May 11 th , 2007 LNF Scient. Comm M.Spinetti 1 OPERA/CNGS1 scillation Project with Emulsion-tRacking Apparatus 1. Electronic detectors status of installation 2. Results from detectors commissioning TT RPC HPT 3. Cosmic and CNGS run results 4. Brick production and filling 5. Emulsions analysis Scanning facilities Track matching and analysis 6. Test beam activities 7. Detector filling strategy and CNGS runs 8. OPERA sensitivity updated 9. Conclusions

May 11 th, 2007 LNF Scient. Comm M.Spinetti 1 OPERA/CNGS1 O scillation P roject with E mulsion-t R acking A pparatus 1. Electronic detectors status of

Embed Size (px)

Citation preview

Page 1: May 11 th, 2007 LNF Scient. Comm M.Spinetti 1 OPERA/CNGS1 O scillation P roject with E mulsion-t R acking A pparatus 1. Electronic detectors status of

May 11th, 2007 LNF Scient. Comm M.Spinetti 1

OPERA/CNGS1Oscillation Project with Emulsion-tRacking Apparatus

1. Electronic detectors status of

installation2. Results from detectors

commissioning• TT• RPC• HPT

3. Cosmic and CNGS run results4. Brick production and filling5. Emulsions analysis

• Scanning facilities• Track matching and analysis

6. Test beam activities7. Detector filling strategy and

CNGS runs8. OPERA sensitivity updated9. Conclusions

Page 2: May 11 th, 2007 LNF Scient. Comm M.Spinetti 1 OPERA/CNGS1 O scillation P roject with E mulsion-t R acking A pparatus 1. Electronic detectors status of

May 11th, 2007 LNF Scient. Comm M.Spinetti 2

Electronic detectors installationVeto

BMS Target TrackerSM2Spectrometer:

Magnet, RPC, XPC,HPT

Ago ‘06 run: all installed and running except Veto and HPT/2

May ‘07 : Veto and HPT/2 installed and under commissioning

HPT/2

Page 3: May 11 th, 2007 LNF Scient. Comm M.Spinetti 1 OPERA/CNGS1 O scillation P roject with E mulsion-t R acking A pparatus 1. Electronic detectors status of

May 11th, 2007 LNF Scient. Comm M.Spinetti 3

Event building: time stamp

Event building by sorting in time individual hit from sub-detectors

The time stamp (10 nsec bin) is correlated with the GPS (100 nsec resolution) in order to select CNGS beam event

HPT

RPC

TT

10 nsec binning

Page 4: May 11 th, 2007 LNF Scient. Comm M.Spinetti 1 OPERA/CNGS1 O scillation P roject with E mulsion-t R acking A pparatus 1. Electronic detectors status of

May 11th, 2007 LNF Scient. Comm M.Spinetti 4

Event reconstruction: time stamp resolution

Without fiber transmission correction

With position correctionSigma : 9 nsec

down going muon : side view

Time

difference

Strip

number

Page 5: May 11 th, 2007 LNF Scient. Comm M.Spinetti 1 OPERA/CNGS1 O scillation P roject with E mulsion-t R acking A pparatus 1. Electronic detectors status of

May 11th, 2007 LNF Scient. Comm M.Spinetti 5

3. Results from electronic detectors commissioning

Page 6: May 11 th, 2007 LNF Scient. Comm M.Spinetti 1 OPERA/CNGS1 O scillation P roject with E mulsion-t R acking A pparatus 1. Electronic detectors status of

May 11th, 2007 LNF Scient. Comm M.Spinetti 6

Target Tracker efficiency

using cosmic ray tracks

Trigger rate:• 1 p.e. 20 cps per pixel• 2 p.e. 10 cps per pixel

1 p.e.

2 p.e.

3 p.e.

