May 7, 2008
TPTF
Early Delivery SystemsStatus
Daryl Cote
2TPTF4/1/2008 2
Agenda
• EDS SLA• EDS 2
– Release 3: State Estimator– Release 4: NOMCR
• EDS 3– Release 5: SCED– Release 6: LFC– Release 7: CRR
• EDS 4– Release 8: COMS– Release 9: DAM / RUC / SASM
• Go-live Procedure
3TPTF4/1/2008 3
EDS SLA Metrics
4TPTF4/1/2008 4
TSP - Request for Telemetry Status
5TPTF4/1/2008 5
Load Status
6TPTF4/1/2008 6
Next Steps
• ERCOT has communicated production ICCP server information to TSP and QSEs with Resources– ERCOT asked MPs to respond with completed AIEF
(Association Information Exchange Form) within 3 days of receipt
– ERCOT will coordinate with TSPs and QSEs with Resources to implement / test the new links
• Goal is to migrate TSPs and QSEs to new Servers by Mid-June
• Send follow up emails to QSEs for SI points and to confirm ownership of points TSPs indicated they do not own– Emails to go out Mid-May after TSPs respond (see slide 3)
7TPTF4/1/2008 7
Alarm Configuration and Testing Status
• Market Facing Notifications and Alerts– Current Status:
• Business is reviewing list of alerts and notices
– Next Steps:• Obtain ERCOT Business approval • Submit to TPTF for review and approval• After ERCOT and TPTF approval MIS will submit to the appropriate
Nodal teams who will schedule implementation
• Control Room Alarms– Current Status:
• Business is reviewing list of alarms for category, priority and text
– Next Steps:• Implement and test Alarms with EMS 5 FAT testing. FAT is
scheduled to be completed by the end of June.
8TPTF4/1/2008 8
Release 4 – NMMS / NOMCR
2007 2008Sep Oct Nov Dec Jan Feb
R4: NOMCR / Network Model verificationE2 R4NOMCR Checkout Network Model Verification
Onsite NMMS training and scripted scenario execution completed by: AEP, Rayburn, STEC, and College Station, AEN, CenterPoint, Garland, & CPS
Onsite training to occur week of 5/7 for: Brownsville, TNMP, TMPA, LCRA
Onsite training to occur week of 5/13 for: BEC, MVEC, Denton, Greenville
All MP to complete onsite training week of 5/19 BTU, MEC, Oncor
Concurrent user test conducted May 1st
28 MPs and 15 ERCOT users simultaneously used the system
9TPTF4/1/2008 9
Release 5 - SCED
2007 2008
SCED R5.1 SCED R5.3: RT ICCP SCED R5.4: LMP Post
Sep Oct Nov Dec Jan Feb
SCED R5.2E3 R56-month LMP PostingRT ICCP
EDS 3 Release 5 Exit Criteria % Complete
Comments
Daily submissions of COP, TPO, and OS ~90% •Expect large payload support in August
SCED Inputs verified: HRL, LRL, SURAMP, SDRAMP, HDL, LDL; GTBD, ICCP
100%(90%)
Results from first pre-6.3 test provided to QSEsResults from second pre-6.3 test provided to QSEs
SCED Outputs verified: QSE’s ability to receive Resource Base Points and LMPs via ICCP
100%(90%)
