53
GMP Amendment – Exhibit C – Viera Area ES/RFQ#19-422-Q-DR Page 1 of 4 EXHIBIT C GUARANTEED MAXIMUM PRICE AMENDMENT TO AGREEMENT FOR CONSTRUCTION MANAGEMENT SERVICES BY AND BETWEEN WHARTON-SMITH, INC. AND SCHOOL BOARD OF BREVARD COUNTY 2700 JUDGE FRAN JAMIESON WAY VIERA, FL 32940 PHONE: (321) 633-1000 FAX: (321) 633-4646 FOR THE CONSTRUCTION OF: VIERA AREA ELEMENTARY SCHOOL RFQ #19-422-Q-DR May 15, 2019

May 15, 2019 - Brevard Public Schoolseagendatoc.brevardschools.org/05-28-2019 School... · 2.2 Final Completion Date: Final completion of the Work shall be achieved by September 8,

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: May 15, 2019 - Brevard Public Schoolseagendatoc.brevardschools.org/05-28-2019 School... · 2.2 Final Completion Date: Final completion of the Work shall be achieved by September 8,

GMP Amendment – Exhibit C – Viera Area ES/RFQ#19-422-Q-DR Page 1 of 4

EXHIBIT C

GUARANTEED MAXIMUM PRICE AMENDMENT

TO

AGREEMENT FOR CONSTRUCTION MANAGEMENT SERVICES

BY AND BETWEEN

WHARTON-SMITH, INC.

AND

SCHOOL BOARD OF BREVARD COUNTY

2700 JUDGE FRAN JAMIESON WAY

VIERA, FL 32940

PHONE: (321) 633-1000

FAX: (321) 633-4646

FOR THE CONSTRUCTION OF:

VIERA AREA ELEMENTARY SCHOOL

RFQ #19-422-Q-DR

May 15, 2019

Page 2: May 15, 2019 - Brevard Public Schoolseagendatoc.brevardschools.org/05-28-2019 School... · 2.2 Final Completion Date: Final completion of the Work shall be achieved by September 8,

GMP Amendment – Exhibit C – Viera Area ES/RFQ#19-422-Q-DR Page 2 of 4

ARTICLE 1. GUARANTEED MAXIMUM PRICE (GMP) 1.1 Guaranteed Maximum Price (GMP): Construction Manager guarantees that it shall not

exceed a Guaranteed Maximum Price (GMP) of Twenty-Two Million, Nine Hundred Sixty-Three

Thousand, Two Hundred Forty-Three Dollars ($22,963,243.00) for the identified Project. 1.2 Basis of the GMP:

1.2.1 Construction Documents: The Scope of Work for the GMP shall be as defined in the Contract

Construction Documents, prepared by Architects RZK, Inc. entitled Brevard Public Schools New Viera

Elementary School and dated February 28, 2019 and revised April 17, 22, 24, 25, 26 and 29, 2019.

1.2.2 List of Construction Documents identified in Article 7 of this Guaranteed Maximum Price

Amendment.

1.2.3 Exceptions, Clarifications and Exclusions: The Scope of Work defined in the Construction

Contract Documents shall be modified and/or clarified as identified in Article 8 of this Guaranteed

Maximum Price Amendment.

1.2.4 Credit for Fill: The Construction Manager agrees to execute a deductive change order in an

amount equivalent to Four Dollars and Fifty Cents ($4.50) per cubic yard of fill provided by The Viera

Company and paid directly by the Owner for use on the Project.

ARTICLE 2. PROJECT TIME 2.1 Substantial Completion Date: Substantial Completion of the Work shall be achieved by June

12, 2020.

2.2 Final Completion Date: Final completion of the Work shall be achieved by September 8,

2020.

2.3 Project Schedule: Attached to this Amendment will be a schedule identifying the above

noted completion times and intermediate milestone dates estimated for the Project. The

proposed schedule shall be integrated into the Construction Manager’s Schedule upon

approval of this Guaranteed Maximum Price Amendment.

ARTICLE 3. CONSTRUCTION MANAGER FEE 3.1 Construction Manager Fee: The Construction Manager Fee for the Project shall be a Lump

Sum of Nine Hundred Twenty-Three Thousand, Nine Hundred Twenty-One Dollars

($923,921.00).

ARTICLE 4. REIMBURSABLE GENERAL CONDITIONS COSTS 4.1 General Conditions: General Conditions costs for the Project shall not exceed One Million,

Three Hundred Thirty-Seven Thousand, Three Hundred Seventy-Six Dollars ($1,337,376.00).

General Conditions costs shall be reimbursed at Construction Manager’s actual cost.

General Conditions costs shall be in compliance with the General Conditions to the

Agreement for Construction Management Services (Exhibit A) and are identified in the

attached document prepared by the Construction Manager.

Page 3: May 15, 2019 - Brevard Public Schoolseagendatoc.brevardschools.org/05-28-2019 School... · 2.2 Final Completion Date: Final completion of the Work shall be achieved by September 8,

GMP Amendment – Exhibit C – Viera Area ES/RFQ#19-422-Q-DR Page 3 of 4

ARTICLE 5. LIQUIDATED DAMAGES 5.1 Substantial Completion: Construction Manager shall pay Owner One Thousand Dollars

($1,000.00) as liquidated damages for each day that Substantial Completion extends

beyond the Substantial Completion Date.

5.2 Final Completion: Construction Manager shall pay Owner Five Hundred Dollars ($500.00)

as liquidated damages for each day that Final Completion extends beyond the Final

Completion Date.

ARTICLE 6. PROJECT REPRESENTATIVES 6.1 Owner’s Representative: Owner designates the individual listed below as its Owner’s

Project Manager to provide direct interface with Construction Manager with respect to

Owner’s responsibilities.

David Martin Owner’s Project Manager 6.2 Construction Manager’s Representative: Construction Manager designates the individual listed

below as its Construction Manager’s Representative to provide direct interface with Owner with

respect to Construction Manager’s responsibilities.

David Romero Construction Manager’s Project Manager

ARTICLE 7. LIST OF CONSTRUCTION CONTRACT DOCUMENTS 7.1 Drawings: Listed below are the Drawings developed by the Design Firm and their issue

Date which is the basis of this Guaranteed Maximum Price Amendment:

See attached Wharton-Smith, Inc. proposal dated May 13, 2019

7.2 Specifications: Listed below are the Specification Sections developed by the Design Firm

and their issue Date which is the basis of this Guaranteed Maximum Price Amendment:

See attached Wharton-Smith, Inc. proposal dated May 13, 2019

ARTICLE 8. EXCEPTIONS, EXCLUSIONS AND CLARIFICATIONS 8.1 Exceptions and Exclusions: Listed below are specific Exceptions and Exclusions identified

by the Construction Manager during the development of this Project Design and Bidding:

See attached Wharton-Smith, Inc. proposal dated May 13, 2019

8.2 Clarifications: Listed below are specific Clarifications identified by the Construction

Manager during the development of this Guaranteed Maximum Price:

See attached Wharton-Smith, Inc. proposal dated May 13, 2019

Page 4: May 15, 2019 - Brevard Public Schoolseagendatoc.brevardschools.org/05-28-2019 School... · 2.2 Final Completion Date: Final completion of the Work shall be achieved by September 8,

GMP Amendment – Exhibit C – Viera Area ES/RFQ#19-422-Q-DR Page 4 of 4

SIGNATURE PAGE: THE SCHOOL BOARD OF CONSTRUCTION MANAGER: BREVARD COUNTY, FLORIDA: WHARTON-SMITH, INC. By:_____________________________ By:___________________________ Tina Descovich, Chairperson Print Name: ___________________ ATTEST (WITNESS): Title: _________________________ By:_____________________________ Date:_________________________ Mark W. Mullins, Ed.D. Superintendent Date:___________________________ ATTEST (WITNESS): By:___________________________ Print Name:____________________ Title:__________________________ Approved as to form: ___________________________ Amy Envall, General Counsel

END OF EXHIBIT C

Darin A. Crafton

Executive Vice President

05/15/19

Kimberly A. Murray

Administrative Manager

Page 5: May 15, 2019 - Brevard Public Schoolseagendatoc.brevardschools.org/05-28-2019 School... · 2.2 Final Completion Date: Final completion of the Work shall be achieved by September 8,

750 Monroe Road, Sanford, FL 32771 I Phone: (407) 321-8410 I Fax: (407) 829-4453

Mailing Address: P.O. Box 471028, Lake Monroe, FL 32747-1028

AL – 45684 I FL - CG C032669 I GA – GCCO 001333 I LA – 52227 I MS – 18232MC I NC – 38755 I SC – G97817 I TN – 62419 I VA – 2705121584A

May 13, 2019

Mrs. Susan Hann

School Board of Brevard County

2700 Judge Fran Jamieson Way

Viera, FL 32940-6699

Re: Construction Management Services for the Viera Area Elementary School ‘V’ Project

GMP Proposal

Dear Sue,

We are pleased to provide the attached Sub-Project Guaranteed Maximum Price (GMP) Proposal for the

Viera Area Elementary School ‘V’ Project for your review and approval.

Please contact us with any questions regarding this GMP. We look forward to working with you on this

project.

Sincerely,

Wharton-Smith, Inc.

Johnathan Wilkes

Sr. Project Manager

Page 6: May 15, 2019 - Brevard Public Schoolseagendatoc.brevardschools.org/05-28-2019 School... · 2.2 Final Completion Date: Final completion of the Work shall be achieved by September 8,

GUARANTEED MAXIMUM PRICE PROPOSAL FOR

SCHOOL BOARD OF BREVARD COUNTY

Construction Management Services for the Viera Area Elementary School ‘V’ Project

SUBMITTED BY: WHARTON-SMITH, INC.

DATE: May 13, 2019

Page 7: May 15, 2019 - Brevard Public Schoolseagendatoc.brevardschools.org/05-28-2019 School... · 2.2 Final Completion Date: Final completion of the Work shall be achieved by September 8,

1

School Board of Brevard County Construction Management Services for the Viera Area Elementary School ‘V’ Project

TABLE OF CONTENTS Exhibit C GMP Summary ......................................................................................... Section 01 Exhibit C-1 List of Contract Documents ................................................................ Section 02 Exhibit C-2 Description of Work ............................................................................. Section 03 Specification Listing ..................................................................................................... 3.1 Qualifications and Assumptions ................................................................................... 3.2 Exclusions .................................................................................................................... 3.3 Value Engineering Recommendations ......................................................................... 3.4 Allowance Schedule ..................................................................................................... 3.5 Add Alternate Schedule ............................................................................................... 3.6 ODP Schedule ............................................................................................................. 3.7 GMP Cost Summary ................................................................................................ Section 04 Master Project Schedule ......................................................................................... Section 05

RFQ #19-422-Q-DR Page 1 of 47 05/13/19

Page 8: May 15, 2019 - Brevard Public Schoolseagendatoc.brevardschools.org/05-28-2019 School... · 2.2 Final Completion Date: Final completion of the Work shall be achieved by September 8,

1

SECTION 01

GMP Summary

The Viera Area Elementary School ‘V’ Project to be located on a new campus at 8300 Stadium Parkway in Viera, Florida 32940. The Guaranteed Maximum Price (GMP) encompasses the following scope of services; The project includes site development, utilities and improvements including but not limited to site fill, paved drives, parking area, sidewalks, covered walkway canopies, ramps, curbs, exterior signage, electrical service and utilities to the structure. The new main structure is a single story building of reinforced precast concrete tilt wall system on concrete footings, with a slab on grade. The main frame and roof structure are products of a pre-engineered metal building (PEMB) manufacturer. The exterior material include a standing seam metal roof and the exterior face of the concrete tilt wall system shall have a texture coating. The interior finishes include a suspended acoustical tile ceiling, painted and textured gypsum wallboard on furring or metal stud framing. Floors are specified to be covered with VCT, carpet, porcelain tile or epoxy paint. Interior doors are solid core with some specialty doors. The HVAC system includes water cooled chillers, cooling towers, pumps, AHU’s and VAV’s with ducted supply and return air. The Plumbing System includes toilet fixtures, work sinks and condensate as well as the various piping systems for sanitary sewer and domestic water distribution. The Electrical System includes power for convenience and theatre systems, lighting for ordinary Illumination and theatre production and wiring for various theatre communication systems. The exterior will have a hardscape and landscaping.

