MB-IOT test bench at CERN

13.01.15Eric Montesinos

Page 2: MB-IOT test bench at CERN 13.01.15 Eric Montesinos

K1577/AB Addendum 19• CERN & ESS will jointly study and agree a test programme

• CERN will source, prepare and make available test stands and equipment to enable test of relevant parameters and requirements

• The IOT will be tested for ESS and CERN SPL operational parameters

• CERN will allocate test time, resources and utilities for an extended test of the IOT > months

• ESS and CERN shall jointly prepare a report no later than October 2016 provided that IOT are delivered on time to permit the testing programme to be started no later than 01 October 2015

• The test stand shall remain property of CERN

• The IOT shall remain property of ESS

Page 3: MB-IOT test bench at CERN 13.01.15 Eric Montesinos

First draft test stand proposal

HVPS Capacitor bank Crowbar IOT RF load

Drivers

LVPSAlready available at CERN

To be bought by CERN

Page 4: MB-IOT test bench at CERN 13.01.15 Eric Montesinos

First draft test stand proposal

HVPS Capacitor bank Crowbar IOT

Drivers

LVPS

David did a more detailed study:LHC2 is almost the only acceptable placeSR2 ?

Olivier agreed to lend one ‘LHC spare’

SPS 800 MHz spare TX(to be validated at 704 MHz)

Two SPS 800 MHz spare loads (to be validated at 704 MHz, simulations ok)+Splitter to be designed and to be built

RF load

Page 5: MB-IOT test bench at CERN 13.01.15 Eric Montesinos

Second draft test stand proposal

HVPS Capacitor bank Crowbar IOT RF load

Drivers

LVPSThales/CPI requested 10 individual unitsCost not included in the initial estimatesThales will provide it and it will remain CERN propertyThales will make FAT at CERN’s test stand

Page 6: MB-IOT test bench at CERN 13.01.15 Eric Montesinos

Second draft test stand proposal

HVPS Capacitor bank Crowbar IOT RF load

Drivers

LVPSDavid is taking care of itLEP HVPS converted from CW to pulsed operationOlivier proposed help of Gianfranco as well, I will use it for sure

Page 7: MB-IOT test bench at CERN 13.01.15 Eric Montesinos

K1577/AB Addendum 19

• With Morten we now have regular follow-up meetings

– jointly study and prepare an agreement of a test programme

– Prepare agreement on equipment to enable test of relevant parameters and requirements

– I insist to keep ESS and CERN SPL operational parameters

• Just started, as right now IOT contract was confidential

Page 8: MB-IOT test bench at CERN 13.01.15 Eric Montesinos

Two IOT

HVPS Capacitor bank Crowbar IOT RF load

Drivers LVPS

Already available at CERN

To be bought by CERN

Capacitor bank IOT

Drivers

RF load

LVPS

Main goal:Double the tests capability& to have the same test facility for both tubes, in order to better compare results

Page 9: MB-IOT test bench at CERN 13.01.15 Eric Montesinos

Two IOT

HVPS Capacitor bank Crowbar IOT RF load

Drivers LVPS

Capacitor bank IOT

Drivers

RF load

LVPS

More or less the same difficulty as the first oneHigher safety issues ?

Schedule Cost

Page 10: MB-IOT test bench at CERN 13.01.15 Eric Montesinos

Two IOT

HVPS Capacitor bank Crowbar IOT RF load

Drivers LVPS

Capacitor bank IOT

Drivers

RF load

LVPS

Our TX is probably capable to drive two IOTStill to be definedTwo circulators to insulate IOT inputs ?Splitter with L3 configuration ?SSPA ?

Schedule Cost

Page 11: MB-IOT test bench at CERN 13.01.15 Eric Montesinos

Two IOT

HVPS Capacitor bank Crowbar IOT RF load

Drivers LVPS

Capacitor bank IOT

Drivers

RF load

LVPS

L3 does not want Thales/CPI to know about it (even NOT cern !)Thales already gave me a detailed sketch

Schedule Cost

Page 12: MB-IOT test bench at CERN 13.01.15 Eric Montesinos

Two IOT

HVPS Capacitor bank Crowbar IOT RF load

Drivers LVPS

Capacitor bank IOT

Drivers

RF load

LVPS

Second splitter should be okSecond set of loads has to be designed, tested and built (old supplier does not exist anymore), or to be bought

Schedule Cost

Page 13: MB-IOT test bench at CERN 13.01.15 Eric Montesinos

Summary

Schedule CostHVPS

Capacitor

Crowbar

Drivers

LVPS

Load

Schedule Cost

Schedule Cost

Schedule Cost

Schedule Cost

Schedule Cost

Test area Schedule Cost

Schedule Cost

Schedule Cost

Schedule Cost

Schedule Cost

Schedule Cost

Schedule Cost

Schedule Cost

1 IOT 2 IOT

Schedule ScheduleCost Cost

Need a bit more time to tell you how many delay and how much money