Upload
matte87
View
220
Download
0
Tags:
Embed Size (px)
DESCRIPTION
Bachelor of Architecture Folio
Citation preview
MATT EAGLE 2014
ARTPLAY1
DOCKLANDS INTERCHANGE2
ACTIVATING ROOFSCAPES3
ARTPLAY2011 (FIRST YEAR)
TUTORSROSS BREWIN & YVONNE MENGPROJECT LENGTHSEMESTER3 WEEKS INDIVIDUAL/ 6 WEEKS GROUP
THE BRIEF FOR THE PROJECT WAS TO DESIGN A CHILDREN’S PLAY SPACE, MORE SPECIFICALLY A SPACE FOR THE ACTIVITY OF LISTENING.
THE MAIN CONSTRAINT PLACED ON THE DESIGN WAS THAT IT WAS TO BE COMPLETELY MADE OF CORRUGATED CARDBOARD. THERE WAS ALSO A FINITE AMOUNT OF CARD AVAILABLE, SO THIS HAD TO BE CONSIDERED BY STUDENTS.
THE FIRST 3 WEEKS OF THE PROJECT SAW EACH STUDENT DEVELOP A PROPOSAL WITH ONE SELECTED TO BE REFINED AND COMPLETED FOR THE REMAINDER OF THE SEMESTER
INDIVIDUAL PROPOSAL
THE LISTENING SPACE WILL BE LOCATED WITH 3 OTHER INSTALLATIONS
CREATION OF ISOLATION FROM COMPETING STIMULI PROVIDE FOR AN IDEAL INTERNAL SPACE FOR THE ACTIVITY OF LISTENING
A SMALL ENTRANCE WILL INCREASE THIS ISOLATION, AS WELL AS CREATING A FORMAL SETTING FOR THE INTERNAL LISTENING SPACE
ACTIVATION OF EXTERIOR CREATES INTERACTION BETWEEN PASSERS-BY IN AN INFORMAL MANNER
MATT EAGLE FOLIO 2014 1
CHANNELING SOUND SOUND TUNNEL
EAR PIECE/ MICROPHONE POD COMMUNICATION SYSTEM
600
2800
300
2760
300
1000
1980
2200
AA
AA
ELEVATION ELEVATION
PLAY
1
ART
GROUP DEVELOPMENT
0 0.5 1 1.5M
AA
A A
PLAY
1
ART
1. 8 x CARDBOARD STRIPS
2. FOLD & ALLOW STRIPS TO RECEIVE
3. BOLT FOLDED PIECES TOGETHER
4. INTERLOCK 4TH PIECE TO SECURE
5. 1 BLOCK OF THE FLOORING SYSTEM
6. ENTIRE FLOORING SYSTEM
1. 2. 3.
4. 5. 6.
C-BEAM CONSTRUCTION
LISTENING SPACE ISONOMETRIC CONSTRUCTION
MATT EAGLE FOLIO 2014 3PLAY
1
ART
BOURKE
ST
MERCHANT ST
MERCHANT ST
IMPORT LN
ENTERPRISE WY
PIGOTT ST
DOCKLANDS INTERCHANGE2013 (THIRD YEAR)
TUTORJOHN SADARPROJECT LENGTH4 WEEKSINDIVIDUAL
THE BRIEF FOR THIS PROJECT ASKED FOR THE DEVELOPMENT OF A FUEL STATION IN THE HEART OF THE DOCKLANDS PRECINCT.
STUDENTS WERE ASKED TO CONSIDER THE ROLE OF THE AUTOMOBILE WITHIN AUSTRALIAN SOCIETY, AND THE RELATIONSHIP THAT EXISTS BETWEEN THE AUTOMOBILE AND FUEL STATIONS.
THE CHALLENGE WAS TO CREATE AN INTERACTION BETWEEN THE CAR AND THE FUEL STATION THAT COULD POSSIBLY INCREASE THE SIGNIFICANCE OF THE LOCATION AND THE RELATIONSHIP EXPERIENCED BY NOT ONLY MOTORISTS, BUT THAT OF THE SURROUNDING GENERAL PUBLIC.
