Oak Avenue Gree Play Primary School 2 Cricket Pitch Circular Walk Extra Care Apartments Health Care Retail Retail MASTERPLANNING AND URBAN DESIGN .co.uk

MASTERPLANNING · 2020-02-25 · A12 Hall Rd Purdis Rd Straight Rd Allotments Sports Pitches Parking Parking ay venue ay venue venue Play Play Play Community Orchard Primary School

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

Page 1: MASTERPLANNING · 2020-02-25 · A12 Hall Rd Purdis Rd Straight Rd Allotments Sports Pitches Parking Parking ay venue ay venue venue Play Play Play Community Orchard Primary School

ILLUSTRATIVE MASTERPLAN3615-L-01 rev -

1:3000 @A1

18th April 2019 MO/ KMNGladman Developments LtdOrwell Green

\\Fpcr-vm-04\projects\7900\7939\LANDS\Plans\7939-L-11 REV J Illustrative Masterplan.indd

7939-L-11 revJILLUSTRATIVE MASTERPLAN

This drawing is the property of FPCR Environment and Design Ltd and is issued on the condition it is not reproduced, retained or disclosed to any unauthorised person, either wholly or in part without written consent of FPCR Environment and Design Ltd.

Aerial imagery © 2017 Bluesky, DigitalGlobe, Getmapping plc, Infoterra Ltd and Bluesky. Map data © 2017 Google

Residential (72.48 ha)(2,700 dwellings @ 36 dph including 100no apartments) within the Neighbourhood Centre)

New Roundabout Access off A12

Extra Care Apartments (0.9ha)

Sports Pitches & Changing Facilities (6.54ha)

Primary School (5.00ha)Primary School 1 - 2 Form Entry & Expansion (2.5ha)Primary School 2 - 2 Form Entry & Expansion (2.5ha)

Allotments (1.00ha)

Village Green with Cricket Pitch (1.90ha)

Play Areas (0.12ha included in GI Links)

Detention Basins (2.06ha)

Neighbourhood Centre (2.38ha)

Up to 100 ApartmentsSingle Large Retail Unit (400sqm)8 Smaller Retail Units/Terrace (800sqm)Doctors Surgery (600sqm)Community Building (400sqm)B1 Offices (400sqm)

Green Infrastructure - 43% of overall Area (60.84ha)

Community Park (17.6 ha)

Development - 57% of overall Area (81.04ha)

Proposed Infrastructure

Main Avenue

Secondary Streets

Green Lanes

Circular Walk

Existing Public Right of Way

Retained Trees and Hedgerow

Proposed Trees and Hedgerow

Proposed Street Trees

Green links (31.74ha)Pub/Restaurant (0.28ha)

Archaeological Features

Bund

Application Boundary (142.1 ha)Including 0.22ha for Works to Roundabout

J 58

A14

Bucklesham Rd

A12

Hall

Rd

Purdis Rd

Stra

ight

Rd

Allotments

Sports Pitches

Parking

Parking

Green

Way

Oak

Ave

nue

Gree

n W

ay

Lime Avenue

Lim

e Av

enue

Play

Play

Play

CommunityOrchard

Primary School 1

Primary School 2

Cricket Pitch

Community Park

Circular Walk

Circular Walk

Circular Walk

Pavilion & Changing

Extra Care Apartments

Health CareRetail

Retail

Pub/Restaurant

Changing Facilities

Village Green

N

0 100 200 300 400 500m

MASTERPLANNINGAND URBAN DESIGN

.co.uk

Page 2: MASTERPLANNING · 2020-02-25 · A12 Hall Rd Purdis Rd Straight Rd Allotments Sports Pitches Parking Parking ay venue ay venue venue Play Play Play Community Orchard Primary School

Introduction

FPCR are one of the UK’s longest established and most successful Environmental Design Practices

Cranbrook New Town, Exeter

FPCR’s team of Masterplanners and Urban Designers provide a varied range of services addressing all areas of Masterplanning and urban design.

As a multi-disciplinary practice, FPCR offers a high quality design service, drawing on a wide range of expertise.

The masterplanning of complex schemes on difficult sites has become a hallmark of the practice. Our mix of in-house site investigation and design skills enables us to provide a comprehensive and co-ordinated masterplanning service. Typical projects range from smaller schemes of 50 dwellings to sustainable urban extensions within excess of 5,000 new homes. We also masterplan multi modal distribution sites, employment parks and leisure development.

