12
MATT EAGLE 2014 ARTPLAY 1 DOCKLANDS INTERCHANGE 2 ACTIVATING ROOFSCAPES 3

Matt Eagle Folio 2014

  • Upload
    matte87

  • View
    220

  • Download
    0

Embed Size (px)

DESCRIPTION

Bachelor of Architecture Folio

Citation preview

Page 1: Matt Eagle Folio 2014

MATT EAGLE 2014

ARTPLAY1

DOCKLANDS INTERCHANGE2

ACTIVATING ROOFSCAPES3

Page 2: Matt Eagle Folio 2014

ARTPLAY2011 (FIRST YEAR)

TUTORSROSS BREWIN & YVONNE MENGPROJECT LENGTHSEMESTER3 WEEKS INDIVIDUAL/ 6 WEEKS GROUP

THE BRIEF FOR THE PROJECT WAS TO DESIGN A CHILDREN’S PLAY SPACE, MORE SPECIFICALLY A SPACE FOR THE ACTIVITY OF LISTENING.

THE MAIN CONSTRAINT PLACED ON THE DESIGN WAS THAT IT WAS TO BE COMPLETELY MADE OF CORRUGATED CARDBOARD. THERE WAS ALSO A FINITE AMOUNT OF CARD AVAILABLE, SO THIS HAD TO BE CONSIDERED BY STUDENTS.

THE FIRST 3 WEEKS OF THE PROJECT SAW EACH STUDENT DEVELOP A PROPOSAL WITH ONE SELECTED TO BE REFINED AND COMPLETED FOR THE REMAINDER OF THE SEMESTER

INDIVIDUAL PROPOSAL

THE LISTENING SPACE WILL BE LOCATED WITH 3 OTHER INSTALLATIONS

CREATION OF ISOLATION FROM COMPETING STIMULI PROVIDE FOR AN IDEAL INTERNAL SPACE FOR THE ACTIVITY OF LISTENING

A SMALL ENTRANCE WILL INCREASE THIS ISOLATION, AS WELL AS CREATING A FORMAL SETTING FOR THE INTERNAL LISTENING SPACE

ACTIVATION OF EXTERIOR CREATES INTERACTION BETWEEN PASSERS-BY IN AN INFORMAL MANNER

MATT EAGLE FOLIO 2014 1

CHANNELING SOUND SOUND TUNNEL

EAR PIECE/ MICROPHONE POD COMMUNICATION SYSTEM

600

2800

300

2760

300

1000

1980

2200

AA

AA

ELEVATION ELEVATION

PLAY

1

ART

Page 3: Matt Eagle Folio 2014

GROUP DEVELOPMENT

0 0.5 1 1.5M

AA

A A

PLAY

1

ART

Page 4: Matt Eagle Folio 2014

1. 8 x CARDBOARD STRIPS

2. FOLD & ALLOW STRIPS TO RECEIVE

3. BOLT FOLDED PIECES TOGETHER

4. INTERLOCK 4TH PIECE TO SECURE

5. 1 BLOCK OF THE FLOORING SYSTEM

6. ENTIRE FLOORING SYSTEM

1. 2. 3.

4. 5. 6.

C-BEAM CONSTRUCTION

LISTENING SPACE ISONOMETRIC CONSTRUCTION

MATT EAGLE FOLIO 2014 3PLAY

1

ART

Page 5: Matt Eagle Folio 2014

BOURKE

ST

MERCHANT ST

MERCHANT ST

IMPORT LN

ENTERPRISE WY

PIGOTT ST

DOCKLANDS INTERCHANGE2013 (THIRD YEAR)

TUTORJOHN SADARPROJECT LENGTH4 WEEKSINDIVIDUAL

THE BRIEF FOR THIS PROJECT ASKED FOR THE DEVELOPMENT OF A FUEL STATION IN THE HEART OF THE DOCKLANDS PRECINCT.

STUDENTS WERE ASKED TO CONSIDER THE ROLE OF THE AUTOMOBILE WITHIN AUSTRALIAN SOCIETY, AND THE RELATIONSHIP THAT EXISTS BETWEEN THE AUTOMOBILE AND FUEL STATIONS.