Page 7: May 11 th, 2007 LNF Scient. Comm M.Spinetti 1 OPERA/CNGS1 O scillation P roject with E mulsion-t R acking A pparatus 1. Electronic detectors status of

May 11th, 2007 LNF Scient. Comm M.Spinetti 7

RPC efficiencies

SM1 SM2

1 HV row missing

Electronic

s

using cosmic ray tracks

All problems have been cured

Page 8: May 11 th, 2007 LNF Scient. Comm M.Spinetti 1 OPERA/CNGS1 O scillation P roject with E mulsion-t R acking A pparatus 1. Electronic detectors status of

May 11th, 2007 LNF Scient. Comm M.Spinetti 8

RPC spatial resolution

Tracking resolution ~ 1.3 cm, Misalignments ~

few mm

using cosmic ray tracks

Page 9: May 11 th, 2007 LNF Scient. Comm M.Spinetti 1 OPERA/CNGS1 O scillation P roject with E mulsion-t R acking A pparatus 1. Electronic detectors status of

May 11th, 2007 LNF Scient. Comm M.Spinetti 9

RPC p reconstruction

Muon momentum reconstruction using only RPC

using cosmic ray tracks

-

very

preliminary

RPC data only

Page 10: May 11 th, 2007 LNF Scient. Comm M.Spinetti 1 OPERA/CNGS1 O scillation P roject with E mulsion-t R acking A pparatus 1. Electronic detectors status of

May 11th, 2007 LNF Scient. Comm M.Spinetti 10

Status of HPT/1

-Timing corrections implemented

-Resolution of ~500m in single planes

-Fine alignment ongoing with CR tracks

-80% track efficiency for cosmic data

-reconstruction running stable for data

Page 11: May 11 th, 2007 LNF Scient. Comm M.Spinetti 1 OPERA/CNGS1 O scillation P roject with E mulsion-t R acking A pparatus 1. Electronic detectors status of

May 11th, 2007 LNF Scient. Comm M.Spinetti 11

4. CNGS runs and cosmics results

Page 12: May 11 th, 2007 LNF Scient. Comm M.Spinetti 1 OPERA/CNGS1 O scillation P roject with E mulsion-t R acking A pparatus 1. Electronic detectors status of

May 11th, 2007 LNF Scient. Comm M.Spinetti 12

August’06 run: first CNGS neutrinos

50 ms10.5 s 10.5 s

machine energy

spill

Page 13: May 11 th, 2007 LNF Scient. Comm M.Spinetti 1 OPERA/CNGS1 O scillation P roject with E mulsion-t R acking A pparatus 1. Electronic detectors status of

May 11th, 2007 LNF Scient. Comm M.Spinetti 13

August ‘06 run events

QuickTime™ and aTIFF (Uncompressed) decompressor

are needed to see this picture.

QuickTime™ and aTIFF (Uncompressed) decompressor

are needed to see this picture.

CC in magnetstopping track (first event)

Page 14: May 11 th, 2007 LNF Scient. Comm M.Spinetti 1 OPERA/CNGS1 O scillation P roject with E mulsion-t R acking A pparatus 1. Electronic detectors status of

May 11th, 2007 LNF Scient. Comm M.Spinetti 14

August ‘06 run events

QuickTime™ and aTIFF (Uncompressed) decompressor

are needed to see this picture.

QuickTime™ and aTIFF (Uncompressed) decompressor

are needed to see this picture.

CC in magnet CC in TT

Page 15: May 11 th, 2007 LNF Scient. Comm M.Spinetti 1 OPERA/CNGS1 O scillation P roject with E mulsion-t R acking A pparatus 1. Electronic detectors status of

May 11th, 2007 LNF Scient. Comm M.Spinetti 15

August ‘06 run: Beam Direction

OPERA

August Run result: <>=3.4±0.3

y >0

y <0

y

z

Zenith angle of muon track

Select events around beam (0 < < 0.15 rad) direction and check if there are on time

Page 16: May 11 th, 2007 LNF Scient. Comm M.Spinetti 1 OPERA/CNGS1 O scillation P roject with E mulsion-t R acking A pparatus 1. Electronic detectors status of

May 11th, 2007 LNF Scient. Comm M.Spinetti 16

μCC in the magnets

• CC in magnets selection efficiency 52% • very pure sample, NC contamination 4% (1,1 event)

August only with 2 cut • Data = 29 ± 5 evt.• MC = 23.7 evt.

August + October Data = 36 ± 6 evt.MC = 29.9 evt.