Our services include initial baseline surveys and audits, constraints analysis mapping, environmental capacity assessments, detailed designs, design guides and briefs. In contrast to some other urban design practices, we are frequently involved in subsequent implementation and management. This provides a practical understanding of development and what makes successful places.

We work on a large number of schemes throughout the UK, both as promotions through the local plan process, and planning applications.

We are able to offer a flexible and tailored approach to the delivery of our services to ensure that they offer value for money, are efficiently delivered and completed to agreed timescales and deadlines.

Page 3: MASTERPLANNING · 2020-02-25 · A12 Hall Rd Purdis Rd Straight Rd Allotments Sports Pitches Parking Parking ay venue ay venue venue Play Play Play Community Orchard Primary School

Constraints and Opportunities

We would visit the site and carry out an appraisal, alongside completing a desk study of site constraints and opportunities. This work would be presented on a constraints and opportunities plans, which could be used in due course within a Design and Access Statement, or other promotional material.

Development Concept, ‘Capacity’ and Parameter Plans

These plans are prepared in the early stages of the project, following the identification of constraints and opportunities, and will be informed by the work of other consultants, existing studies and early appraisal work. They consider the overall extent and form of the development and enable the areas for built development to be identified and quantified.

Framework Plans

Framework Plans include, amongst other things:

the application/proposed development boundary;the location and amount of built land uses;the average development density;green infrastructure to include drainage features;retained features/site vegetation;vehicular points of access into the site;maximum heights of buildings/features; andany specific mitigation strategies

The Framework Plan will evolve and be refined during the baseline process following liaison with other team members covering issues such as planning, drainage, highways, ecology, and landscape.

Public Consultation

If required we can produce a suite of presentation material, from promotional documents to display boards, using our in-house graphic design team.

Display boards explain the need for the scheme, and the proposed design approach. The illustrative material can include indicative three dimensional illustrations of the proposed development. We can also host websites for specific developments.

Design and Access Statement and Illustrative MasterplanThe Design and Access Statement (DAS) is a key planning document to demonstrate the design process from concept to development proposals. FPCR is highly experienced at producing attractive and easy to follow DAS’s. They typically include illustrative photographs, plans and diagrams. The DAS covers: response to context; amount; layout; scale; access; landscape; and appearance. The document can also include some 3D sketches/sections of ‘character streets’ or ‘character areas’.

The DAS would include a ‘Vision’ for the development through the use of urban design principles and an Illustrative Layout. The DAS, for outline schemes, will illustrate how the development could come forward and will provide a framework for the detailed Reserved Matters.

The following pages illustrate a range of recent projects.

Typical ApproachThe initial stage of work would involve meeting the client and consultant team, and becoming fully aware of the background and objectives of the project.

Bridgwater, Somerset

Page 4: MASTERPLANNING · 2020-02-25 · A12 Hall Rd Purdis Rd Straight Rd Allotments Sports Pitches Parking Parking ay venue ay venue venue Play Play Play Community Orchard Primary School

Key assets of the site such as the “Willow Man” sculpture informed the masterplanning approach

Bridgwater, Somerset

A complex and ecologically sensitive site, consent has been granted for 2,000 new homes, a Primary School, and Local Centre. The proposal also includes 30 hectares of employment use, to include a new Regional Distribution Centre for Wm Morrisons Supermarket plc.

The practice prepared and coordinated the Environmental Impact Assessment, the Masterplan, the Design & Access Statement, and the Green Infrastructure Biodiversity Strategy. FPCR liaised with Sedgemoor District Council on the “Vision for Bridgwater”, as well as working closely both with the Council and Natural England during the application process. The practice provided landscape services to include a LVIA as part of the Morrison Regional Distribution Centre. This is now operational and, in accordance with the aspirations of the local planning authority, forms a distinctive landmark building alongside the M5 corridor.

FPCR are the environmental and masterplanning consultants, for a major 143 hectare mixed use development on the northern edge of Bridgwater.

Client: Hallam Land ManagementLocation: SomersetProject Details: 143Ha 2,000 new homes Primary School Local Centre Wm Morrisons Supermarket

Page 5: MASTERPLANNING · 2020-02-25 · A12 Hall Rd Purdis Rd Straight Rd Allotments Sports Pitches Parking Parking ay venue ay venue venue Play Play Play Community Orchard Primary School

West Of Loughborough

FPCR also provided specialist EIA studies including landscape and visual, ecology and nature conservation, and arboricultural studies.

