361.75 Office Furniture

    2011‐Mar‐31Aboriginal and Northern Affairs Dauphin Recreation Services $1,369.43 NC Regional Workshop

    2011‐Apr‐01Aboriginal and Northern Affairs Bruce & Voivin Consulting Group Inc. $60,300.00

    Plan, coordinate, promote and manage the Summit on Missung & Murdered Aboriginal women and girls for 100 ‐ 120 participants

    2011‐Apr‐01Aboriginal and Northern Affairs Herb Arpin $15,000.00 Salt Point community road maintenance

    2011‐Apr‐01Aboriginal and Northern Affairs Positive Solutions $19,800.00

    To provide assistance & advice to staff in the Administration & Finance Branch of ANA on financial and administrative matters on an as needed basis until such a time as a Director of Finance starts working in the office.  To mentor and provide advice and support to the new Director of Finance for ANA on matters relating to Government processes, departmental financial matters and policies on and as needed basis.  Plus any pre‐approved out‐of‐pocket expenses.

    2011‐Apr‐08Aboriginal and Northern Affairs Dalco Cleanflow Supply Company $1,248.24 Meadow Portage Water Treatment Plan ‐ supplies for emergency repair of drinking water disinfection system

    2011‐Apr‐08Aboriginal and Northern Affairs Oasis Originals   $3,664.77 Backpacks/screen art

    2011‐Apr‐14Aboriginal and Northern Affairs Healy's Gods Lake Narrows Lodge $2,022.30 Hotel/lodging/meals ‐ only accommodation in God's Lake

    2011‐Apr‐14Aboriginal and Northern Affairs Oasis Originals $1,310.75 Jackets, purchased by Dauphin Office

    2011‐Apr‐14Aboriginal and Northern Affairs TNT Plumbing & Heating $1,896.61 Red Sucker lake water treatment plant emergency repairs ‐ TNT is the only plumber willing to go to the community

    2011‐Apr‐15Aboriginal and Northern Affairs Dr. Bruce Stanfeld $25,000.00

    Manto Sipi's independent review of o/s issues arising from MB's extension of mining claim W45426 and MB's issurance of Mineral Exploration Licence 395A

    2011‐Apr‐18Aboriginal and Northern Affairs Janico Investments Ltd. $2,788.30 Gas/Diesel for Loon Straits ‐ recurring requirement

    Manitoba Untendered Contracts Report as of April 1, 2008

    Page 1 of 663

  • Data Reported as of October 1, 2015Date Signed Department Contractor Value Purpose

    Manitoba Untendered Contracts Report as of April 1, 2008

    2011‐Apr‐26Aboriginal and Northern Affairs Kani Kanichihk Inc. $60,300.00

    Plan, coordinate, promote and manage the Summit on Missing & Murdered Aboriginal Women and girls for 100 ‐ 120 participants

    2011‐Apr‐27Aboriginal and Northern Affairs ADVA Marketing & Consulting $1,250.00 Freight to remove old fuel tank in Brochet ‐ availability ‐ winter road backhaul

    2011‐Apr‐29Aboriginal and Northern Affairs Canada Culvert $5,269.48 Salt Point roads culberts ‐ phone tender by contact person

    2011‐May‐02Aboriginal and Northern Affairs Shippam & Assoc. $2,402.02 Workshop/supplies/promotions ‐ ongoing supplier used by ANA for community employee years of service awards

    2011‐May‐05Aboriginal and Northern Affairs Oasis Originals $3,900.70 Tshirts/sweaters

    2011‐May‐10Aboriginal and Northern Affairs Canad Inns Polo Park $1,661.44 Boardroom Rental/food

    2011‐May‐11Aboriginal and Northern Affairs Canad Inns Polo Park $1,701.58 Boardroom rental/food

    2011‐May‐12Aboriginal and Northern Affairs Canad Inns Polo Park $1,694.10 Boardroom rental/food

    2011‐May‐13Aboriginal and Northern Affairs Canad Inns Polo Park $1,033.72 Boardroom rental/food

    2011‐May‐13Aboriginal and Northern Affairs Dalco Cleanflow Supply Company $1,002.26 Princess Harbour (C. Tyrell) ‐ 3 suppliers contacted by phone, only one quote received and accepted

    2011‐May‐15Aboriginal and Northern Affairs Cordell Satellite $1,617.28 Satellite phone cards/minutes/activation ‐ availability locally

    2011‐May‐24Aboriginal and Northern Affairs Bryan Thompson $1,102.50 Duck Bay backhoe services ‐ phone tender by the community, lowest bid accepted

    2011‐May‐24Aboriginal and Northern Affairs Hubert Arpin  $1,343.22 Reimbursement to Hubert Arpin ‐ phone tender by community contact person

    2011‐May‐28Aboriginal and Northern Affairs Lakeside Excavating $3,707.50 Salt Point Community road maintenance ‐ culvert installation.  Phone tender by community contact person

    2011‐May‐30Aboriginal and Northern Affairs ESRI Canada $1,540.80 Arc View maintenance ‐ designated provider through IT which is Department of business Transformation and Technology

    2011‐May‐30Aboriginal and Northern Affairs Oasis Originals $1,022.39 Jackets (22) ‐ promo items for community workshop purchased on short notice and company already had artwork in place

    2011‐May‐31Aboriginal and Northern Affairs Campbell Construction $1,146.60 Duck Bay sandbagging restricted roads ‐ emergency flood protection

    2011‐Jun‐03Aboriginal and Northern Affairs Wescan Inn $1,302.22 Technical/Public Works meetings ‐ availability of accommodation close to meeting venue

    2011‐Jun‐09Aboriginal and Northern Affairs Endurapak Inc. $11,753.86 Red Deer Lake bags for sand ‐ flood costs ‐ emergency flood protection

    2011‐Jun‐09Aboriginal and Northern Affairs Flaman Rentals $7,119.25 Red Deer Lake flood costs ‐ emergency flood protection

    2011‐Jun‐10Aboriginal and Northern Affairs Lakeside Excavating $89,556.50 Benyk's Point & Woods Creek ‐ flood cost ‐ equipment & materials for flood protection

    2011‐Jun‐10Aboriginal and Northern Affairs Leonard Kendzierski $8,475.00 Benyk's Point flood cost ‐ emergency response for 2011 flood relief

    Page 2 of 663

  • Data Reported as of October 1, 2015Date Signed Department Contractor Value Purpose

    Manitoba Untendered Contracts Report as of April 1, 2008

    2011‐Jun‐11Aboriginal and Northern Affairs Gail McQuaker $21,676.00 Benyk's Point flood cost ‐ emergency response for 2011 flood relief

    2011‐Jun‐15Aboriginal and Northern Affairs Lakeside Excavating $287,755.78 Benyk's Point ‐ flood cost ‐ equipment & materials for emergency flood protection

    2011‐Jun‐15Aboriginal and Northern Affairs South Beach Casino & Resort $10,406.48

    Division Workshop meeting rooms and accommodations ‐ other facilities unable to provide pricing; no occupancy due to accomodating flood victims

    2011‐Jun‐15Aboriginal and Northern Affairs Team Contracting  $10,967.56 Red Deer Lake sand

    2011‐Jun‐15Aboriginal and Northern Affairs Wings over Kississing $1,040.30 Charter to Thompson ‐ Nelson River ‐ availability

    2011‐Jun‐16Aboriginal and Northern Affairs Humphry Inn and Suites $1,018.27 AAS Planning session ‐ reasonable rates provided and met the needs as required for session

    2011‐Jun‐17Aboriginal and Northern Affairs Alcom Electronic Communications $28,264.22

    Installation at Cross Lake/Wabowden/Easterville/Moose Lake/Sherridon/Norway House for base station/radio/batteries/travel/mileages/hotel ‐ lowest bid received

    2011‐Jun‐20Aboriginal and Northern Affairs Evron  $5,375.00 FAS 100 Support plus/asset accounting 3 user

    2011‐Jun‐21Aboriginal and Northern Affairs Times Development $55,000.00 Crane River dyke project and road repairs

    2011‐Jun‐22Aboriginal and Northern Affairs Lakeside Excavatin $10,320.00 Wood's Creek ‐ flood cost ‐ material for 2011 flood protection and access to Woods Creek

    2011‐Jun‐22Aboriginal and Northern Affairs P. Baker Backho Ltd, $5,335.00 Crane River flood cost ‐ emergency flood protection

    2011‐Jun‐23Aboriginal and Northern Affairs Dyck Construction Ltd. $14,078.82 Benyk's Point ‐ flood cost ‐ hauling gravel for 2011 flood relief

    2011‐Jun‐23Aboriginal and Northern Affairs Lamontagne Chocolate $1,071.43 Duck Bay ‐ purchased by Community, fundraising chocolates for Recreation program

    2011‐Jun‐24Aboriginal and Northern Affairs Blair Johnson $5,002.25 Beynyk's Point flood cost

    2011‐Jun‐24Aboriginal and Northern Affairs Derrick Murray $17,984.95 Benyk's Point flood cost ‐ emergency flood protection

    2011‐Jun‐24Aboriginal and Northern Affairs Eric Altenburg $10,107.75 Benyk's Point flood cost ‐ emergency flood protection

    2011‐Jun‐24Aboriginal and Northern Affairs John Tucker Trucking Ltd. $12,343.39 Benyk's Point flood cost ‐ emergency flood protection

    2011‐Jun‐24Aboriginal and Northern Affairs Leonard Kendzierski $7,940.66 Benyk's Point flood cost ‐ emergency flood protection

    2011‐Jun‐24Aboriginal and Northern Affairs McMunn/Yates Building Supplies $1,283.84 Benyk's Point flood cost ‐ emergency flood protection

    2011‐Jun‐24Aboriginal and Northern Affairs Parkland Tractor Ltd. $11,424.15 Crane River flood cost ‐ emergency flood protection

    2011‐Jun‐24Aboriginal and Northern Affairs RSV Ventures Ltd. $67,700.00 Benyk's Point flood cost‐ emergency flood protection

    2011‐Jun‐27Aboriginal and Northern Affairs Clint Moffat & Sons Ltd. $44,600.00 Crane River flood cost ‐ emergency flood protection

    Page 3 of 663

  • Data Reported as of October 1, 2015Date Signed Department Contractor Value Purpose

    Manitoba Untendered Contracts Report as of April 1, 2008

    2011‐Jun‐27Aboriginal and Northern Affairs Doug Bass $23,168.00 Crane River flood cost ‐ emergency flood protection

    2011‐Jun‐27Aboriginal and Northern Affairs Elite Benefit Solutions $21,398.00 VFIS policy #VFP9124475‐03 ‐ only supplier who provided this specific insurance for volunteer fire fighters.