August + October Data = 36 ± 6 evt.MC = 29.9 evt.

Azimuth angle (rad) OnTime 319Trigger eq. 308OpRec 289Vertex 42MuID 36D

ata

re

duct

ion

Event selection:• on time beam events• μ id (> 10 Fe slabs)• fiducial volume

Page 17: May 11 th, 2007 LNF Scient. Comm M.Spinetti 1 OPERA/CNGS1 O scillation P roject with E mulsion-t R acking A pparatus 1. Electronic detectors status of

May 11th, 2007 LNF Scient. Comm M.Spinetti 17

High energy muon charge ratio

Can be measured in using the OPERA spectrometers :

Overburden : ~3000 m.w.e.

Eμ underground : 300 GeVEμ surface cut-off : 1400 GeV

Page 18: May 11 th, 2007 LNF Scient. Comm M.Spinetti 1 OPERA/CNGS1 O scillation P roject with E mulsion-t R acking A pparatus 1. Electronic detectors status of

May 11th, 2007 LNF Scient. Comm M.Spinetti 18

5. Brick production and filling

Page 19: May 11 th, 2007 LNF Scient. Comm M.Spinetti 1 OPERA/CNGS1 O scillation P roject with E mulsion-t R acking A pparatus 1. Electronic detectors status of

May 11th, 2007 LNF Scient. Comm M.Spinetti 19

Brick components: lead

ChemicalVacuum pack Mech

pack

Alpha activity

Pb+ Ca 0.07% NO(Fog Up)

Yes Yes(<30 cm2/day)

Pb+Ca 0.04% NO(Fog Up)

Yes Yes(<30 cm2/day)

PbCa colaminatedwith pure

lead

Yes Yes Yes(<30 cm2/day)

Pb+ Sb 2.5% Yes Yes NO(Surface Po migration)

PbSb colaminatedwith pure

lead

Yes Yes NO(Surface Po migration)

Pure Pb Yes yes NO(Surface Po migration)

Lead vs emulsion chemical & radioactivity compatibility tests

Page 20: May 11 th, 2007 LNF Scient. Comm M.Spinetti 1 OPERA/CNGS1 O scillation P roject with E mulsion-t R acking A pparatus 1. Electronic detectors status of

May 11th, 2007 LNF Scient. Comm M.Spinetti 20

Brick components: lead

•Mass production started at JL-Goslar in Jul ‘06•Custom production line for casting, lamination, washing and packing•Up to 800 brick/day granted

Page 21: May 11 th, 2007 LNF Scient. Comm M.Spinetti 1 OPERA/CNGS1 O scillation P roject with E mulsion-t R acking A pparatus 1. Electronic detectors status of

May 11th, 2007 LNF Scient. Comm M.Spinetti 21

Brick components: emulsion

Produ-ction

Beam exposure

Develop-ment

Initial sensitivity

Development

After refreshing

Refreshing

Produ-ction

Beam exposure

Sensitivity of refreshed film

Condition : 30 98℃ % 3days

G.D. 36/100μm

F.D.     1.3/1000μm 3

G.D.         below 8/100μm

F.D.        2.1/1000μm 3G.D.    33/100μm

F.D.       1.5/1000μm 3

Production

Beam exposure

Development

Refreshing

Performance of refreshed emulsion films

Page 22: May 11 th, 2007 LNF Scient. Comm M.Spinetti 1 OPERA/CNGS1 O scillation P roject with E mulsion-t R acking A pparatus 1. Electronic detectors status of

May 11th, 2007 LNF Scient. Comm M.Spinetti 22

BAM: lead loading and drum section (in light)

lead box loading(one day work)

station for filling the BMS drums

Page 23: May 11 th, 2007 LNF Scient. Comm M.Spinetti 1 OPERA/CNGS1 O scillation P roject with E mulsion-t R acking A pparatus 1. Electronic detectors status of

May 11th, 2007 LNF Scient. Comm M.Spinetti 23

BAM: dark room for 5 piling stations

Page 24: May 11 th, 2007 LNF Scient. Comm M.Spinetti 1 OPERA/CNGS1 O scillation P roject with E mulsion-t R acking A pparatus 1. Electronic detectors status of

May 11th, 2007 LNF Scient. Comm M.Spinetti 24

BAM: piling and pressing station

QuickTime™ and aYUV420 codec decompressor

are needed to see this picture.