Our approach has been to work closely with the Clients Project team as well as Charnwood Borough Council’s officers and key stakeholders such as Heritage England, Natural England, the Environment Agency, County Council Highways and Highways England to ensure that the most sustainable WOL Masterplan has evolved, driven iteratively by a comprehensive base line analysis of all the environmental and heritage assets across the site and its setting. The existing network of landscape and biodiversity features are retained and enhanced to form an attractive setting for 3,200 homes, new schools, local centre and a 14 hectare business park. The historic Garendon Park will be restored to become a gateway public open space for the local community.

FPCRs Masterplan is supported by a comprehensive Design and Access Statement (DAS) and Green Infrastructure Biodiversity Management Plan (GIBMP). The SUE gained planning consent in 2015 and we are currently assisting with Reserved Matters Applications.

FPCR are the lead designers for this sustainable Urban Development (SUE) to the west of Loughborough (WOL).

Client: Persimmon Homes, William Davis Ltd

Location: West of LoughboroughProject Details: Restored historic park 3,200 new homes Schools and Local Centre 14Ha Business Park

Illustrative Aerial Perspective

Page 6: MASTERPLANNING · 2020-02-25 · A12 Hall Rd Purdis Rd Straight Rd Allotments Sports Pitches Parking Parking ay venue ay venue venue Play Play Play Community Orchard Primary School

New Lubbesthorpe, Leicestershire

Around half of the 400 hectare site dedicated as green space taking the form of extensive new parklands, encompassing the Lubbesthorpe Deserted Medieval Village (a Scheduled Monument) and Lubbesthorpe Brook, as well as new informal and formal public open space. New road infrastructure includes two new bridges crossing both the M1 and M69 motorways to connect the development with Leicester to the east of the M1 and to provide a link between the new housing and the strategic employment site located south of the M69.

FPCR have provided landscape, ecology and arboricultural services and co-ordinated the Environmental Impact Assessment (EIA) work. The Practice also produced the Green Infrastructure and Biodiversity Framework and Management Plan and the Arboricultural Assessment, along with the Landscape and Visual Impact Assessment, Ecological Assessment and Waste Assessment for the Environmental Statement.

Following outline approval, FPCR are preparing the Green Infrastructure package for the first phase of development and detailed landscape and public realm design for Reserved Matters Applications.

A significant urban extension of 4,250 new homes together with a secondary and two primary schools, a district centre, two local centres and a gateway employment area as well as a further strategic employment site.

Client: Hallam Land Management, Barratt David Wilson, Davidson Developments

Location: LeicestershireProject Details: 400Ha 4,250 new homes Secondary and Primary Schools A District Centre and two Local Centres

Page 7: MASTERPLANNING · 2020-02-25 · A12 Hall Rd Purdis Rd Straight Rd Allotments Sports Pitches Parking Parking ay venue ay venue venue Play Play Play Community Orchard Primary School

The Bridge, Dartford

Client: Prologis DevelopmentsLocation: DartfordProject Details: 105Ha site Sensitively designed Masterplan 200 water voles transferred to a breeding facility

The scheme comprises a mixed-use business and innovation park, 1,500 new homes, and enhanced green infrastructure within the Thames Gateway. The site supported common lizard, slow worms, grass snakes and a large population of water vole.

FPCR have been heavily involved with this project since 1999, where the masterplan was sensitively designed to protect and enhance existing habitats. Care was taken to ensure that those species recorded continue to occupy the site in perpetuity. Reptiles within the site were translocated to specifically created reserves to protect them from injury and ensure the population thrives and grows, thus maintaining their Favourable Conservation Status.

Water vole trapping was undertaken over two years and transferred to a breeding facility, where their offspring was used for reintroduction around the UK. Habitats within The Bridge were created for water voles which included ditches and areas around both large lakes; the fourth generation of the original population was reintroduced into The Bridge.

The site now supports a very successful mixed use community, served by an innovative ‘Fast track’ guided bus network linking to Bluewater Retail Park and Dartford Station

FPCR provided Landscape, Masterplanning, EIA co-ordination and Ecological surveys and guidance at The Bridge development, a 105 hectare site in Dartford.