    2011‐Jun‐27Aboriginal and Northern Affairs Setpoint Refrigeration $6,982.66 Repairs to refrigerator units in Garden Hill ‐ First Nation community

    2011‐Jun‐28Aboriginal and Northern Affairs Energy Consultants International Inc. $23,512.00 Infrastructure Audits ‐ 20 MANA communities

    2011‐Jun‐28Aboriginal and Northern Affairs Keith Anderson $4,125.00 Rental charges for CRDAP Leaf Rapids survey

    2011‐Jun‐28Aboriginal and Northern Affairs Winds over Kississing $1,662.10 Charter to Landing Lake

    2011‐Jun‐30Aboriginal and Northern Affairs Arnason Industries $1,795,000.00 Crane River dyke ‐ flood protection Lakeshore Road Dike and road construction ‐ emergency response for 2011 flood relief

    2011‐Jun‐30Aboriginal and Northern Affairs Neegan Burnside $5,000.00 Homebrook ‐ road flooding

    2011‐Jul‐01Aboriginal and Northern Affairs D & S Bretecher Ranch Ltd. $4,100.00 Benyk's Point flood cost

    2011‐Jul‐02Aboriginal and Northern Affairs John Tucker Trucking Ltd. $34,775.14 Benyk's Point flood cost ‐ emergency flood protection

    2011‐Jul‐04Aboriginal and Northern Affairs Hubert Arpin $2,653.00 Salt Point Road riprapping ‐ phone tender by community contact person

    2011‐Jul‐10Aboriginal and Northern Affairs Hartman Construction Ltd. $900,000.00 Provide access to the community from flooding related to rising levels of Lake Manitoba

    2011‐Jul‐11Aboriginal and Northern Affairs John Loring $2,910.00 Spence Lake flood cost ‐ emergency response for 2011 flood relief.

    2011‐Jul‐12Aboriginal and Northern Affairs Big Sky Equip. Ltd. $37,719.90 Spence Lake/Crane River flood cost ‐ unable to rent pumps.  Only supplier with pumps at the time.

    2011‐Jul‐12Aboriginal and Northern Affairs Derrick Murray $9,453.00 Benyk's Point flood cost ‐ emergency flood protection

    2011‐Jul‐12Aboriginal and Northern Affairs Goodman's Landing fisheries $11,000.00 Gravel for road repairs for Goodman's landing 

    2011‐Jul‐12Aboriginal and Northern Affairs McMunn/Yates Building Supplies $3,423.57 Benyk's Point flood cost ‐ emergency flood protection

    2011‐Jul‐12Aboriginal and Northern Affairs Slyzuik Trucking $3,040.00 Beynyks Point flood cost ‐ emergency flood protection

    2011‐Jul‐14Aboriginal and Northern Affairs Delaney and Associates Inc. $1,899.00 Certificate Training for the International Association for Public Participation

    2011‐Jul‐14Aboriginal and Northern Affairs Eric Altenburg $7,387.04 Benyk's Point flood cost ‐ emergency flood protection

    2011‐Jul‐14Aboriginal and Northern Affairs Kowalchuk Electric/Mechanical $11,365.54 Woods Creek flood cost ‐ emergency flood protection

    2011‐Jul‐15Aboriginal and Northern Affairs Lakeside Excavating $2,080.00 Spence Lake flood cost ‐ material supply for 2011 flood relief

    Page 4 of 663

  • Data Reported as of October 1, 2015Date Signed Department Contractor Value Purpose

    Manitoba Untendered Contracts Report as of April 1, 2008

    2011‐Jul‐15Aboriginal and Northern Affairs Lakeside Excavating $138,876.00 Benyk's Point & Woods Creek ‐ emergency flood protection ‐ equipment & materials

    2011‐Jul‐18Aboriginal and Northern Affairs Campbell Construction $15,154.50 Duck Bay flood cost ‐ emergency flood protection

    2011‐Jul‐18Aboriginal and Northern Affairs Campbell Construction Inc. $42,048.56 Camperville Community ‐ road repair ‐ emergency response for 2011 flood relief

    2011‐Jul‐18Aboriginal and Northern Affairs Hubert Arpin  $2,060.00 Tractor work on Salt Point roads ‐ phone tender by community contact person.

    2011‐Jul‐18Aboriginal and Northern Affairs Paradis Eavestroughin $4,600.00 Benyk's Point flood cost ‐ emergency flood protection

    2011‐Jul‐18Aboriginal and Northern Affairs Paradis Eavestroughing $28,660.00 Benyk's Point flood cost

    2011‐Jul‐18Aboriginal and Northern Affairs RSV Ventures Ltd. $5,915.00 Benyk's Point Flood cost ‐ emergency flood protection

    2011‐Jul‐18Aboriginal and Northern Affairs Safety Care Inc. $1,535.00 License/subscription

    2011‐Jul‐18Aboriginal and Northern Affairs Stantec Consulting $11,226.25 Engineering Services for the design and contract administration ‐ God's Lake Narrows Water Treatment Plant project

    2011‐Jul‐19Aboriginal and Northern Affairs D & S Bretecher Ranch Ltd. $9,584.00 Benyk's Point ‐ flood cost diking

    2011‐Jul‐19Aboriginal and Northern Affairs Darrel Ferland $13,983.50 Red Deer Lake flood costs ‐ emergency flood protection

    2011‐Jul‐20Aboriginal and Northern Affairs Doug Bass $5,400.00 Benyk's Point flood cost ‐ emergency flood protection

    2011‐Jul‐27Aboriginal and Northern Affairs 4741669 Manitoba Ltd. ceo Eric Altenburg $2,087.50 Benyk's Point flood cost

    2011‐Aug‐02Aboriginal and Northern Affairs Irene Moffat $6,175.00 Benyk's Point flood cost ‐ filling, hauling and placing sandbags

    2011‐Aug‐02Aboriginal and Northern Affairs Ray Moffatt $2,400.00 Benyk's Point ‐ flood cost ‐ filing, hauling and placing sandbags

    2011‐Aug‐03Aboriginal and Northern Affairs Buz‐z Enterprise  $13,255.04 Benyk's Point ‐ Flood cost Fuel:  Diesel & Gas 2011 flood relief

    2011‐Aug‐04Aboriginal and Northern Affairs Dalco Cleanflow Supply Company $1,532.54

    Baden/Duck Bay/Landfill Attendance Invoices: $204.78 for safety equipment for regional WDS attendant at Seymourville for water testing supplies for Baden WTP for WTP equipment for Duck Bay WTP.

    2011‐Aug‐16Aboriginal and Northern Affairs Cordell Satellite $1,899.24 Satellite phone for Granville Lake.

    2011‐Aug‐18Aboriginal and Northern Affairs Eric Altenburg $1,152.50 Benyk's Point flood cost ‐ emergency flood protection

    2011‐Aug‐18Aboriginal and Northern Affairs Hans Myhre Crane River $29,029.00 Crane River flood cost ‐ emergency flood protection

    2011‐Aug‐18Aboriginal and Northern Affairs RSV Ventures Ltd. $3,525.00 Beynyk's Point flood cost ‐ emergency flood protection

    2011‐Aug‐19Aboriginal and Northern Affairs Dufour Enterprise Ltd. $3,350.00 Seymourville CC ‐ Equipment ‐ Lagoon work, Community tendered, lowest bid accepted

    Page 5 of 663

  • Data Reported as of October 1, 2015Date Signed Department Contractor Value Purpose

    Manitoba Untendered Contracts Report as of April 1, 2008

    2011‐Aug‐19Aboriginal and Northern Affairs Viscount Gord Hotel $1,293.60 Hotel

    2011‐Aug‐22Aboriginal and Northern Affairs Kevin Disbrowe $1,000.00 Disbrowe Community ‐ Eastside Dock ‐ Community tendered, lowest bid accepted

    2011‐Aug‐23Aboriginal and Northern Affairs Chandler McLeod $2,000.00 2 promotional art items ‐ gifts

    2011‐Aug‐23Aboriginal and Northern Affairs Doug Bass $8,690.00 Benyk's Point flood cost

    2011‐Aug‐25Aboriginal and Northern Affairs Hillside Backhood Service $21,070.00 Benyk's Point/Woods Creek Flood cost ‐ emergency response for 2011 flood relief

    2011‐Aug‐25Aboriginal and Northern Affairs Setpoint Refrigeration $3,028.35 Repairs at Garden Hill ‐ First Nation community

    2011‐Aug‐29Aboriginal and Northern Affairs Elaine Shewchuk $7,428.06 Pump and generator rentals for Benyk's Point community ‐ emergency flood protection

    2011‐Aug‐29Aboriginal and Northern Affairs H. Baudry Construction $2,625.00 Install culvert on Loon Straits Road ‐ emergency situation ‐ road washed from windstorm, invoice submitted by Council

    2011‐Sep‐02Aboriginal and Northern Affairs Global Hydration $28,186.60

    Pilot test of Water treatment system ‐ Seymourville ‐ This is a pilot project offered to MANA as an alternative water treatment source available for the first time in Canada

    2011‐Sep‐04Aboriginal and Northern Affairs ALZ Hauling $4,200.00 Spence Lake flood cost ‐ emergency response for 2011 flood relief

    2011‐Sep‐04Aboriginal and Northern Affairs ALZ Hauling $23,450.00 Benyk's Point flood cost ‐ emergency response for 2011 flood relief

    2011‐Sep‐07Aboriginal and Northern Affairs Biomark, Boise ID $2,970.00 Injector needles/implanter

    2011‐Sep‐07Aboriginal and Northern Affairs Paradis Eavestroughing $4,930.00 Woods Creek dyke, Benyk's Point dyke ‐ emergency response for 2011 flood relief

    2011‐Sep‐08Aboriginal and Northern Affairs Dwayne Moffat $3,594.00 Benyk's Point ‐ flood cost ‐ filling, hauling and placing sandbags

    2011‐Sep‐09Aboriginal and Northern Affairs Derrick Murray $6,824.00 Benyk's Point flood cost ‐ emergency flood protection

    2011‐Sep‐09Aboriginal and Northern Affairs Hans Myhre $15,000.00 Crane River flood cost ‐ emergency flood protection