SKETCHING WITH METAL
10M
5M2.5M
AN INTERCHANGE BETWEEN FUEL PUMP & MOTOR VEHICLE
TRADITIONAL FUEL STATION SCENARIO
WHAT IF THE FUEL PUMP BECAME THE MOBILE OBJECT IN THE RELATIONSHIP?
1
2
3
4
5
6
7
8
17
18
19
20
21
22
23
24
910
11
12
13
14
15
16
25
26
27
28
29
30
31
32
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
45 DEGREE LAYOUT MOBILE FUEL SYSTEM
THE MOBILE FUEL SYSTEM CREATES A GRID NEWTORK THAT ALLOWS ONE PUMP TO SERVICE EIGHT DESIGNATED CAR SPACES, WITH EVERY SPACE HAVING TWO ‘FUEL DELIVERY ZONES’. ONE LOCATED AT THE FRONT OF THE VEHICLE (A), AND ONE LOCATED AT THE
REAR (B).
MATT EAGLE FOLIO 2014 4INTERCHANGE
2
DOCKLANDS
A
A
B
B
ENT
EXT
ENT
EXT
0 5 10 15 20 25M0 5 10 15 20 25M
AA BB
GROUND FLOOR FIRST FLOOR
MATT EAGLE FOLIO 2014 5INTERCHANGE
2
DOCKLANDS
ROOFTOP GARDEN & RESTAURANT
PUBLIC STEPS
PERFORATED METAL SKIN ALLOWING NATURAL LIGHT TO ENTER THE FUEL STATION, WHILST STILL ISOLATING THE INDUSTRIAL NATURE OF THE MOBILE FUEL STATION
PRIMARY STRUCTURAL SYSTEM
MOBILE FUEL CRANE SYSTEM
32 SPACE CARPARK WITH MOBILE AUTOMATED FUEL PUMPS & MOBILE AUTOMATED CARWASH
(ABOVE):SOUTH EAST PERSPECTIVE(RIGHT): NORTH WEST PERSPECTIVE - VIEW FROM ROOFTOP GARDENUSING RHINO
MOBILE FUEL/CARWASH CRANE SYSTEM
MOBILE CARWASH
MOBILE FUEL PUMP
VEHICLE PLATFORM
ELECTRONIC VEHICLE JACK
GUIDANCE TRACKS FOR MOBILE DEVICES
PIT FOR ELECTRONIC HYDRAULIC JACK STORAGE
INTERCHANGE
2
DOCKLANDS
MATT EAGLE FOLIO 2014 6
SOUTH EAST FACING ELEVATION
1:500
MITIGATING THE URBAN HEAT ISLAND
EFFECT
COOL PAVEMENTS
GREEN ROOFS
RETAINING WATER
VEGETATIVE SOLUTIONS
ACTIVATING ROOFSCAPES2013 (THIRD YEAR)
TUTORELLIET SPRINGPROJECT LENGTHFULL SEMESTERINDIVIDUAL
THE STUDIO INVITED STUDENTS TO INVESTIGATE THE PLAYFUL APPROPRIATION OF SPACE WITHIN THE CBD OF MELBOURNE.
THE TASK WAS TO DEVELOP A NETWORK THROUGHOUT THE CBD THAT COULD ENGAGE WITH CITIZENS, PROMPTING THEM TO ANALYSE THEIR DAY TO DAY DECISIONS & LIFESTYLE.
THROUGOUT THE SEMESTER THE IDEA OF VEGETATION EXISTING WITHIN THE CBD TO A MUCH GREATER EXTENT BECAME THE DRIVING FORCE BEHIND THE DEVELOPMENT OF THE PROPOSED NETWORK.
