Material Recovery Plan Material Recovery Plan 30 December 2017 Loan No. 3084
MYA: Power Distribution Improvement Project
Prepared by Yangon Electricity Supply Corporation (YESC) through the Ministry of Electricity
and Energy (MOEE) of the Union of the Myanmar Republic and the Asian Development
Bank.
This material recovery plan report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or área.
30/12/2017
The Republic of the Union of Myanmar
Ministry of Electricity and Energy
Yangon Electricity Supply Corporation
Material Recovery Plan
Loan No:3084-MYA (SF)
Power Distribution Improvement Project
Power Distribution Improvement Project Date: 30/12/2017
Material Recovery Plan Page: 1
Quantity
(No).KVA Location Quantiy Location
5 East North Dagon 1000 0 0 0
6 East Mingalar Taung Nyunt 200 0 0 0
7 East South Okkalaa 400 0 0 0
8 East Pa Zun Taung 400 0 0 0
9 South Hlaing Thar Yar 200 0 0 0
Note: Non recyclable materials are to be undergone for aution.
1
West Kamaryut
Inn Sein
1000
West Mayangone
North Mingalardone
North
1000
2000
1
Replaced KVA
Replaced Units
1000
2000
3000
1000
Installed
Capacity
3 10003000
Thiri Street, San Gyi Wa Quarter, Mingalardone Township
1.Lower Mingalardone Road ,Inn Sein Township
2.Corner of Lan Thit Road & Shwe Pyi Aye Street,Inn Sein
Township
1000
1.Corner of Aunt Theik Hti Street & Aung Theik Hti Kyaung
Street , Mayangone Township
2.Corner of Ah Laung Pha Yar Street & 8th
Street,Mayangone Township
2
1000
Township
Area: Yangon Region
PIC Expert: Phoo Ngon Thin
Action to Take
Reutilization Auction Abandon Estimated Date
X
Type of Material: Distribution Transformers
1
3
4
2
Item DistrictRecyclable Units (No) Not Recyclable Units (No)
Ma Hlwa Gone Substation,Mingalar Taung Nyunt Township
1000
X
X
Awaiting for other incoming
transformers to be autioned
together.
x
Done
Done
Done
DoneX
Total 9400 7500 17 7000
10 DalaSouth 200 0 1
Store,
Department of
transformer
maintenance
500 0
Power Distribution Improvement Project Date: 24 30/12/2017
Material Recovery Plan Page: 2
Area: Yangon Region
Type of Material: Line Materials
Quantity
(No).Material Location Quantiy (kg) Material Location
6 East North Okkalapa - 276 SWG 7/12 x Q4 2017/Q1 2018
7 East North Okkalapa 4Cx70mm2+1Cx16mm2 AL/XLPE/Insulated LV ABC Cable 237 HDBC No.6 x Q4 2017/Q1 2018
8 East North Okkalapa 4Cx70mm2+1Cx16mm2 AL/XLPE/Insulated LV ABC Cable 106 HDBC No.8 x Q4 2017/Q1 2018
9 West Kamaryut 11kV 1Cx120mm2 Aerial Spacer Cable 156 ACSR 70mm2 x Q4 2017/Q1 2018
10 West Kamaryut 11kV 1Cx120mm2 Aerial Spacer Cable 229 ACSR 95mm2 x Q4 2017/Q1 2018
11 West Kamaryut 4Cx70mm2+1Cx16mm2 AL/XLPE/Insulated LV ABC Cable 153 HDBC No.4 x Q4 2017/Q1 2018
12 West Kamaryut 4Cx70mm2+1Cx16mm2 AL/XLPE/Insulated LV ABC Cable 114 HDBC No.8 x Q4 2017/Q1 2018
20 North Mayangone 4Cx70mm2+1Cx16mm2 AL/XLPE/Insulated LV ABC Cable 36 HDBC No.6 x Q4 2017/Q1 2018
21 North Mayangone 4Cx70mm2+1Cx16mm2 AL/XLPE/Insulated LV ABC Cable 35 HDBC No.8 x Q4 2017/Q1 2018
22 North Ah Pyauk 4Cx70mm2+1Cx16mm2 AL/XLPE/Insulated LV ABC Cable 1100 ACSR 35mm2 x Q4 2017/Q1 2018
23 North Ah Pyauk 4Cx70mm2+1Cx16mm2 AL/XLPE/Insulated LV ABC Cable 325 ACSR 25mm2 x Q4 2017/Q1 2018
24 North Ah Pyauk 11kV 1Cx120mm2 Aerial Spacer Cable 129 ACSR 70mm2 x Q4 2017/Q1 2018
Note: Non recyclable materials are to be undergone for aution.