RFQ #19-422-Q-DR Page 2 of 47 05/13/19

Page 9: May 15, 2019 - Brevard Public Schoolseagendatoc.brevardschools.org/05-28-2019 School... · 2.2 Final Completion Date: Final completion of the Work shall be achieved by September 8,

COV Cover Sheet 2/28/2019

C-101 Overall Site Plan 2/28/2019

C-102 Site and Striping Plan 2/28/2019 4/29/19 (BA4)

C-103 Site and Striping Plan 2/28/2019

C-104 Site and Striping Plan 2/28/2019

C-105 Paving and Drainage Plan 2/28/2019 4/24/2019 (BA 3)

C-106 Paving and Drainage Plan 2/28/2019 4/24/2019 (BA 3)

C-107 Paving and Drainage Plan 2/28/2019

C-108 Paving and Drainage Plan 2/28/2019 4/24/2019 (BA 3)

C-109 Water, Sanitary and Reuse Plan 2/28/2019

C-110 Water, Sanitary and Reuse Plan 2/28/2019

C-111 Water, Sanitary and Reuse Plan 2/28/2019

C-501 Paving and Drainage Details 2/28/2019 4/29/19 (BA4)

C-502 Water Details 2/28/2019

C-503 Water Details 2/28/2019

C-505 Sanitary Details 2/28/2019

C-506 Lift Station Details 2/28/2019

AS-1.0 Architectural Site Plan and SMEP Sheet Index 2/28/2019

LS-0.0 Life Safety Code Compliance Information 2/28/2019

LS-0.1 Life Safety Code Compliance Information 2/28/2019

LS-0.2 Life Safety Code Compliance Information 2/28/2019

LS-1.0 Life Safety Site Plan 2/28/2019

LS-2.0 Life Safety Plan – School 2/28/2019

LS-2.1 Life Safety Plan – Covered Plan 2/28/2019

LS-2.2 Life Safety Plan – Mech. Yard 2/28/2019

L-101 Landscape Plan (BA1) 2/28/2019 4/19/2019 (BA1)

L-102 Landscape Plan (BA1) 2/28/2019 4/19/2019 (BA1)

L-103 Landscape Plan (BA1) 2/28/2019 4/19/2019 (BA1)

L-104 Landscape Plan (BA1) 2/28/2019 4/19/2019 (BA1)

L-105 Landscape Plan (BA1) 2/28/2019 4/19/2019 (BA1)

1A-1.0 School Dimension Floor Plan 2/28/2019

1A-1.1 Enlarged Dim. Floor Plan – Multi-Purpose 2/28/2019

PLANS

EXHIBIT C-1

SECTION 02

CONTRACT DOCUMENTS

Sheet No Sheet TitleDate of

IssueRevised

RFQ #19-422-Q-DR Page 3 of 47 05/13/19

Page 10: May 15, 2019 - Brevard Public Schoolseagendatoc.brevardschools.org/05-28-2019 School... · 2.2 Final Completion Date: Final completion of the Work shall be achieved by September 8,

EXHIBIT C-1

SECTION 02

CONTRACT DOCUMENTS

1A-1.2 Enlarged Dim. Floor Plan – Administration 2/28/2019

1A-1.3 Enlarged Dim. Floor plan – Classrooms 2/28/2019

1A-1.4 School Reference Floor Plan 2/28/2019

1A-1.5 Enlarged Ref. Floor Plan – Multi-Purpose 2/28/2019

1A-1.6 Enlarged Kitchen Floor Plan 2/28/2019

1A-1.7 Enlarged Ref. Floor Plan – Administration 2/28/2019

1A-1.8 Enlarged Ref. Floor Plan – Classrooms 2/28/2019

1A-1.9 Enlarged Ref. Floor Plan – Classrooms 2/28/2019

1A-1.10 Enlarged Ref. Floor Plan – Classrooms 2/28/2019

1A-1.11 Enlarged Ref. Floor Plans – Restrooms 2/28/2019

1A-1.12 Mechanical Mezzanine Floor Plan and Details 2/28/2019

1A-1.13 Plan Details 2/28/2019

1A-2.0 School Reflected Ceiling Plan 2/28/2019

1A-2.1 Enlarged RCP – Multi-Purpose 2/28/2019

1A-2.2 Enlarged RCP – Administration 2/28/2019

1A-2.3 Enlarged RCP - Classrooms 2/28/2019

1A-2.4 Enlarged RCP – Classroom 2/28/2019

1A-3.0 School Roof Plan 2/28/2019

1A-4.0 School Exterior Elevations 2/28/2019

1A-5.0 School Building Sections 2/28/2019

1A-5.1 Building Sections 2/28/2019

1A-6.0 School Wall Section 2/28/2019

1A-6.1 School Wall Sections 2/28/2019

1A-7.0 School Interior Elevations 2/28/2019

1A-7.1 School Interior Elevations 2/28/2019

1A-7.2 School Interior Elevations 2/28/2019

2A-1.0 Covered Play Floor Plan 2/28/2019

2A-2.0 Covered Play Reflected Ceiling Plan 2/28/2019

2A-3.0 Covered Play Roof Plan 2/28/2019

2A-4.0 Covered Play Exterior Elevations 2/28/2019

2A-5.0 Covered Play Building Section 2/28/2019

2A-6.0 Covered Play Wall Sections 2/28/2019

2A-7.0 Covered Play Interior Elevations 2/28/2019

3A-1.0 Mech Yard Floor Plan 2/28/2019

3A-2.0 Mech Yard Reflected Ceiling Plan 2/28/2019

RFQ #19-422-Q-DR Page 4 of 47 05/13/19

Page 11: May 15, 2019 - Brevard Public Schoolseagendatoc.brevardschools.org/05-28-2019 School... · 2.2 Final Completion Date: Final completion of the Work shall be achieved by September 8,

EXHIBIT C-1

SECTION 02

CONTRACT DOCUMENTS

3A-3.0 Mech Yard Roof Plan 2/28/2019

3A-4.0 Mech Yard Exterior Elevations 2/28/2019

3A-5.0 Mech Yard Building Section 2/28/2019

A-8.0 Door Schedule and Types 2/28/2019

A-8.1 Door Details 2/28/2019

A-8.2 Window Schedule, Types and Details 2/28/2019

A-8.3 Window Details 2/28/2019

A-10.0 Wall Types 2/28/2019

A-10.1 Wall Types 2/28/2019

A-10.2 Wall Types 2/28/2019

A-10.3 Wall Types 2/28/2019

A-10.4 Wall Types 2/28/2019

1S-0.1 Structural Index, Abbreviations, and Symbols 2/28/2019

1S-0.2 Structural Notes 2/28/2019

1S-0.3 Structural Notes 2/28/2019

1S-0.4 Structural Notes 2/28/2019

1S-0.5 Wind Load Diagram 2/28/2019

1S-1.0 Foundation / Slab Plan 2/28/2019

1S-2.0 Roof Framing Plan 2/28/2019

1S-3.0 Enlarged Mezzanine Plans 2/28/2019

2S-1.0 Covered Play Foundation / Slab & Roof Framing Plan 2/28/2019

3S-1.0 Chiller Building Structural Plans 2/28/2019

S-3.0 Structural Sections 2/28/2019

S-4.0 Structural Details 2/28/2019

S.4.1 Structural Details 2/28/2019

S.4.2 Structural Details 2/28/2019

S.4.3 Structural Details 2/28/2019

S.4.4 Structural Details 2/28/2019

S.4.5 Structural Details 2/28/2019

S.4.6 Structural Details 2/28/2019

RFQ #19-422-Q-DR Page 5 of 47 05/13/19

Page 12: May 15, 2019 - Brevard Public Schoolseagendatoc.brevardschools.org/05-28-2019 School... · 2.2 Final Completion Date: Final completion of the Work shall be achieved by September 8,

EXHIBIT C-1

SECTION 02

CONTRACT DOCUMENTS

P-0.1 Plumbing Legend & General Notes 2/28/2019

P-1.0 Level 1 – Plumbing Plan –Domestic Water – Overall 2/28/2019

P-1.1 Level 1 – Plumbing Plan – Domestic Water – Area A 2/28/2019

P-1.2 Level 1 – Plumbing Plan – Domestic Water – Area B 2/28/2019

P-1.3 Level 1 – Plumbing Plan – Domestic Water – Area C 2/28/2019

P-1.4 Level 1 – Plumbing Plan – Domestic Water – Area D 2/28/2019

P-1.5 Level 1 – Plumbing Plan – Domestic Water – Area E 2/28/2019

P-1.6 Level 1 – Plumbing Plan – Domestic Water – Area F 2/28/2019

P-1.7 Level 1 – Plumbing Plan – Domestic Water – Chiller Plant 2/28/2019

P-2.0 Level 1 – Plumbing Plan – Sanitary – Overall 2/28/2019

P-2.1 Level 1 – Plumbing Plan – Sanitary – Area A 2/28/2019

P-2.2 Level 1 – Plumbing Plan – Sanitary – Area B 2/28/2019

P-2.3 Level 1 – Plumbing Plan – Sanitary – Area C 2/28/2019

P-2.4 Level 1 – Plumbing Plan – Sanitary – Area D 2/28/2019

P-2.5 Level 1 – Plumbing Plan – Sanitary – Area E 2/28/2019

P-2.6 Level 1 – Plumbing Plan – Sanitary - Area F 2/28/2019

P-2.7 Level 1 – Plumbing Plan – Sanitary – Chiller Plant 2/28/2019

P-2.8 Mezzanine Level – Plumbing Plan – Sanitary 2/28/2019

P-4.0 Plumbing Schedules 2/28/2019

P-5.0 Plumbing Details 2/28/2019

P-5.1 Plumbing Details 2/28/2019

P-5.2 Plumbing Details 2/28/2019

P-5.3 Plumbing Details 2/28/2019

M-0.1 Mechanical Legend and Notes 2/28/2019

M-1.0 Level 1 – Mechanical Overall Plan 2/28/2019

M-1.1 Level 1 – Mechanical Plan – Area A 2/28/2019

M-1.2 Level 1 – Mechanical Plan – Area B 2/28/2019

M-1.3 Level 1 – Mechanical Plan – Area C 2/28/2019

M-1.4 Level 1 – Mechanical Plan – Area D 2/28/2019

M-1.5 Level 1 – Mechanical Plan – Area E 2/28/2019

M-1.6 Level 1 – Mechanical Plan – Area F 2/28/2019

M-1.7 Level 1 – Mechanical Plan – Chiller Plant / PE Building 2/28/2019

M-1.8 Mezzanine Level – Mechanical Plan 2/28/2019

M-2.0 Level 1 – Mechanical Overall Piping Plan 2/28/2019

M-5.0 Mechanical Details 2/28/2019

RFQ #19-422-Q-DR Page 6 of 47 05/13/19

Page 13: May 15, 2019 - Brevard Public Schoolseagendatoc.brevardschools.org/05-28-2019 School... · 2.2 Final Completion Date: Final completion of the Work shall be achieved by September 8,

EXHIBIT C-1

SECTION 02

CONTRACT DOCUMENTS

M-5.1 Mechanical Details 2/28/2019

M-5.2 Mechanical Details 2/28/2019

M-6.0 Mechanical Controls 2/28/2019

M-7.0 Mechanical Schedules 2/28/2019

M-7.1 Mechanical Schedules 2/28/2019

E-0.1 Electrical Legend 2/28/2019

E-0.2 Electrical Notes 2/28/2019

E-0.3 Lighting Fixture Schedule 2/28/2019

ES-1.0 Site Lighting Plan 2/28/2019

ES-2.0 Site Power Plan 2/28/2019

ES-5.0 Site Lighting Details 2/28/2019

ES-5.1 Site Power Details 2/28/2019

EL-1.0 Level 1 – Overall Electrical Lighting Plan 2/28/2019

EL-1.1 Level 1 – Lighting Plan – Area A 2/28/2019

EL-1.2 Level 1 – Lighting Plan – Area B 2/28/2019

EL-1.3 Level 1 – Lighting Plan – Area C 2/28/2019

EL-1.4 Level 1 – Lighting Plan – Area D 2/28/2019

EL-1.5 Level 1 – Lighting Plan – Area E 2/28/2019

EL-1.6 Level 1 – Lighting Plan – Area F 2/28/2019

EL-1.7 Lighting Plan Mezzanine 2/28/2019

EL-1.8 Level 1 – Lighting Plan – Chiller Plant & Covered Play 2/28/2019

EL-5.0 Electrical Lighting Details 2/28/2019

EP-1.0 Level 1 – Overall Electrical Power Plan 2/28/2019

EP-1.1 Level 1 – Power Plan – Area A 2/28/2019

EP-1.2 Level 1 – Power Plan – Area B 2/28/2019

EP-1.3 Level 1 – Power Plan – Area C 2/28/2019

EP-1.4 Level 1 – Power Plan – Area D 2/28/2019

EP-1.5 Level 1 – Power Plan – Area E 2/28/2019

EP-1.6 Level 1 – Power Plan – Area F 2/28/2019

EP-1.7 Electrical Plan Mezzanine 2/28/2019

EP-1.8 Level 1 – Power Plan – Chiller Plant & Covered Play 2/28/2019

EP-5.0 Electrical Power Details 2/28/2019

EP-5.1 Electrical Power Details 2/28/2019

EP-5.2 Electrical Power Details 2/28/2019

EP-6.0 Electrical One-Line Diagram 2/28/2019

RFQ #19-422-Q-DR Page 7 of 47 05/13/19

Page 14: May 15, 2019 - Brevard Public Schoolseagendatoc.brevardschools.org/05-28-2019 School... · 2.2 Final Completion Date: Final completion of the Work shall be achieved by September 8,

EXHIBIT C-1

SECTION 02

CONTRACT DOCUMENTS

EP-6.1 Feeder Schedule 2/28/2019

E-7.0 Electrical Panel Schedules 2/28/2019

E-7.1 Electrical Panel Schedules 2/28/2019

E-7.2 Electrical Panel Schedules 2/28/2019

E-7.3 Electrical Panel Schedules 2/28/2019

E-7.4 Electrical Panel Schedules 2/28/2019

E-7.5 Electrical Panel Schedules 2/28/2019

E-7.6 Electrical Panel Schedules 2/28/2019

T-0.1 Technology Legend 2/28/2019

T-0.2 Technology Notes 2/28/2019

TA-1.0 Level 1- Overall A/V and Security Plan 2/28/2019

TA-1.1 Level 1 – A/V and Security Plan – Area A 2/28/2019

TA-1.2 Level 1 – A/V and Security Plan – Area B 2/28/2019

TA-1.3 Level 1 – A/V and Security Plan – Area C 2/28/2019

TA-1.4 Level 1 – A/V and Security Plan – Area D 2/28/2019

TA-1.5 Level 1 – A/V and Security Plan – Area E 2/28/2019

TA-1.6 Level 1 – A/V and Security Plan – Area F 2/28/2019

TA-1.7 Level 1 – A/V and Security Plan – Chiller Plant 2/28/2019

TA-5.0 A/V and Security Details 2/28/2019

TA-5.1 A/V and Security Details 2/28/2019

TA-5.2 A/V and Security Details 2/28/2019

TN-1.0 Level 1 – Overall Voice Data Plan 2/28/2019

TN-1.1 Level 1- Voice Data Plan – Area F 2/28/2019

TS-1.0 Site Technology Plan 2/28/2019

TN-1.2 Level 1 – Voice Data Plan – Area B 2/28/2019

TN-1.3 Level 1 – Voice Data Plan – Area C 2/28/2019

TN-1.4 Level 1- Voice Data Plan – Area D 2/28/2019

TN-1.5 Level 1 – Voice Data Plan – Area E 2/28/2019

TN-1.6 Level 1 – Voice Data Plan – Area F 2/28/2019

TN-1.7 Level 1 – Voice Data Plan – Chiller Plant 2/28/2019

TN-1.8 Voice Data Plan Mezzanine 2/28/2019

TN-4.0 Voice Data Enlarged Plans 2/28/2019

TN-5.0 Voice Data Details 2/28/2019

TN-5.1 Voice Data Details 2/28/2019

TN-5.2 Voice Data Details 2/28/2019

RFQ #19-422-Q-DR Page 8 of 47 05/13/19

Page 15: May 15, 2019 - Brevard Public Schoolseagendatoc.brevardschools.org/05-28-2019 School... · 2.2 Final Completion Date: Final completion of the Work shall be achieved by September 8,