    2011‐Sep‐09Aboriginal and Northern Affairs Hillside Backhoe Service $11,390.00 Benyk's Point flood cost ‐ emergency flood protection

    2011‐Sep‐09Aboriginal and Northern Affairs John Stykalo $2,824.80 Woods' Creek ‐ flood cost ‐ emergency flood cost

    2011‐Sep‐09Aboriginal and Northern Affairs Leonard Kendzierski $26,246.59 Benyk's Point flood cost ‐ emergency flood protection

    2011‐Sep‐09Aboriginal and Northern Affairs M.R. Plumbing Ltd. $5,036.53

    Supply of parts required for permanent repairs of sewer lift station ‐ Emergency in Granville Lake, part of dept. plan for Granville Lake

    2011‐Sep‐09Aboriginal and Northern Affairs Paradis Eavestroughing $12,845.00 Benyks' Point flood cost ‐ emergency flood protection

    2011‐Sep‐09Aboriginal and Northern Affairs Paradis Eavestroughing  $14,237.50 Benyks' Point/ Wood's Creek flood cost ‐ emergency flood protection

    Page 6 of 663

  • Data Reported as of October 1, 2015Date Signed Department Contractor Value Purpose

    Manitoba Untendered Contracts Report as of April 1, 2008

    2011‐Sep‐09Aboriginal and Northern Affairs Robert Taylor $5,400.00 Benyks' Point flood cost ‐ emergency flood protection

    2011‐Sep‐09Aboriginal and Northern Affairs Shachtay Sales & Service Ltd. $3,261.39 Purchasing riding lawnmower ‐ remote community, this is the closest supplier

    2011‐Sep‐12Aboriginal and Northern Affairs Glenn Howard Inn $1,026.13

    Meeting rooms and refreshments for AAS Planning Session ‐ limited meeting space in the Lac du Bonnet area to accommodate number of participants

    2011‐Sep‐13Aboriginal and Northern Affairs Buz‐z Enterprise $93,367.25 Benyk's Point Flood cost ‐ emergency flood protection

    2011‐Sep‐13Aboriginal and Northern Affairs Moose Lake Public Works $6,256.00 Equipment rental for MCN clean up cost project ‐ landfill clean up (MB Conservation)

    2011‐Sep‐15Aboriginal and Northern Affairs Leroy Fracois $1,500.00 Rental of boat for Nelson House Survery

    2011‐Sep‐15Aboriginal and Northern Affairs Mosakahiken Cree Nation $24,721.00 Tolko Road maintenance ‐ MB contribution

    2011‐Sep‐19Aboriginal and Northern Affairs Dalco Cleanflow Supply Company $1,264.77 Duck Bay WTP supplies & equipment

    2011‐Sep‐19Aboriginal and Northern Affairs John Tucker Trucking Ltd.  $3,605.00 Benyk's Point Flood cost ‐ emergency resopnse for 2011 flood relief

    2011‐Sep‐20Aboriginal and Northern Affairs SKO Construction Inc. $40,080.00 Road maintenance of Bison Road

    2011‐Sep‐22Aboriginal and Northern Affairs Cec Hanec & Assoc. $1,267.16 Facilitator/meals/mileage for LGD planning workshop

    2011‐Sep‐22Aboriginal and Northern Affairs Stantec Consulting $41,795.73 Engineering Services for the design and contract administration ‐ God's Lake Narrows Water Treatment Plant project

    2011‐Sep‐22Aboriginal and Northern Affairs Terry Lavalle Construction $44,618.50 Homebrook flood cost ‐ emergency flood protection

    2011‐Sep‐23Aboriginal and Northern Affairs Conrad Campbell $1,682.00 Equipment rental of MCN cheap‐up costs project

    2011‐Sep‐26Aboriginal and Northern Affairs Lakeside Excavating $12,330.00 Woods Creek Road Repair

    2011‐Sep‐26Aboriginal and Northern Affairs Lakeside Excavating $42,600.00 Benyk's Point flood cost ‐ road repair ‐ emergency response for 2011 flood relief

    2011‐Sep‐26Aboriginal and Northern Affairs Lakeside Excavating $42,600.00 Benyk's Point flood cost ‐ road repair ‐ emergency response for 2011 flood relief

    2011‐Sep‐27Aboriginal and Northern Affairs Arnason Industries $970,720.00 Flood restoration to the community roads of Crane River

    2011‐Sep‐29Aboriginal and Northern Affairs Cunningham Business Interiors $2,534.08 Computer Tables, chairs and keyboard

    2011‐Sep‐29Aboriginal and Northern Affairs TEAM Contracting $4,379.89 April 5, 2010 ‐ Barrows WWSP Expansion ‐ Geo‐Textile bags unit increase.  Extra work order to existing contract

    2011‐Sep‐29Aboriginal and Northern Affairs TEAM Contracting $26,620.00 Barrows WWSP Expansion ‐ Pump rentals

    2011‐Sep‐29Aboriginal and Northern Affairs TEAM Contracting $51,970.00 Barrows WWSP Expansion ‐ Additional De‐Sludge

    Page 7 of 663

  • Data Reported as of October 1, 2015Date Signed Department Contractor Value Purpose

    Manitoba Untendered Contracts Report as of April 1, 2008

    2011‐Sep‐30Aboriginal and Northern Affairs Muriel Huhtala $2,500.00 Road maintenance of Bison Road

    2011‐Sep‐30Aboriginal and Northern Affairs The Technology Consortium $1,709.86 HP Scanner ‐ assigned vendor

    2011‐Oct‐03Aboriginal and Northern Affairs Burntwood Hotel $1,329.91 Meeting rooms and refreshments for CAO meeting

    2011‐Oct‐04Aboriginal and Northern Affairs Meemeeweeseepi Development Corp. $91,804.71 Benyk's Point Flood cost ‐ emergency response for 2011 flood relief

    2011‐Oct‐04Aboriginal and Northern Affairs RSV Ventures Ltd. $2,510.00 Benyk's Point flood cost ‐ emergency response for 2011 flood relief

    2011‐Oct‐04Aboriginal and Northern Affairs RSV Ventures Ltd., Rorketon $2,510.00 Benyk's Point Flood cost ‐ emergency response for 2011 flood relief

    2011‐Oct‐06Aboriginal and Northern Affairs Miller Equipment Ltd. $18,270.25 Crane River flood cost ‐ emergency response for 2011 flood relief

    2011‐Oct‐11Aboriginal and Northern Affairs Miller Equipment Ltd., Dauphin MB $18,270.25 Crane River Flood cost ‐ emergency response for 2011 flood relief

    2011‐Oct‐13Aboriginal and Northern Affairs Delaney & Associates Inc. $1,899.00 Certificate training for the International Association for Public Participation

    2011‐Oct‐17Aboriginal and Northern Affairs Dalco‐Cleanflo $3,077.32 Supply fencing for Pine Dock Waste Site

    2011‐Oct‐17Aboriginal and Northern Affairs Frederick Soucy $2,748.46

    Facilitator services for Northern Leadership Training and Wellness Workshop ‐ Frederick lives in Thompson saving costs, past positive feedback from participants

    2011‐Oct‐19Aboriginal and Northern Affairs Janico Investments Ltd. $1,783.24 Supply fuel for Loon Straits

    2011‐Oct‐21Aboriginal and Northern Affairs Anokiiwin Training Institute $13,692.90 Simply Accounting training w/mobile computer lab ‐ no local service provider available with computer lab

    2011‐Oct‐21Aboriginal and Northern Affairs Strilkiwski Contracting Ltd. $12,000.00 Benyk's Point flood cost ‐ 6" Diesel pump rentals (4)

    2011‐Oct‐21Aboriginal and Northern Affairs The Technology Consortium $2,131.44 Widescreen lcd monitor ‐ assigned vendor provider from Dept. of ETT

    2011‐Oct‐22Aboriginal and Northern Affairs Stantec Consulting $41,795.73

    August 6, 2009 ‐ Engineering Services for the design and contract administration ‐ God's Lake Narrows Water Treatment Plant project

    2011‐Oct‐24Aboriginal and Northern Affairs Gateway Electrical $1,956.24 Water Treatment pilot project in Seymourville

    2011‐Oct‐24Aboriginal and Northern Affairs Northern Rentals & Power Products $5,476.26 Camperville flood ‐ equipment repair

    2011‐Nov‐02Aboriginal and Northern Affairs Miller Equipment Ltd. $29,657.73 Crane River flood cost

    2011‐Nov‐03Aboriginal and Northern Affairs Wolseley Canada Inc. $3,098.44 Supply Red Sucker Lake WTP with filters

    2011‐Nov‐04Aboriginal and Northern Affairs Strilkiwski Contracting Ltd. $2,484.00 Repair bridge road ‐ Salt Point

    2011‐Nov‐06Aboriginal and Northern Affairs B & G Associates $41,170.00 Carpenter training to construct Water Treatment Plant superstructure (building), using local labour

    Page 8 of 663

  • Data Reported as of October 1, 2015Date Signed Department Contractor Value Purpose

    Manitoba Untendered Contracts Report as of April 1, 2008

    2011‐Nov‐09Aboriginal and Northern Affairs Dufour Enterprise Ltd. $7,930.00 Provide concrete bases for installation of 911 paging towers

    2011‐Nov‐15Aboriginal and Northern Affairs Campbell construction Inc. $17,976.87 Road repairs ‐ Richard Point Road affected by flood waters ‐ Camperville

    2011‐Nov‐15Aboriginal and Northern Affairs Energy Consultants International Inc. $3,000.00 Infrastructure Assessment

    2011‐Nov‐30Aboriginal and Northern Affairs Frederick Soucy $2,600.00 Facilitate Northern Leadership and Wellness Workshop

    2011‐Dec‐02Aboriginal and Northern Affairs MiSask Industries $5,482.70 Manufacture and delivery of 6 re‐circulation Aqua‐flo pump freeze prevention units

    2011‐Dec‐02Aboriginal and Northern Affairs Viscount Gort Hotel $2,468.60 Technical/Public Works meetings

    2011‐Dec‐13Aboriginal and Northern Affairs Paradis Eavestroughing $2,380.00 Benyk's Point flood cost (equipment rentals)

    2011‐Dec‐14Aboriginal and Northern Affairs Gene's Telecom $24,882.11 Ready communities for 911 service

    2011‐Dec‐14Aboriginal and Northern Affairs Keywin Industries Ltd. $2,887.29 Supply of high pressure chemical pump and programming ‐ one supplier