Base Point and LMP calculation verified for Resources with Offer Curves or Output Schedules
100%(100%)
Reports 100%(100%)
LMPs verified for Reasonability and posted to MIS for Market Participant review 100%
(100%)
Legend: % in parentheses are from the 4/1 TPTF update
10TPTF4/1/2008 10
Release 6 - LFC
2008Jan Feb Mar Apr May Jun
E3 R6 R6.1: RLC & ACE
EDS 3 Release 6.1 Criteria % Complete
Comments
ACE Performance Verification 100%(0%)
Approved by TPTF April 21, 2008
Completed Test Form Received back from MP 100%(80%)
Completed
RLC Validation Completed 100%(71%)
Completed
Emergency Base-Point Validation Completed 100%(33%)
Completed
EDS 3 Release 6.2 Criteria % Complete
Comments
Pre-Test & Test Times Scheduled 100% Dates have been set with all QSE organizations
Submit Units for Testing 74%
Provide Ramp Rate Curves and 5 Minute BPS 28%
Prove ability to receive Nodal Instructions 28%
Ability to receive Nodal & Zonal instruction Simultaneously 28%
Pre-Test Complete 28%
R6.2: QSE Testing R6.3: TST
Legend: % in parentheses are from the 4/1 TPTF update
11TPTF4/1/2008 11
Release 6 – LFC Phase II Testing Status
LFC Phase II Testing Status
QSE SP Test Date Test Time Test Complete Test Date Test Time Test Complete
AEN - Austin Energy 24-Apr 1:00 PM 24-Apr 21-May 1:00 PMAEP - American Electric Power 1-Apr 9:00 AM 1-Apr 30-Apr 9:00 AM 30-AprAPX Group A 21-Apr 11:00 AM 21-Apr 1-May 9:00 AMAPX Group B 21-Apr 1:00 PM 21-Apr 8-May 9:00 AMAPX Group C 24-Apr 9:00 AM 24-Apr 15-May 9:00 AMBEC - Brazos Electric Coop 6-May 1:00 PM 22-May 1:00 PMBP Energy 20-May 1:00 PM 27-May 1:00 PMBTU - Bryan Texas Utilities 22-Apr 9:00 AM 22-Apr 7-May 9:00 AMCalpine Power Management 19-May 1:00 PM 28-May 9:00 AMConstellation Energy 6-May 9:00 AM 20-May 9:00 AMCoral Power 23-Apr 9:00 AM 23-Apr 14-May 1:00 PMCPS - City Public Services 13-May 1:00 PM 21-May 9:00 AMExelon 8-Apr 9:00 AM 8-Apr 28-Apr 1:00 PM 28-AprFPL 22-Apr 1:00 PM In Process 14-May 1:00 PMGarland Power and Light 20-Mar 9:00 AM 20-Mar 27-Mar 1:00 PM 27-MarLCRA - Lower Colorado River 3-Apr 1:00 PM 3-Apr 29-Apr 9:00 AM 29-AprLEC - Luminant Energy Company 23-Apr 1:00 PM 23-Apr 7-May 1:00 PMNRG 27-Mar 1:00 PM 27-Mar 1-Apr 1:00 PM 17-AprOXY - Occidental Power Svcs 3-Apr 9:00 AM 3-Apr 29-Apr 1:00 PM 29-AprReliant 14-May 9:00 AM 22-May 9:00 AMSTEC - South Texas Electric Coop 20-Mar 1:00 PM 20-Mar 26-Mar 9:00 AM 26-MarSuez Energy Marketing 18-Mar 1:00 PM 25-Mar 5-May 1:00 PM In ProcessTenaska Power Services Group 1 16-Apr 9:00 AM 16-Apr 30-Apr 9:00 AMTenaska Power Services Group 2 16-Apr 9:00 AM 16-Apr 29-May 9:00 AM
PreTest Test
The remaining schedule is very full, Mondays and Fridays being used to accommodate long running test, and make-ups.