EXHIBIT C-1

SECTION 02

CONTRACT DOCUMENTS

TN-5.3 Voice Data Details 2/28/2019

TN-5.4 Voice Data Details 2/28/2019

TN-5.5 Voice Data Details 2/28/2019

TN-5.6 Voice Data Details 2/28/2019

Type Name

RFI Pre-Bid RFI #1

RFI Pre-Bid RFI #2

Addenda Addendum 1

Addenda Addendum 2

Addenda Addendum 3

Addenda Addendum 4

Addenda Addendum 5

Modification List

Date

4/29/2019

4/29/2019

4/25/2019

4/24/2019

4/22/2019

4/26/2019

4/17/2019

RFQ #19-422-Q-DR Page 9 of 47 05/13/19

Page 16: May 15, 2019 - Brevard Public Schoolseagendatoc.brevardschools.org/05-28-2019 School... · 2.2 Final Completion Date: Final completion of the Work shall be achieved by September 8,

Division Description

TITLE PAGE

DIVISION 00 PROCUREMENT AND CONTRACTING REQUIREMENTS     

00 30 00 AVAILABLE INFORMATION (Universal Engineering Sciences Report)

05 52 33 AGREEMENT BETWEEN OWNER AND CONSTRUCTION MANAGER

00 90 10 PROJECT FORMS

DIVISION 01 GENERAL REQUIREMENTS

36535 SUMMARY OF THE WORK

36547 ALTERNATES

36556 SCHEDULES, REPORTS, PAYMENTS

40209 OWNER DIRECT PURCHASE PROGRAM

01 33 00 SHOP DRAWINGS, PRODUCT DATA AND SAMPLES

01 40 00 QUALITY CONTROL SERVICES

01 41 00 PROJECT COORDINATION

01 42 00 DEFINITIONS AND STANDARDS

01 50 00 TEMPORARY FACILITIES

01 60 00 PRODUCTS AND SUBSTITUTIONS

01 60 01 ZERO TOLERANCE HAZARDOUS MATERIALS STATEMENT

01 74 19 CONSTRUCTION WASTE MANAGEMENT

01 77 00 PROJECT CLOSEOUT

01 77 10 FLOOR CARE

DIVISION 02 EXISTING CONDITIONS – NOT USED

DIVISION 03 CONCRETE

36595 CONCRETE FORMING AND ACCESSORIES

36605 CONCRETE REINFORCING

36615 CAST-IN-PLACE CONCRETE

03 47 13 TILT-UP CONCRETE

DIVISION 04 MASONRY

36638 CONCRETE UNIT MASONRY

DIVISION 05 METALS

36658 STRUCTURAL STEEL FRAMING

36677 STEEL DECKING

05 50 00 METAL FABRICATIONS

05 52 00 GUARDRAILS AND HANDRAILS

DIVISION 06 WOOD, PLASTICS, AND COMPOSITES

06 10 13 WOOD BLOCKING, GROUNDS & FURRING

06 40 23 ARCHITECTURAL LAMINATE CASEWORK

06 65 00 RECYCLED PLASTIC LUMBER

SPECIFICATIONS

SECTION 3.1

SPECIFICATION LISTING

RFQ #19-422-Q-DR Page 10 of 47 05/13/19

Page 17: May 15, 2019 - Brevard Public Schoolseagendatoc.brevardschools.org/05-28-2019 School... · 2.2 Final Completion Date: Final completion of the Work shall be achieved by September 8,

SECTION 3.1

SPECIFICATION LISTING

DIVISION 07 THERMAL AND MOISTURE PROTECTION

07 11 13 BITUMINOUS DAMPPROOFING

07 21 00 BATT INSULATION

07 21 13 RIGID WALL INSULATION

07 23 13 FOIL FACED SEMI-RIGID WALL INSULATION

07 27 00 FIRE STOPPING

07 84 00 SPRAY-ON FIREPROOFING

07 84 10 FIRE RATED PENETRATIONS & JOINTS

07 90 00 JOINT SEALERS

DIVISION 08 OPENINGS

08 10 00 HOLLOW METAL FRAMES

08 11 00 HOLLOW METAL DOORS

08 20 00 WOOD DOORS

08 21 00 HARDBOARD FACED DOORS

08 31 00 ACCESS DOORS

08 40 90 ALUMINUM ENTRANCES AND STOREFRONTS (COASTALCOUNTIES)

08 52 10 ALUMINUM WINDOWS

08 71 00 FINISH HARDWARE

08 80 00 GLASS AND GLAZING (INTERIOR)

DIVISION 09 FINISHES

09 12 00 CEILING SUSPENSION SYSTEMS

09 12 50 INTERIOR NON-BEARING METAL FRAMING

09 24 00 LATH AND STUCCO

09 29 00 GYPSUM DRYWALL

09 29 10 INTERIOR TILE BACKER BOARD

09 30 00 CERAMIC TILE

09 40 00 SOLID SURFACE COUNTERTOPS

09 51 13 ACOUSTICAL CEILING PANELS

09 54 10 ACOUSTICAL INSULATION

09 65 00 RESILIENT FLOORING

09 68 13 CARPET TILE

09 77 11 ACOUSTICAL WALL PANELS

09 91 00 PAINTING

DIVISION 10 SPECIALTIES

10 11 00 MARKERBOARDS

10 14 00 IDENTIFYING DEVICES

10 14 10 SITE SIGNAGE

10 21 13 SOLID PLASTIC COMPARTMENTS/PARTITIONS

10 22 26 MANUAL OPERABLE PARTITION

RFQ #19-422-Q-DR Page 11 of 47 05/13/19

Page 18: May 15, 2019 - Brevard Public Schoolseagendatoc.brevardschools.org/05-28-2019 School... · 2.2 Final Completion Date: Final completion of the Work shall be achieved by September 8,

SECTION 3.1

SPECIFICATION LISTING

10 26 13 HIGH IMPACT CORNER GUARDS

10 28 00 TOILET AND BATH ACCESSORIES

10 44 00 FIRE EXTINGUISHERS & CABINETS

10 51 13 METAL LOCKERS

10 67 00 SHELVING

10 75 00 FLAGPOLE(S)

DIVISION 11 EQUIPMENT

11 40 30 FOOD SERVICE EQUIPMENT

11 52 13 MANUAL PROJECTION SCREENS

11 52 14 MOTORIZED PROJECTION SCREENS

11 61 43 ACOUSTICAL CURTAINS AND TRACK

DIVISION 12 FURNISHINGS

12 93 13 BICYCLE RACKS

DIVISION 13 SPECIAL CONSTRUCTION

13 34 19 PRE-ENGINEERED METAL BUILDING SYSTEM

DIVISION 14 CONVEYING EQUIPMENT – NOT USED

DIVISION 21 FIRE SUPPRESSION

42876 SLEEVES AND SLEEVE SEALS FOR FIRE-SUPPRESSION PIPING

43241 ESCUTCHEONS FOR FIRE-SUPPRESSION PIPING

45067 GENERAL-DUTY VALVES FOR FIRE PROTECTION PIPING

47259 HANGERS & SUPPORTS FOR FIRE SUPRESSION PIPING & EQUIP.

56025 IDENTIFICATION FOR FIRE-SUPPRESSION PIPING & EQUIPMENT

21 13 13 WET-PIPE SPRINKLER SYSTEMS

DIVISION 22 PLUMBING

22 05 17 SLEEVES AND SLEEVE SEALS FOR PLUMBING PIPING

22 05 18 ESCUTCHEONS FOR PLUMBING PIPING

22 05 19 METERS AND GAGES FOR PLUMBING PIPING

22 05 23.12 BALL VALVES FOR PLUMBING PIPING

22 05 29 HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIP.

22 05 53 IDENTIFICATION FOR PLUMBING PIPING AND EQUIPMENT

22 11 16 DOMESTIC WATER PIPING

22 11 19 DOMESTIC WATER PIPING SPECIALTIES

22 13 16 SANITARY WASTE AND VENT PIPING

22 13 19 SANITARY WASTE PIPING SPECIALTIES

22 33 00 ELECTRIC, DOMESTIC-WATER HEATERS

22 34 00 FUEL-FIRED, DOMESTIC-WATER HEATERS

RFQ #19-422-Q-DR Page 12 of 47 05/13/19

Page 19: May 15, 2019 - Brevard Public Schoolseagendatoc.brevardschools.org/05-28-2019 School... · 2.2 Final Completion Date: Final completion of the Work shall be achieved by September 8,

SECTION 3.1

SPECIFICATION LISTING

DIVISION 23 HEATING, VENTILATING & AIR CONDITIONING (HVAC)

23 05 19 METERS AND GAGES FOR HVAC PIPING

23 05 23.12 BALL VALVES FOR HVAC PIPING

23 05 23.13 BUTTERFLY VALVES FOR HVAC PIPING

23 05 23.14 CHECK VALVES FOR HVAC PIPING

23 05 23.15 GATE VALVES FOR HVAC PIPING

23 05 29 HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT

23 05 48.13 VIBRATION CONTROLS FOR HVAC

23 05 53 IDENTIFICATION FOR HVAC PIPING AND EQUIPMENT

23 05 93 TESTING, ADJUSTING AND BALANCING FOR HVAC

23 07 13 DUCT INSULATION

23 07 19 HVAC PIPING INSULATION

23 08 00 COMMISSIONING OF HVAC

23 09 23 INSTRUMENTATION AND CONTROL FOR HVAC

23 09 23.11 CONTROL VALVES

23 09 23.12 CONTROL DAMPERS

23 09 23.14 FLOW INSTRUMENTS

23 11 23 FACILITY NATURAL-GAS PIPING

23 21 13 HYDRONIC PIPING

23 21 16 HYDRONIC PIPING SPECIALTIES

23 21 23 HYDRONIC PUMPS

23 23 00 REFRIGERANT PIPING

23 25 13 WATER TREATMENT FOR CLOSED-LOOP HYDRONIC SYSTEMS

23 25 16 WATER TREATMENT FOR OPEN-LOOP HYDRONIC SYSTEMS

23 31 13 METAL DUCTS

23 33 00 AIR DUCT ACCESSORIES

23 33 46 FLEXIBLE DUCTS

23 34 16 CENTRIFUGAL HVAC FANS

23 36 00 AIR TERMINAL UNITS

23 37 13.13 AIR DIFFUSERS

23 37 13.23 REGISTERS AND GRILLES

23 37 23 HVAC GRAVITY VENTILATORS

23 38 13 COMMERCIAL-KITCHEN HOODS

23 64 23.16 WATER-COOLED, SCROLL WATER CHILLERS

23 65 14.13 COOLING TOWERS

23 73 13.13 INDOOR, BASIC AIR-HANDLING UNITS

23 81 26 SPLIT-SYSTEM AIR-CONDITIONERS

23 82 19 FAN COIL UNITS

RFQ #19-422-Q-DR Page 13 of 47 05/13/19

Page 20: May 15, 2019 - Brevard Public Schoolseagendatoc.brevardschools.org/05-28-2019 School... · 2.2 Final Completion Date: Final completion of the Work shall be achieved by September 8,

SECTION 3.1

SPECIFICATION LISTING

DIVISION 26   ELECTRICAL

26 00 10 BASIC ELECTRICAL REQUIREMENTS

26 05 19 LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES

26 05 23 CONTROL-VOLTAGE ELECTRICAL POWER CABLES

26 05 26 GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS

26 05 29 HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS

26 05 33 RACEWAYS AND BOXES FOR ELECTRICAL SYSTEMS

26 05 44 SLEEVES&SLEEVESEALSFORELECTRICALRACEWAYS&CABLING

26 05 53 IDENTIFICATION FOR ELECTRICAL SYSTEMS

26 05 73 OVERCURRENT PROTECTIVE DEVICE COORDINATION STUDY

26 05 74 OVERCURRENT PROTECTIVE DEVICE ARC-FLASH STUDY

26 08 00 COMMISSIONING OF ELECTRICAL

26 09 23 LIGHTING CONTROL DEVICES

26 22 00 LOW-VOLTAGE TRANSFORMERS

26 24 13 SWITCHBOARDS

26 24 16 PANELBOARDS

26 27 26 WIRING DEVICES

26 28 13 FUSES

26 28 16 ENCLOSED SWITCHES AND CIRCUIT BREAKERS

26 29 13.03 MANUAL AND MAGNETIC MOTOR CONTROLLERS

26 29 23 VARIABLE-FREQUENCY MOTOR CONTROLLERS

26 32 13 ENGINE GENERATORS

26 36 00 TRANFER SWITCHES

26 41 13 LIGHTNING PROTECTION FOR STRUCTURES

26 43 13 SURGEPROTECTIONFORLOW-VOLTAGEELECTRICALPOWERCIRCUITS

26 51 00 INTERIOR LIGHTING

26 56 13 LIGHTING POLES AND STANDARDS

26 56 19 LED EXTERIOR LIGHTING

DIVISION 27 COMMUNICATIONS

27 05 26 GROUNDING AND BONDING FOR COMMUNICATIONS SYSTEMS

27 05 28 PATHWAYS FOR COMMUNICATIONS SYSTEMS

27 05 29 HANGERS AND SUPPORTS FOR COMMUNICATIONS SYSTEMS

27 05 36 CABLE TRAYS FOR COMMUNICATIONS SYSTEMS

27 05 44 SLEEVES&SLEEVESEALSFORCOMMUNICATIONSPATHWAYS&CABLING

27 05 53 IDENTIFICATION FOR COMMUNICATIONS SYSTEMS

27 11 00 COMMUNICATIONS EQUIPMENT ROOM FITTINGS

27 11 16 COMMUNICATIONS RACKS, FRAMES AND ENCLOSURES

27 13 13 COMMUNICATIONS COPPER BACKBONE CABLING

27 13 23 COMMUNICATIONS OPTICAL FIBER BACKBONE CABLING

RFQ #19-422-Q-DR Page 14 of 47 05/13/19

Page 21: May 15, 2019 - Brevard Public Schoolseagendatoc.brevardschools.org/05-28-2019 School... · 2.2 Final Completion Date: Final completion of the Work shall be achieved by September 8,

SECTION 3.1

SPECIFICATION LISTING

27 15 13 COMMUNICATIONS COPPER HORIZONTAL CABLING

27 51 23.50 EDUCATIONAL INTERCOMMUNICATIONS & PROGRAM SYSTEMS

27 53 19 DISTRIBUTED ANTENNA INFRASTRUCTURE

DIVISION 28 ELECTRONIC SAFETY AND SECURITY

28 15 00 ACCESS CONTROL HARDWARE DEVICES

28 20 00 VIDEO SURVEILLANCE

28 46 21.11 ADDRESSABLE FIRE-ALARM SYSTEMS

DIVISION 31   EARTHWORK

36830 SITE CLEARING

31 20 00 EARTH MOVING

31 23 20 DEWATERING

31 25 00 EROSION AND SEDIMENT CONTROL

31 31 16 TERMITE CONTROL

31 63 16 AUGER CAST GROUT PILES

DIVISION 32 EXTERIOR IMPROVEMENTS

48564 ASPHALT PAVING

32 13 13 CONCRETE PAVING

32 31 13 CHAIN LINK FENCES AND GATES

DIVISION 33   UTILITIES

33 10 00 WATER UTILITIES

33 30 00 SANITARY SEWERAGE UTILITIES

33 41 00 STORM UTILITY DRAINAGE PIPING

RFQ #19-422-Q-DR Page 15 of 47 05/13/19

Page 22: May 15, 2019 - Brevard Public Schoolseagendatoc.brevardschools.org/05-28-2019 School... · 2.2 Final Completion Date: Final completion of the Work shall be achieved by September 8,

1

SECTION 03

Description of Work

3.2 Qualifications and Assumptions

The following is a summary of Qualifications and Assumptions:

1. The cost of staff identified in the General Conditions not stationed on site, but working exclusively on the project, shall be reimbursed by the SBBC as shown in the attached General Conditions exhibit.

