MAYOR WYKLE 2019 TOWN UPDATE
Town Council Meeting December 11, 2019
2019 COUNCIL GOALS
• Started with 7 proposed goals… • Ended with 12, the majority of which were accomplished with
significant progress made on others including: • Sign Ordinance being addressed through MCSP process,
and Rheem Center improvements project • Applied for SB 2 Grant to re-evaluate 3 step planning
process • Tremendous amount of work completed by our outstanding
staff – Thank you!!
PARKS AND RECREATION (AKA THE FUN DEPARTMENT)
MOBILE MORAGA
In May the Town launched Mobile Moraga which enables citizens to report non-emergency concerns to the Town
The FREE app is available for download in the App Store and in Google Play
The Mobile Moraga work order system allows the Town to streamline the work order process, improving efficiencies
To date, 1,175 individuals have downloaded the app and 680 work orders have been completed
ACTIVATION OF THE HACIENDA Thank you to the Hacienda Foundation for the donation to make improvements to the Casita
The Town launched an After School Enrichment Program (ASEP) at the Hacienda and enrollment is strong
Hacienda rentals increased due to the implementation of non-exclusive use of the property to maximize usage and revenue
ACTIVATION OF THE HACIENDA Thank you to the Hacienda Foundation for the donation to make improvements to the Casita
The Town launched an After School Enrichment Program (ASEP) at the Hacienda and enrollment is strong
Hacienda rentals increased due to the implementation of non-exclusive use of the property to maximize usage and revenue
RESTAURANT AT THE HACIENDA
The Town is preparing to issue an RFP in January 2020 to identify a restaurant to operate at the Hacienda further activating the space and reducing the Town’s maintenance costs
EVENTS
July 4 Celebration Hacienda Nights
Family Camp Out
Summer
EVENTS
Breakfast with Santa
Pear & Wine Festival Teddy Bear Tea
Fall & Winter
Veterans Day Celebration
POLICE DEPARTMENT
MORAGA – 4TH SAFEST CITY IN CALIFORNIA WWW.SECURITYBARON.COM
EMERGENCY PREPAREDNESS
Evacuation Zones established and drills completed
Community Warning System (CWS) – registrations more than doubled to 6,593
Kept Town operating during Public Safety Power Shutoffs (PSPS)
Successfully evacuated residents during the Merrill fire
PLANNING DEPARTMENT
BUSINESS ATTRACTION Update of the Town’s Community and Limited Commercial zoning to allow
outright permitted uses
Consolidation of the Design Review Board and Planning Commission to streamline review
New Businesses: Bay Area Ballplayers Canyon Club Brewery Chase Bank Outdoor Supply Hardware Squeeze at Rheem Center Designs 2 Consign Amabile School of Music
RHEEM THEATRE
Scheduled to open December 19, 2019
New 4,113 square-foot addition to rear of building to create two additional auditoriums, increasing the total number of auditoriums from 4 to 6
Renovation of existing auditoriums, including reclining seats
Reserved seating available
MCSP IMPLEMENTATION PLAN PROGRESS
MCSP Ad Hoc Subcommittee Established
Contracted with Placeworks 35 member Citizens Advisory
Committee (CAC) established Four CAC Meetings held Technical Advisory Committee (TAC)
Established Draft MCSP Zoning Ordinance and
Development Standards in Progress
MCSP IMPLEMENTATION PLAN - NEXT STEPS
2 TAC Meetings Input on Circulation and Streetscapes
Planning Commission Study Session – tentatively scheduled for January
Planning Commission Recommendation to Town Council on Draft Zoning and Development Standards
Town Council Adoption of Final Zoning and Development Standards
HOUSING UPDATE
Bella Vista - 27 homes for sale
Moraga Town Center Homes – 36 homes for sale
Los Encinos – 10 homes under construction
Hetfield Estates – 7 lots under final review
Moraga Town Center Homes
CLIMATE ACTION PLAN IMPLEMENTATION
Status report provided on May 8
Water Bottle Refilling Stations Installed (grant funded)
EV Charging Stations Purchased (grant funded)
Energy-Efficient Lighting Upgrades Authorized
Exploration of Additional Grant Funding
PUBLIC WORKS DEPARTMENT
INVESTING IN STREETS AND ROADS
The 2018 Pavement Management Report outlines the Town’s progress since 2012 to improve Moraga roads from a PCI of 49 “Poor” to the current PCI of 74 “Good” thanks to Measure K
In 2019, The Town resurfaced 29 residential and 3 major arterial streets; Commons Parking Lot; and 2 Basketball Courts
INVESTING IN STREETS AND ROADS CONTINUED
Moraga Way - Extended bicycle and pedestrian improvements from Orinda to Moraga Road and resurfaced street
Canyon Road and Camino Pablo - Improved pedestrian crossing safety to slow traffic and resurfaced street
Alta Mesa and Moraga Road Intersection - Crosswalk Improvements
STORM DRAIN O&M PROGRAM
Asset Management Software Field Mapping Project Spot Repairs Implementation to come
Cleaning
Closed-Circuit TV
Online GIS app
CANYON ROAD PERMANENT BRIDGE
Design work on the Canyon Road permanent bridge has been completed and the project has been approved to receive grant funding for the $9.7 million projected cost
Construction of the bridge is scheduled to begin in spring 2020 and be completed by fall 2021
EBMUD has agreed to pay the Town $105,000 for necessary design work for a retaining wall by December 31, 2019, and the Town continues to negotiate a settlement agreement with EBMUD. The delay is due to EBMUD’s continued efforts to determine the viability of a project to remediate future landslides.