Aerial Photograph

Page 8: MASTERPLANNING · 2020-02-25 · A12 Hall Rd Purdis Rd Straight Rd Allotments Sports Pitches Parking Parking ay venue ay venue venue Play Play Play Community Orchard Primary School

SwiftValley

CommunityPark

EmploymentSite

M1

M1

A4303

Gilmorto

n Road

Swinford Road

A4304

Misterton

Rye CloseSpinney

River Swift

Lutterworth

GilmortonFields

MistertonMarshes SSSI

WycliffeFields

Gilm

orto

n Ro

ad

'Swift ValleyBusiness Park'

ThornboroughSpinney

UpperThornborough

A426 Leicester Road

2.00 ha

Misterton

-

rev date description drn chkd

CAD file:

client

project

drawing title

scale

drawing number

drawn / checked revision date

rev

environmental assessment

arboriculture

ecology

masterplanning

landscape designurban design FPCR Environment and Design Ltd

Lockington HallLockingtonDerby DE74 2RH

t: 01509 672772f: 01509 674565e: [email protected]: www.fpcr.co.uk

fpcrarchitecture

Leicestershire County Council

East of Lutterworth Strategic Development AreaLutterworth

ILLUSTRATIVE MASTERPLAN

1:5000 @ A1 DB / BC 27 February 2019

8379-L-05 E\\FPCR-VM-04\EarlyWork\8300\8379\LANDS\Plans\8379-L-05E Illustrative Masterplan.dwg

NOTESAll dimensions to be verified on site. Do not scale this drawing. Any discrepancies to beclarified with project Landscape Architect.

This drawing is the property of FPCR Environment and Design Ltd and is issued on thecondition it is not reproduced, retained or disclosed to any unauthorised person, eitherwholly or in part without written consent of FPCR Environment and Design Ltd.

Ordnance Survey material - Crown Copyright. All rights reserved. Licence Number:100019980 (Centremapslive.com).

N

KEY

0 500m100 200 300 400

Application Boundary

Main Street

Residential

Employment

Misterton Marshes SSSI

Community Hub

Primary School

Spine Road

Swift Valley Community Park

Sports Pitches with Changing Pavilion

Indicative Equipped Children's Play Area

Retained Hedgerows, Trees and Woodland

River Swift and Existing Watercourses

Allotments

Sustainable Transport Link

Proposed Structural Planting Framework(includes woodland, hedges, shrubs)

Zone for Sustainable Drainage Features

Greenways - Existing Rights of Way and PermissiveWalking Routes Upgraded and New Walking andCycling Routes

Built Development

Up to 2,750 homes at circa 38 dph. Includesresidential element within the Community Hub.

Access

Green InfrastructureIncludes: Retained hedgerows, trees, watercourses, SSSI and existing woodland, newwoodland, hedgerows, tree planting, play, grassland, wetland habitats and drainagebasins, recreational routes, greenways, allotments, cemetery and sports pitches.

The Illustrative Masterplan is indicative. It provides an indication ofthe design approaches envisaged. It illustrates how the detailedlayout, scale and appearance of streets, buildings and green spacecould come forward as part of reserved matters applications basedupon the configuration of land uses defined on the Parameters Plan.

Retail, Health, Community and Cultural Facilities

Bus, Pedestrian and Cyclist Only

Lutterworth East

Allocated as a Strategic Development Area, a planning application has been submitted for a mixed-use development of 2,750 homes, primary schools, neighbourhood centre, employment, parks and greenspace.

The masterplan, which has been developed through the iterative process of an Environmental Impact Assessment (EIA) and various stakeholder engagements, is focused on three new neighbourhoods that extend from the central greenspace of Misterton Marshes SSSI and the valley of the river Swift. Clear direct connectivity around the layout and into Lutterworth is a key component of the scheme, together with an extensive green infrastructure that includes a new Swift Valley Community Park.

FPCR are providing masterplanning and urban design advice for all elements of the scheme, which includes preparing the project’s Design Code. As a multidisciplinary practice, FPCR coordinated the EIA process, in addition to providing landscape, ecological and arboricultural services.

Appointed by Leicestershire County Council, FPCR are the masterplanners for the Lutterworth East development.

Client: Leicestershire County CouncilLocation: LeicestershireProject Details: 2,750 new homes Primary Schools Neighbourhood Centre Employment Community ParkIllustrative MasterplanIllustrative visualisations for the public realm design

Page 9: MASTERPLANNING · 2020-02-25 · A12 Hall Rd Purdis Rd Straight Rd Allotments Sports Pitches Parking Parking ay venue ay venue venue Play Play Play Community Orchard Primary School

East Midlands Gateway

East Midlands Gateway SRFI will deliver 6 million sq. ft of rail and road served warehousing; including an intermodal freight terminal, new road and rail infrastructure, a public transport interchange and extensive new landscape and environmental proposals. This Nationally Significant Infrastructure project (NSIP) received its Development Consent Order in 2016 and follows on from other successful SRFI projects undertaken by the practice. The site is located very close to our office at Lockington, being next to Junction 24 of the M1 motorway and north of East Midlands Airport.