2. The cost of suitable import fill dirt material available on the adjacent property and calculated into this GMP proposal is $4.50 per cubic yard.

3. If any additional fill dirt materials are required and not immediately available at the cost of $4.50 per cubic yard, then additional costs per cubic yard will be required and paid by the Owner.

4. The GMP Proposal includes $46,730 for independent material testing and inspections.

5. The GMP Proposal includes $26,250 for Engineer’s threshold inspections & testing.

6. The GMP Proposal only includes provisions for independent material testing and threshold Inspections. Any other testing or inspections are not included within the GMP Budget.

RFQ #19-422-Q-DR Page 16 of 47 05/13/19

Page 23: May 15, 2019 - Brevard Public Schoolseagendatoc.brevardschools.org/05-28-2019 School... · 2.2 Final Completion Date: Final completion of the Work shall be achieved by September 8,

1

SECTION 03

Description of Work

3.3 Exclusions

The following is a listing of Exclusions;

1. The GMP excludes any FF&E, including but not limited to, Furniture, Kiln, Technology, Flat Panel Teaching Displays, Televisions, Phones, Computers, and DVD/VCR Players.

2. The GMP excludes any emergency generator, automatic transfer switches and fuel tanks.

3. The GMP excludes any and all liquid propane tanks and Stage 1 gas regulators.

4. The GMP excludes any temporary utilities or infrastructure if TVC has not completed their work on time and provide availability when required to service project requirements.

5. The GMP excludes removal of unsuitable soils or other unknown hazardous conditions.

6. Removal of “casual water” (normal rainwater) is included in the GMP, however, mass site dewatering, well pointing, mud pumping and subterranean drilling of any type is not included.

7. The GMP excludes 3rd Party Commissioning of any type (note: the GMP does include Threshold Inspections).

8. The GMP excludes any provisions for wall covering or wall paper.

9. The GMP excludes any provisions for an irrigation system.

10. The GMP excludes the cost of Permitting, Permit Expediting and Impact fees.

11. The GMP excludes the cost of any start-up chemicals.

12. The GMP excludes the cost of any start-up electric consumption charges.

RFQ #19-422-Q-DR Page 17 of 47 05/13/19

Page 24: May 15, 2019 - Brevard Public Schoolseagendatoc.brevardschools.org/05-28-2019 School... · 2.2 Final Completion Date: Final completion of the Work shall be achieved by September 8,

1

SECTION 03

Description of Work

3.4 Value Engineering Recommendations

Final Design Documents include value management ideas discussed by the project team and School Board of Brevard County during the design development process. These value management items have been incorporated into the Guaranteed Maximum Price Proposal through the inclusion of the current contract documents as listed in the Exhibit C-1 Section 02 List of Contract Documents and Section 3.1 Specifications Listing.

RFQ #19-422-Q-DR Page 18 of 47 05/13/19

Page 25: May 15, 2019 - Brevard Public Schoolseagendatoc.brevardschools.org/05-28-2019 School... · 2.2 Final Completion Date: Final completion of the Work shall be achieved by September 8,

1

SECTION 03

Description of Work

3.5 Allowance Schedule

1. Evacuation Gate Entrance Allowance ........................................................... $10,000.

2. Play Court Surfacing Allowance ...................................................................... $4,872.

3. Monument Sign Allowance ($25,000 Signage/$25,000 Electrical/Data) ........ $50,000.

4. Flagpole Allowance…………………………………………………………………..$4,412.

5. Audio Visual Equipment Allowance ................................................................. $6,000.

6. Athletic Equipment Allowance………………………………………………………$3,600.

7. Playground Surfacing & Equipment Allowance ............................................. $87,574.

8. Primary Electric Power Allowance ................................................................. $25,000.

9. Lightning Protection Allowance……………………………………………………$15,000.

10. Access Control Systems Allowance .............................................................. $50,000.

RFQ #19-422-Q-DR Page 19 of 47 05/13/19

Page 26: May 15, 2019 - Brevard Public Schoolseagendatoc.brevardschools.org/05-28-2019 School... · 2.2 Final Completion Date: Final completion of the Work shall be achieved by September 8,

1

SECTION 03

Description of Work

3.6 Add Alternates Schedule

The following is a summary of Add Alternates which have been incorporated into the GMP Estimate:

1. Provide add alternate for the Covered Play canopy and the restrooms, office, storage and electrical rooms. 2. Provide add alternate for black vinyl coated fencing in lieu of the aluminized coated fencing. 3. Provide deduct for VCT with vinyl base in all locations that are indicated to be porcelain tile floor with porcelain tile base. 4. Provide add alternate for acoustical wall treatments (AWT) within Multi-Purpose / Dining – 200 and Hall – 205. 5. Provide add alternate for the water cooled chillers to have low delivery water temperature option. 6. Provide a ground rod based lightning protection system for the entire facility. See Section 3.5 Allowance Schedule, Item 9. 7. Provide electronic controlled LED school marquis sign with message board. See Section 3.5 Allowance Schedule, Item 3. 8. Provide add for conduits for future connections associated with covered play building.

RFQ #19-422-Q-DR Page 20 of 47 05/13/19

Page 27: May 15, 2019 - Brevard Public Schoolseagendatoc.brevardschools.org/05-28-2019 School... · 2.2 Final Completion Date: Final completion of the Work shall be achieved by September 8,

1

SECTION 03

Description of Work

3.7 ODP Schedule

The Owner Direct Purchase (ODP) Values for this project will be determined ASAP and submitted following the GMP approval. Please see below for the estimated amounts; Estimated Owner Direct Purchases (ODP) $3,800,000.00 Estimated Sales & Sur Tax $228,750.00 Total Estimated Owner Direct Purchases (ODP) with Taxes $4,028,750.00

RFQ #19-422-Q-DR Page 21 of 47 05/13/19

Page 28: May 15, 2019 - Brevard Public Schoolseagendatoc.brevardschools.org/05-28-2019 School... · 2.2 Final Completion Date: Final completion of the Work shall be achieved by September 8,

1

SECTION 04

GMP Cost Summary

SEE ATTACHED

RFQ #19-422-Q-DR Page 22 of 47 05/13/19

Page 29: May 15, 2019 - Brevard Public Schoolseagendatoc.brevardschools.org/05-28-2019 School... · 2.2 Final Completion Date: Final completion of the Work shall be achieved by September 8,

WHARTON-SMITH CONSTRUCTION GROUP

GMP Estimate

New Viera ES

DIVISION

LINE DESCRIPTION TOTAL

1 Site Earthwork, Utilities & Paving 3,170,493

2 Landscaping 202,247

3 Fencing & gates 78,053

4 Concrete & Masonry 1,711,986

5 Architectural Laminate Casework 451,437

6 Damproofing & Sealants 54,200

7 Spray Applied Fireproofing 13,500

8 Doors, Frames & Hardware 550,178

9 Glass & Glazing 729,821

10 Drywall & Stucco 1,919,086

11 Acoustical Ceilings & Wall Panels 439,977

12 Resilient tile & carpet 383,815

13 Painting 264,570

14 Visual Display & Marker Boards 71,583

15 Identifying Devices 68,832

16 Toilet Partitions & Accessories 115,520

17 Fire Extinguishers & Cabinets 6,870

18 Lockers & Metal Storage Shelving 2,390

19 Flagpoles (Allowance) 4,412

20 Food Service Equipment 281,721

21 Audio Visual Equipment (Allowance) 6,000

22 Stage Curtains 6,858

23 Athletic Equipment (Allowance) 3,600

24 Pre-Engineered Metal Building 2,983,806

25 Horizontal Louver Blinds 10,202

26 Bicycle Storage Racks 8,860

27 Playground Surfacing & Equipment (Allowance) 87,574

28 Fire Protection 206,345

29 Plumbing 1,160,760

30 HVAC 2,424,870

31 Test & Balance 29,780

32 Electrical 2,952,600

33 Total Direct Cost 20,401,946

34 General Conditions 1,116,527

35 General Liability Insurance 68,890

36 Builders Risk 22,734

37 Bond 129,225

38 Total Adjusted Cost 21,739,322

39 CM Fee 923,921

40 Contingency 300,000

41 Total Construction Cost 22,963,243

RFQ #19-422-Q-DR Page 23 of 47 05/13/19

Page 30: May 15, 2019 - Brevard Public Schoolseagendatoc.brevardschools.org/05-28-2019 School... · 2.2 Final Completion Date: Final completion of the Work shall be achieved by September 8,

WHARTON-SMITH CONSTRUCTION GROUP

GMP Estimate

New Viera ES

LINE DESCRIPTION QTY UNIT TOTALS

42 Site Earthwork, Utilities & Paving

43

44

45

46 Survey & control

47 Layout 802,383 sf 80,238

48 Certified as-builts 802,383 sf 24,553

49 Erosion Control

50 Type III silt fence 4,946 lf 4,946

51 Inlet protection 40 ea 8,800

52 Maintain thru duration of project 11 mo 2,200

53 Soil Track Prev device @ 2 locations 68 sy 812

54 Dust control for 2/3 time 26 wk 9,152

55 Earthwork & Grading

56 Strip site 6" 20,060 cy 50,149

57 Reuse stripping @ 80% 16,048 cy 36,107

58 Export excess stripping 4,012 cy 32,095

59 Cut 2,134 cy 5,335

60 Fill 63,202 cy 158,005

61 Import fill (Fill provided by TVC @ 4.5/CY and left near site) 49,867 cy 224,403

62 Compact building pad 14,480 cy 21,720

63 Compact sidewalk & walkways 3,171 sy 4,757

64 Rough grade 89,154 sy 66,865

65 Fine grade 66,865 sy 100,298

66 Storm system

67 6" Downspout Stub and Cap 40 ea 4,400

68 WYE 6" FOR DOWNSPOUT 1,265 lf 18,089

69 4" PERFORATED 402 lf 10,062

70 12" PVC 922 lf 23,969

71 15" PVC 366 lf 10,253

72 6" RCP 143 lf 2,868

73 8" RCP 500 lf 12,093

74 12" RCP 213 lf 5,851

75 15" RCP 140 lf 4,912

76 18" RCP 885 lf 43,811

77 24" RCP 996 lf 65,731

78 30" RCP 373 lf 30,773

79 36" RCP 80 lf 8,184

80 12" x 15" INCREASER 1 ea 550

81 CO's 14 ea 9,240

82 Connect to existing pipe 2 ea 2,000

83 FES (flared end section) 6 ea 18,000

84 TYPE D INLET 6 ea 22,800

85 TYPE C INLET 10 ea 35,000

86 CURB INLET GRATE 9 ea 49,500

87 MANHOLE 3 ea 22,500

88 CONTROL STRUCTURE CS-1-D (MODIFIED TYPE D CATCH BASIN) 1 ea 3,500

89 18" X 18" YARD DRAIN 10 ea 32,000

RFQ #19-422-Q-DR Page 24 of 47 05/13/19

Page 31: May 15, 2019 - Brevard Public Schoolseagendatoc.brevardschools.org/05-28-2019 School... · 2.2 Final Completion Date: Final completion of the Work shall be achieved by September 8,