TOWN ADMINISTRATION
COUNCIL PROTOCOLS
The Council adopted Protocols in October to establish policies and procedures for councilmembers, meetings and Town business. Importantly, the new protocols tighten financial controls. This action completes the 2019 Town Council and Community Goal to "Develop written guidelines for Ad Hoc Committees and individual Councilmembers' roles, responsibilities, and powers."
TOWN’S FINANCIAL POSITION Received over $5 million in Federal Emergency Relief
reimbursements
Repaid $1.6 million to the General Fund which enabled the Town to restore the General Fund Reserve to 50%, consistent with Town policy
The State Auditor’s Office ranked the 471 California cities for fiscal distress based on ten indicators and Moraga’s fiscal conservancy has paid off. The Town is in a better financial situation than 87% of California cities.
BULK REIMBURSEMENT ENABLED INVESTMENT IN THE TOWN’S FACILITIES IN FY 2019/20
$233,000 was available from the Emergency Relief reimbursement funds to fund some of the many Asset Replacement projects including:
Commons Park - Parking Lot Surface Seal $ 22,000 IT Asset Replacement $ 31,000 Hacienda ADA Pathway Match $ 36,000 Library Roof Restoration $ 28,000 Minor Capital Improvement Projects $ 30,000 Public Works Trailer $ 11,000 Rancho Laguna Sewer System Repair/Replacement $ 75,000 $233,000
EXPENSE REVIEW
The Audit and Finance Committee completed a review of non-personnel expenses. Major cost savings were not identified but the AFC recommended an RFP for auditing and IT services.
The Town Council completed a performance review of the Town Attorney and shared the analysis of legal fees. Changes to reduce legal fees are being implemented.
UNFUNDED NEEDS ANALYSIS #1 CAPITAL ASSET REPLACEMENT
Completed a review and update of the Town’s capital asset schedule
Developed a capital asset replacement funding strategy that recommends a $1M deposit in FY 2020/21, followed by flat $618,000 annual deposits beginning in FY 2021/22
Reprioritization reduced the annual funded need to $456,000 (assuming a $1M deposit in FY 2020/21)
UNFUNDED NEEDS ANALYSIS #2 2019 ADDENDUM TO THE STORM DRAIN MASTERPLAN
Updated the 2015 Storm Drain Master Plan to reprioritize capital projects and update costs. Identified $120,000 in annual funding needed to complete High and Moderate capital projects
$420,000 in annual funding for an enhanced Storm Drain O&M Program also recommended
The 2019 Addendum serves as a planning tool for Town to identify funding needs over next 10 years
UNFUNDED NEEDS ANALYSIS #3 UNFUNDED PENSION LIABILITY
The Council contracted with Bartel Associates for an Actuarial Analysis to better understand the Town’s unfunded pension liability
The study provided a comprehensive review and summary of historical CalPERS actuarial information and projected contribution rates for the next 20 years
Bartel recommended the establishment of a Supplemental Pension Trust to offset future increases and mitigate year-to-year volatility
THANKS TO OUR PARTNERS
THANK YOU!
Stay tuned to 2020 as we continue to work on the unfunded needs and new goals. Please go to the Town website and fill out the survey about how your money should be spent!
Questions?