    2011‐Dec‐14Aboriginal and Northern Affairs Keywin Industries Ltd. $4,266.59 Keywin Industries Ltd., Winnipeg MB

    2011‐Dec‐14Aboriginal and Northern Affairs Peter Neufeld Consulting Inc. $2,800.00 Training ‐ Workplace Safety and Health Workshop ‐ fall protection, spil clean up training

    2012‐Jan‐04Aboriginal and Northern Affairs Dalco Cleanflow Supply company $3,766.80

    Supply and install necessary plumbing fixtures to maintain water service to the community of Moose Lake ‐ emergency situation with WTP

    2012‐Jan‐05Aboriginal and Northern Affairs Cunningham Business Interiors $1,220.30 Computer data table, chair, keyboard tray

    2012‐Jan‐17Aboriginal and Northern Affairs Thompson Home Hardware $34,614.15 Material supply ‐ Thicket Portage MB Water Treatment Plant project ‐ lowest quote for materials in the area

    2012‐Feb‐01Aboriginal and Northern Affairs Hartman Construction Ltd. $30,788.40 Provide access to the community from flooding related to rising levels of Lake Manitoba

    2012‐Feb‐03Aboriginal and Northern Affairs Cedar Lake Community futures Development $1,066.01 Coordinate/facilitate meeting to discuss Regional Waste Disposal Site

    2012‐Feb‐08Aboriginal and Northern Affairs Selkirk Inn & Conference Centre $10,737.33 Supply food, refreshments, rooms for public works workshop

    2012‐Feb‐13Aboriginal and Northern Affairs Mystery Lake Motor Hotel $8,113.39 Hotel lodging

    2012‐Feb‐27Aboriginal and Northern Affairs Custom Helicopter Ltd., St. Andrews MB $4,931.75 Charter to Granville Lake (Bayer/Halleux) on Feb. 27, 2012 ‐ quote obtained by Government Air

    2012‐Feb‐27Aboriginal and Northern Affairs Ma‐Mow‐We‐Tak Friendship Centre $3,751.10 Catering/Meeting Room/Sound Equipment

    2012‐Mar‐01Aboriginal and Northern Affairs Mystery Lake Motor Hotel $1,765.10 Hotel lodging

    2012‐Mar‐02Aboriginal and Northern Affairs Victoria Inn $2,704.80 Hotel lodging

    Page 9 of 663

  • Data Reported as of October 1, 2015Date Signed Department Contractor Value Purpose

    Manitoba Untendered Contracts Report as of April 1, 2008

    2012‐Mar‐08Aboriginal and Northern Affairs Viscount Gort Hotel $21,220.75 Refreshments/Lodging for Regional workshop

    2012‐Mar‐12Aboriginal and Northern Affairs Warehouse Artworks Ltd. $1,446.64 Members of Legislative Assembly of Assiniboia framed

    2012‐Mar‐13Aboriginal and Northern Affairs Chandler McLeod $1,500.00 Aboriginal Art

    2012‐Mar‐19Aboriginal and Northern Affairs A Sapach Trucking $1,029.10 Unload Tanks from trailer and repair springs and tires

    2012‐Mar‐19Aboriginal and Northern Affairs Millenium Office Furnishings $13,080.75 Office furniture to replace furniture damaged by water flood, same vendor that supplied furnishings in 2008

    2012‐Mar‐21Aboriginal and Northern Affairs Delaney and Associates Inc. $2,004.50 Develop tool for designing & implementing effective participation in public participation exchanges

    2012‐Mar‐21Aboriginal and Northern Affairs Manitoba Keewatinowi Okimakanak $1,000.00 NRTA National Summit ‐ tradeshow booth rental

    2012‐Mar‐22Aboriginal and Northern Affairs Winnipeg Furniture Service Ltd. $27,999.93 Emergency cleanup work after water damage at 200 ‐ 500 Portage Ave.

    2012‐Mar‐27Aboriginal and Northern Affairs Louis J Stevenson $2,500.00 Provide statistical report of flood evacuee residential options

    2012‐Mar‐27Aboriginal and Northern Affairs Louis J Stevenson $5,000.00 Civil Legal Services approved contract form

    2012‐Mar‐28Aboriginal and Northern Affairs Arnason Industries $2,480.00 Clear snow and ice making access to Disbrowe Island

    2012‐Mar‐28Aboriginal and Northern Affairs Thompson Home Hardware $2,600.00 Amendment ‐ January 27,2012 material supply ‐ Thicket Portage B Water Treatment Plant project.

    2012‐Apr‐18Aboriginal and Northern Affairs Keywin Industries Ltd. $2,337.95 Emergency repair of raw water supply

    2012‐Apr‐18Aboriginal and Northern Affairs Keywin Industries Ltd. $2,887.29 Supply of high pressure chemical pump and programming

    2012‐May‐04Aboriginal and Northern Affairs Peter Neufeld Consulting Ltd. $2,800.00 2 day training in Winnipeg ‐ Fall protection, ladder safety and MHMIS

    2012‐May‐10Aboriginal and Northern Affairs All Seasons Catering Incorporated $1,460.93 May 10th Event at the Manitoba Legislative Building

    2012‐May‐10Aboriginal and Northern Affairs Bruce & Boivin Consulting Group Inc. $3,000.00 May 10th Event at the Manitoba Legislative Building

    2012‐May‐15Aboriginal and Northern Affairs Safety care Inc., Burlington ON $1,370.00 Montie Subscription Renewal ‐ WPSH ‐ provided safety video library

    2012‐May‐16Aboriginal and Northern Affairs Ramada Viscount Gort Hotel $11,172.00 Workshop Boardroom/Food/Motel Rooms (Jamie Bertrand)

    2012‐May‐24Aboriginal and Northern Affairs Day's Inn ‐ Thompson $1,209.60 Tech P/W meeting in Thompson May 22 ‐ 24 for D Shingler/C Tyrell/J Bertrand/M Nagle/A Sandberg

    2012‐May‐24Aboriginal and Northern Affairs Fort Garry Trucks Ltd. $1,706.65 Assess the condition of the truck in the cmty and repairs required (NCR)

    2012‐May‐25Aboriginal and Northern Affairs Ramada Viscount Fort Hotel $8,994.16 Food/room/equipment/banquet/gratuity from May 1 ‐ 4, 2012 (NCR)

    Page 10 of 663

  • Data Reported as of October 1, 2015Date Signed Department Contractor Value Purpose

    Manitoba Untendered Contracts Report as of April 1, 2008

    2012‐Jun‐27Aboriginal and Northern Affairs Wamair Service & Outfitting $2,933.57

    Charter to Pine Dock, RSL, Island Lake/Little Grand Rapids/Princess Harbour for required WPSH inspections ‐ lower quote of the 2 flight providers in the area

    2012‐Jun‐30Aboriginal and Northern Affairs Setpoint Refrigeration $4,023.86 Repair of refrigeration unit at St. Theresa Point, damaged belt, fan motor, condensor and electric motor

    2012‐Jul‐05Aboriginal and Northern Affairs Canad Inns Destination Centre Fort Garry $2,016.97 Venue provided meeting space and food during the Division Planning Session for Aboriginal Affairs Secretariat

    2012‐Jul‐06Aboriginal and Northern Affairs Ramada Viscount Gort Hotel $2,116.80 Room charge April 30 ‐ May 3 for L Little/J Lambert/G Paupanekis/M Budnikaf (NCR)

    2012‐Jul‐12Aboriginal and Northern Affairs Paradis Eavestroughing $2,420.25 Benyk's Point ‐ Robertson Rd. ‐ haul clay and construct ramp over existing dike

    2012‐Jul‐19Aboriginal and Northern Affairs Fort Garry Trucks Ltd. $18,731.40 Duck Bay CC ‐ 1992 Fort F800 Fire Truck repairs

    2012‐Jul‐19Aboriginal and Northern Affairs SKO Construction Inc. $2,640.00 Gravel/grading ‐ Salt Point Rd. ‐ maintenance

    2012‐Jul‐25Aboriginal and Northern Affairs Northern Rentals & Power Products $2,899.68 Baden ‐ equipment purchase (riding mower)

    2012‐Jul‐27Aboriginal and Northern Affairs Nickel City Motors $1,061.77 Nelson River Sturgeon Road ‐ honda Generator ‐ engine repair

    2012‐Aug‐07Aboriginal and Northern Affairs Gene's Telecom $50,400.87 Installations of towers and purchase of radios to prepare for 911 ‐ Easterville ‐ only northern service provider.

    2012‐Aug‐13Aboriginal and Northern Affairs Campbell Construction $20,578.92 Road maintenance to Whitefish Lake Cottage Association

    2012‐Aug‐15Aboriginal and Northern Affairs Dan's Excavating Ltd. $3,045.00

    Brushing services ‐ break up dam/dump clean up ‐ Wanipigow Cottage Assoc. ‐ invoice forwarded for payment.  Work tendered and authorized by Cottage Assoc.

    2012‐Aug‐17Aboriginal and Northern Affairs

    Ramada Viscount Gort Hotel ‐ NCR NACC Attendees $1,646.40 NCR NACC Attendees.

    2012‐Aug‐21Aboriginal and Northern Affairs Corix Water Products $13,258.00 Nelson House Water Treatment Plant process train supply ‐ recommended, only supplier of this process train in Canada.

    2012‐Aug‐27Aboriginal and Northern Affairs Rick Paradis $3,740.00 Benyk's Point Flood ‐ emergency response for 2011 flood relief.

    2012‐Sep‐28Aboriginal and Northern Affairs Oasis Originals $1,340.24 Trade show promo items ‐ contractor used by ANA.

    2013‐Jan‐03Aboriginal and Northern Affairs Nickel City Motors $1,085.28 Powerhead Ice auger ‐ Setting Lake Cottage Assoc. ‐ warranty.

    2013‐Apr‐02Aboriginal and Northern Affairs Oasis Originals $3,212.40 Keychains AAWG ‐ a reputable supplier for short notice order.

    2013‐Apr‐02Aboriginal and Northern Affairs TNT Plumbing & Heating $1,449.04

    Remove existing carbon tanks and hook up new filter tank, run drain and hook up into distribution water line ‐ only contractor available.