Page 25: May 11 th, 2007 LNF Scient. Comm M.Spinetti 1 OPERA/CNGS1 O scillation P roject with E mulsion-t R acking A pparatus 1. Electronic detectors status of

May 11th, 2007 LNF Scient. Comm M.Spinetti 25

BAM milestone and performance

Brick Production

0

1000

2000

3000

4000

5000

6000

7000

8000

9000

10000

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

Weeks

Bri

ck

s

brick sum

weekly bricks

• Costruction started in Jan ‘05 in firm site• Delivery at LNGS starting in Jun ‘06• Comissioning and preproduction for Oct run in Sept ‘06• Many improvements since Mar ‘07 • Production in rather stable conditions since Mar-Apr ‘07• Up to last week 14.000 bricks produced • Production rate: 450 - 600 brick/day, ie 2-2.5 drums/day

last week

Page 26: May 11 th, 2007 LNF Scient. Comm M.Spinetti 1 OPERA/CNGS1 O scillation P roject with E mulsion-t R acking A pparatus 1. Electronic detectors status of

May 11th, 2007 LNF Scient. Comm M.Spinetti 26

BMS (Brick Mainipulation System)

Loading station and drumfor brick transfer

Draw bridge for brick insertion

Storage Carrousel

Camera for positioning

Vacuum sucker vehicle to retrieve bricks

Portico

Manipulating platform

Filling performance: 2 drums/day

Page 27: May 11 th, 2007 LNF Scient. Comm M.Spinetti 1 OPERA/CNGS1 O scillation P roject with E mulsion-t R acking A pparatus 1. Electronic detectors status of

May 11th, 2007 LNF Scient. Comm M.Spinetti 27

6. Emulsion analysis

Page 28: May 11 th, 2007 LNF Scient. Comm M.Spinetti 1 OPERA/CNGS1 O scillation P roject with E mulsion-t R acking A pparatus 1. Electronic detectors status of

May 11th, 2007 LNF Scient. Comm M.Spinetti 28

Event reconstruction in the brick

Page 29: May 11 th, 2007 LNF Scient. Comm M.Spinetti 1 OPERA/CNGS1 O scillation P roject with E mulsion-t R acking A pparatus 1. Electronic detectors status of

May 11th, 2007 LNF Scient. Comm M.Spinetti 29

Automated Microscopes for Nuclear Emulsions

High speed CCD Camera (3 kHz)

Piezo-controlled objective lens

Constant speed stage

Synchronization of objective lens and

stageCustomized commercial optics and

mechanics + asynchronous DAQ software

Hard-coded algorithms

scanning speed ~ 20 cm2/h

~ 30 bricks will be daily extracted from target and analyzed using high-speed automatic systems

S-UTS (Japan)European Scanning System

scanning speed ~ 30 cm2/h

Page 30: May 11 th, 2007 LNF Scient. Comm M.Spinetti 1 OPERA/CNGS1 O scillation P roject with E mulsion-t R acking A pparatus 1. Electronic detectors status of

May 11th, 2007 LNF Scient. Comm M.Spinetti 30

Scanning capabilities in Europe

1. CSD scanning :6 ESS at LNGS -> ~ 8CSdoublet/day ( ~ 5

microscopes missing )

2. Brick Vertex location and confirmation : Italy : 12 10 bricks/day

EU : 6 ESS 5 bricks/day plate changer in progress ( with dry and oil

objectives )

• Dedicated to Special events ( min. bias, decays, electrons, …): Italy : 4 ESS ~ 200 events/yr EU : 2 ESS ~ 100 events/yr

•30 ESS distributed among 11 labs ( 22 ESS in 8 Italian labs ): Bari, Bern, Bologna, Lngs, Lyon, Napoli, Roma, Salerno + + Neuchatel, LNF, Padova

