Upload
aj369
View
28
Download
3
Embed Size (px)
DESCRIPTION
Master Workshop - Construction Claims & Forensic Delay Analysis - Brochure
Citation preview
MASTER WORKSHOP: CONSTRUCTION CLAIMS (FIDIC & Other Forms of Contract)
A Full-Day Practical Course (09:00—18:00 Hrs)
(This Course Will Be Held in English & Polish)
Warsaw: July 27, 2010 Venue: TGC Conference Centre (ul. Królewska 27)
Wrocław: August 3, 2010 Venue: To Be Confirmed Kraków: August 10, 2010 Venue: To Be Confirmed Fees: PLN499/€125 (Early Rate: Until 20/07/10), PLN599/€149 (From 21/07/10)
Actions Speak Louder Than Words…
THIS IS NOT A SEMINAR, IT’S A WORKSHOP!
Following On From Prime Consulting’s Highly Successful Master Workshops On Construction Claims In Europe, We
Are Pleased To Announce The Launch Of This Event In The U.A.E. This Is Not A Seminar But A Full Day Intensive Course Filled With Workshops/Case Studies Which Will
Enable The Attendees To Comprehensively Understand How To Prepare Construction Claims And Carry Out Forensic
Delay Analyses. Delegates Will Be Provided With Laptops, Planning Software And Will Be Taught The Basics Of The Latter. Subsequently, Each Delegate Will Be
Involved In Carrying Out Delay Analyses Using Recognised Industry Methodologies Such As As-Planned Impacted,
Collapsed As-Built, Time Impact Analysis Et Al. The Delegates Will Also Be Involved In Analysing/Creating EOT, Acceleration And Disruption Claims.
“Real World” Workshops On Claims And Forensic Claims
Planning Will Be Analysed & Solved By Each Attendee On
Laptops (Primavera Project Planning Software Will Be
Used For The Delay Analysis Workshops – Delegates Will
Also Be Given A Basic Course On How To Use Primavera).
Topics Covered Include:
A Detailed Introduction To The Science Behind Claims.
Extension of Time Claims (With Workshop).
Disruption/Acceleration Claims (With Workshops).
Preparing a Defence Against a
Claim (With Workshop).
Forensic Delay Analysis with Workshops (Using Primavera).
Who Should Attend?
This Workshop Provides Essential
Training To All Professionals Operating In The Real Estate And
Construction Industry Including Investors, Contractors, Lawyers, Consultants, Bankers, Insurers &
Others Involved With Construction Projects.
Please Note That Prior
Knowledge Of Primavera Is Not Required To Attend This Course. Basic Primavera
Training Will Be Provided At The Workshop.
Places Are Strictly Limited, Early
Booking Is Recommended. Group Discounts (10%) Are Available For More Than 5 Delegates.
To Register for the Master Workshop, Please Contact:
Ms.Rachel John Email: [email protected]
Tel: +9714 325 7373 Fax: +9714 325 7474
SPEAKERS:
LEE SPORLE:
Lee Is Based In Dubai And Is The Managing Director Of
Sporle Consultancy Services Which Specialises In Providing Forensic Claims Planning Services And Other Comprehensive Planning Solutions To Companies. Lee Is A
Qualified Building Services Engineer And A Construction Delay Analyst/Forensic Planner Having Over 24 Years
Experience, 16 Of Which Have Been In The Middle East. He Has Worked/Consulted In The UK, Egypt, Qatar, Bahrain, Oman, Indonesia, Morocco And The UAE.
N.M.RAJ:
N.M.Raj Is Based In Europe And Is The Managing Partner
Of Prime Consulting – Construction Claims & Contracts Consultants And The Author Of “Quick Guide To Construction Claims”. He Has Around 20 Years Of
Commercial/Claims Management Experience On Iconic Projects Such As The Limerick Tunnel - Ireland, Zlote
Tarasy - Poland, Media City – Egypt, Gazprom Tower – Russia Et Al. Raj Has Worked/Consulted In UK/Ireland, Europe, Russia/CIS, Asia, Africa, Middle East & The Far
East. He Specialises In Construction Claims, FIDIC Contracts (And Other Major Forms Of Contract) &
Commercial/Contracts Management. Raj Holds Dual Qualifications In Engineering & English Law; He Has A Degree In Civil Engineering And Is A Member (MCIArb) of
the Chartered Institute of Arbitrators (UK) & FIDIC. Raj Has Also Held Memberships With The RICS (UK), CIOB
(UK), AACE (US) and APM (UK).