MORE SPECIFICALLY, THE ‘ACTIVATING ROOFSCAPES’ PROJECT INVESTIGATED THE PHENOMENA OF THE “URBAN HEAT ISLAND” AND PROPOSED A NEW GREEN NETWORK THAT COULD EXIST WITHIN THE CBD, PROVIDING A SOURCE OF MITIGATION TO THIS PHENOMENA.
DETAIL OF PEDESTRIAN SYSTEM CONNECTION WITH EXISTING INFRASTRUCTURE
DETAIL OF PEDESTRIAN SYSTEM WITH INDEPENDENT STRUCTURAL
SYSTEM
EXISTING BUILDING CANTILEVER I-BEAMS
CREATING A CONNECTION BETWEEN NO-THRU LANEWAYS
ACTIVATION OF THE ROOFTOP SEPERATING THE LANEWAYS PROVIDES THE OPPORTUNITY TO CREATE A
LINKED PATHWAY
BREAKDOWN OF EXISTING PEDESTRIAN NETWORKS WITHIN MELBOURNE
NO-THRU LANEWAYS
LANEWAYS & MINOR ROADS
MAJOR ROADS
I-BEAM FORMING PRIMARY
STRUCTURAL ELEMENT
T I M B E R DECKING
S T O R M W A T E R PIPING
RAILING T I M B E R DECKING
RAILING
CONCRETE COLUMN FORMING PRIMARY
STRUCTURAL ELEMENT
I-BEAMS
CAPTURING & RECYCLING STORMWATER
WATER STORAGE BELOW LANEWAY ALLOWS FOR THE RETENTION OF WATER WHICH IS PUMPED BACK UP TO THE ACTIVATED ROOFTOP ABOVE
LARGE AMOUNTS OF WATER IS REMOVED FROM THE CITY VIA STORMWATER DRAINS
THE PEDESTRIAN SYSTEM CAPTURES SOME OF THIS RUNOFF IN ITS STORAGE FACILITY
MATT EAGLE FOLIO 2014 7ROOFSCAPES
3
ACTIVATING
Bourke Street
Little Collins Street
Kitz Lane
William Street
Queen Street
Little Bourke Street
Thomson Street
VEGETATED AREASTEPPED TERRAIN
TIMBER COLUMN
WORK OUT AREA - TIMBER FLOORING
ANGLED SIT-UP STATION
BEGINNING OF “THE HILL”
VEGETATED AREA
GLASS FENCING
F
F
STEPS - 500MM HIGH FOR WORKOUT
GLASS SCREEN
EXISTING STRUCTURESUBSTRATE
TIMBER STRUCTURE
AB WORKOUT STATION
VEGETATION AREA
CHIN-UP BARS
PUSH-UP BARS
GLASS BARRIER
“THE HILL” - ANGLED AT 12 DEGREES
E
E
INTEGRATED TABLE TENNIS TABLE
TABLE & CHAIRS WITH CHESSBOARD TABLETOP
GIANT NOVELTY CHESSBOARD INTEGRATED INTO TERRAIN
INTEGRATED BENCH/ STEP
VEGETATED AREA
STEPPED TERRIN/ FURNITURE
EXISTING STRUCTURE OF BUILDING BELOW
SUBSTRATE AND STRUCTURAL CONDITIONING FOR VEGETATION
ANGLED TERRAIN PROVIDING FURNITURE AND LOOSE BARRIER BETWEEN ACTIVITIES
TRADITIONAL CHESS SETUP. UNDERCOVER CHAIRS AND TABLES
WALKABLE ROOF
VOID CREATING RESTING SPACES
VEGETATION AREA
TABLE TENNIS TABLE
GIANT CHESS
FF EE
THE HILL AT KITZ GAMES BENCH
0 5 10 15 20 25M0 5 10 15 20 25M
1:5000
ROOFSCAPES
3
ACTIVATING
Bourke Street
Bourke Street
Sugden Place
Swanston Street
Elizabeth Street