Q4 2017/Q1 2018
North Dar Pain 4Cx70mm2+1Cx16mm2 AL/XLPE/Insulated LV ABC Cable 278 HDBC No.6
North Dar Pain 4Cx70mm2+1Cx16mm2 AL/XLPE/Insulated LV ABC Cable 134 HDBC No.8
x Q4 2017/Q1 2018
x Q4 2017/Q1 2018
North Dar Pain 4Cx70mm2+1Cx16mm2 AL/XLPE/Insulated LV ABC Cable HDBC No.4 Q4 2017/Q1 2018
HDBC No.4
x435
Q4 2017/Q1 2018
x Q4 2017/Q1 2018
643.3
South
Hlaing thar yar
2
17
East Hlaing thar yar 4Cx70mm2+1Cx16mm2 AL/XLPE/Insulated LV ABC Cable 120.5
80.9
Hlaing thar yar 11kV 1Cx120mm2 Aerial Spacer Cable 240
East Hlaing thar yar 4Cx25mm2 AL/XLPE/Insulated ABC Cable 1155.2
16
11kV 1Cx120mm2 Aerial Spacer Cable 1467 ACSR 95mm2 x
x
0 0 8250.9
18
East Yan kin 4Cx70mm2+1Cx16mm2 AL/XLPE/Insulated LV ABC Cable
1 East Thinkankyun 11kV 1Cx120mm2 Aerial Spacer Cable
360
PIC Expert: Phoo Ngon Thin
Item District Township Unit (Nos.) to be replaced
Replaced Units
Recyclable Units (No) Not Recyclable Units (No)
428
Q4 2017/Q1 2018
ACSR 70mm2
ACSR 70mm2
4
3
HDBC No.8
ACSR 120mm2
4Cx70mm2+1Cx16mm2 AL/XLPE/Insulated LV ABC CableHlaing thar yarEast HDBC No.6
x Q4 2017/Q1 2018HDBC No.8 3ph,4W
South Hlaing thar yar 11kV 1Cx120mm2 Aerial Spacer Cable Q4 2017/Q1 2018
South
5
13
14
15
Main Store, Ahlone
Township
Action to Take
Reutilization Auction Abandon Estimated Date
x Done (May 2017)
x
x Q4 2017/Q1 2018
x
Total
Q4 2017/Q1 201819 North Mayangone 4Cx70mm2+1Cx16mm2 AL/XLPE/Insulated LV ABC Cable 13 HDBC No.4 x
Annex 1 :
Recyclable Units
Replaced Unit from Mayangone Township
Replaced Unit fromMayangone Township
Annex 2
Storage condition (ACSR,HDBC) at Ahlone Township, Storage Area
ACSR 95mm2 at Dala Township, Storage Area 400V HDBC at TwantayTownship, Storage
Annex 3:
List of reputable recycling service providers
No Company Name
1 Asia General Electric Co, Ltd
2 Capital Power Co, Ltd
3 Hitachi Soe Elecric & Machinery Co., Ltd
4 Chint Co., Ltd
5 UPT Co., Ltd
6 Yangon Transformer Electric Co., Ltd
1 Yangon Crown Wire Co., Ltd
Transformers
Cables & Conductors