MASTER WORKSHOP (CONSTRUCTION CLAIMS & FORENSIC DELAY ANALYSIS)
A Full-Day Practical Course (09:00—18:00 Hrs)
Dubai, UAE: December 12th, 2010, Venue: Dusit Thani
ORGANISER (MENA)
Sporle Consultancy Services An ACSESSLINE Group Company
ORGANISER (EUROPE): Prime Consulting
Construction Claims & Contracts Consultants(
Please Contact Ms.Rachel John At +9714 325 7373 (Fax: +9714 325 7474) To Check For The Availability Of Seats And Confirm The Registration Prior To Making Any Payments.
Please Email The Following Data To [email protected]
Name of Company: ___________________________________________ Address of Company: ___________________________________________
Contact Person: ___________________________________________
Telephone: ___________________________________________
Email: ___________________________________________
Name & Position of Delegates
1. _____________________________ 2.______________________
3. _____________________________ 4.______________________ 5. _____________________________ 6.______________________
After Registration, Please Transfer The Requisite Course Fees To The Following Bank Account.
Please Include Details of Your Company in the Bank Transfer and Email Details of the Transfer To [email protected].
MASTER WORKSHOP FEES : USD 300.00 (Lunch Included)
BANK ACCOUNT DETAILS:
Name Of bank: Emirates NBD
Bank Address: EBILAEAD , CIF Number- 42452874 Emirates NBD, Sheikh Zayed Road Branch, P.O.Box: 777
Recipient : Lee Sporle
Account No: 102- 42452874-02 (USD)
SWIFT: EBILAEAD , CIF Number- 42452874 ADDITIONAL INFORMATION:
All Attendees Will Be Given A Certificate Of Completion (Including Professional Development Hours/Credits) And Detailed Course Materials.
For Queries, Please Contact: Ms.Rachel John Email: [email protected] Tel: +9714 325 7373
Note: Payment should be made in advance of the event. It is not possible to offer a refund for any
cancellations, however, a replacement delegate may be sent at no additional cost. In case of any unforeseen
circumstance(s) beyond our control, we reserve the right to change the content, timing, speakers and/or
venue.
REGISTRATION FORM
PAYMENT
RECOMMENDATIONS FOR THE SPEAKER: LEE SPORLE
“I had the pleasure of working with Lee for Knowles Middle East. Lee worked hands-on whilst
directing, supervising and training the regional planning and delay analysis teams. Lee’s outstanding knowledge and reputation has earned him great respect as a competent construction professional and expert delay analyst.”
Gary Beamish
Project Director & Claims Consultant, Hill International (formerly Knowles Middle East) “I have worked with Lee on many projects and found his expertise and experience invaluable in
achieving the Client's aims.”
Colin Smith Associate Director, J R Knowles Middle East Ltd
“We employed Lee to undertake a review of our procedure and processes behind our planning departments operation. The aim was to identify weakness and opportunities for us to develop
systems staff and procedures to use in the estimation, creation and execution of projects. As well as creating both a template for general usage, weighted and coded to suit our needs (specifically MEP related) he was tasked with communicating the changes to the stakeholders including those
whom owned the planning works as well as those that would be using what was developed, at estimation and execution stage on site.”
Top qualities: Personable, Expert, On Time Peter Brimson,
Project Director at Habtoor Specon
“Lee has worked with Fairway going back several years. He assisted us on various projects providing his expertise in delay analysis in clear and concise reports.”
John McSheaffrey
Associate Director and Regional Manager, Gulf, Gardiner & Theobald Fairway
“Lee is a very professional, smart and talented director. Lee manages the task of directing his successful consultancy business, but still find time to engage personally with each of his
consultants, making you feel valued and part of the team. FLC provided many exciting and challenging opportunities for me and I got the chance to work for some very first-rate clients.”