    2013‐Apr‐05Aboriginal and Northern Affairs Postage by Phone $1,000.00 Postage meter usage ‐ to get mail to communities faster than travelling to Winnipeg first

    2013‐Apr‐16Aboriginal and Northern Affairs The Storm Caterin at the Winnipeg Art Gallery $1,560.28 AAWG Dinner 2013 for Ministers/Leaders ‐ dinner meeting

    2013‐Apr‐16Aboriginal and Northern Affairs The Storm Catering at the Winnipeg Art Gallery  $1,218.06 AAWG Dinner meeting for Deputy Ministers/Senior Officials

    Page 11 of 663

  • Data Reported as of October 1, 2015Date Signed Department Contractor Value Purpose

    Manitoba Untendered Contracts Report as of April 1, 2008

    2013‐May‐06Aboriginal and Northern Affairs Winnipeg Art Gallery $1,298.75 AAWG 2013 Film screening

    2013‐Jul‐02Aboriginal and Northern Affairs Eric Altenburg $4,288.95 Lot 5 Benyk's Point ‐ DFA Remediation ‐ 2011 Lake Manitoba Flood

    2013‐Jul‐03Aboriginal and Northern Affairs Susan Denhard $1,905.00 Block 3 Site 7 Benyk's Point Dike Removal and beach clean up.  DFA ‐ Remediation ‐ 2011 Lake MB Flood

    2013‐Jul‐03Aboriginal and Northern Affairs Waterhen $2,150.00 Clean up project ‐ supervision June 7 ‐ 19  2013/DFA ‐ Remediation/2011 Lake MB Flood

    2013‐Jul‐05Aboriginal and Northern Affairs Eleanor McLean $3,674.57 Site 7 Benyk's Point Clean up, DFA ‐ Remediation ‐ 2011 Lake Manitoba Flood

    2013‐Jul‐05Aboriginal and Northern Affairs Ryane Harrison $2,747.50 Site 7 Benyk's Point clean up, DFA ‐ remediation ‐ 2011 Lake Manitoba Flood ‐ urgency due to flood remediation

    2013‐Jul‐12Aboriginal and Northern Affairs The Fort Garry Hotel $16,136.68

    Aboriginal Affairs Working Group April 16, 2013 ‐ location used for previous meeting and all needs were met.  Hosting Meeting of P/T Ministers responsible for Aboriginal Affairs and Leaders of the National Aboriginal Organizations

    2013‐Jul‐15Aboriginal and Northern Affairs Russell Thorne $1,728.22 Fitness training ‐ only instructor available to teach during the week

    2013‐Jul‐18Aboriginal and Northern Affairs Kenneth Spence $2,720.00 Site 7 Benyk's Point ‐ Emergency situation and compliance with residency

    2013‐Jul‐25Aboriginal and Northern Affairs Kivalliq Air $1,130.16 Island Lake Retrofit (charter) ‐ cost effective for group travel

    2013‐Aug‐08Aboriginal and Northern Affairs Winnipeg Outfitters $1,317.38 Replacement of damaged jerseys ‐ 18 jerseys for girls Eastman Soccer Team (2012 MB Summer Games)

    2013‐Sep‐25Aboriginal and Northern Affairs ALS Environmental $1,419.42 Seymourville WTP Test Pilot Project ‐ lab work for pilot study

    2013‐Sep‐26Aboriginal and Northern Affairs Amanda Hebner Catering Services $1,220.40 Catering for Northern Leadership Workshop ‐ used for a previous workshop ‐ quick & professional service

    2013‐Oct‐15Aboriginal and Northern Affairs

    Sammy's Farm Supply Limited & Lakeside Excavating $15,286.11 Culbert installation ‐ emergency situation

    2013‐Oct‐17Aboriginal and Northern Affairs Gibraltar Dining Corporation $1,997.83

    IDWG & Lake Winnipeg East System ‐ venue met all needs and requirements, also provided competitive rates for room & food

    2013‐Oct‐30Aboriginal and Northern Affairs Waterhen Community Council $2,283.44 Pump lagoon ‐ Community Public Works doing the work

    2013‐Nov‐12Aboriginal and Northern Affairs Advance Telemetry Systems $20,658.60 Location collars for caribou in William Lake area ‐ sole source

    2013‐Dec‐18Aboriginal and Northern Affairs Balchen and Kulchycki Surveys $5,690.00 Addition of work for surveying. 

    2013‐Dec‐18Aboriginal and Northern Affairs Balchen and Kulchyycki Surveys $5,690.00 Addition of work for surveying.   Created new contract instead of amending existing contract.

    2014‐Jan‐20Aboriginal and Northern Affairs SKO Construction (Skownan First Nations) $4,210.80 Culvert replacement and road construction ‐ Flooding required immediate construction to continue road access

    2014‐Jan‐27Aboriginal and Northern Affairs Arnason Industries Ltd. $23,489.00 Backwash valve replacement in water treatment plant ‐ Emergency

    Page 12 of 663

  • Data Reported as of October 1, 2015Date Signed Department Contractor Value Purpose

    Manitoba Untendered Contracts Report as of April 1, 2008

    2014‐Jan‐28Aboriginal and Northern Affairs Manitoba Fitness Council $1,032.73 Facilitators Fees ‐ Fitness Workshop ‐ sole source

    2014‐Feb‐26Aboriginal and Northern Affairs The Fairmont Winnipeg $5,000.00

    Deposit ‐ Ministers/Leaders and Deputy Ministers/Officials Aboriginal Affairs Working Group Meeting ‐ Fairmont Winnipeg provided the AAWG meeting with adequate space and accomodations

    2014‐Feb‐28Aboriginal and Northern Affairs Lake Manitoba cottages $2,237.08

    Provided private lodging accommodations during Water Treatment Training course ‐ remote location used to host Water Treatment Training course

    2014‐Feb‐28Aboriginal and Northern Affairs Lake Manitoba Lodge $2,335.02

    Provide meals, meeting facilities, refreshments for Water Treatment Training course ‐ only meal option within 65 km of facility

    2014‐Feb‐28Aboriginal and Northern Affairs Red River College $2,760.00 Provide 4 day training course ‐ sole source

    2014‐Mar‐14Aboriginal and Northern Affairs Manitoba Fitness Council $1,093.93 Facilitators fees ‐ Fitness workshop ‐ Sole Source

    2014‐Mar‐28Aboriginal and Northern Affairs Fort Garry Fire Truck $3,450.00 Inspection of fire truck in Brochet ‐ water pump was frozen and needed to be inspected ‐ Emergency

    2014‐Sep‐10Aboriginal and Northern Affairs 4 Imprint $2,201.36 Vendor had items needed and could deliver in time for event.

    2014‐Sep‐10Aboriginal and Northern Affairs Signal Industries $4,680.72

    Cost savings ‐ vendor previously worked with MIT on a similar design, so little to no design time required and vendor had the required materials for traffics signage.

    2014‐Sep‐23Aboriginal and Northern Affairs Novaturi Group Inc. $10,968.00

    Strategic Planning 1 1/2 day workshop.  Creation of vision and mission statements, reports including board development, strategic thinking, and strategic planning reports, and travel expenses.   Board members and management staff in attendance.  Company selected due to their in‐depth knowledge of CEDF as a Crown Corporation and their knowledge of crown corporation governance.

    2014‐Nov‐10Aboriginal and Northern Affairs Dialogue Partners Inc. $17,266.94 5 day specialized training for 10 staff ‐ sole source

    2014‐Nov‐28Aboriginal and Northern Affairs Ultra Insights Planning & Research Services $4,800.00 Data analysis & preparation of report

    2014‐Dec‐24Aboriginal and Northern Affairs SKO Construction $20,870.00 Road Repair and Culvert Installation

    2015‐Jan‐09Aboriginal and Northern Affairs Anderson Logging Inc. $1,837.50 Emergency Road Maintenance

    2015‐Jan‐22Aboriginal and Northern Affairs PRAXIS $5,000.00 Cost savings ‐ Vendor able to provide training with little customization required

    2015‐Jan‐23Aboriginal and Northern Affairs Dialogue Partners Inc. $11,368.33 Cost Savings ‐ Vendor provided similar training previously

    2015‐Feb‐06Aboriginal and Northern Affairs Ultra Insights Planning & Research Services $2,850.00 Completion of final report, preparation & presentation of findings

    2015‐Mar‐20Aboriginal and Northern Affairs CDW Canada $1,463.83 Routers for remote offices

    2015‐Apr‐02Aboriginal and Northern Affairs Leah Gazan   $3,000.00

    Completion of Sixties Scoop working group meeting report Direct Award ‐ Provider possesses specific and/or unique knowledge.

    2015‐Apr‐13Aboriginal and Northern Affairs Red River College   $1,300.00

    Water treatment training. Sole Source ‐ Due to the proprietary and/or specialized nature of the requirement, products or services can be supplied only by a particular supplier and no reasonable alternative or substitute exists.

    Page 13 of 663

  • Data Reported as of October 1, 2015Date Signed Department Contractor Value Purpose

    Manitoba Untendered Contracts Report as of April 1, 2008

    2012‐Jun‐04Advanced Education and Literacy Freynet‐Gagne Translations $2,300.00 Translation of the following document: Adult Learning Centres funding Agreement 

    2012‐Sep‐14Advanced Education and Literacy American Council on Education $10,705.00

    2012 Annual contract with GED for First Time Test Writer Test Battery Fee: Annual Testing Centre Fee ($175). Annual rental of GED test batteries (113x94).  Administrative materials and shipping ($185). $10,982.00 USD. 

    2008‐Apr‐04Advanced Education and Literacy  Electrolab Training Systems $22,728.00

    To purchase equipment and accessories related to the CATIA (Computer Aided Three Dimensional Interactive Application) project. Equipment will be shared by the ten participating schools. (Invoice paid out of BA16

    2008‐Apr‐21Advanced Education and Literacy  CDX Global DVP Media PTY Ltd. $146,210.00

    To provide an automotive program resource "CDX Online Resource Kit" to all Automotive programs in Manitoba schools and colleges

    2008‐May‐20Advanced Education and Literacy  Probe Research Inc. $4,102.20

    To support work related to the Departmental Plan, including consultations and planning, developing and facilitating meetings for senior management.

    2008‐Jun‐04Advanced Education and Literacy  Sanford Evans Research Group $17,655.00 Lease only of data link to Manitoba Student Aid's Student Financial Assistance Information System

    2008‐Jun‐19Advanced Education and Literacy 

    American Council on Education GED Testing Centre $2,857.14 Annual first time battery writer fee contract (330 students), $2805.00 USD.