EXISTING STRUCTURE OF BUILDING BELOW
SUBSTRATE & STRUCTURAL CONDITIONING
SERVING COUNTERWINERY
ROCK CLIMBING WALLGRAPES
TIMBER DECK CANTILEVERED FROM STRUCTURAL I-BEAMS
SAFETY BARRIER - GLASS
BALLASTRADEWALKABLE ROOR - VEGETATED AREA
C C
VEGETATED AREA
STONE TILES
TIMBER STRUCTURE
WATER PIPE SYSTEM OPERATING ON GRID TO CREATE WATER WALLS
VEGETATED AREA
GLASSES FENCING
VEGETATED AREATIMBER STRUCTURE WATER PIPES
VEGETATED AREA
GUTTER/ DRAIN SYSTEM FOR WATER WALLS
WATER STORAGE UNIT
EXISTING BUILDING STRUCTURE
SUBSTRATE
DD CC
CLIMBING AMONGST THE VINES WATERWALLS
0 5 10 15 20 25M 0 5 10 15 20 25M
1:5000
MATT EAGLE FOLIO 2014 9ROOFSCAPES
3
ACTIVATING
D
D
TIMBER DECKING
STEPS TO ROOFTOP
VERTICAL VINE YARD
MAIN STRUCTURE OF VINEYARD - I-BEAM
RAMP CONECTING MAIN FLOOR TO ROOF
PROCESSING WORKSHOP FOR WINERY - VATS/ SORTING TABLES/ SINKS
WINE BARRELS FOR STORAGE
WC
SERVING COUNTER
Bourke Street
Little Collins Street
Little Bourke Street
Russell Street
Exhibition Street
Coromandel Place
Coverlid Place
POOL ROOM/ EQUIPMENT ROOM
STEPPED TERRAIN - TIMBER
WATER STORAGE AND PUMPING SYSTEM
WORKS IN A CYCLICAL NATURE, BEING RETURNED VIA THE “WATERFALL”
EXISTING STRUCTURE OF BUILDING BELOW
SUBSTRATE & STRUCTURAL CONDITIONING
POOLSAFETY BARRIER
CHANGEROOM/ SHOWER/ WC
WATERFALL EDGE - ALLOWS WATER TO FLOW BACK TO STORAGE/ PUMPING SYSTEM
BB
PLANT ROOM/ POOL EQUIPMENT
VEGETATED AREA
GLASS FENCE
TIMBER FLOORING
GUTTER FOR WATERFALL FROM ABOVE POOL
VEGETATED AREA
CHANGEROOMS/ SHOWERS/WC
WAVE PLATFORM STRUCTURE
POOL
STEPPED TERRAIN ABOVE POOL ROOM
A A
GOLF NETS
VEGETATED AREA
BALCONY
VOID IN STEPPED TERRAIN ALLOWING LIGHT TO PATHWAY BELOW
VOID IN STEPPED TERRAIN ALLOWING LIGHT TO PATHWAY BELOW
DESIGNATED RESTING SPACES
VEGETATED AREA
GOLF NETS
DESIGNATED RESTING SPACES
DESIGNATED RESTING SPACE
DESIGNATED RESTING SPACE
STEPPED TERRAIN
GOLF NETS
STEPPED TERRAIN GOLF NETS
PEDESTRIAN WALKWAY
VEGETATION SUBSTRATE & ADDITIONAL STRUCTURE
EXISTING BUILDINGS STRUCTURE
VEGETATED AREA
VEGETATED AREA
BB AA
SURFING IN THE CITY THE NETS
0 5 10 15 20 25M 0 5 10 15 20 25M
1:5000
MATT EAGLE FOLIO 2014 10ROOFSCAPES
3
ACTIVATING
NODE 1 - GAMES BENCH NODE 3 - CLIMBING AMONGST THE VINES NODE 5 - SURFING IN THE CITY
NODE 2 - THE HILL AT KITZ NODE 4 - WATERWALLS NODE 6 - THE NETS
1
2
34
5
6
1:12500
ROOFSCAPES
3
ACTIVATING