90 Trench Drain @ play courts 121 lf 11,495

91 Testing 5,734 lf 11,468

92 Dewatering - Installation 5,734 lf 29,535

93 Dewatering - Fuel & Maintain 57 dy 8,601

94 Potable Water

95 Water main 12" 1,260 lf 27,721

96 Water main 10" 385 lf 7,622

97 Water main 6" 361 lf 4,765

98 Water main 4" 163 lf 1,613

99 16" X 12" TAPPING SADDLE W/ GV 1 ea 3,500

100 2" METER 1 ea 1,000

101 2" RPBFP 1 ea 2,500

102 6" X 4" REDUCER 1 ea 500

103 8" GV 1 ea 1,500

104 8" STUB W/ BLIND FLANGE 1 ea 2,500

105 10" X 4" TEE 1 ea 500

106 12" 45° BEND 1 ea 750

107 12" GV 1 ea 2,000

108 12" X 8" TEE 1 ea 1,000

109 4" 90° BEND 1 ea 500

110 Testing 1,328 lf 2,656

111 Dewatering - Installation 2,169 lf 13,013

112 Dewatering - Fuel & Maintain 22 dy 3,470

113 Fire

114 PVC fire line 8" 352 lf 6,977

115 PVC fire line 6" 111 lf 1,827

116 FDC 1 ea 2,800

117 FH assembly 3 ea 10,800

118 6" 45° BEND 2 ea 1,000

119 6" 90° BEND 2 ea 1,000

120 6" DDCA 1 ea 10,000

121 6" GV 5 ea 7,500

122 6" PLUG 1 ea 2,500

123 6" TEE 2 ea 1,500

124 8" 45° BEND 1 ea 600

125 8" X 6" REDUCER 1 ea 750

126 8" X 6" TEE 2 ea 1,500

127 12" X 6" TEE 1 ea 1,000

128 12" X 10" REDUCER 1 ea 1,000

129 Testing 463 lf 926

130 Dewatering - Installation 463 lf 2,779

131 Dewatering - Fuel & Maintain 5 dy 741

132 Gravity Sewer Main

133 8" PVC C-900 227 lf 16,996

134 8" PVC 737 lf 35,390

135 6" PVC 310 lf 9,299

136 4" PVC 109 lf 2,727

137 Sanitary Manhole 4 ea 20,000

138 Cleanout 6" 1 ea 600

139 8" Cap for future use 1 ea 1,500

140 Testing 1,022 lf 2,045

141 Dewatering - Installation 914 lf 5,482

142 Dewatering - Fuel & Maintain 9 dy 1,462

143 Force Sewer Main

144 FORCE MAIN 6" 740 lf 37,000

RFQ #19-422-Q-DR Page 25 of 47 05/13/19

Page 32: May 15, 2019 - Brevard Public Schoolseagendatoc.brevardschools.org/05-28-2019 School... · 2.2 Final Completion Date: Final completion of the Work shall be achieved by September 8,

145 PUMP STATION 1 1 ea 240,000

146 12" X 6" TAPPING SADDLE W/ GV 1 ea 3,000

147 Testing 740 lf 1,480

148 Dewatering - Installation 740 lf 4,440

149 Dewatering - Fuel & Maintain 7 dy 1,184

150 Temporary Stabilized roadways for construction

151 6" crushed concrete for crane road 16,644 sy 149,800

152 Maintain 8 mo 6,400

153 Paving

154 HD Pavement @ Bus loop & asocc. parking 13,832 sy 525,614

155 LD Pavement @ Parent loop & service yard 12,745 sy 407,855

156 Pavement Markings

157 4" solid white stripe 6,800 lf 2,720

158 6" solid white stripe 1,056 lf 422

159 B06 18" chevrons 0 lf 0

160 24" stop bar - thermoplastic 77 lf 1,538

161 B08 directional arrow 31 ea 2,945

162 12" crosswalk, painted onsite - thermoplastic 302 lf 4,530

163 ADA parking symbol & sign 9 ea 2,205

164 Letters - No parking fire lane 17 ea 1,615

165 Traffic signage 17 ea 1,785

166 12" crosswalk, painted off-site - thermoplastic 75 lf 1,125

167 Site concrete

168 Modified Type F Curb 12,387 lf 222,957

169 Type A curb 258 lf 4,127

170 Wheel stops 6 ea 210

171 Bike Rack (Moved to Division 10) 8 ea

172 Approved Alternates ea

173 Alt #4. PEMB Covered Play Area Civil Work 1 ls 28,300

174 ea

175 ea

176 0

177 Bond 3,206,685 $ 64,134

178 Adjusted total 1 LS (100,326)

179 0

180 0

181 0

182 Subtotal - Site Earthwork, Utilities & Paving 3,170,493

RFQ #19-422-Q-DR Page 26 of 47 05/13/19

Page 33: May 15, 2019 - Brevard Public Schoolseagendatoc.brevardschools.org/05-28-2019 School... · 2.2 Final Completion Date: Final completion of the Work shall be achieved by September 8,

183 Landscaping

184

185

186 Trees 98 ea 58,800

187 Shrubs 1,042 ea 17,714

188 Groundcover 347 sf 2,429

189 Bahia sod 421,673 sf 126,502

190 Mulch 4" deep 170 cy 6,800

191 Soils Testing for Fertilizer 1 ls 1,500

192 Soil amendments 347,057 sf 3,471

193 Irrigation 0 0

194 Irrigated area 0 sf 0

195 Sleeves 0 lf 0

196 Maintenance 8 trips 8,000

197 0

198 0

199 Bond 225,215 $ 4,504

200 Adjusted total 1 LS (27,473)

201 0

202 0

203 0

204 Subtotal - Landscaping 202,247

205 Fencing & gates

206

207

208 6' high galv chain link fence (TVC to pay upcharge) 2,342 lf 42,156

209 6' high galv chain link fence @ propane tank 60 ea 1,080

210 6' high galv chain link fence @ chiller yard 20 ea 360

211 4' high galv chain link fence @ playground 250 ea 3,750

212 20' wide, dble swing, CL gate 1 ea 2,000

213 12' wide, dble swing, CL gate 1 ea 1,200

214 6' wide, dble swing, CL gate 3 ea 1,800

215 4' wide, dble swing, CL gate 1 ea 400

216#1 Typical Security Gate Allowance - (2) 48" wide x 6' tall.

(Allowance) 1 ls 10,000

217 Chiller Yard 10' Dbl Gate 2 ea 2,400

218 Dumpster Gates 12'-4" Dbl 2 ea 4,800

219 Approved Alternates ea

220 Alt # C-1. Black Coating Added to aluminized fencing 1 ls 17,260

221 ea

222 ea

223 0

224 0

225 0

226 Bond 87,206 $ 1,744

227 Adjusted total 1 LS (10,897)

228 0

229 0

230 0

231 Subtotal - Fencing & gates 78,053

RFQ #19-422-Q-DR Page 27 of 47 05/13/19

Page 34: May 15, 2019 - Brevard Public Schoolseagendatoc.brevardschools.org/05-28-2019 School... · 2.2 Final Completion Date: Final completion of the Work shall be achieved by September 8,

232 Concrete & Masonry

233

234 Concrete

235 MAIN BUILDING 0

236 Building Foundation Pads 0

237 F3 - 3'-0" x 3'-0" x 1'-0" 7 ea 1,982

238 F4 - 4'-0" x 4'-0" x 1'-4" 12 ea 5,943

239 F4.5 - 4'-6" x 4'-6" x 1'-6" 12 ea 8,108

240 F5 - 5'-0" x 5'-0" x 1'-6" 36 ea 29,210

241 F6 - 6'-0" x 6'-0" x 1'-6" 12 ea 14,534

242 F7 - 6'-0" x 6'-0" x 1'-8" 2 ea 3,321

243 F8.4 - 8'-0" x 4'-0" x 1'-6" 2 ea 2,127

244 F9 - 9'-0" x 9'-0" x 2'-0" 4 ea 11,917

245 F10 - 10'-0" x 10'-0" x 2'-0" 22 ea 78,974

246 F11 - 11'-0" x 11'-0" x 2'-0" 4 ea 17,489

247 F12 - 12'-0" x 12'-0" x 2'-0" 2 ea 10,191

248 Continuous Footers

249 WFST 1'-6"x Cont. 1'-0" at Stage 208 lf 9,035

250 Slabs

251 4" Slab On grade on 15mil VB W/6x6-W2.9 x w2.9 wwf 113,606 sf 550,048

252 4" Elevated Stage Slab 1,480 sf 10,279

253 Courtyard and Entry Slabs 9,268 sf 46,340

254 Second floor, 3 1/2", normal weight, reinforced Mezzanine 4,841 sf 33,781

255 Covered Play Area (Add Alternate)

256 MFX.X - 8'-0" x 8'-0" x 3'-3" @ covered play canopy Pads 10 ea 0

257 Chiller Plant Building

258 WF2.0 - 2'-0" x Cont x 1'-0" 84 lf 4,343

259 WF3 - 3'-0" x Cont x 1'-0" 144 lf 15,690

260 WF4 - 4'-0" x Cont x 1'-0" 73 lf 9,840

261 Tie beams x 16" (Rake, room separation and tie-beams ) 367 lf 20,837

262 5" Slab On grade on 15mil VB W/6x6-W2.9 x w2.9 wwf 3,028 lf 15,140

263 TS1.33 Interior Mono Ftg. 64 lf 4,025

264 Dumpster & Compactor Enclosure

265 WF6 - 6'-0" x Cont x 1'-4" 208 lf 208

266 5" Slab On grade on 15mil VB W/6x6-W2.9 x w2.9 wwf 620 sf 3,100

267 Miscellaneous Concrete

268 Stage/ramp/stairs 178 sf 24,823

269 Mechanical pads 8" 180 sf 1,620

270 Mechanical pads 4" 806 sf 7,250

271 Termite treatment 122,538 sf 24,508

272 Slab thickened edge @ stage 210 lf 8,564

273 Stair nosing install (furnished by others) 146 lf 491

274 Concrete pan filled stairs 146 sf 1,095

275 Concrete Filled Landings 2 sf 650

276 Site Concrete Paving

277 4" Sidewalks 21,494 sf 112,844

278 Off-site 4" Sidewalks 7,045 sf 36,986

279 ADA ramps 377 sf 1,979

280 Bicycle enclosure SOG 2,582 sf 12,910

281 School Sign Footing 10 lf 50

282 Lift Pump Concrete Cap & Driveway 925 sf 6,475

283 Basketball goal installation 2 ea 300

284 Bollard installation 9 ea 4,500

285 Propane Tank Slab 1 ea 1,500

RFQ #19-422-Q-DR Page 28 of 47 05/13/19

Page 35: May 15, 2019 - Brevard Public Schoolseagendatoc.brevardschools.org/05-28-2019 School... · 2.2 Final Completion Date: Final completion of the Work shall be achieved by September 8,

286 Building Tilt-Wall Panels, Including Embeds, Erection, Bracing, etc.

287 Casting slabs and removal sf 0

288 Panels, 5 1/2" (Net Area Measured) 30,871 sf 432,187

289 Embeds (panel-panel, panel-foundation) 30,871 sf 3,087

290 Grout @ panel base 71 cf 3,557

291 Grout @ panel side 233 cf 11,650

292 Layout 0

293 Fine grading 0

294 Excavate & Backfill 0

295 Install H/M frames in tiltwalls (supply by others) 0

296 Masonry

297 Main Campus

298 Stage Stemwall 2 block height 279 sf 3,910

299 Interior Doorways to 10'-8" height 650 sf 9,100

300 Column Wrap w/Downspouts 373 sf 5,221

301 Central Energy Plant 0 0

302 14' CMU With 1'-4" TB finishing height @ 15'-4" 1,013 sf 14,177

303 11'-4" AVG with 1'-4" Rake Beam 1,405 sf 19,669

304 10'-0" CMU plus 1'-4" TB 263 sf 3,682

305 9'-0" CMU with BB at Dumpster 915 sf 12,814

306 9'-0" CMU with BB at Cooling Tower 605 sf 8,467

307 8'-8" CMU with 1'-4" TB finishing height 10'-0" 1,254 sf 17,558

308 Approved Alternates ea

309 Alt #4. PEMB Covered Play Area Concrete Work 1 ls 56,170

310 Alt #4. PEMB Covered Play Area Masonry Work 1 ls 24,375

311 ea

312 0

313 Bond 1,778,631 $ 35,573

314 Adjusted total 1 LS (102,217)

315

316

317

318 Subtotal - Concrete & Masonry 1,711,986

319 Architectural Laminate Casework

320

321

322 Base Cabinets 2,366 lf 473,200

323 Wall Cabinets 1,340 lf 234,500

324 Cubie Cabinet 336 lf 84,000

325 Counter Tops 2,693 sf 201,975

326 Upper level Counter12" Wide 43 lf 5,375

327 Tall storage cabinet (36x24x72) Solid Door 112 ea 61,600

328 Tall storage cabinet (36x24x72) Open 1/2 56 ea 25,200

329 Tall storage cabinet (36x24x72) Open 1/2 @ Music 1 ea 450

330 Tall storage cabinet (60x24x72) Solid Door @ Resource 3 ea 2,250

331 0 0

332 Bond 1,088,550 $ 0

333 Adjusted total 1 LS (637,113)

334 0

335 0

336 0

337 Subtotal - Architectural Laminate Casework 451,437

RFQ #19-422-Q-DR Page 29 of 47 05/13/19

Page 36: May 15, 2019 - Brevard Public Schoolseagendatoc.brevardschools.org/05-28-2019 School... · 2.2 Final Completion Date: Final completion of the Work shall be achieved by September 8,

338 Damproofing & Sealants

339

340

341

342 Ext wall joint Backer Rod and Caulking

343 CMU 15 ft 165 sf 371

344 SOG control joints 9,932 lf 19,865

345 Floor expansion joints 3,135 lf 6,270

346 Tilt Wall & CMU Bituminous Coating 1 ls 28,000

347 Sidewalk to building 741 lf 1,112

348 Sidewalk expansion joints 250 lf 375

349

350 Bond 55,993 $ 0

351 Adjusted total 1 LS (1,793)

352 0

353 0

354 0

355 Subtotal - Damproofing & Sealants 54,200

356 Spray Applied Fireproofing

357

358 Spray Applied Fireproofing

359 Columns/beams/joists at Mezzanine 3,028 sf 13,626

360 Protect vented deck/clean floors 4,000 sf 3,000

362

363 Bond 16,626 $ 333

364 Adjusted total 1 LS (3,459)

366 0

367 0

368 Subtotal - Spray Applied Fireproofing 13,500

369 Doors, Frames & Hardware

370

371 EXTERIOR

372 Hollow Metal

373 4070 G90 Type H1 1 ea 300

374 3070 G90 Type H4 1 pr 600

375 3070 G90 Type H5 60 Minute Fire Rated 1 pr 325

376 3070 G90 Type 6 6 pr 2,100

377 4070 G90 HM Frame 1 ea 150

378 6070 G90 HM Frame 7 ea 2,100

379 6070 G90 HM Frame 60 minute Fire Rated 1 ea 300

380 INTERIOR

381 3070 A60 Type H1 HM 12 ea 3,600

382 3070 A60 Type H5 7 pr 2,100

383 3070 A60 HM Frames 12 ea 1,800

384 6070 A60 HM Frames 7 ea 2,100

385 3070 A60 HM Frames 140 ea 21,000

386 3070 60 Minute Fire Rated HM Frames 56 ea 8,400

387 3070 20 Minute Fire Rated HM Frames 58 ea 8,700

388 6070 60 Minute Fire Rated HM Frames 10 ea 3,000

389 6870 60 Minute Fire Rated HM Frames 5 ea 1,625

390 6070 20 Minute Fire Rated HM Frames 1 ea 325

391 WOOD DOORS

392 3070 Flush Type M1- Paint Grade Hardboard 131 ea 45,850

393 3070 Flush with UL 60 Minute 6 ea 2,100

394 3070 flush with DLO Type M2 1 ea 350

RFQ #19-422-Q-DR Page 30 of 47 05/13/19

Page 37: May 15, 2019 - Brevard Public Schoolseagendatoc.brevardschools.org/05-28-2019 School... · 2.2 Final Completion Date: Final completion of the Work shall be achieved by September 8,