    2008‐Jun‐19Advanced Education and Literacy 

    American Council on Education GED Testing Centre $12,254.70 Annual Contract ‐ testing centre fee and rental of test batteries (143 batteries), $12031.00 USD.

    2008‐Aug‐22Advanced Education and Literacy  Dr. Benjamin Levin $62,900.00 To lead the Province of Manitoba's commission on Tuition Fees and Accessibility to Post‐Secondary Education

    2008‐Aug‐28Advanced Education and Literacy  Linda Hughes, Caroline Park $10,000.00 To undertake a review of registered nursing competencies and standards for education programs

    2008‐Sep‐17Advanced Education and Literacy  Carole Freynet‐ Gagné $2,800.00 To translate the document Prévisions budgétaires ‐ CUSB

    2008‐Sep‐20Advanced Education and Literacy  Carole Freynet‐Gagné $1,050.92 To translate the document Literacy Activities ‐ 2007‐2008 ‐ Provincial/Territorial Report

    2008‐Oct‐14Advanced Education and Literacy  C. Jean Britton $4,962.24

    To investigate and present options for a Manitoba unique adult learner identifier in accordance with AEL's data management strategy

    2008‐Oct‐20Advanced Education and Literacy  Sheldon George $4,600.00

    To review documents and provide a comprehensive report on articulation. Develop an articulation guide and template to be used in Manitoba, based on best practices

    2008‐Oct‐24Advanced Education and Literacy  Carole Freynet‐Gagné $2,100.00 To translate the document What We Heard, the report on the consultation on Adult Literacy in Manitoba

    2008‐Oct‐27Advanced Education and Literacy  Canadian Council on Learning $25,000.00 To consult with post‐secondary institutions about the Departmental Data Management Strategy.

    2008‐Oct‐29Advanced Education and Literacy  Probe Research Inc. $14,500.00

    To develop and conduct four focus group sessions with Grade 12 students and with first time Manitoba Student Aid applicants to discuss the application process

    2008‐Nov‐13Advanced Education and Literacy  Proactive  Information Services $4,900.00 To facilitate two one‐day sessions. To identify desired outcomes and develop activities for each day

    2008‐Nov‐19Advanced Education and Literacy  Sybase $20,409.24 Renewal of software support and maintenance

    2009‐Jan‐14Advanced Education and Literacy  Sun‐Street Inc. $5,300.00

    To provide advice to the Department and partners concerning education‐related support to immigrants. To develop and deliver leaders and other stakeholders to consider how the post‐secondary education sector may most optimally support the integration of immigrants into the Manitoba labour force and society

    2009‐Jan‐30Advanced Education and Literacy 

    Community Economic Development Association $25,000.00

    To carry out research and development of curriculum for Indigenous Teacher Education Model and to consult with post‐secondary institutes regarding potential delivery of the curriculum

    Page 14 of 663

  • Data Reported as of October 1, 2015Date Signed Department Contractor Value Purpose

    Manitoba Untendered Contracts Report as of April 1, 2008

    2009‐Feb‐05Advanced Education and Literacy  Cheryl Sullivan $2,500.00 To review Design Drafting curriculum drafts and work with the Design Drafting committee on revisions

    2009‐Feb‐06Advanced Education and Literacy  Carole Freynet‐Gagne $4,599.14 To translate the Survey of Graduates‐Manitoba Universities and Colleges.

    2009‐Feb‐19Advanced Education and Literacy  Sierra Sytems Group Inc. $12,000.00

    To develop a business plan that formally indetifies the objectives that will enable the Department to implement coordinated data management.

    2009‐Mar‐05Advanced Education and Literacy  Proactive Information Services $3,700.00 To facilitate a structures framework of accountability within the field of vocational education.

    2009‐Mar‐05Advanced Education and Literacy  Proactive Information Services $3,840.00 To conduct an abbreviated literature review to identify areas of "Best Practices"

    2009‐Mar‐31Advanced Education and Literacy  Literacy Partners of Manitoba $10,000.00

    To provide background research to Adult Learning and Literacy for the development of a logo to promote and identify adult literacy programs (ALP) and Adult Learning Centres by: consulting with ALC and ALP stakeholders; conducting 3 focus groups; and writing a report based on research and findings.

    2009‐May‐14Advanced Education and Literacy  Sanford Evans Research Group $16,500.00 Renewal of lease ‐ Data guide fo the Gold Book Review using model years 1999‐2005 for cars/ trucks

    2009‐Jun‐03Advanced Education and Literacy  Canadian Council on Learning (CCL) $15,000.00

    To follow up on the Data Management Strategy report prepared for the Department; to organize and facilitate a learning symposium bringing together researchers and managers who have worked with similar data management systems

    2009‐Jun‐15Advanced Education and Literacy  PRA inc. $25,000.00

    To finalize an interview guide and conduct interviews that will be used to gather opinions and feedback from institutional stakeholders concerning the organizational and operational review of COPSE

    2009‐Jun‐18Advanced Education and Literacy  Probe Research Inc. $15,000.00 To develop and conduct focus group sessions with high school students.

    2009‐Jun‐23Advanced Education and Literacy  Carol Freynet‐Gagne $1,400.00 Translate CUSB Financial statements

    2009‐Jul‐08Advanced Education and Literacy 

    American Council on  Education, General Educational Development Testing Centre $3,829.72 Annual first time test battery writer fee contract (330 students), $3300.00 USD.

    2009‐Jul‐16Advanced Education and Literacy 

    American Council on Education, General Educational Development Testing Centre $13,649.90 Annual Contract. Annual testing fee and rental of GED test batteries (143 batteries), $12106.00 USD.

    2009‐Jul‐17Advanced Education and Literacy  Danielle Verrier $4,500.00 To translate the COPSE annual report

    2009‐Aug‐04Advanced Education and Literacy  Sierra Systems Group Inc $12,000.00

    To support the development of the Advanced Education and Literacy Data Management Strategy through document development related to: statement of purpose and principles; terms of reference for data governance options for institutional participation; terms of reference for data management body; roles and responsibilities for data management

    2009‐Sep‐04Advanced Education and Literacy 

    Community Education Development Association $85,000.00

    To carry out research and development of curriculum for Indigenous Teacher Education Model and to work with the implementation of the curriculum. 

    2009‐Sep‐21Advanced Education and Literacy  Carole Freynet‐Gagne $2,300.00 To translate the document Previsions Budgetaires ‐ SUSB

    2009‐Oct‐19Advanced Education and Literacy  Brigid Hayes $20,000.00

    To conduct background research for a review of the adult learning system in Manitoba with a focus on adult learning and literacy programming supported by Advanced Education and Literacy

    2009‐Oct‐26Advanced Education and Literacy  Sue Folinsbee $20,000.00

    To conduct a review of the adult learning system in Manitoba with a focus on adult learning and literacy programming supported by Manitoba Advanced Education and Literacy

    2009‐Oct‐30Advanced Education and Literacy  Pat Hogue $2,900.00

    To proof, wordsmith and format the MB Early Learning and Child Care Competencies for the Child Care Education Approval Committee

    Page 15 of 663

  • Data Reported as of October 1, 2015Date Signed Department Contractor Value Purpose

    Manitoba Untendered Contracts Report as of April 1, 2008

    2009‐Nov‐18Advanced Education and Literacy  Belton Cullimore Consulting Ltd. $170,000.00

    To provide project leadership/research and project management services for the  "Partnerships for Labour Market‐Driven Bridge Program in Manitoba's Post‐Secondary Institutions" Initiative

    2009‐Nov‐23Advanced Education and Literacy  Sun Street Inc. $3,300.00

    To provide cosultations to the project "Partnership for Labour Market‐Driven Bridge Programs in Manitoba's Post‐Secondary Intituitions"

    2009‐Nov‐25Advanced Education and Literacy  CDX Global $60,000.00 To update the curriculum content and customization of the menu in the CDX online Automative Resource Kit plus

    2009‐Nov‐27Advanced Education and Literacy  Dynamic Resource $28,000.00

    To develop an electronic process to support Adult Learning and Literacy branch staff review of draft Competency Standard statements for the purpose of final agreement of core competencies: develop a set of written materials and/or supporting tools to ensure effective and consistent communication of key messages related to the Training Framework to literacy practitioners and other key stakeholders; develop a datebase of literacy practitionaers currently in practice in Manitob, including information on key chracteristics for purposes of identifying potential candidates fro PLAR process and to address literacy succession planning

    2009‐Dec‐23Advanced Education and Literacy  PRA Inc. $28,000.00

    To work with COPSE to finalize interview guide that will be used to gather opinions and feedback from institutional stakeholders concerning the organizational and operational review of COPSE.(previously reported for $25,000.00 on the June 6‐June 19/09 report)

    2010‐Feb‐10Advanced Education and Literacy  Dynamic Resources $50,000.00

    To develop a new Literacy Prior Learning and Recognition (PLAR) assessment model; develop supporting PLAR tools to guide Literacy practitioners in completing the PLAR process; and to design the PLAR imlementation process

    2010‐Feb‐15Advanced Education and Literacy  Dynamic Resource Management $5,000.00

    To provide pre‐consultation, facilitation of 2 days of strategic planning  sessions with branch staff, and post‐strategy follow‐up as staff develop a work plan for implementing significant changes to the adult literacy program assessment, review and funding process

    2010‐Mar‐01Advanced Education and Literacy  Margerit Roger $4,600.00

    To prepare for delivery and follow‐up documents for a planned series of two Trades Curriculim workshops offered through the Partnerships for Labour Market‐Driven Bridge Programs in Manitoba's Post‐Secondary Institution

    2010‐Mar‐08Advanced Education and Literacy  Consilium West $23,000.00

    To provide leadership, research and the preparation of a final report related to a project for the Partnership for Labour Market‐Driven Bridge Programs in Manitoba's Post‐Secondary Institutions

    2010‐Mar‐22Advanced Education and Literacy  Sandra Adelman $25,000.00

    To provide assistant project management services for the initiative Partnership for Labour Market‐Driven Bridge Programs in Manitoba's Post‐Secondary Institutions

    2010‐Mar‐30Advanced Education and Literacy  Carole Freynet‐Gagne $5,115.00 To translate and revise the Manitoba Student Aid Website

    2010‐May‐19Advanced Education and Literacy  Sun Street Inc $14,200.00 Facilitation of Workshop for the Labour Market Bridge Program 

    2010‐May‐21Advanced Education and Literacy  Sheena Trimble $5,000.00

    Sheena will undertake specific International Education related research projects for the branch. In the past year she has done reports on the future of the Manitoba Council for Internatin Education, a matrix for student recruitment (used at the Federal Provincial Consultive Committee for Education Related Internaiton Activities)

    2010‐Jun‐17Advanced Education and Literacy  Catherine Baxter $4,070.00

    Facilitator for 2 workshops as part of the Labour Market‐Driven Bridge Program planners in Manitoba. The first session is an introduction to the principles of participant assessment that is the first step towards developong a model for participant assessment in the post‐secondary sector. The second session will review experience in the selection of participants for the pilot programs that are part of the initiative towards formalizing a process model for participant assessment that is appropriate for Manitoba Post‐secondary bridge program

    2010‐Jun‐24Advanced Education and Literacy 

    Educational Development Testing Centre (GEDTS) $12,539.60 Annual contract. Annual testing fee and rental of GED test batteries (143 batteries), $12136.00 USD.