Extensive consultation underpinned this NSIP process and the practice was central to this providing visualisations, photomontages, landscape masterplans and site sections. The practice also worked alongside a specialist firm on the production of a detailed visual ‘fly through’ of the scheme, which supported the public consultation and visual assessment work.

Further detailed analysis included the production of computer modelled Zones of Theoretical Visibility (ZTV) to inform the design and assessment process.

FPCR provided landscape masterplanning, impact assessment and arboricultural services on the project and were instrumental in shaping the proposals and delivering a strong Landscape and Green Infrastructure Strategy.

Client: RoxhillLocation: DerbyshireProject Details: 6 million sq. ft Rail and road served warehousing

Aerial Photograph

Page 10: MASTERPLANNING · 2020-02-25 · A12 Hall Rd Purdis Rd Straight Rd Allotments Sports Pitches Parking Parking ay venue ay venue venue Play Play Play Community Orchard Primary School

Bishop’s Stortford North

The consented scheme provides up to 2,200 new homes, two Local Centres and Primary Schools, 21,000m2 of employment, and around 59 hectares of multifunctional greenspace and landscape habitats.

FPCR produced the ‘ground up’ Masterplan with particular attention paid to landform, retained habitats, heritage issues, walking and cycling and urban design strategies. FPCR also produced a Design & Access Statement, a Green Infrastructure Strategy Document, and a series of Design Codes and Proving Layouts to inform the detailed design. The practice also undertook extensive liaison with statutory consultees and local interest groups as well as providing presentations to the Council and Members.

FPCR are working with the consortium on the reserved matters application, which includes producing the detailed landscape design and management strategies for the development.

FPCR are the lead masterplanning, landscape, ecological and arboricultural consultants for the mixed use 130 hectare development at Bishop’s Stortford North.

Client: Bishop’s Stortford North Consortium(Bovis, Taylor Wimpey, Persimmon, Kier and Fairfield Partnership)

Location: HertfordshireProject Details: 130Ha

2,200 new homesTwo Local Centres and Primary Schools59Ha of multifunctional greenspace

Illustrative Masterplan

Page 11: MASTERPLANNING · 2020-02-25 · A12 Hall Rd Purdis Rd Straight Rd Allotments Sports Pitches Parking Parking ay venue ay venue venue Play Play Play Community Orchard Primary School

8006-P-02

PLANNING LAYOUT

InDesign file: K:\8000\8006\LANDS\Plans\8006-P-02 rev D - Planning Layout - Whole Site.indd

drawing number

1:1250 @ A1scale drawn / checked revision date

revision

drawing title

Land at Otterham Quay Lane,Rainham

project

Persimmon Homesclient

fpcr

masterplanning environmental assessment

landscape design urban design

ecology architecture

arboriculture

FPCR Environment and Design LtdLockington HallLockington Derby DE74 2RH

t: 01509 672772f: 01509 674565e: [email protected]: www.fpcr.co.uk

rev date revision drn chkd

D 31.08.2018 Minor amendments to client comments TCM KMN C 02.08.2018 Minor amendments to client comments TCM KMNB 31.07.2018 Minor amendments to client comments TCM KMNA 27.07.2018 Minor amendments to client comments TCM KMN - 20.07.2018 First issue. TCM KMN

DTCM / KMN 31 August 2018

NOTESThis drawing is the property of FPCR Environment and Design Ltd and is issued on the condition it is not reproduced, retained or disclosed to any unauthorised person, either wholly or in part without written consent of FPCR Environment and Design Ltd.Ordnance Survey Mastermap - Crown Copyright. All rights reserved. Licence Number 100019980 (Centremapslive.com).

N

0 125m25 50 75 100

Riverside Primary School

Railway

Otte

rham

Qua

y La

ne

Wak

eley

Roa

d

Farn

ham

Clo

se

VineyardCrescent

Seym

our R

oad

Canterbury LaneCloverlay Industrial Park

ChestnutCourt

8006-P-04

8006-P-03

Rainham

The scheme was given Reserved Matters approval at the Medway Planning Committee on 21st November 2018. FPCR also developed the masterplan for the 300 unit scheme. The scheme creates two distinctive character areas, both reflecting local vernacular in the built form and landscape character. The elevations include the use of protruding zinc effect picture frame windows, buff brick and dark grey composite weatherboard cladding.