THE CHALLENGE WAS TO CREATE AN INTERACTION BETWEEN THE CAR AND THE FUEL STATION THAT COULD POSSIBLY INCREASE THE SIGNIFICANCE OF THE LOCATION AND THE RELATIONSHIP EXPERIENCED BY NOT ONLY MOTORISTS, BUT THAT OF THE SURROUNDING GENERAL PUBLIC.

SKETCHING WITH METAL

10M

5M2.5M

AN INTERCHANGE BETWEEN FUEL PUMP & MOTOR VEHICLE

TRADITIONAL FUEL STATION SCENARIO

WHAT IF THE FUEL PUMP BECAME THE MOBILE OBJECT IN THE RELATIONSHIP?

1

2

3

4

5

6

7

8

17

18

19

20

21

22

23

24

910

11

12

13

14

15

16

25

26

27

28

29

30

31

32

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

B

B

B

B

B

B

B

B

B

B

B

B

B

B

B

B

B

B

B

B

B

B

B

B

B

B

B

B

B

B

B

B

45 DEGREE LAYOUT MOBILE FUEL SYSTEM

THE MOBILE FUEL SYSTEM CREATES A GRID NEWTORK THAT ALLOWS ONE PUMP TO SERVICE EIGHT DESIGNATED CAR SPACES, WITH EVERY SPACE HAVING TWO ‘FUEL DELIVERY ZONES’. ONE LOCATED AT THE FRONT OF THE VEHICLE (A), AND ONE LOCATED AT THE

REAR (B).

MATT EAGLE FOLIO 2014 4INTERCHANGE

2

DOCKLANDS

Page 6: Matt Eagle Folio 2014

A

A

B

B

ENT

EXT

ENT

EXT

0 5 10 15 20 25M0 5 10 15 20 25M

AA BB

GROUND FLOOR FIRST FLOOR

MATT EAGLE FOLIO 2014 5INTERCHANGE

2

DOCKLANDS

Page 7: Matt Eagle Folio 2014

ROOFTOP GARDEN & RESTAURANT

PUBLIC STEPS

PERFORATED METAL SKIN ALLOWING NATURAL LIGHT TO ENTER THE FUEL STATION, WHILST STILL ISOLATING THE INDUSTRIAL NATURE OF THE MOBILE FUEL STATION

PRIMARY STRUCTURAL SYSTEM

MOBILE FUEL CRANE SYSTEM

32 SPACE CARPARK WITH MOBILE AUTOMATED FUEL PUMPS & MOBILE AUTOMATED CARWASH

(ABOVE):SOUTH EAST PERSPECTIVE(RIGHT): NORTH WEST PERSPECTIVE - VIEW FROM ROOFTOP GARDENUSING RHINO

MOBILE FUEL/CARWASH CRANE SYSTEM

MOBILE CARWASH

MOBILE FUEL PUMP

VEHICLE PLATFORM

ELECTRONIC VEHICLE JACK

GUIDANCE TRACKS FOR MOBILE DEVICES

PIT FOR ELECTRONIC HYDRAULIC JACK STORAGE

INTERCHANGE

2

DOCKLANDS

MATT EAGLE FOLIO 2014 6

SOUTH EAST FACING ELEVATION

1:500

Page 8: Matt Eagle Folio 2014

MITIGATING THE URBAN HEAT ISLAND

EFFECT

COOL PAVEMENTS

GREEN ROOFS

RETAINING WATER

VEGETATIVE SOLUTIONS

ACTIVATING ROOFSCAPES2013 (THIRD YEAR)

TUTORELLIET SPRINGPROJECT LENGTHFULL SEMESTERINDIVIDUAL

THE STUDIO INVITED STUDENTS TO INVESTIGATE THE PLAYFUL APPROPRIATION OF SPACE WITHIN THE CBD OF MELBOURNE.

THE TASK WAS TO DEVELOP A NETWORK THROUGHOUT THE CBD THAT COULD ENGAGE WITH CITIZENS, PROMPTING THEM TO ANALYSE THEIR DAY TO DAY DECISIONS & LIFESTYLE.