    Page 16 of 663

  • Data Reported as of October 1, 2015Date Signed Department Contractor Value Purpose

    Manitoba Untendered Contracts Report as of April 1, 2008

    2010‐Jul‐12Advanced Education and Literacy  Proactive Information Services $1,585.00

    To facilitate a one day session. Proactive will meet with Technical Vocational Initiative to identify desired outcomes and develop activities for the day as well as draft an agenda for review and approval. Proactive will print the agenda for the session

    2010‐Aug‐26Advanced Education and Literacy  Motzart $3,576.30 Translation of the Annual Report 2009‐10

    2010‐Sep‐15Advanced Education and Literacy  GrokChina, LLC‐Kim Morrison, Principal Partner $10,500.00

    GrokChina specializes in providing services to Canadian and American education institutions and governments. The company is an authority in the field of China's education system. They will provide advance coordination fo the education‐related activities of the Premier's mission to China's participants, scheduled for Septemeber 2010

    2010‐Oct‐04Advanced Education and Literacy  Carol Freynet Gagne $1,539.13 Translation ‐ College universitaire de Saint Boniface Previsions budgetaires

    2010‐Oct‐14Advanced Education and Literacy  Elizabeth Challis $5,500.00

    Provide research and draft of handbooks for International students as well as a draft for a Homestay Guidelines document. This contract amount was extended from $3,000.00 to $5,500.00

    2010‐Dec‐08Advanced Education and Literacy  Seamantique $3,359.16 Translation‐Council on Post Secondary ‐ COPSE website

    2010‐Dec‐21Advanced Education and Literacy  Tynebridge Communication $6,000.00

    To record, transcribe and report on the sessions in a way that engages readership through a professional style of presentation (Eduation Network)

    2011‐Feb‐27Advanced Education and Literacy  MultiCultural Business Solutions $9,000.00

    To deliver three large‐group presentations on integrating internationally educated immigrants and managing cultural diversity in post‐secondary institutions

    2011‐Mar‐24Advanced Education and Literacy 

    Manitoba Council for International Education (MCIE) $2,000.00 For consultation services, recording and drafting of comments at professional development event.

    2011‐Mar‐31Advanced Education and Literacy  Carole Freynet‐Gagne $5,000.00 Translation of Student Assistance Information System

    2011‐Apr‐28Advanced Education and Literacy  Sanford Evans Research Group $17,000.00 Renewal Lease ‐ data guide for the Gold Book Review using model years 1990‐2010 for cars/traucks

    2011‐May‐03Advanced Education and Literacy  Probe Research Inc. $3,850.00

    The contractor will facilitate a session for reps of the post‐secondary sector to aid in completion of an exercise in which each institution involved offering Bridge Programs in MB's Post‐Secondary Institutions will outline its current capacity for offering bridge programming for Internationally Educated immigrants

    2011‐May‐05Advanced Education and Literacy  Semantique $1,600.00 Translation of document 2011‐11 Early Leavers Questionaire

    2011‐May‐25Advanced Education and Literacy  Joanne Broatch $10,000.00

    The contractor will develop and implement a strategic plan implementation framework for the Child Care Education Program Approval Committee

    2011‐May‐26Advanced Education and Literacy  Richard Lobdell $25,000.00

    The contractor is to review data, mission and mandate, structural, staffing, infrastructure. partnership and produce a draft report of the results of the University College of the North Organizational and Operational review

    2011‐Jun‐22Advanced Education and Literacy  Sierra Systems Group Inc. $15,000.00

    A summary report focused on 2 possible approaches for housing and maintaining education data:1) Within the Department and 2) at a third party entity such as the MB Centre for Health Policy(MCHP)

    2011‐Jun‐27Advanced Education and Literacy  American Council on Education $3,749.19 Annual Contract with GEDTS:  First Time Test Writer‐Test Battery Fee (330 writers x USD11.50), $3795.00 USD.

    2011‐Jun‐29Advanced Education and Literacy  American Council on Education $13,568.70

    Annual contract with GEDTS for 2012:  Annual Testing Centre fee ($175)  Annual rental of GED test batteries (143 x $94)  Administrative materials ($155), $13772.00 USD.

    2011‐Jul‐28Advanced Education and Literacy  Carole Frenet‐Gagne $4,000.00 Translation of document COPSE Annual Report 2011‐12

    Page 17 of 663

  • Data Reported as of October 1, 2015Date Signed Department Contractor Value Purpose

    Manitoba Untendered Contracts Report as of April 1, 2008

    2011‐Sep‐21Advanced Education and Literacy 

    CDX Global‐Division of Jones & Bartlett Learning $185,000.00

    Maintain on‐line access for all Manitoba public schools and colleges and Apprenticeship Manitoba to the CDX Online Automotive Resource Kit Plus.

    2012‐Jan‐16Advanced Education and Literacy  Alliance of Manitoba Sector Councils $31,500.00 The contractor will initiate a stronger and extended network of  educators within post‐secondary institutions.

    2012‐Mar‐07Advanced Education and Literacy 

    The Manitoba Council for International Education $20,000.00

    To coordinate services provided such as promotion, research and promotional materials. Partnership Development and On‐the‐ground assistance.

    2012‐Mar‐19Advanced Education and Literacy  Ma Mawi Wi Chi Itata $45,000.00

    The contractor will complete the steps in phase 2 of the Indigenous Teacher Model (ITEM) project. The overall intent of the ITEM project is to increase the number of Aboriginal teachers in Manitoba classrooms in order to increase the success of Manitoba's Aboriginal students.

    2012‐Jun‐20Advanced Education and Literacy  Sanford Evans Research Group $17,000.00 Renewal of lease ‐ data guide for the Gold Book Review using model years 1990‐2011 for cars/trucks

    2012‐Nov‐06Advanced Education and Literacy 

    The Project Group (TPG) Consulting Cooperative Ltd. $4,800.00

    The contractor will assist in the design, implementation and creation of documents for the COPSE Secretariat Organizational Plan and the COPSE Strategic Plan.

    2012‐Nov‐21Advanced Education and Literacy  GrokChina, LLC $19,000.00

    GrokChina will assist in the on‐ground supports and advance work for the Council of the Federation (COF) Mission to China where the Premier and delegation will be working to support institutional  partnerships and agreements with Chinese education providers.

    2013‐Mar‐14Advanced Education and Literacy  Sheena Trimble $2,500.00

    Provide information with regards to international education legislation/acts/regulations in other jurisdictions in Canada and internationally; research and information on collection of international tuition and ancillary fees in Manitoba comparing to other provinces and countries and what fees are charged to international students and/ or  institutions hosting them; research and information on how ancillary international student fees are used in other provinces and countries to market/promote internationally and/ or to monitor/regulate/enhance the welfare of international student

    2013‐May‐27Advanced Education and Literacy  Grass Roots Research Ltd. $22,000.00

    To develop and deliver a one day workshop on Canadian Adult Reading Assessment (CARA) and Diagnostic Adult Literacy Assessment for Beginning Readers (DALA) to the staff of Adult Learning and Literacy. 

    2013‐Jun‐07Advanced Education and Literacy  Sanford Evans Research Group $17,000.00 Renewal of Lease‐date guide for the Gold Book Review using model years 1990‐2012 for cars/trucks. 

    2013‐Jul‐30Advanced Education and Literacy  Carole Freynet‐Gagne $2,863.90 Translation of the COPSE Annual Report and Financial Statements 2012‐2013  

    2013‐Sep‐18Advanced Education and Literacy  Freynet‐Gagne Translation $1,170.00 Translation of the 2014‐15 to 2016‐17 Budget Estimates for the UIniversité de Saint‐Boniface 

    2008‐Apr‐01Agriculture, Food & Rural Initiatives Provincial Exhibition of Manitoba $3,000.00 MLA Banquet

    2008‐Apr‐14Agriculture, Food & Rural Initiatives Abbott Laboratories Ltd $15,790.15 Equipment Service contract.

    2008‐Apr‐14Agriculture, Food & Rural Initiatives Fisher Scientific Ltd $5,007.60 Lab equipment.

    2008‐Apr‐14Agriculture, Food & Rural Initiatives Leica Microsystems (Canada) Ltd $5,400.00 Equipment Service Contract

    2008‐Apr‐14Agriculture, Food & Rural Initiatives Varian Canada Inc $9,890.45 Equipment service contract

    2008‐Apr‐24Agriculture, Food & Rural Initiatives Screen Door $1,428.45 Aprons ‐ Capturing Opportunities

    2008‐Apr‐24Agriculture, Food & Rural Initiatives Summit Promotions $1,097.43 Volunteer shirts ‐ Capturing Opportunities

    Page 18 of 663

  • Data Reported as of October 1, 2015Date Signed Department Contractor Value Purpose

    Manitoba Untendered Contracts Report as of April 1, 2008

    2008‐Apr‐24Agriculture, Food & Rural Initiatives Summit Promotions $1,148.71 Volunteer shirts ‐ Capturing Opportunities

    2008‐May‐01Agriculture, Food & Rural Initiatives L & S Distribution $1,700.00 Storage ‐ Ranchers Choice

    2008‐May‐01Agriculture, Food & Rural Initiatives Mulberry Tree $1,029.90 Decorations for banquet ‐ Capturing Opportunities

    2008‐May‐01Agriculture, Food & Rural Initiatives Photography by Sandy Black $1,926.00 Photo coverage ‐ Capturing Opportunites

    2008‐May‐01Agriculture, Food & Rural Initiatives Steris Canada Inc $2,247.00 Lab Supplies

    2008‐May‐01Agriculture, Food & Rural Initiatives Vern's Appliance $7,302.75 Fridges/Stoves for Food Fight ‐ Capturing Opportunities