395 ROTARY CUT BIRCH TRANSPARENT

396 3070 Flush Type W1 60 Minute 11 ea 4,400

397 3070 Flush Type 20 Minute 6 ea 2,400

398 3070 Flush 6 ea 2,400

399 3070 flush with DLO Type W2 2 ea 800

400 3070 flush with DLO UL 20 Minute 52 ea 20,800

401 3070 flush with DLO UL 60 Minute 39 ea 15,600

402 3070/3070 UL 60 Minute Type W5 1 pr 400

403 3070/3070 UL 60 Minute Type W6 9 pr 3,600

404 3470/3470 UL 60 Minute 5 pr 2,000

405 3070/3070 UL 20 Minute 1 pr 400

406 Door Covers and Protection 1 ls 4,500

407 Hollow Metal Interior Windows 56 ea 28,000

408 Hardware 298 ea 149,000

409 Installation Doors and Hardware 1 ls 95,000

410 Approved Alternates ea

411 Alt #4. PEMB Covered Play Area Doors & Hardware 1 ls 9,000

412 0

413 Bond 445,125 $ 8,903

414 Adjusted total 1 LS 96,150

416 0

417 Subtotal - Doors, Frames & Hardware 550,178

418 Glass & Glazing

419

420

421 Door Glazing 0 0

422 View Lite (2'8" x 0'3") - based on 80% 138 sf 8,280

423 Glazing @ Exterior HM Storefront 0 0

424 Window Type A 12'-0 x 5'-6" 3,168 sf 269,280

425 Window Type C 5'-0 x 3'-6" 35 sf 2,975

426 Window Type F Punch 9'-0" x 4'-8" w/Sliding Panes 42 sf 3,573

427 Window Type G Punch 4'-4" x 2'-8" 12 sf 985

428 Window Type H Punch 3'-0" x 3'-6" 21 sf 1,785

429 Aluminum Storefront 0 0

430 Alum - Exterior storefront 14.0 x 12.0 115 sf 10,898

431 Alum - Exterior storefront 26.5 x 12.0 234 sf 22,230

432 Alum - Exterior storefront 27.0 x 12.0 0 sf 0

433 Alum Storefront doors - single 4 ea 10,400

434 Alum Storefront doors - double 0 ea 0

435 0 0

436 0 0

437 Bond 330,406 $ 6,608

438 Adjusted total 1 LS 392,807

439 0

440 0

441 0

442 Subtotal - Glass & Glazing 729,821

RFQ #19-422-Q-DR Page 31 of 47 05/13/19

Page 38: May 15, 2019 - Brevard Public Schoolseagendatoc.brevardschools.org/05-28-2019 School... · 2.2 Final Completion Date: Final completion of the Work shall be achieved by September 8,

443 Drywall & Stucco

444

445

446 Drywall 0 0

447 GWB on tilt 21,000 sf 115,500

448 Stucco on 20 CMU Columns 1,400 sf 35,000

449 GWB partition to 12 ft 50,148 sf 413,721

450 GWB partition Smoke Partition Wall 12ft 18,084 sf 159,139

451 GWB partition Smoke Partition Wall 20ft 11,500 sf 103,500

452 GWB partition Fire Wall 20ft 22,640 sf 215,080

453 GWB partition Fire Wall 25ft 11,125 sf 110,138

454 GWB Smoke Envelop Ceiling Lid 1A-5.-0 12,605 sf 63,025

455 GWB bulkheads 10,135 sf 50,675

456 GWB ceilings 6,672 sf 40,032

457 GWB soffits 4,450 sf 26,700

458 Antimicrobial Wall Panels 1,599 sf 13,989

459 Approved Alternates ea

460 Alt #4. PEMB Covered Play Area Drywall 1 ls 11,900

461 0

462 0 0

463 0 0

464 Bond 1,358,398 $ 27,168

465 Adjusted total 1 LS 533,520

466 0

467 0

468 0

469 Subtotal - Drywall & Stucco 1,919,086

470 Acoustical Ceilings & Wall Panels

471

472 24" x 24" Lay-In Acoustical Panel w/ Suspended Grid 91,856 sf 321,496

473 24" x 24" Lay-In Acoustical Panel w/ Suspended Grid - 1hr Fire Rated 15,205 sf 76,025

474 24" x 48" Lay-In Acoustical Panel w/ Suspended Grid - Moisture Resistant 2,415 sf 9,056

475 Acoustical Sound Panels @ Multipurpose (See Alternates) 0 sf 0

476 Acoustical Sound Panels @ Music 2,052 sf 28,728

477 Acoustical Sound Panels @ Classroom AWT 600 sf 8,400

478 Acoustical Sound Panels @ classrooms AWT-3 0 sf 0

479 Acoustical Sound Panels @ classrooms AWT-4 0 sf 0

480 Approved Alternates ea

481 Alt #10. Acoustical Sound Panels @ Multipurpose 1 ls 25,850

482 0

484 Bond 469,555 $ 9,391

485 Adjusted total 0 LS (38,969)

486

487

489 Subtotal - Acoustical Ceilings & Wall Panels 439,977

RFQ #19-422-Q-DR Page 32 of 47 05/13/19

Page 39: May 15, 2019 - Brevard Public Schoolseagendatoc.brevardschools.org/05-28-2019 School... · 2.2 Final Completion Date: Final completion of the Work shall be achieved by September 8,

490 Resilient tile & carpet

491

492

493 Flooring

494 Carpet tile 11,699 sf 49,720

495 Vinyl Treads and Risers 299 sf 10,465

496 Stage risers 184 sf 6,440

497 Porcelain Tile 95,156 sf 880,193

498 Quarry Tile 2,375 sf 21,371

499 Vinyl Comp. Tile @ stage 1,042 sf 2,605

500 Wall Tile 0 0

501 Porcelain tile - wainscot height at wet walls 2,693 sf 28,277

502 Porcelain tile - full height - wet walls - group RR 0 sf 0

503 Porcelain tile - full height - dry walls - group RR 0 sf 0

504 Porcelain tile - wainscot at wet walls - small RR 0 sf 0

505 Porcelain tile - wainscot at wet walls - classroom RR 0 sf 0

506 Porcelain tile - full height at wet walls - classroom RR 0 sf 0

507 Base 0 0

508 VB - Vinyl Base 13,452 lf 24,214

509 Quarry Tile Base 1,500 lf 13,500

510 VB - Vinyl Base 1,130 lf 2,034

511 0 0

512 Window Sills -Marble 0 0

513 Window Sills 0 lf 0

514 Window Type A 12'-0 x 5'-6" 576 lf 10,368

515 Window Type C 5'-0 x 3'-6" 10 lf 180

516 Window Type F Punch 9'-0" x 4'-8" w/Sliding Panes 9 lf 162

517 Window Type G Punch 4'-4" x 2'-8" 5 lf 96

518 Window Type H Punch 3'-0" x 3'-6" 6 lf 108

519 0 0

520 Floor Prep 110,754 sf 33,226

521 Floor Protection 110,754 sf 27,689

522 Approved Alternates ea

523 Alt #4. PEMB Covered Play Flooring 1 ls 13,730

524 Alt # A-8 Deduct to use VCT ILO porcelain flooring (Exclude Restrooms) 1 ls (720,130)

525 0

526 0 0

527 0 0

528 Bond 404,246 $ 8,085

529 Adjusted total 1 LS (28,517)

530 0

531 0

532 0

533 Subtotal - Resilient tile & carpet 383,815

RFQ #19-422-Q-DR Page 33 of 47 05/13/19

Page 40: May 15, 2019 - Brevard Public Schoolseagendatoc.brevardschools.org/05-28-2019 School... · 2.2 Final Completion Date: Final completion of the Work shall be achieved by September 8,

534 Painting

535

536 Interior Paint

537 GWB on tilt 18,900 sf 12,285

538 GWB partition to 12 ft 66,865 sf 43,462

539 GWB partition to 20 ft 23,915 sf 15,545

540 GWB partition 25 ft 29,814 sf 19,379

541 GWB bulkheads 10,135 sf 6,588

542 GWB ceilings 7,194 sf 5,396

543 GWB soffits 4,450 sf 3,338

544 Panels, 5 1/2" @ main bldg 30,871 sf 38,588

545 Panels, 6 1/4" @ CEP 1,578 sf 1,973

546 Panels, 6 1/4" @ CEP Yard & Dumpster screen walls 1,719 sf 2,149

547 Exposed structure 6,123 sf 6,123

548 Play Court Sidelines and Markings (Allowance) 1 ls 4,872

549 Hollow Metal Frames 314 ea 12,560

550 HM Doors 88 ea 6,600

551 Bollard Safety Yellow 9 ea 360

552 Seal block 6,884 sf 2,065

553 Seal concrete 10,562 sf 3,697

554 Approved Alternates ea

555 Alt #4. PEMB Covered Play Area Painting Work 1 ls 11,300

556 ea

557 ea

558 0 0

559 0 0

560 Bond 196,279 $ 3,926

561 Adjusted total 1 LS 64,365

562 0

563 0

564 0

565 Subtotal - Subtotal - Resilient tile & carpet 264,570

566 Visual Display & Marker Boards

567

568

569 Tack board (4'x4') 56 ea 8,120

570 Tack strip (1.5") 56 ea 6,720

571 MB-6 Marker board (4'x6') 126 ea 63,000

572 0 0

573 0 0

574 Bond 77,840 $ 0

575 Adjusted total 1 LS (6,257)

576 0

577 0

578 0

579 Subtotal - Visual Display & Marker Boards 71,583

RFQ #19-422-Q-DR Page 34 of 47 05/13/19

Page 41: May 15, 2019 - Brevard Public Schoolseagendatoc.brevardschools.org/05-28-2019 School... · 2.2 Final Completion Date: Final completion of the Work shall be achieved by September 8,

580 Identifying Devices

581

582

583 Signage 0 0

584 Room name/number 314 ea 29,830

585 S-2 Evac map 10 ea 500

586 RR 6 ea 300

587 No storage 2 ea 100

588 In case of fire - stair sign 2 ea 100

589 Stair sign 4 ea 200

590 Roof access 1 ea 50

591 Max capacity 10 ea 500

592 Secured access 2 ea 100

593 FAAP 1 ea 50

594 Monument sign LED Controlled (Allowance) 1 ls 25,000

595 16" Alum letters "School Name" 30 ea 2,466

596 16" Alum letters numeric street address 4 ea 329

597 16" Alum letters building number 3 ea 247

598 0 0

599 Plaque 1 ea 1,980

600

601 Bond 61,751 $ 0

602 Adjusted total 1 LS 7,081

603 0

604 0

605 0

606 Subtotal - Identifying Devices 68,832

607 Toilet Partitions & Accessories

608

609

610 Toilet Partitions

611 ADA Compartment 4 ea 3,600

612 Standard compartment 9 ea 6,300

613 Urinal Screen 1 ea 250

614 Toilet Accessories

615 A-4 42" Horizontal grab bar 152 ea 11,400

616 A-6 Waste receptacle 30 ea 2,700

617 A-7 Surface mounted hand towel dispenser w/ attachable receptacle 147 ea 40,425

618 A-8 Mop racks 8 ea 240

619 A-12 18"x30" L-shaped horiz grab bar 3 ea 225

620 A-14 Toilet paper dispenser 88 ea 13,200

621 A-15 Surface mounted san napkin disposal 22 ea 3,850

622 A-16 Soap dispenser 154 ea 23,100

623 A-17 Folding shower seat 3 ea 675

624 A-20 Mirror 16"x24" 92 ea 13,800

625 A-21 Shower Curtain & Rod 3 ea 300

626 A-23 Robe hook 88 ea 3,080

627 Poster frame installation 2 400

628 Hufcor Partition Wall -Price from Hufcor (W/O Closet Door) 1 ea 19,050

629 Corner guard (Vinyl 96" w/2" leg @ corridor, high traffic areas, cafeteria) 223 ea 7,805

630 0 0

631 Bond 150,400 $ 0

632 Adjusted total 1 LS (34,880)

634 0

635 0

RFQ #19-422-Q-DR Page 35 of 47 05/13/19

Page 42: May 15, 2019 - Brevard Public Schoolseagendatoc.brevardschools.org/05-28-2019 School... · 2.2 Final Completion Date: Final completion of the Work shall be achieved by September 8,

636 Subtotal - Toilet Partitions & Accessories 115,520

637 Fire Extinguishers & Cabinets

638

639

640 Fire extinguisher - bracket mounted 19 ea 1,206

641 Fire extinguisher - wall mounted Type K 1 ea 165

642 Fire extinguisher & cabinet - recess mounted 14 ea 2,450

643 Defibrillator 3 3,750

644 Knoxbox 1 400

646 0 0

647 Bond 7,971 $ 0

648 Adjusted total 1 LS (1,101)

650 0

651 0

652 Subtotal - Fire Extinguishers & Cabinets 6,870

653 Lockers & Metal Storage Shelving

654

655

656 Lockers and benches 0 0

657 Employee lockers (12x15x72) 5 ea 1,200

658 A4 - "heavy duty" shelving units 0 ea 0

659 0 0

660 0 0

661 Bond 1,200 $ 0

662 Adjusted total 1 LS 1,190

663 0

664 0

665 0

666 Subtotal - Lockers & Metal Storage Shelving 2,390

667 Flagpoles (Allowance)

668

669 0

670 Flagpole - 30' 1 ea 2,500

671 Flagpole setup, alignment, & installation 1 ls 1,912

672 0 0

673 0 0

674 Bond 4,412 $ 0

675 Adjusted total 0 LS 0

676 0

677 0

678 0

679 Subtotal - Flagpoles (Allowance) 4,412

680 Food Service Equipment

681

682

683 Serving Line Cashier 1 ea 2,200

684 Serving Line Frost Top 1 ea 10,600

685 Serving Line Countertop 1 ea 7,200

686 Serving Line Four Well Hot Top 1 ea 10,500

687 Mixer 1 ea 7,900

688 Mixer 1 ea 16,000

689 Slicer 1 ea 4,600

690 Food Cutter 1 ea 5,400

691 Range 1 ea 3,100

692 Reach In Refrigerator 1 ea 9,700

RFQ #19-422-Q-DR Page 36 of 47 05/13/19

Page 43: May 15, 2019 - Brevard Public Schoolseagendatoc.brevardschools.org/05-28-2019 School... · 2.2 Final Completion Date: Final completion of the Work shall be achieved by September 8,