12TPTF4/1/2008 12
LFC 6.3 pre-Test
• Prior to R6.3 (total system test) the market desires an open loop test to validate SCED dispatch. Approach to accomplish this:– Performed open loop test on 4/28 from 10am-noon
• Results on following slides
– Performed open loop test on 5/5 from 4pm-9pm• Results on following slides
– Perform open loop test on 5/12 from 7am-9am
13TPTF4/1/2008 13
0.3
0.4
0.5
0.6
0.7
0.8
0.9
1
1:00 2:00 3:00 4:00 5:00 6:00 7:00 8:00 9:00 10:00 11:00 12:00 13:00 14:00 15:00 16:00 17:00 18:00
HE
%Nodal SE Convergence: 4-28
Began Contacting QSEs
14TPTF4/1/2008 14
MW set to 15 & MVar at 30, spikes removed from graph (4/28)
-60
-40
-20
0
20
40
6:04:59 AM
6:19:59 AM
6:34:59 AM
6:49:59 AM
7:04:59 AM
7:19:59 AM
7:34:59 AM
7:49:59 AM
8:04:59 AM
8:17:13 AM
8:25:53 AM
8:36:41 AM
8:49:13 AM
9:00:53 AM
9:12:17 AM
9:24:19 AM
9:37:27 AM
9:51:29 AM
10:06:29 AM
10:17:37 AM
10:31:47 AM
10:44:11 AM
10:47:45 AM
10:52:19 AM
11:04:13 AM
11:15:37 AM
11:30:01 AM
11:43:03 AM
11:55:59 AM
12:10:59 PM
12:25:59 PM
12:40:59 PM
12:55:59 PM
1:10:59 PM
1:23:41 PM
1:38:43 PM
1:51:59 PM
2:06:59 PM
2:21:59 PM
2:36:59 PM
2:51:59 PM
3:06:59 PM
3:21:59 PM
3:36:59 PM
3:51:59 PM
4:06:59 PM
4:21:59 PM
Maximum MW mismatch at bus Maximum MVAR mismatch at bus
15TPTF4/1/2008 15
Limits during test period 4-28, 10am - Noon
0
10000
20000
30000
40000
50000
60000
10:00 10:10 10:20 10:30 10:40 10:50 10:58 11:05 11:15 11:25 11:35 11:45 11:55
SCED Timestamp
MW
SUM_HEL
SUM_HSL
SUM_HASL
SUM_HDL
GTBD
SUM_LDL
SUM_LASL
SUM_LSL
SUM_LEL
Results look good minus the aggregated LEL limits (one resource had 6099 for the LEL)
16TPTF4/1/2008 16
LMPs Vs GTBD (4/28)
30400
30500
30600
30700
30800
30900
31000
31100
31200
10:0
0
10:0
5
10:1
0
10:1
5
10:2
0
10:2
5
10:3
0
10:3
5
10:4
0
10:4
5
10:5
0
10:5
5
10:5
8
11:0
0
11:0
5
11:1
0
11:1
5
11:2
0
11:2
5
11:3
0
11:3
5
11:4
0
11:4
5
11:5
0
11:5
5
$44.50000
$45.00000
$45.50000
$46.00000
$46.50000
$47.00000
$47.50000
GTBD LMP
Aggregated offer curve had a flat point of a few 100 MWs Changes to amount of MW considered by SCED correctly moved LMPs
Uniform LMP result of no constraints in Nodal LMPs, for the most part, remained between min and max zonal MCPEs
17TPTF4/1/2008 17
30%
40%
50%
60%
70%
80%
90%
100%
Hour Ending
Convergence
Nodal SE Convergence: 5-5
Began Contacting MPs
18TPTF4/1/2008 18
-100
-50
0
50
100
150
3:1
4:2
1 P
M
3:1
7:4
9 P
M
3:2
0:1
1 P
M
3:2
7:5
5 P
M
3:3
0:4
9 P
M
3:3
7:4
3 P
M
3:4
8:0
9 P
M
3:5
5:4
1 P
M
4:1
0:1
9 P
M
4:2
2:3
7 P
M
4:3
7:3
9 P
M
4:4
6:0
9 P
M
4:5
7:1
7 P
M
5:0
2:4
1 P
M
5:1
0:0
7 P
M
5:1
4:3
1 P
M
5:2
1:1
3 P
M
5:2
4:1
3 P
M
5:3
2:0
1 P
M
5:4
3:2
9 P
M
5:5
8:2
9 P
M
6:1
3:2
9 P
M
6:2
8:2
9 P
M
6:4
3:2
9 P
M
6:5
8:2
9 P
M
7:1
3:2
9 P
M
7:2
8:2
9 P
M
7:4
3:2
9 P
M
7:5
8:2
9 P
M
8:1
3:2
9 P
M
8:2
8:2
9 P
M
8:4
3:2
9 P
M
8:5
8:2
9 P
M
9:1
3:2
9 P
M
9:2
8:2
9 P
M
9:4
3:2
9 P
M
9:5
8:2
9 P
M
10
:13
:29
PM
10
:28
:29
PM
10
:43
:29
PM
10
:58
:29
PM
11
:13
:29
PM
11
:28
:29
PM
Maximum MW mismatch at bus Maximum MVAR mismatch at bus
MW set to 15 & MVar at 30, spikes removed from graph (5/5)
19TPTF4/1/2008 19
10,000
15,000
20,000
25,000
30,000
35,000
40,000
45,000
50,000
55,000
Sced Timestamp
MW
SUM_HEL
SUM_HSL
SUM_HASL
SUM_HDL
GTBD
SUM_LDL
SUM_LASL
SUM_LSL
SUM_LEL