FPCR also created a fly through which shows part of the scheme, starting within the higher density terraced character area, crossing the central open space and orchards finishing within the lower density rural edge.

At Rainham, Kent, FPCR have worked with Persimmon South East to produce new contemporary elevations for their house types and bespoke apartments.

Client: Persimmon SouthLocation: KentProject Details: 300 new homes

Masterplanners Production of detailed house types

Planning Layout Illustrative visualisations

Page 12: MASTERPLANNING · 2020-02-25 · A12 Hall Rd Purdis Rd Straight Rd Allotments Sports Pitches Parking Parking ay venue ay venue venue Play Play Play Community Orchard Primary School

Select Client List

North Notts College North West Regional Health Authority Northamptonshire County CouncilNottinghamshire County CouncilNottingham City AirportNottingham Trent UniversityOxford Brookes UniversityParkridgePersimmon HomesProLogisPure Leisure GroupRedrow HomesRolls Royce Aerospace GroupRosconnRoxhill Developments LtdSavillsSegroSevern TrentShropshire County CouncilSkanskaSouth Derbyshire District CouncilSouth Northamptonshire CouncilSt Modwen Developments LtdSytner CarsTarmacTaylor WimpeyThe National ForestTurner & TownsendUniversity of LeicesterUniversity of OxfordWaystone LtdWesterman HomesWilliam DavisWilson Bowden DevelopmentsWincanton LogisticsWinvic Construction

Forestry Commission Gallagher EstatesGalliford TryGladmanGleeson DevelopmentsGoodmanHallam Land Management LtdHansonHarworthHighways EnglandHistoric EnglandHomes EnglandIKEAIM PropertiesJ B Developments Partnership LtdJCBJelsonKeepmoat HomesLafargeLaing O’RourkeLands ImprovementLarkfleet HomesLidlLincoln City CouncilLondon Thames GatewayLeicestershire County CouncilLoughborough UniversityMactaggart and MickelMick GeorgeMillerMinistry of DefenceNational GridNational TrustNatural EnglandNetwork RailNorbert Dentressangle

Althorp EstateAmazonAvant HomesBakBalfour BeattyBarratt HomesBarwood HomesBellway HomesBirmingham City CouncilBirmingham City UniversityBirmingham International AirportBloor HomesBovis HomesBritish Airports AuthorityBritish GasBritish Land DevelopmentsCALA HomesCambridgeshire County CouncilCambridge UniversityCentral NetworksCharles ChurchChesterfield CollegeChurch CommissionersCity of LondonCommercial Estates GroupCo-opCorby Borough CouncilCory EnvironmentalCrown EstateDavid Wilson HomesDavidson DevelopmentsEast Midlands AirportEnvironment AgencyEverards BreweryExtracare Charitable TrustFCC Environment

Page 13: MASTERPLANNING · 2020-02-25 · A12 Hall Rd Purdis Rd Straight Rd Allotments Sports Pitches Parking Parking ay venue ay venue venue Play Play Play Community Orchard Primary School

DORKING OFFICE

LOCKINGTON HALLHEAD OFFICE

EXETER OFFICE

YORK OFFICE

LOCKINGTON HALL (HEAD OFFICE)FPCR Environment and Design Ltd

Lockington HallLockington

DerbyDE74 2RH

tel: 01509 672772

FPCRFPCR are extremely versatile because of their combined long term expertise across a huge range of varied projects. The diverse integrated team thrive on complex and challenging schemes, ranging from the restoration of historic landscaped parks to the masterplanning of 21st century garden villages. We are happy to explore any opportunity. For more information, please see our website or contact us by email or telephone.

YORK OFFICEFPCR Environment and Design Ltd

The National Agri-Food Innovation CampusSand Hutton

York YO41 1LZ

tel: 01904 406112

www.fpcr.co.uk [email protected]

EXETER OFFICEFPCR Environment and Design Ltd

Addlepool Business CentreClyst St George

ExeterEX3 0NR

tel: 01392 874499

DORKING OFFICEFPCR Environment and Design Ltd

Studio 2 Dunley Hill CourtDunley Hill Farm

RanmoreDorking

RH5 6SXtel: 01483 282523

■ masterplanning ■ environmental assessment ■ landscape design■ urban design ■ ecology ■ architecture ■ arboriculture ■ graphic design

.co.uk