THROUGOUT THE SEMESTER THE IDEA OF VEGETATION EXISTING WITHIN THE CBD TO A MUCH GREATER EXTENT BECAME THE DRIVING FORCE BEHIND THE DEVELOPMENT OF THE PROPOSED NETWORK.

MORE SPECIFICALLY, THE ‘ACTIVATING ROOFSCAPES’ PROJECT INVESTIGATED THE PHENOMENA OF THE “URBAN HEAT ISLAND” AND PROPOSED A NEW GREEN NETWORK THAT COULD EXIST WITHIN THE CBD, PROVIDING A SOURCE OF MITIGATION TO THIS PHENOMENA.

DETAIL OF PEDESTRIAN SYSTEM CONNECTION WITH EXISTING INFRASTRUCTURE

DETAIL OF PEDESTRIAN SYSTEM WITH INDEPENDENT STRUCTURAL

SYSTEM

EXISTING BUILDING CANTILEVER I-BEAMS

CREATING A CONNECTION BETWEEN NO-THRU LANEWAYS

ACTIVATION OF THE ROOFTOP SEPERATING THE LANEWAYS PROVIDES THE OPPORTUNITY TO CREATE A

LINKED PATHWAY

BREAKDOWN OF EXISTING PEDESTRIAN NETWORKS WITHIN MELBOURNE

NO-THRU LANEWAYS

LANEWAYS & MINOR ROADS

MAJOR ROADS

I-BEAM FORMING PRIMARY

STRUCTURAL ELEMENT

T I M B E R DECKING

S T O R M W A T E R PIPING

RAILING T I M B E R DECKING

RAILING

CONCRETE COLUMN FORMING PRIMARY

STRUCTURAL ELEMENT

I-BEAMS

CAPTURING & RECYCLING STORMWATER

WATER STORAGE BELOW LANEWAY ALLOWS FOR THE RETENTION OF WATER WHICH IS PUMPED BACK UP TO THE ACTIVATED ROOFTOP ABOVE

LARGE AMOUNTS OF WATER IS REMOVED FROM THE CITY VIA STORMWATER DRAINS

THE PEDESTRIAN SYSTEM CAPTURES SOME OF THIS RUNOFF IN ITS STORAGE FACILITY

MATT EAGLE FOLIO 2014 7ROOFSCAPES

3

ACTIVATING

Page 9: Matt Eagle Folio 2014

Bourke Street

Little Collins Street

Kitz Lane

William Street

Queen Street

Little Bourke Street

Thomson Street

VEGETATED AREASTEPPED TERRAIN

TIMBER COLUMN

WORK OUT AREA - TIMBER FLOORING

ANGLED SIT-UP STATION

BEGINNING OF “THE HILL”