Limits during test period 5-5, 4pm – 6pm
Limits Improved from first pre-test but a number of units continued to have questionable values
20TPTF4/1/2008 20
Reference LMPs Vs GTBD (5/5)
Price remained flat from 1730-1750 while GTBD changed due to the generation that was changing over this period were price takers
Other nuances attributable to generation with no EOC, changes in OS, and telemetered limits MCPE for this period remained slightly lower than the Reference LMP
35,600
35,700
35,800
35,900
36,000
36,100
36,200
SCED Timestamp
$57.00000
$58.00000
$59.00000
$60.00000
$61.00000
$62.00000
$63.00000
$64.00000
$65.00000
$66.00000
GTBD REFERENCE_LMP
21TPTF4/1/2008 21
LMP Graphics from 5/5
22TPTF4/1/2008 22
Target Dates for 6.3 Tests
• Week of June 16th – 2 hour test– ERCOT desires to proceed with the 2hr test with/out CIM
– EDS plans to purge the resource data from MMS on May 15 and load it
with data from the Certified RARFs
• Week of July 7th – 8 hour test
• Week of July 28th – 48 hour test
23TPTF4/1/2008 23
EDS 3 Release 7 - CRR
EDS 3 Release 7 Status % Complete Comments
Release 7.1 Connectivity and Submissions 100%(0%)
59 participants successfully completed UI testing (97% participation)
* completion of R7.1 qualifies MP for production cert
Release 7.2 Scripted Monthly Auction 100%(0%)
No Change
Release 7.3 unscripted Monthly Auction 100%(0%)
No Change
Release 7.4 Unscripted Annual Allocation/Auction
66%(0%)
9 participants successfully submitted PCRR nominations (82% participation)
46 participants successfully submitted bids (75% participation)
Jan 08 Feb 08 Mar 08 Apr 08 May 08Dec 07
CRR – R7.0 CRR – R7.1 CRR – R7.2 CRR – R7.3 CRR R7.4 CRR – R7.5 (TBD)
Jan 08 Feb 08 Mar 08 Apr 08 May 08Dec 07 Jan 08 Feb 08 Mar 08 Apr 08 May 08Dec 07
CRR – R7.0 CRR – R7.1 CRR – R7.2 CRR – R7.3 CRR – R7.5 (TBD)
R7.4 exit delayed 10 Business Days (to 5/16) due to issues clearing annual auction: Data and system environment / application tuning
Legend: % in parentheses are from the 4/1 TPTF update
24TPTF4/1/2008 24
Release 8 – COMS Statements and Invoices Posted
Statements and Invoices posted to Readiness Center:
Standard Statements and Invoices
Mock CARD Invoices
Mock CRR Balancing Account Invoices
Mock DAM Late Fee Invoices
Mock DAM Settlement Statements and Invoices
Release 7.2 CRR Auction Invoices
MIS Certified Area:
DAM Statements and Invoices for Operating Days 4/18/08, 4/23/08, 4/25/08 and 4/30/08 (DAM awards only)
Release 7.3 CRR Auction Invoices
25TPTF4/1/2008 25
Release 8 – continued
Reports, DDLs, XSDs and Reports posted to Readiness Center:
CMM Credit Standing to ERCOT Counterparty Report
CMM Total Potential Exposure Detail Report
EDW – PRDE Draft DDL
EDW – Settlements Draft DDL
EDW – PRDE Draft XSD
EDW – Settlements Draft XSD
COMS – Market Data Transparency Specifications
Verifiable Costs:
Received a large number of intent emails with resources specified
ERCOT will generate “temporary” Verifiable Costs for EDS testing based on resources provided in intent email
26TPTF4/1/2008 26
Release 8 – Upcoming Activities
• Mock RTM Initial Settlement Invoices and RTM Late Fee Invoices with input data to Readiness Center. (May 15, 2008)
• Mock RTM Settlement Statement in which there is no DAM for the Operating Day with input data to Readiness Center. (May 15, 2008)