693 Proofer/Hot Box 3 ea 11,100

694 Platform Scale 1 ea 1,250

695 Power Wash Sink 1 ea 13,200

696 Bun Pan Rack 2 ea 950

697 Bun Pan Rack 3 ea 1,500

698 Work Table 7 ea 3,955

699 Produce Sink 1 ea 2,500

700 Faucet 1 ea 300

701 Pot Rack Table 1 ea 1,870

702 Steamer 1 ea 16,500

703 Kettle 1 ea 15,200

704 Faucet 1 ea 150

705 Convection Oven 4 ea 58,000

706 Ice/Machine Bin 1 ea 3,200

707 Walk-in Cooler & Freezer 1 ea 25,000

708 Dunnage Rack 1 ea 165

709 Shelving 1 ea 260

710 Washer 1 ea 780

711 Dryer 1 ea 700

712 Reach-in Freezer 1 ea 10,500

713 Salad Bar 1 ea 5,000

714 Milk Cooler 1 ea 0

715 Soda Cooler 1 ea 0

716 Ice Cream Freezer 1 ea 0

717 Gas Hoses 1 ea 1,650

718 Installation 1 ea 20,000

719 0 0

720 0 0

721 Bond 270,930 $ 5,419

722 Adjusted total 1 LS 5,372

723 0

724 0

725 Subtotal - Food Service Equipment 281,721

726 Audio Visual Equipment (Allowance)

727

728 Recess mounted projection screens 12x9 2 ea 5,000

729 Projector Mounting Plate 2 ea 1,000

730 Flat panel monitors 0 0

731 0 0

732 Bond 6,000 $ 0

733 Adjusted total 0 LS 0

734 0

735 0

736 0

737 Subtotal - Audio Visual Equipment (Allowance) 6,000

738 Stage Curtains

739

740 Theatrical curtain & track package 1 ls 12,000

741 0 0

742 0 0

743 Bond 12,000 $ 0

744 Adjusted total 1 LS (5,142)

745 0

746 0

747 Subtotal - Stage Curtains 6,858

RFQ #19-422-Q-DR Page 37 of 47 05/13/19

Page 44: May 15, 2019 - Brevard Public Schoolseagendatoc.brevardschools.org/05-28-2019 School... · 2.2 Final Completion Date: Final completion of the Work shall be achieved by September 8,

748 Athletic Equipment (Allowance)

749 See Addendum #1

750

751

752 Basketball backboards & posts 2 ea 3,600

753 0 0

754 0 0

755 0 0

756 Bond 3,600 $ 0

757 Adjusted total 1 LS 0

758 0

759 0

760 0

761 Subtotal - Athletic Equipment (Allowance) 3,600

762 Pre-Engineered Metal Building

763

764

765

766 Pre-engineered metal building

767 Main frames 124,399 sf 497,596

768 Purlins 131,571 sf 394,713

769 Girts 4,104 lf 49,248

770 Girt subframe behind fascia panels @ tilt wall 9,101 sf 27,304

771 Fascia panels 9,101 sf 45,506

772 Standing seam roof 131,571 sf 1,598,588

773 Roof insulation 131,571 sf 460,499

774 Wall insulation 9,101 sf 25,028

775 Gutters 1,852 lf 33,336

776 Downspouts 13'-6" 405 lf 7,290

777 Downspouts 10'-6" 63 lf 1,134

778 Mezzanine Columns, Base Plates & Beams 0 0

779 Connection Angles and Bracing 3 tons 9,873

780 Metal decking, corrugated, 1-1/2" 20 Ga G60 VL (floor) 4,769 sf 10,730

781 Embeds, panel to steel frame 1 ls 25,000

782 118A Stair, steel pan with handrail 1 fl 9,000

783 118B Stair, steel pan with handrail 1 fl 9,000

784 Miscellaneous steel 1 ls 29,263

785 Pad Anchor Bolts ( 20"x3/4" Galvanized) 640 ea 7,680

786 Tiebeam Anchor Bolts (12"x5/8"Galv.) 80 ea 640

787 Approved Alternates ea

788 Alt #4. PEMB Covered Play Area PEMB Work 1 ls 135,000

789 ea

790 ea

791 0

792 0 0

793 Bond 3,376,428 $ 67,529

794 Adjusted total 1 LS (460,151)

795 0

796 0

797 0

798 Subtotal - Pre-Engineered Metal Building 2,983,806

RFQ #19-422-Q-DR Page 38 of 47 05/13/19

Page 45: May 15, 2019 - Brevard Public Schoolseagendatoc.brevardschools.org/05-28-2019 School... · 2.2 Final Completion Date: Final completion of the Work shall be achieved by September 8,

799 Horizontal Louver Blinds

800

801

802

803 Window Blinds

804 Window Type A 12'-0 x 5'-6" 48 sf 240

805 Window Type C 5'-0 x 3'-6" 2 sf 10

806 Window Type G Punch 4'-4" x 2'-8" 2 sf 10

807 Window Type H Punch 3'-0" x 3'-6" 2 sf 10

808 0 0

809 0 0

810 Bond 270 $ 0

811 Adjusted total 1 LS 9,932

812 0

813 0

814 0

815 Subtotal - Horizontal Louver Blinds 10,202

816 Bicycle Storage Racks

817

818 Bicycle storage rack 16 ea 12,000

819 Installation 16 ea 1,600

820 0 0

821 0 0

822 Bond 13,600 $ 0

823 Adjusted total 1 LS (4,740)

824 0

825 0

826 0

827 Subtotal - Bicycle Storage Racks 8,860

828 Playground Surfacing & Equipment (Allowance)

829

830

831 Tot Lot Surfacing - artificial mulch 3,090 sf 9,270

832 Gravel base 0 tn 0

833 Concrete border curb 238 lf 3,332

834 Youth Play lot - artificial mulch 6,084 sf 18,252

835 Gravel base 0 tn 0

836 Concrete ribbon curb 330 lf 4,620

837 Play structure @ tot lot 1 ls 20,000

838 Play structure @ youth play 1 ls 32,000

839 Shade structure @ tot lot 0 ls 0

840 Shade structure @ youth play 0 ls 0

841 0 0

842 0 0

843 Bond 87,474 $ 1,749

844 Adjusted total 1 LS (1,649)

845 0

846 0

847 0

848 Subtotal - Playground Surfacing & Equipment (Allowance) 87,574

RFQ #19-422-Q-DR Page 39 of 47 05/13/19

Page 46: May 15, 2019 - Brevard Public Schoolseagendatoc.brevardschools.org/05-28-2019 School... · 2.2 Final Completion Date: Final completion of the Work shall be achieved by September 8,

849 Fire Protection

850

851

852 Fire Protection 124,399 sf 261,238

853 Provide Sprinkler System to meet or exceed NFPA-13. 0 0

854 Shop Drawings and Permits as required 0 0

855 2 risers with control valves, tamper switches, main drains etc. 0 0

856 78 brass standard coverage upright sprinklers on exposed pipe. 0 0

857 116 white semi-recessed pendants 0 0

858 4 white semi-recessed dry pendant fire sprinklers 0 0

859 Underground Piping 0 0

860 0 0

861 Bond 261,238 $ 5,225

862 Adjusted total 1 LS (60,118)

863 0

864 0

865 0

866 Subtotal - Fire Protection 206,345

867 Plumbing

868

869

870 Drinking Fountain Outdoor 2 ea 3,000

871 Elec Water Cooler Bi Level w/Bottle Fill 4 ea 18,000

872 L - Lavatory Wall Hung 96 ea 336,000

873 WC - Water Closet Flr Mtd 91 ea 318,500

874 UR - Urinal Wall Hung 6 ea 21,000

875 CS - Drop-in Counter Sink 71 ea 177,500

876 Bubbler fountain @ drop in sink 64 ea 22,400

877 Shower 2 ea 7,000

878 MS - Mop Sink 6 ea 24,000

879 RCP - Water Heater Circ system 7 ea 42,000

880 EWH - Electric Water Heater @ custodial closets - 20 gal 7 ea 24,500

881 GWH - Electric Water Heater Kitchen 120 Gal 1 ea 7,500

882 WMB - Washing machine box 1 ea 500

883 IMB - Ice Maker Box 3 ea 1,500

884 Carriers 108 ea 64,800

885 CO 87 ea 39,150

886 HB 55 ea 35,750

887 Valves 154 ea 69,300

888 Mixing Valves 35 ea 26,250

889 FD - Floor, hub drains 32 ea 56,000

890 VTR - Vent Thru Roof 18 ea 9,000

891 PT - Plaster Trap 1 ea 1,500

892 Grease trap 1250 gal 3 ea 21,000

893 SI - Solids interceptor 1 ea 3,500

894 HS - Hand sink - Furnished by food service equip) 4 ea 3,200

895 TD - Floor Trough (furnished by food service equipment) 2 ea 1,200

RFQ #19-422-Q-DR Page 40 of 47 05/13/19

Page 47: May 15, 2019 - Brevard Public Schoolseagendatoc.brevardschools.org/05-28-2019 School... · 2.2 Final Completion Date: Final completion of the Work shall be achieved by September 8,

896 3 compartment sink (furnished by food service equipment) 1 ea 600

897 2 compartment sink (furnished by food service equipment) 1 ea 600

898 Gas Piping Distribution - Kitchen & WH 0 ls 0

899 Approved Alternates ea

900 Alt #4. PEMB Covered Play Area Plumbing Work 1 ls 47,000

901 ea

902 ea

903 0 0

904 Bond 1,382,250 $ 27,645

905 Adjusted total 1 LS (249,135)

906 0

907 0

908 0

909 Subtotal - Plumbing 1,160,760

910 HVAC

911

912

913 HVAC 0

914 Carrier Chillers - (2) 173 = 346 tons water cooled Models - 30HXC186 346 tons 207,600

915 (2) B&G 20 HP Primary CHW Pumps 40 hp 24,000

916 (3) 10 HP B&G Condenser Water Pumps 30 hp 18,000

917 1-B&G Model B-200 53 Gal Expansion tank 1 ea 4,000

918 Air Separator B&G R-6F. 1 ea 5,000

919 Chemical Shot Feeders & Treatment 1 ea 5,000

920 Refrigerant Monitoring System 1 ea 8,000

921 Evapco USS 29-4118 C. Tower Dual Cell SS -346 Tons, cell size 520 GPM 346 tons 86,500

922 Chilled water supply & return AG CEP 0 0

923 6" Insulated pipe OH 380 lf 60,800

924 8" Insulated pipe OH 166 lf 35,690

925 Fittings, valves, strainers, operators, instrumentation 75 ea 86,250

926 Chilled water supply & return AG Main Bldg 0 0

927 6" Insulated pipe OH 120 lf 19,200

928 8" Insulated pipe OH 120 lf 31,800

929 Chilled water supply & return UG 0 0

930 8" Insulated pipe UG 462 lf 92,400

931 Isolation valves 8" 2 ea 7,000

932 Valve vault 1 ea 2,500

933 (7) Air handlers 91,215 cfm 296,449

934 Bipolar ionization 91,215 cfm 18,243

935 Exhaust 6,510 cfm 14,972

936 VAV's Terminal Units 88 ea 81,400

937 Captive Air Kitchen Hoods (KEF 1 & 2) Roof Exhausts Included 2 30,000

938 Carrier DX Split Unit (AHU/CU-5) 1 30,000

939 Mini-Splits 8 12,800

940 In-Line Ceiling Exhaust Fans 9 4,500

941 Exterior Wall Mount Louvers 5 1,000

942 Ductwork 242,658 lbs 727,974

943 Insulation 66,154 sf 165,385

944 Exhaust grille 99 ea 5,487

945 Supply register 426 ea 50,673

946 Return register 200 ea 12,920

947 Balancing Damper 101 ea 2,904

948 Fire/Smoke damper 59 ea 27,553

949 MVD - Motorized volume damper 7 ea 8,932

950 OAL - Outside air louver 10 ea 10,750

RFQ #19-422-Q-DR Page 41 of 47 05/13/19

Page 48: May 15, 2019 - Brevard Public Schoolseagendatoc.brevardschools.org/05-28-2019 School... · 2.2 Final Completion Date: Final completion of the Work shall be achieved by September 8,