VEGETATED AREA

GLASS FENCING

F

F

STEPS - 500MM HIGH FOR WORKOUT

GLASS SCREEN

EXISTING STRUCTURESUBSTRATE

TIMBER STRUCTURE

AB WORKOUT STATION

VEGETATION AREA

CHIN-UP BARS

PUSH-UP BARS

GLASS BARRIER

“THE HILL” - ANGLED AT 12 DEGREES

E

E

INTEGRATED TABLE TENNIS TABLE

TABLE & CHAIRS WITH CHESSBOARD TABLETOP

GIANT NOVELTY CHESSBOARD INTEGRATED INTO TERRAIN

INTEGRATED BENCH/ STEP

VEGETATED AREA

STEPPED TERRIN/ FURNITURE

EXISTING STRUCTURE OF BUILDING BELOW

SUBSTRATE AND STRUCTURAL CONDITIONING FOR VEGETATION

ANGLED TERRAIN PROVIDING FURNITURE AND LOOSE BARRIER BETWEEN ACTIVITIES

TRADITIONAL CHESS SETUP. UNDERCOVER CHAIRS AND TABLES

WALKABLE ROOF

VOID CREATING RESTING SPACES

VEGETATION AREA

TABLE TENNIS TABLE

GIANT CHESS

FF EE

THE HILL AT KITZ GAMES BENCH

0 5 10 15 20 25M0 5 10 15 20 25M

1:5000

ROOFSCAPES

3

ACTIVATING

Page 10: Matt Eagle Folio 2014

Bourke Street

Bourke Street

Sugden Place

Swanston Street

Elizabeth Street

EXISTING STRUCTURE OF BUILDING BELOW

SUBSTRATE & STRUCTURAL CONDITIONING

SERVING COUNTERWINERY

ROCK CLIMBING WALLGRAPES

TIMBER DECK CANTILEVERED FROM STRUCTURAL I-BEAMS

SAFETY BARRIER - GLASS

BALLASTRADEWALKABLE ROOR - VEGETATED AREA

C C

VEGETATED AREA

STONE TILES

TIMBER STRUCTURE

WATER PIPE SYSTEM OPERATING ON GRID TO CREATE WATER WALLS

VEGETATED AREA

GLASSES FENCING

VEGETATED AREATIMBER STRUCTURE WATER PIPES

VEGETATED AREA

GUTTER/ DRAIN SYSTEM FOR WATER WALLS

WATER STORAGE UNIT

EXISTING BUILDING STRUCTURE

SUBSTRATE

DD CC

CLIMBING AMONGST THE VINES WATERWALLS

0 5 10 15 20 25M 0 5 10 15 20 25M

1:5000

MATT EAGLE FOLIO 2014 9ROOFSCAPES

3

ACTIVATING

D

D

TIMBER DECKING

STEPS TO ROOFTOP

VERTICAL VINE YARD

MAIN STRUCTURE OF VINEYARD - I-BEAM

RAMP CONECTING MAIN FLOOR TO ROOF

PROCESSING WORKSHOP FOR WINERY - VATS/ SORTING TABLES/ SINKS

WINE BARRELS FOR STORAGE

WC

SERVING COUNTER

Page 11: Matt Eagle Folio 2014

Bourke Street

Little Collins Street

Little Bourke Street

Russell Street

Exhibition Street

Coromandel Place

Coverlid Place

POOL ROOM/ EQUIPMENT ROOM

STEPPED TERRAIN - TIMBER

WATER STORAGE AND PUMPING SYSTEM

WORKS IN A CYCLICAL NATURE, BEING RETURNED VIA THE “WATERFALL”

EXISTING STRUCTURE OF BUILDING BELOW

SUBSTRATE & STRUCTURAL CONDITIONING

POOLSAFETY BARRIER

CHANGEROOM/ SHOWER/ WC

WATERFALL EDGE - ALLOWS WATER TO FLOW BACK TO STORAGE/ PUMPING SYSTEM

BB

PLANT ROOM/ POOL EQUIPMENT

VEGETATED AREA

GLASS FENCE

TIMBER FLOORING

GUTTER FOR WATERFALL FROM ABOVE POOL

VEGETATED AREA

CHANGEROOMS/ SHOWERS/WC

WAVE PLATFORM STRUCTURE

POOL

STEPPED TERRAIN ABOVE POOL ROOM

A A

GOLF NETS

VEGETATED AREA

BALCONY

VOID IN STEPPED TERRAIN ALLOWING LIGHT TO PATHWAY BELOW

VOID IN STEPPED TERRAIN ALLOWING LIGHT TO PATHWAY BELOW

DESIGNATED RESTING SPACES

VEGETATED AREA

GOLF NETS

DESIGNATED RESTING SPACES

DESIGNATED RESTING SPACE

DESIGNATED RESTING SPACE

STEPPED TERRAIN

GOLF NETS

STEPPED TERRAIN GOLF NETS

PEDESTRIAN WALKWAY

VEGETATION SUBSTRATE & ADDITIONAL STRUCTURE

EXISTING BUILDINGS STRUCTURE

VEGETATED AREA

VEGETATED AREA

BB AA

SURFING IN THE CITY THE NETS

0 5 10 15 20 25M 0 5 10 15 20 25M

1:5000

MATT EAGLE FOLIO 2014 10ROOFSCAPES

3

ACTIVATING

Page 12: Matt Eagle Folio 2014

NODE 1 - GAMES BENCH NODE 3 - CLIMBING AMONGST THE VINES NODE 5 - SURFING IN THE CITY

NODE 2 - THE HILL AT KITZ NODE 4 - WATERWALLS NODE 6 - THE NETS

1

2

34

5

6

1:12500

ROOFSCAPES

3

ACTIVATING