• CRR Auction Invoices – Release 7.4 Auction Results (2 business days after auction clears)
27TPTF4/1/2008 27
EDS 4 Release 9.1
2008Jan Feb Mar Apr May Jun
E4 R9 R9.1: DAM/RUC Submission Testing R9.3: R9.4: DAM/ Adj Period, RT
R9.2: Outage Scheduler
Legend: % in parentheses are from the 2/22 TPTF update
EDS 4 Release 9.1 Exit Criteria % Complete
Comments
Sign-Up Testing Window Scheduled 94%(86%)
The following need to schedule test windows:Aquila, Clearview Electric, Glacial Energy, Kansas City Power and Light, National Power Company, Texpo Power, Urban Energy Source
MP8 - QSE Ability to Submit Transactions Via MIS
92%(86%)
MP9 – QSE Ability to Submit Web Service Transactions
100%(100%)
Of those who indicated desire to use Web Services
28TPTF4/1/2008 28
EDS 4 Release 9.2
2008Jan Feb Mar Apr May Jun
E4 R9 R9.1: DAM/RUC Submission Testing R9.3: R9.4: DAM/ Adj Period, RT
R9.2: Outage Scheduler
Legend: % in parentheses are from the 4/1 TPTF update
EDS 4 Release 9.2 Exit Criteria % Complete
Comments
Test Window Scheduled 83%(0%)
The following need to schedule test windows:
QSEs: FPL, STEC, Scurry, Westar
TSPs: College Station, Denton, MVEC, MEC, Rayburn, STEC, TNMP
Completed Scripted Testing 0% Recurring Outages: target release 5/19
Grouped Outages through UI: target release 5/26
Opportunity outage: target release 6/2
Outage Notifications: target release to sandbox mid-June; EDS late June
Participate in Performance testing 0%
Participate in Dual Entry days (prior to 168hr test)
0%
29TPTF4/1/2008 29
EDS 4 Release 9.3
2008Jan Feb Mar Apr May Jun
E4 R9 R9.1: DAM/RUC Submission Testing R9.3: R9.4: DAM/ Adj Period, RT
30TPTF4/1/2008 30
Go-Live Procedure: TPTF Comments
• Guiding principals
– Reduce risk by limiting the number of moving parts leading up
to, during, and just after the Texas Nodal Market Implementation
Date (TNMID)
– Reduce risk by operating the systems as-if they are production
prior to operating under protocols
– Reduce risk by regression testing nodal systems
– Provide decision makers with a guideline for protocol section
21.12.5 Reinstatement of Zonal Protocol Provisions
31TPTF4/1/2008 31
Go-Live Procedure: TPTF Comments
• New Resources coming on-line between the start of the 168-Hr test and the TNMID– New QSEs for resources coming on-line after the start of the 168
hour test but that are not associated with a QSE that is fully qualified that demonstrate that there is no feasible way to become qualified before the 168 hour test shall be allowed to qualify for zonal and/or nodal operation after the 168 hour test is completed
32TPTF4/1/2008 32
Go-Live Procedure: TPTF Comments
• It is one thing to complete Nodal testing and another to complete qualification. Qualification means that at an establish date of the Transition Plan each QSE will have completed required testing and have posted whatever required credit/collateral with ERCOT. If required items are missing then digital certificate access to Nodal MIS will be suspended just before Go-Live.– If a QSE is currently active in Zonal and is transitioning to Nodal they
must complete Nodal testing and post any change in credit/collateral prior to establish date in the Transition Plan.