951 EL - Exhaust louver 8 ea 8,600

952 GRV - Gravity vent 8 ea 8,600

953 Gravel Bed for Chiller Yard (20 CUYDS) 1 ls 3,000

954 Control System 124,399 sf 205,258

955 T & B (Removed to Separate Division Below) 1 ls 40,000

956 Copper Condensate Lines 1 ls 15,000

957 Motor Starters 1 ls 4,000

958 Commissioning Assistance 1 ls 5,000

959 Approved Alternates ea

960 Alt #4. PEMB Covered Play Area Painting Work 1 ls 24,000

961 Alt #M-4 Install Low delivery temperature water cooled chillers. 1 ls 2,244

962 ea

963 ea

964 0 0

965 Bond 2,421,140 $ 48,423

966 Adjusted total 1 LS (134,937)

967 0

968 0

969 0

970 Subtotal - HVAC 2,424,870

971 Test & Balance

972

973

974 Test & Balance 124,399 sf 37,320

975 0 0

976 Bond 37,320 $ 0

977 Adjusted total 1 LS (7,540)

978 0

979 0

980 0

981 Subtotal - Test & Balance 29,780

982 Electrical

983

984 Site Electrical

985 Primary power & conduit (Allowance) 1 ls 25,000

986 Secondary conduit w/conc encasement to MDP1 290 lf 43,500

987 Conduit U/G 3'' w/3 #300 1,890 lf 84,748

988 Conduit U/G 3'' w/4 #500 168 lf 13,154

989 Trenching 357 lf 2,678

990 Concrete Encasement Premium 95 lf 1,425

991 Structured Cable Backbone

992 UG 1.5" to 4" conduit 5,251 lf 38,282

993 Handhole/pullbox 4 ea 6,000

994 Trenching 1,889 lf 14,168

995 Building Power & Lighting

996 New Building Power & Lighting 124,399 sf 995,192

997 Light Fixture Type A 2 x 4 Lay In H 1,331 ea 465,850

998 Light Fixture Type B 2 x 4 Lay In H 159 ea 55,650

999 Light Fixture Type C 4' 2 Tube Strip H 109 ea 38,150

1000 Light Fixture Type CL Wall Pack 11 ea 10,450

1001 Light Fixture Type D Downlight 6" Dia 7 ea 2,450

1002 Light Fixture Type F 4' 2 Tube Recessed H 94 ea 25,850

1003 Light Fixture Type G 2 x 4 Lay In H 68 ea 23,800

1004 Light Fixture Type H 2 x 4 Lay In H 19 ea 6,650

1005 Light Fixture Type K 2 x 4 Lay In H 18 ea 7,200

RFQ #19-422-Q-DR Page 42 of 47 05/13/19

Page 49: May 15, 2019 - Brevard Public Schoolseagendatoc.brevardschools.org/05-28-2019 School... · 2.2 Final Completion Date: Final completion of the Work shall be achieved by September 8,

1006 Light Fixture Type M Wall Pack 51 ea 56,100

1007 Light Fixture Type X1 Exit Sign Recessed Mtd 26 ea 4,550

1008 Light Fixture Type X2 Exit Sign Wall Mtd 18 ea 2,880

1009 Light Fixture Type Y2 Emergency Light 2 Head w/Battery Pack 357 ea 190,995

1010 Dimming Package 1 ls 50,000

1011 Daylight/Energy Conserve Wiring Class Rooms 56 ea 84,000

1012 Occ Sensors 183 ea 41,175

1013 Light Fixture SLB Sgl Head 30' Pole Mtd 22 ea 77,000

1014 Light Fixture SLB Sgl Head 20' Pole Mtd 17 ea 51,000

1015 Standard systems

1016 Data 0 sf 0

1017 Monument Sign Data Allowance 1 ls 25,000

1018 Fire Alarm 124,399 sf 186,599

1019 Intercom 121,329 sf 181,994

1020 Lightning Protection Grounding Allowance 1 ls 15,000

1021 CCTV 121,329 sf 60,665

1022 Intrusion Prevention - pathway only 121,329 sf 30,332

1023 Access Control 1 ls 50,000

1024 Security Cameras 36 ea 108,000

1025 TV Production System 1 ea 15,000

1026 Multipurpose Sound System 1 ea 30,000

1027 Special lighting & systems

1028 Theatrical Lighting System 1 ls 50,000

1029 Classroom Sound Enhancement

1030 Generator 80KW w/sound enclosure, fuel & testing 1 75,000

1031 ATS 2 ea 5,000

1032 System Testing if not by owner 1 ea 34,000

1033 Approved Alternates ea

1034 Alt #4. PEMB Covered Play Area Electrical Work 1 ls 36,000

1035 Alt # E-4 Provide UL Listed lightning protection system (See Allowances) 1 ls 0

1036 Alt # T-1 Provide Data for Monument Sign (See Allowances) 1 ls 0

1037 Alt # T-2 Conduit only for low Volt eqpt at Covered Play Bldg w/ buyout 1 ls 0

1038 ea

1039 ea

1040 0 0

1041 0 0

1042 Bond 3,275,485 $ 65,510

1043 Adjusted total 1 LS (433,394)

1044 0

1045 0

1046 0

1047 Subtotal - Electrical 2,952,600

1048 TOTAL 20,401,946

RFQ #19-422-Q-DR Page 43 of 47 05/13/19

Page 50: May 15, 2019 - Brevard Public Schoolseagendatoc.brevardschools.org/05-28-2019 School... · 2.2 Final Completion Date: Final completion of the Work shall be achieved by September 8,

RFQ #19-422-Q-DR Page 44 of 47 05/13/19

Page 51: May 15, 2019 - Brevard Public Schoolseagendatoc.brevardschools.org/05-28-2019 School... · 2.2 Final Completion Date: Final completion of the Work shall be achieved by September 8,

WHARTON-SMITH CONSTRUCTION GROUP

340 dy

GMP Estimate 49 wk

New Viera ES 11 mo

LINE GENERAL CONDITIONS TOTALS COMMENTSITEM DESCRIPTION QTY UNIT1,105 Water and ice 0 wk 0

1,106 Water - monthly 11 mo 2,943

1,107 Electric - FPL Temporary Transformer 0

1,108 Electric - install/remove temp system 0 ea 0 BY ELECTRICIAN

1,109 Electric - monthly charges (field) 6 mo 9,630

1,110 Generators - 10,000 watts 3 ea 6 Mos 6 mo 28,890

1,111 Generators - fuel (216 hr/mo x 2gal/hr) 7,794 gal 29,189

1,112 Temporary lighting (night lighting) 0

1,113 Field office - WSI - rent (2 wide) 11 mo 25,894

1,114 Field office - BPS - rent 0 mo 0 TBD

1,115 Field office - set up & remove - WSI 1 ea 4,428

1,116 Field office - set up & remove - BPS 0 ea 0 TBD

1,117 Field office furnishings & equipment - purchase 1 ls 5,350

1,118 Copier rental 11 mo 5,002

1,119 Computer, copier & other equip for field office - 4 ea rental 11 mo 10,452 $148 x 6 Computers

1,120 Software licenses (PlanGrid) 11 mo 3,825

1,121 Project FTP site 0

1,122 Storage & tool trailers (1 ea) 11 mo 2,354

1,122 Storage & tool trailers - set up & remove 1 ea 614

1,123 Temporary Fence and Gates 4,950 lf 22,275

1,124 Temporary toilets - 10 ea 11 mo 18,244

1,125 Temporary sewage holding tanks - 2 ea 0 mo 0

1,124 Daily Clean-up 49 wks 15,729

1,125 Final Clean-up 1 ls 44,100

1,126 Dumpsters/Dump Charges 90 ea 36,000

1,127 CONSTRUCTION EQUIPMENT & TOOLS 0

1,128 Small tools 11 mo 5,500

1,129 Extended boom forklift mo 0

1,130 All terrain vehicle 11 mo 7,062

1,131 Equipment fuel 0

1,132 Water Supply Truck 6 mo 22,470

1,133 Broom Truck 0

1,134 Fuel tank 0

1,135 Vehicle, fuel, oil, grease 11 mo 50,545 $919 x 5 Vehicles

1,136 Equipment maintenance 0

1,137 Move in/out equipment 0

1,138 Move in material 0

1,139 SAFETY & HEALTH & HOUSEKEEPING 0

1,140 Safety meetings 0

1,141 Safety devices & equipment 1 ls 1,500

1,142 Preventative medicine 0

1,143 JLA Badging 8 ea 813

1,144 PROJECT START-UP & CLOSEOUT 0

1,145 Start up chemicals 0 BY OWNER

1,146 Start up electric consumption charges 0 BY OWNER

1,147 0

1,148 SUBTOTAL GENERAL CONDITIONS 1,103,6121,149 SALES TAX 12,9151,150 TOTAL GENERAL CONDITIONS 1,116,527

RFQ #19-422-Q-DR Page 45 of 47 05/13/19

Page 52: May 15, 2019 - Brevard Public Schoolseagendatoc.brevardschools.org/05-28-2019 School... · 2.2 Final Completion Date: Final completion of the Work shall be achieved by September 8,

1

SECTION 05

Master Project Schedule

Master Project Schedule Narrative: Site Work & Underground Utilities: The project schedule reflects commencement of construction activities on July 8th, 2019 for the new elementary school. Mobilization will begin on 7/8/2019 with immediate erection of temporary fence and SWPPP silt fence. Clearing and grubbing will begin shortly after and the project site will be graded for the building pad. Once the site is graded and the building pad in place the underground utilities will begin. Slab on Grade & Form Panels: The slab will be poured in two stages. The first pour will be around the perimeter of the building so that the panels can be formed on the slab and the MEP trades can continue to work where the slab is not poured. Once the plumbing is finished the interior slab will be poured. Erect Tilt Panels & PEMB: The end of October the precast panels will be tilted into place. Once the panels are in place and finalized the pre-engineered metal building will be erected. The PEMB erection will last about two months including roof placement and dry-in. Interior Finishes: Beginning in early January 2020 once the building is dried in the interior metal framing and drywall will be installed. MEP rough in, interior finishes, and MEP trim out will follow through until May of 2020. Parking Lots and Landscape: The roads, parking lots, sidewalks, and landscaping will be constructed in early March and April of 2020. Final Inspections: Subcontractor inspections will take place in the end of May. Punchlist and Test & Balance activities will continue until June with Building Final Inspections the first week of June and a Substantial Completion date of June 12th of 2020.

RFQ #19-422-Q-DR Page 46 of 47 05/13/19

Page 53: May 15, 2019 - Brevard Public Schoolseagendatoc.brevardschools.org/05-28-2019 School... · 2.2 Final Completion Date: Final completion of the Work shall be achieved by September 8,

Activity Name Original Duration Start Finish

19-013 - VES - GMP SCHEDULE19-013 - VES - GMP SCHEDULE19-013 - VES - GMP SCHEDULE19-013 - VES - GMP SCHEDULE

PRECONSTRUCTIONPRECONSTRUCTIONPRECONSTRUCTIONPRECONSTRUCTION

Kick Off Meeting 0 04-Jan-19

Preconstruction Proposal 10 07-Jan-19 18-Jan-19

Board Approval 20 21-Jan-19 15-Feb-19

Budget Estimate / Constructability Review 15 18-Feb-19 08-Mar-19

Budget / Plan Review Meeting 0 11-Mar-19

Update Budget / Plans 20 11-Mar-19 05-Apr-19

GMP Bidding Process 17 08-Apr-19 30-Apr-19

Budget / Plan Review Meeting 0 01-May-19

Bid Evaluation / GMP Preparation 6 01-May-19 08-May-19

GMP Review & Approval 13 09-May-19 28-May-19

Notice to Proceed 0 29-May-19

PRELIMINARY TASKSPRELIMINARY TASKSPRELIMINARY TASKSPRELIMINARY TASKS

Permitting and Procurement 27 29-May-19 05-Jul-19

Procurement of Metal Building 96 29-May-19 11-Oct-19

Commencement of Construction 0 08-Jul-19*

Construction Trailer Setup 5 29-Jul-19 02-Aug-19

SITEWORKSITEWORKSITEWORKSITEWORK

Fence & SWPPP 5 08-Jul-19 12-Jul-19

Clear & Grub 15 08-Jul-19 26-Jul-19

Grading Building Pad & Casting Slabs 20 29-Jul-19 23-Aug-19

Underground Utilities 45 26-Aug-19 28-Oct-19

Tie-In Utilities 15 29-Oct-19 18-Nov-19

Pavilion 20 10-Jan-20 06-Feb-20

Parking Lot 30 06-Mar-20 16-Apr-20

Hardscape 20 20-Mar-20 16-Apr-20

Testing & Inspections 5 17-Apr-20 23-Apr-20

BUILDINGBUILDINGBUILDINGBUILDING

Layout Building 1 26-Aug-19 26-Aug-19

Auger Poles 5 27-Aug-19 03-Sep-19

Form In Place Foundations 15 27-Aug-19 17-Sep-19

Slab on Grade or Casting Slabs 10 18-Sep-19 01-Oct-19

MEP Underground 20 25-Sep-19 22-Oct-19

Tilt Panels Form In Place 15 02-Oct-19 22-Oct-19

Slab on Grade over MEP UG 15 23-Oct-19 12-Nov-19

Erect Tilt Panels 5 23-Oct-19 29-Oct-19

Erect Metal Building 49 30-Oct-19 09-Jan-20

Building Dry In 0 09-Jan-20

Exterior Finishes 40 10-Jan-20 05-Mar-20

Framing / Drywall 60 10-Jan-20 02-Apr-20

MEP Rough In 45 24-Jan-20 26-Mar-20

Interior Finishes 45 13-Mar-20 14-May-20

MEP Trim Out 40 27-Mar-20 21-May-20

Subcontractor Final Inspections 5 22-May-20 29-May-20

WS Punchlist 10 22-May-20 05-Jun-20

Test & Balance 5 22-May-20 29-May-20

Building Final Inspections 10 01-Jun-20 12-Jun-20

Substanital Completion 0 12-Jun-20

Closeout / Commissioning 60 15-Jun-20 08-Sep-20

Final Completion 0 08-Sep-20

Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan

2019 2020 2021

Kick Off Meeting

Preconstruction Proposal

Board Approval

Budget Estimate / Constructability Review

Budget / Plan Review Meeting

Update Budget / Plans

GMP Bidding Process

Budget / Plan Review Meeting

Bid Evaluation / GMP Preparation

GMP Review & Approval

Notice to Proceed

Permitting and Procurement

Procurement of Metal Building

Commencement of Construction

Construction Trailer Setup

Fence & SWPPP

Clear & Grub

Grading Building Pad & Casting Slabs

Underground Utilities

Tie-In Utilities

Pavilion

Parking Lot

Hardscape

Testing & Inspections

Layout Building

Auger Poles

Form In Place Foundations

Slab on Grade or Casting Slabs

MEP Underground

Tilt Panels Form In Place

Slab on Grade over MEP UG

Erect Tilt Panels

Erect Metal Building

Building Dry In

Exterior Finishes

Framing / Drywall

MEP Rough In

Interior Finishes

MEP Trim Out

Subcontractor Final Inspections

WS Punchlist

Test & Balance

Building Final Inspections

Substanital Completion

Closeout / Commissioning

Final Completion

NEW VIERA ELEMENTARY SCHOOL

GMP MILESTONE SCHEDULE

WHARTON-SMITH, INC.

Project ID:19-013 GMP

Run 10-May-19 at 16:53

 

Actual Work

Remaining Work

Critical Remaining Work

Milestone

Page 1 of 1 TASK filter: All Activities

 

RFQ #19-422-Q-DR Page 47 of 47 05/13/19