    2008‐May‐02Agriculture, Food & Rural Initiatives Bison Boutique $1,110.00 Gift baskets ‐ Capturing Opportunities

    2008‐May‐02Agriculture, Food & Rural Initiatives Display Manitoba $7,464.32 Tables/Curtains ‐ Capturing Opportunities

    2008‐May‐02Agriculture, Food & Rural Initiatives Dundee Metal Designs $1,926.00 Plaques ‐ Capturing Opportunities

    2008‐May‐02Agriculture, Food & Rural Initiatives Richmond Signs $1,648.23 Signs ‐ Capturing Opportunities

    2008‐May‐06Agriculture, Food & Rural Initiatives Surgipath Canada Inc $6,634.00 Equipment repair & maintenance

    2008‐May‐06Agriculture, Food & Rural Initiatives WWR International Co $2,884.04 Lab Supplies

    2008‐May‐08Agriculture, Food & Rural Initiatives Avista Creative Communications $10,186.40 Audio / visual technical production ‐ Capturing Opportunities

    2008‐May‐08Agriculture, Food & Rural Initiatives Benmarks of Brandon $39,980.55 Sound system ‐ Capturing Opportunities

    2008‐May‐08Agriculture, Food & Rural Initiatives Party Professionals $1,100.84 Tablecloths/linens ‐ Capturing Opportunities

    2008‐May‐08Agriculture, Food & Rural Initiatives Up & Away $2,503.80 Balloons for decoration ‐ Capturing Opportunities

    2008‐May‐15Agriculture, Food & Rural Initiatives Dixon Bayco Ltd $1,123.20 Plaques for Ag Societies

    2008‐May‐15Agriculture, Food & Rural Initiatives Fisher Scientific Ltd $1,481.74 Lab Supplies

    2008‐May‐16Agriculture, Food & Rural Initiatives Somagen Diagnostics Inc $1,112.80 Lab Supplies

    2008‐May‐23Agriculture, Food & Rural Initiatives Steris Canada Ltd $4,236.67 Service Contract

    2008‐May‐29Agriculture, Food & Rural Initiatives Pathfinders Research $2,104.41 Capturing Opportunities speaker

    2008‐May‐29Agriculture, Food & Rural Initiatives Strive Inc. $9,171.10 Capturing Opportunities speaker

    Page 19 of 663

  • Data Reported as of October 1, 2015Date Signed Department Contractor Value Purpose

    Manitoba Untendered Contracts Report as of April 1, 2008

    2008‐May‐30Agriculture, Food & Rural Initiatives Keystone Centre $51,163.81 Capturing Opportunities facilities

    2008‐Jun‐09Agriculture, Food & Rural Initiatives Steris Canada Inc. $4,494.00 208 volt generators

    2008‐Jun‐17Agriculture, Food & Rural Initiatives L & S Distribution $1,700.00 June storage for Ranchers Choice Equipment

    2008‐Jun‐17Agriculture, Food & Rural Initiatives L & S Distribution $11,000.00 Moving and loading Ranchers Choice equipment

    2008‐Jun‐19Agriculture, Food & Rural Initiatives Keystone Centre $3,416.92 Executive & Directors planning session

    2008‐Jun‐20Agriculture, Food & Rural Initiatives Blackwell Publishing $1,710.48 Books for the library

    2008‐Jun‐20Agriculture, Food & Rural Initiatives Russell Inn $1,349.60 Canadian Ag Extension Conference

    2008‐Jun‐20Agriculture, Food & Rural Initiatives VMRD $1,631.91 Lab Supplies

    2008‐Jun‐24Agriculture, Food & Rural Initiatives Process & Steam Specialists $3,700.00 Post mortem equipment

    2008‐Jun‐25Agriculture, Food & Rural Initiatives Canadian Alfalfa Seed Council $1,869.00 Lab analysis

    2008‐Jun‐25Agriculture, Food & Rural Initiatives Receiver General of Canada $3,500.00 Environment Canada Grib Data

    2008‐Jul‐04Agriculture, Food & Rural Initiatives University of Manitoba Bookstore $1,377.84 Books for Vet Library

    2008‐Jul‐08Agriculture, Food & Rural Initiatives L & S Distribution $1,700.00 July storage for Ranchers Choice Equipment

    2008‐Jul‐10Agriculture, Food & Rural Initiatives Vet‐Tech Consulting (1993) Ltd. $1,045.00 Vet Task Force meetings

    2008‐Jul‐11Agriculture, Food & Rural Initiatives Bio‐Rad Laboratories Ltd. $11,305.00 Service contract

    2008‐Jul‐11Agriculture, Food & Rural Initiatives Fisher Scientific Ltd $1,135.89 Vacuum Pump

    2008‐Jul‐11Agriculture, Food & Rural Initiatives Prairie Diagnostic Services $1,207.00 Lab testing fees

    2008‐Jul‐16Agriculture, Food & Rural Initiatives AN Scholz & Assoc. $2,500.00 Honoraria for presentation to the Agri‐Food & Rural Development Council

    2008‐Jul‐17Agriculture, Food & Rural Initiatives Hoskin Scientific Ltd. $1,466.00 10 Temp Sensor cables and contacts

    2008‐Jul‐17Agriculture, Food & Rural Initiatives Wolseley Canada Inc. $2,301.38 220 pipe endcaps

    2008‐Jul‐22Agriculture, Food & Rural Initiatives Fairmont Winnipeg $1,563.04 Catering ‐ Russian Delegation

    2008‐Jul‐27Agriculture, Food & Rural Initiatives C L Sturkey Inc $1,685.09 Lab supplies

    Page 20 of 663

  • Data Reported as of October 1, 2015Date Signed Department Contractor Value Purpose

    Manitoba Untendered Contracts Report as of April 1, 2008

    2008‐Jul‐29Agriculture, Food & Rural Initiatives Delta Winnipeg $2,926.64 Planning Workshop

    2008‐Jul‐29Agriculture, Food & Rural Initiatives Miller Environmental Corp $2,795.00 Disposal of toxic materials

    2008‐Jul‐30Agriculture, Food & Rural Initiatives Accent Group Inc $1,029.34 Chair

    2008‐Jul‐31Agriculture, Food & Rural Initiatives Qiagen Inc $3,459.31 Lab Kits

    2008‐Aug‐13Agriculture, Food & Rural Initiatives Con‐Test $3,320.00 Equipment repair

    2008‐Aug‐13Agriculture, Food & Rural Initiatives Snider Veterinary Services Inc. $1,174.50 Vet Services fee

    2008‐Aug‐15Agriculture, Food & Rural Initiatives Economic Consulting Services LLC $37,232.39 Consulting services for the Country of Origin Labelling

    2008‐Aug‐15Agriculture, Food & Rural Initiatives McKenna Long & Aldridge $26,769.98 Legal Services for the Country of Origin Labelling

    2008‐Aug‐15Agriculture, Food & Rural Initiatives University of Manitoba $11,049.33 Yearly fee for microscope use

    2008‐Aug‐21Agriculture, Food & Rural Initiatives Baker Manufacturing $1,697.90 701 feet of tubing

    2008‐Aug‐21Agriculture, Food & Rural Initiatives Fisher Scientific Ltd. $1,149.42 Lab supplies

    2008‐Sep‐02Agriculture, Food & Rural Initiatives L & S Distribution $1,700.00 Equipment storage for Ranchers Choice

    2008‐Sep‐03Agriculture, Food & Rural Initiatives Charles Blackbird $26,630.00 Fencing ‐ TB Bovine Project

    2008‐Sep‐05Agriculture, Food & Rural Initiatives Agvise Laboratories $2,079.00 Lab Analysis

    2008‐Sep‐05Agriculture, Food & Rural Initiatives Elkhorn Resort & Conference Centre $3,183.00 Accommodations and meeting space ‐ Growing Opportunities Team Branch meeting

    2008‐Sep‐05Agriculture, Food & Rural Initiatives ESRI Canada Ltd $1,565.84 Software Training

    2008‐Sep‐09Agriculture, Food & Rural Initiatives Confederation of Indian Industry $6,687.63 Space rental, Agro Tech 2008 ‐ India

    2008‐Sep‐10Agriculture, Food & Rural Initiatives Encore Business Solutions Inc. $2,272.51 Service agreement for lab

    2008‐Sep‐10Agriculture, Food & Rural Initiatives Surgipath Canada Ltd. $1,171.65 Micro lab supplies

    2008‐Sep‐15Agriculture, Food & Rural Initiatives E.H. Price Ltd. $1,924.93 Fan ‐ Lab equipment repair

    2008‐Sep‐15Agriculture, Food & Rural Initiatives Siemens Healthcare Diagnostics Ltd. $9,576.50 Yearly service contract

    2008‐Sep‐16Agriculture, Food & Rural Initiatives Getinge/Castle Canada Ltd. $6,692.26 Equipment repair

    Page 21 of 663

  • Data Reported as of October 1, 2015Date Signed Department Contractor Value Purpose

    Manitoba Untendered Contracts Report as of April 1, 2008

    2008‐Sep‐22Agriculture, Food & Rural Initiatives Pembina Valley Conservation $2,319.50 Labour, analysis and supplies for a LSI project

    2008‐Sep‐25Agriculture, Food & Rural Initiatives AgVise Labs $1,020.80 Lab analysis

    2008‐Sep‐25Agriculture, Food & Rural Initiatives Manitoba Forage Council $2,319.50 Forage variety testing

    2008‐Sep‐29Agriculture, Food & Rural Initiatives AgVise Labs $1,754.31 Lab analysis

    2008‐Sep‐30Agriculture, Food & Rural Initiatives Hummer Productions $15,000.00 Great Tastes of Manitoba Production

    2008‐Sep‐30Agriculture, Food & Rural Initiatives Susan Renwick $1,222.00 ASI project analysis

    2008‐Sep‐30Agriculture, Food & Rural Initiatives VRW International Co. $3,217.50 Post mortem lab supplies

    2008‐Oct‐02Agriculture, Food & Rural Initiatives Astal Scientific Inc. $1,695.60 Air clean service ‐ Viro lab

    2008‐Oct‐06Agriculture, Food & Rural Initiatives L & S Distribution $1,700.00 Storage for Ranchers Choice

    2008‐Oct‐07Agriculture, Food & Rural Initiatives Serby Consulting Inc. $8,220.45 Consultation services related to economic development coordination in Manitoba