MB-IOT test bench at CERN
13.01.15Eric Montesinos
K1577/AB Addendum 19• CERN & ESS will jointly study and agree a test programme
• CERN will source, prepare and make available test stands and equipment to enable test of relevant parameters and requirements
• The IOT will be tested for ESS and CERN SPL operational parameters
• CERN will allocate test time, resources and utilities for an extended test of the IOT > months
• ESS and CERN shall jointly prepare a report no later than October 2016 provided that IOT are delivered on time to permit the testing programme to be started no later than 01 October 2015
• The test stand shall remain property of CERN
• The IOT shall remain property of ESS
First draft test stand proposal
HVPS Capacitor bank Crowbar IOT RF load
Drivers
LVPSAlready available at CERN
To be bought by CERN
First draft test stand proposal
HVPS Capacitor bank Crowbar IOT
Drivers
LVPS
David did a more detailed study:LHC2 is almost the only acceptable placeSR2 ?
Olivier agreed to lend one ‘LHC spare’
SPS 800 MHz spare TX(to be validated at 704 MHz)
Two SPS 800 MHz spare loads (to be validated at 704 MHz, simulations ok)+Splitter to be designed and to be built
RF load
Second draft test stand proposal
HVPS Capacitor bank Crowbar IOT RF load
Drivers
LVPSThales/CPI requested 10 individual unitsCost not included in the initial estimatesThales will provide it and it will remain CERN propertyThales will make FAT at CERN’s test stand
Second draft test stand proposal
HVPS Capacitor bank Crowbar IOT RF load
Drivers
LVPSDavid is taking care of itLEP HVPS converted from CW to pulsed operationOlivier proposed help of Gianfranco as well, I will use it for sure
K1577/AB Addendum 19
• With Morten we now have regular follow-up meetings
– jointly study and prepare an agreement of a test programme
– Prepare agreement on equipment to enable test of relevant parameters and requirements
– I insist to keep ESS and CERN SPL operational parameters
• Just started, as right now IOT contract was confidential
Two IOT
HVPS Capacitor bank Crowbar IOT RF load
Drivers LVPS
Already available at CERN
To be bought by CERN
Capacitor bank IOT
Drivers
RF load
LVPS
Main goal:Double the tests capability& to have the same test facility for both tubes, in order to better compare results
Two IOT
HVPS Capacitor bank Crowbar IOT RF load
Drivers LVPS
Capacitor bank IOT
Drivers
RF load
LVPS
More or less the same difficulty as the first oneHigher safety issues ?
Schedule Cost
Two IOT
HVPS Capacitor bank Crowbar IOT RF load
Drivers LVPS
Capacitor bank IOT
Drivers
RF load
LVPS
Our TX is probably capable to drive two IOTStill to be definedTwo circulators to insulate IOT inputs ?Splitter with L3 configuration ?SSPA ?
Schedule Cost
Two IOT
HVPS Capacitor bank Crowbar IOT RF load
Drivers LVPS
Capacitor bank IOT
Drivers
RF load
LVPS
L3 does not want Thales/CPI to know about it (even NOT cern !)Thales already gave me a detailed sketch
Schedule Cost
Two IOT
HVPS Capacitor bank Crowbar IOT RF load
Drivers LVPS
Capacitor bank IOT
Drivers
RF load
LVPS
Second splitter should be okSecond set of loads has to be designed, tested and built (old supplier does not exist anymore), or to be bought
Schedule Cost
Summary
Schedule CostHVPS
Capacitor
Crowbar
Drivers
LVPS
Load
Schedule Cost
Schedule Cost
Schedule Cost
Schedule Cost
Schedule Cost
Test area Schedule Cost
Schedule Cost
Schedule Cost
Schedule Cost
Schedule Cost
Schedule Cost
Schedule Cost
Schedule Cost
1 IOT 2 IOT
Schedule ScheduleCost Cost
Need a bit more time to tell you how many delay and how much money