Page 31: May 11 th, 2007 LNF Scient. Comm M.Spinetti 1 OPERA/CNGS1 O scillation P roject with E mulsion-t R acking A pparatus 1. Electronic detectors status of

May 11th, 2007 LNF Scient. Comm M.Spinetti 31

Electronic detector-brick connection

Connection between Electronic

trackers and CS:

• tested on few events (~10)

• good results (~70-80%)

• space for improvements

T T Predicted position CS Located position

Ago’06 run

Page 32: May 11 th, 2007 LNF Scient. Comm M.Spinetti 1 OPERA/CNGS1 O scillation P roject with E mulsion-t R acking A pparatus 1. Electronic detectors status of

May 11th, 2007 LNF Scient. Comm M.Spinetti 32

Track Reconstruction and Vertex Search

position residuals between base-tracks and fitted volume tracks

angular residuals between base-tracks and fitted volume tracks

(vertical tracks)

scan-back efficiency 93.1%

volume scan

scan-backtracks followed backward

film by film

tracks in the CS doublet

vertex reconstruction

0.3 1.7 mrad

Page 33: May 11 th, 2007 LNF Scient. Comm M.Spinetti 1 OPERA/CNGS1 O scillation P roject with E mulsion-t R acking A pparatus 1. Electronic detectors status of

May 11th, 2007 LNF Scient. Comm M.Spinetti 33

First neutrino event in emulsion

Muon momentum:• MCS (coord method) : 6.4 ± 1. GeV/c• Spectrometer (RPC) : 7.05 ± 0.4 GeV/c

October CNGS run:• CNGS induced rock muon selected by electronic detectors• brick tagging using the reconstruction software• CSD and brick analysed using the standard scanning system

Prediction accuracy :• Δx = 5.5 mm (along the tray)• Δy = 0.4 mm (vertical direction)• Δθx = 16.6 mrad• Δθy = 24.8 mrad

Page 34: May 11 th, 2007 LNF Scient. Comm M.Spinetti 1 OPERA/CNGS1 O scillation P roject with E mulsion-t R acking A pparatus 1. Electronic detectors status of

May 11th, 2007 LNF Scient. Comm M.Spinetti 34

Brick emulsion alignment with cosmics

RMS 1.1μm

RMS 0.8μm

CNGS rock muon analysis

Page 35: May 11 th, 2007 LNF Scient. Comm M.Spinetti 1 OPERA/CNGS1 O scillation P roject with E mulsion-t R acking A pparatus 1. Electronic detectors status of

May 11th, 2007 LNF Scient. Comm M.Spinetti 35

8. Detector filling strategy and CNGS runs

Page 36: May 11 th, 2007 LNF Scient. Comm M.Spinetti 1 OPERA/CNGS1 O scillation P roject with E mulsion-t R acking A pparatus 1. Electronic detectors status of

May 11th, 2007 LNF Scient. Comm M.Spinetti 36

Detector filling

Assumptions :• Number of bricks on the end of April: 10000 (ok)• Ramp up from average actual speed 4 drums/w to 10 drums/w on

April 30th (~ok)• Reaching 15 drums/week on september 1st

Full target filled (150000 bricks) in May 2008 (including 15%contingencies and 3 weeks for holidays)

SPS tentative schedule : 2008

Physics starts end of april

Page 37: May 11 th, 2007 LNF Scient. Comm M.Spinetti 1 OPERA/CNGS1 O scillation P roject with E mulsion-t R acking A pparatus 1. Electronic detectors status of

May 11th, 2007 LNF Scient. Comm M.Spinetti 37

CNGS run in 2007

Filling @ start run 15/9/07

Filling @ end run15/11/07

Integrated p.o.t

Bricks with interactions

59334 86802 1019 pot 465

~20 Charmed hadron decay

Total number of interactions Integrated p.o.t

x 1019

daysdays

19/3/07

3/9/07 11/11/07

Page 38: May 11 th, 2007 LNF Scient. Comm M.Spinetti 1 OPERA/CNGS1 O scillation P roject with E mulsion-t R acking A pparatus 1. Electronic detectors status of

