3
Matthew Pledger 807 West 3800 South, Bountiful, Utah 84010 Phone: (435) 879-9108 Email: [email protected] Career Focus My main focus is to step into each project with an attitude of knowing that this project will be completed on time and within budget constraints. I am dedicated to the job at hand, with excellent technical, analytical and communication skills. I work well with the team to finish the product and/or project to completion and have been told that I was a key factor for jobs being done on time and with little on the checklist to finish. I have over 25 years in the construction building industry, helping maintain quality and sound product to the end. Superintendent Experience Supervised and kept daily records on the daily outcome of subcontractors. Fluent in all levels of blue prints. Created an environment that would keep the project maintaining the desired outcome of the set schedule. Created a positive relationship with all those working on the project so it could run smoothly and on time. Thorough and complete knowledge and understanding of the General Contract, each Subcontract specifications and addenda, and assisted the Project Manager in the development of on-site procedures. Assisted the Project Manager and Scheduling Manager in the development and refinement of the Project Schedule and worked with the Project Manager to keep the schedules properly updated and saw that the job met the various required dates. Reviewed all Slips to ensure shipments were completed; saved Slips for the Project Manager. Insured that subcontractors enforced their safety programs. And much MORE! Helped set up estimates, budgets and construction timetables for clients and developed the construction strategies. Helped select subcontractors and workers and provided required explanations for the builders and other professionals associated with the project; coordinated and collaborated with architects, engineers and specialists. Ensured the construction project complied with all building codes and any other legal or regulatory requirements. When delays or problems occur – as they always do – the construction manager is the project’s first responder, ready to make changes required to move the project past the issue. Evaluated bid specifications and drawings ensuring that we knew everything required to successfully bid and win projects. Followed-up with subcontractors to ensure that bids were received. Worked with the Project Management teams to follow-up on bids and budgets to close the business.

Matthew Pledger - Resume Updated

Embed Size (px)

Citation preview

Page 1: Matthew Pledger - Resume Updated

Matthew Pledger

807 West 3800 South, Bountiful, Utah 84010

Phone: (435) 879-9108

Email: [email protected]

Career Focus

My main focus is to step into each project with an attitude of knowing that this project will be completed on time and within budget constraints. I am dedicated to the job at hand, with excellent technical, analytical and communication skills. I work well with the team to finish the product and/or project to completion and have been told that I was a key factor for jobs being done on time and with little on the checklist to finish. I have over 25 years in the construction building industry, helping maintain quality and sound product to the end.

Superintendent Experience

Supervised and kept daily records on the daily outcome of subcontractors. Fluent in all levels of blue prints. Created an environment that would keep the project maintaining the desired outcome of the set schedule. Created a positive relationship with all those working on the project so it could run smoothly and on time. Thorough and complete knowledge and understanding of the General Contract, each Subcontract specifications and addenda, and assisted the Project Manager in the development of on-site procedures. Assisted the Project Manager and Scheduling Manager in the development and refinement of the Project Schedule and worked with the Project Manager to keep the schedules properly updated and saw that the job met the various required dates. Reviewed all Slips to ensure shipments were completed; saved Slips for the Project Manager. Insured that subcontractors enforced their safety

programs. And much MORE!

Helped set up estimates, budgets and construction timetables for clients and developed the construction strategies. Helped select subcontractors and workers and provided required explanations for the builders and other professionals associated with the project; coordinated and collaborated with architects, engineers and specialists. Ensured the construction project complied with all building codes and any other legal or regulatory requirements. When delays or problems occur – as they always do – the construction manager is the project’s first responder, ready to make changes required to move the project past the issue.

Evaluated bid specifications and drawings ensuring that we knew everything required to successfully bid and win projects. Followed-up with subcontractors to ensure that bids were received. Worked with the Project Management teams to follow-up on bids and budgets to close the business.

Page 2: Matthew Pledger - Resume Updated

Education

Dixie State College

Pre-Civil engineering

Associate of Science Degree

University of Utah

Salt Lake City, UT

Bachelor of Science Degree and Civil Engineering Minor

Employment Summary

Greystone Construction/Basic Development – 1992 to 2010

Superintendent/Project Manager

Centennial Park, AZ

Geneva Pipe & Precast – 2011 to 2016

Project Coordinator

Orem, Utah

Continental Engineering & Construction Inc. – Current

Superintendent

References

Mark Parry (801) 230-6403

Geneva Pipe & Precast – Senior Accountant

David Costanza (801) 557-1111

Owner – Western States Equipment

Derrick Phillips – (801) 900-0390

Owner – Titan Construction

Bill Camp – (801) 803-0779

Whitaker Construction – Senior Estimator

Craig Gill – (801) 664-5179

Zions Bancorporation – Corporate Risk Officer

Page 3: Matthew Pledger - Resume Updated

Primary Projects as a Superintendent

Project Name Location of Project General or Sub Projects

Kayenta Homes Kayenta, Utah (Outside of Ivins) General Project

Puerto Del Sol Apartments St. George, Utah General Project

Zions Park Inn (Holiday Inn) Springdale, Utah General Project

Terra Dawn Apartments St. George, Utah General Project

Homes in Southern Utah St. George, Utah General Project

Chinle High School Chinle, Arizona Sub – dirt, concrete, framing

Chinle Intermediate Chinle, Arizona Sub – dirt, concrete, framing

Chinle Elementary Chinle, Arizona Sub – dirt, concrete, framing

Indian Housing Chinle, Arizona Sub – dirt, concrete, framing

Indian Housing Dilkon, Arizona Sub – dirt, concrete, framing

Stadium at NAU Flagstaff, Arizona Sub – dirt, concrete

Walmart Supercenter Sedona, Arizona Sub – dirt, concrete, Masonry

Comfort Inn Hill Air Force Base General Project

Sterling Village Apartments South Jordan, Utah Sub – concrete, framing, site

Magna Swimming Pool Magna, Utah Sub – dirt, concrete

Waste Water Treatment Wendover, Nevada Sub – dirt, concrete

Waste Water Treatment Dulce, New Mexico Sub – dirt, concrete, site

Intermediate School Dulce, New Mexico Sub – dirt, concrete, Masonry

Dulce Athletic Center Dulce, New Mexico Sub – dirt, concrete, Masonry

Thunder Butte Refinery MHA, North Dakota Sub – Steel building, Truck Canopy

Kern River Hunter Salt Lake City, Utah Sub – Steel building

Western States Addition Salt Lake City, Utah General Contractor - Current