Upload
others
View
1
Download
0
Embed Size (px)
Citation preview
CC 10- 28- 2015ws
MINUTES OF THE JONESTOWN CITY COUNCIL SPECIAL CALLED WORKSHOP
MEETING HELD OCTOBER 28, 2015, 10: 00 A.M. AT THE CITY COUNCIL
CHAMBER, 18649 FM 1431, SUITE 3A, JONESTOWN, TEXAS
Deane Armstrong, Mayor Donna Jo Priem( Place 1) Joe Aaron( Place 3)
Paul Johnson, Mayor Pro Tern( Place 5) John Tichi( Place 2) Dave Nelsen( Place 4)
A. ITEMS OPENING MEETING
1. CALL TO ORDER
Mayor Armstrong called the meeting to order at 10: 00 a.m.
2. ROLL CALL
Present: Mayor Armstrong, Alderman Tichi, Alderman Aaron, Mayor Pro Tern JohnsonAlderman Nelsen, and Alderwoman Priem.
Absent: None.
A quorum was present.
3. PLEDGE OF ALLEGIANCE
B. WORKSHOP ITEMS
1. Briefing by Jay Engineering and discussion on potential addendum to theWastewater Master Plan.
City Administrator Wilde reported on discussions of a committee including himself,Alderman Nelsen, Alderman Tichi, and Frank Phelan of Jay Engineering on possibleimprovements and revisions to the Wastewater Master Plan. Mr. Phelan outlined a
possible alternative which might allow the entire FM 1431 corridor to be served in one
phase. Council directed staff to move forward with developing this plan revision, to bepresented for public view and comments in two to three weeks, and then brought back
before Council for consideration. No action was taken.
C. ADJOURNMENT
Mayor Armstrong adjourned the meeting at 10: 32 a.m.
PASSED AND APPROVED AT A REGULAR MEETING HELD ON NOVEMBER 12,
2015.
1
CC 10-28-2015ws
i
Deane Armstrong, Mayor /
ATTEST:
k2ete-Aell c v
Rachel Austin, City Secretary
2