May 11th, 2007 LNF Scient. Comm M.Spinetti 38

9. OPERA sensitivity updated

Page 39: May 11 th, 2007 LNF Scient. Comm M.Spinetti 1 OPERA/CNGS1 O scillation P roject with E mulsion-t R acking A pparatus 1. Electronic detectors status of

May 11th, 2007 LNF Scient. Comm M.Spinetti 39

OPERA sensitivity : nominal conditions

SK 90% CL(L/E analysis)

Opera nominal

Opera with beam upgrade and 30% bck reduction

Opera, with beam upgrade (1.5)

Opera with 30% bck reduction

90 % CL Sensitivity F&C

Page 40: May 11 th, 2007 LNF Scient. Comm M.Spinetti 1 OPERA/CNGS1 O scillation P roject with E mulsion-t R acking A pparatus 1. Electronic detectors status of

May 11th, 2007 LNF Scient. Comm M.Spinetti 40

SK 90% CL(L/E analysis)

Opera nominal

Opera with 30% target mass reduction

90 % CL Sensitivity F&C

OPERA sensitivity : nominal conditions

25% reduction

Page 41: May 11 th, 2007 LNF Scient. Comm M.Spinetti 1 OPERA/CNGS1 O scillation P roject with E mulsion-t R acking A pparatus 1. Electronic detectors status of

May 11th, 2007 LNF Scient. Comm M.Spinetti 41

10. Conclusions

Very effective contribution to the experiment installation by LNF

Servicies (Spas, SSCR, Electronic)

Support from LNF still needed for construction, running and

analysis ( workshops, fellowships, ….)

The electronic detectors of the OPERA experiment are ready for

data taking during the fore coming CNGS runs

The brick production is launched and the detector should be filled

before the physics run in 2008

The data analysis chain has been validated for the : electronic detectors during the CNGS beam periods and also

with cosmic rays in 2006

emulsion detectors during many test runs, especially with real

neutrino event from an exposure in the NUMI beam

OPERA Physics program is valid, and it is a great opportunity for

young physicists to learn about Neutrino Physics with real data

Page 42: May 11 th, 2007 LNF Scient. Comm M.Spinetti 1 OPERA/CNGS1 O scillation P roject with E mulsion-t R acking A pparatus 1. Electronic detectors status of

May 11th, 2007 LNF Scient. Comm M.Spinetti 42

Detection of the appearance signal

Two conflicting requirements: Large mass low Xsection High granularity

signal selection background rejection

Target:1800 tons, 5 years running

• 30 000 neutrino interactions• ~150 interactions• ~15 identified• < 1 event of background

Toplogy selection:

Kink signature

The challenge is to identify interactions from interactions

-

Decay “kink”

-

~1 mm

oscillation

-

Page 43: May 11 th, 2007 LNF Scient. Comm M.Spinetti 1 OPERA/CNGS1 O scillation P roject with E mulsion-t R acking A pparatus 1. Electronic detectors status of

May 11th, 2007 LNF Scient. Comm M.Spinetti 43

OPERA/CNGS1 : an hybrid detector

What the brick cannot do: trigger for a neutrino interaction muon identification and momentum/charge measurement need for an hybrid detector

supermodule

8 m

Target Trackers

Pb/Em. target

Emulsion analysis:

Vertex, decay kink e/ ID, multiple scattering, kinematics

Extract selected brick  

Pb/Em. brick

8 cm Pb 1 mm

Basic “cell”

Emulsion

Electronic detectors:

Brick finding muon ID, charge and p

Link to mu ID,Candidate event

Spectrometer

Page 44: May 11 th, 2007 LNF Scient. Comm M.Spinetti 1 OPERA/CNGS1 O scillation P roject with E mulsion-t R acking A pparatus 1. Electronic detectors status of

May 11th, 2007 LNF Scient. Comm M.Spinetti 44

8.3 Kg

Pb

Emulsion layers

1 mm

•ECC : target basic component• Em Provides high space resolution + Lead active target mass•Compact and modular structure

OPERA bricks 1 ECC= 56 Pb + 57 emulsions

2 emulsion layers (44 m thick)poured on a

200 m plastic base

12.5cm

10.2cm

10 X0’s

Interaction From NUMI exposure

Electron shower