– If a QSE is not currently active in Zonal and expects to participate in the Nodal Market at Go-Live the QSE must complete Zonal qualification (posting collateral and/or completing any remaining zonal tests). This is required because if for some reason ERCOT must fail back to Zonal after Go-Live all entities must be Zonal qualified.
– If a QSE is not currently active in Zonal and wishes to begin active participation some time after Go-Live the QSE may wait until ERCOT is ready to begin qualifying QSEs at an establish time after Go-Live (stabilization period).
33TPTF4/1/2008 33
Go-Live Procedure: TPTF Comments
• Sempra Energy Solutions (SES) is troubled to learn that the latest version of the Go-Live Period contemplates a 7X24 parallel operation of both our zonal market systems and our nodal market systems prior to the TNMID. This request, coming after the completion of the 168-Hour Test, imposes at least 90-days of burdensome and duplicative efforts on scheduling and operational resources, resources that have already, presumably, been certified by ERCOT Staff that all Market Readiness Criteria have been met.– SES offers three possible solutions;
• 1) shorten the parallel operation time period to the final week of November,
• 2) exempt QSEs from the parallel operation requirement if they have received certification that they have met the Market Readiness Criteria and schedule less than 1,000 MWs per hour, on average, or
• 3) a combination of items #1 and #2.
34TPTF4/1/2008 34
Go-live Procedure: TPTF Comments
• Market Participants must also enforce a strict code change control procedure managing all aspects of their Texas nodal systems. Beginning thirty days prior to the TNMID, MPs shall notify make no upgrades to key systems such as Generation Management System (GMS) and Market Systems without written approval from ERCOT’s Nodal Executive Director of any changes it intends to make to its Generation Management System (GMS) and Market Systems. Such requests will be made available to all Market Participants. TPTF will determine if Market Participant’s code upgrades in aggregate are significant enough that regressive testing of all Market Participant’s systems must be made.
35TPTF4/1/2008 35
Go-Live Procedure
• Use of Constant Frequency control– Suggested maximum use range from 1 to 24 hours
• ERCOT recommends no more than 12
36TPTF4/1/2008 36
Go-Live Procedure: TPTF Comments
• What is the estimated “significant effort, unusual work hours and additional labor costs”
• What is the escalation procedure during this time should MPs observe issues relating to data and / or processing?
• How will the MP landscape be made aware beyond monitoring the MIS
• in regards to section 10.1 Guidelines for switching back to Zonal: How can ERCOT ensure Accuracy and Intent without the operation of SCED, RUC, DAM, etc. Given that we are migrating to a Financial market these operations are just as critical to the aforementioned systems. If not addressed and should this event occur the likelihood of multiple ADR’s becomes very real.
37TPTF4/1/2008 37
Go-live Procedure: TPTF Comments
• The task on the bottom of page 5 listed as “ Entry of Ninety Day Outages into the nodal Outage Schedule by TSPs to Support December CRR Auction” with a target date of October 5, 2008 looks to be outside of protocols. In section 3.1 of the Nodal Protocols where the requirements for coordination activity for outages are specified; a 90 Day Outage is not defined. What is defined is an ERCOT approval timeline for outages that are submitted on a 90 day period.
• When will ERCOT Nodal system move from EDS to Production? What is the time period to verify MP source data such as MP Resource Registration data?
38TPTF4/1/2008 38
EDS Deliverables
EECP Go-Live 168Hr Test DST
Post for TPTF Comment
Apr 10 April 22 June 2 May 23
Comment Close Apr 25 May 2 June 11 May 30
TPTF Vote May 5 May 5 June 23 June 10
Legend: indicates completion
39TPTF4/1/2008 39
Questions?