Darren Jones
Senior Planning Consultant, First Line Consultancy
“I have known Lee both professionally and personally for over three years and have always found
him to be the consummate professional - always willing to go the extra distance to ensure quality and content of services provided.” Top qualities: Great Results, On Time, High Integrity
Stephen Counsell
Contracts Manager at Habtoor-Specon
RECOMMENDATIONS FOR THE SPEAKER: N.M.RAJ
“I worked with Raj on a landmark project in Europe. Raj's knowledge and understanding of construction claims and FIDIC form of contracts is unparalleled; as a result, we were able to
protect our contractual rights and under his guidance successfully able to protect our contractual entitlements both in terms of cost and extensions of time. The experience and lessons learnt
during this period continue to prove invaluable.” Nigel Taylor, (Former Planning Manager - Skanska, Europe) Regional Planning Manager
(North Africa), Consolidated Contractors Company
“Raj did some excellent work to resolve complex claims from two subcontractors to Bovis Lend Lease (In Europe). Had the claims been successful there would have been a very significant impact to my project in terms of both delay to production start-up and potentially cost. Raj lead the BLL
response to these claims in such a way that installation and commissioning of equipment was not impacted and there was no financial implication to my project. Raj was highly professional in his
dealings with myself and the subcontractors concerned and worked with me in a very open way. I would certainly employ Raj again and was highly impressed with his work. Top qualities: Great Results, Personable, Expert”
Jonathan May, Manager of Projects, Cadbury plc. (Europe)
“During the time Raj worked for Skanska he demonstrated clear thinking, attention to detail, a strong awareness of what was needed for good risk management and an ability to deliver to
targets whilst maintaining good working relationships with his colleagues. Raj was always an asset to the team.”
Ian Luke, Managing Director, Skanska Cementation International Limited (United Kingdom)
“Raj provided sound advice and recommendations to me, on managing construction claims and training of employees, which I expected from the highly professional commercial executive that he
is.” Graham Smithard,
Project Director, Bovis Lend Lease (Russia) “Raj is an experienced commercial manager, specialising in contract claims, developed through his
years as a contractor and as a consultant/project manager working for commercial real estate developers. His proactive & enthusiastic approach to this subject provides his clients and
employers with a roadmap to preventing and mitigating claims for additional cost and time in both design and construction, as well as to contractors in formulating claims. His capability to cover this tricky and involved subject can greatly assist both employers and contractors in formulating their
claims, as well as finding equitable methods to resolving them.” Peter Titus, (Former European Director - BLL)
General Manager Emaar International (Jordan)
“Raj is a highly motivated, extremely professional individual with extensive expertise in the field of Dispute resolution and Claims Management. Raj has provided an invaluable service to many clients
and his systematic approach and in-depth knowledge of dispute resolution ensures he is a leader in his field. Client orientated and a committed team leader, Raj comes highly recommended.” Kevin Murphy,
Senior Commercial Manager, Bovis Lend Lease (Russia)
“I worked with Raj in Romania & Ireland where he remotely and on site helped us with contractual issues and claims. I found him to be extremely professional and an expert in his field. It was a pleasure to work with Raj and I look forward to working with him in the future.”
Warren Collins, Director, Collins Construction & Project Management (Ireland)
A FEW QUOTES FROM DELEGATES THAT ATTENDED THE MASTER WORKSHOP(S) IN EUROPE
Prime Consulting’s last four conferences in Europe had a combined attendance of around
200 delegates from top companies from the real estate, construction, banking and legal sectors, including ING, WBK, Bank Aaeral, Mayland, Hochtief, Bilfinger Berger, Skanska,
Ove Arup, Arcadis, Bovis Lend Lease, Porr, Strabag, Jones Lang LaSalle, Quinlan Private Golub, Apsys, AIG, Eiffage, Mota-Engil, Clifford Chance, Europolis Real Estate, Linklaters,
Eversheds, Baker McKenzie, TGC, Chadbourne & Parke, Beiten Burkhardt, Westdeutche ImmobilienBank AG, Wolf Theiss and several others, including representatives from the
government.
"Highly recommended. The subject of claims simplified in a very realistic and practical manner."
Denis Toomey Project Manager & Contract Specialist
“Without a doubt, the best seminar of its kind in all of Europe. You will have a much better understanding of the intricacies of FIDIC and construction disputes.”
James Yrkoski, Attorney At Law
TGC Corporate Lawyers “A great workshop, a perfect combination of theoretical knowledge and practical examples; I really
appreciated it”. Ioan Dracopol,
Senior Project Manager (Europe) “Raj’s construction claims seminar can make the difference when you are involved with preparing a
construction claim. The seminar had a multitude of real life case studies & workshops which were very practical and also involved key legal principles. I strongly recommend it to legal, technical and
acquisition specialists.” Gheorghe Cuzuc Legal Counsel
Stewart Title Limited
“I think it's definitely the best workshop on FIDIC I have attended so far. As a lawyer specialised in FIDIC agreements, I can definitely say it was extremely useful for a much better understanding of the claims mechanisms. Thank you!”
Adrian Savin Associate
SCPA Biris Goran “Without any doubt the master workshop produces results, offers in-depth study of construction
claims topics and has been specifically developed to address the most relevant needs of today's claims.”
Eng. Anca Luca Contract Administrator
S.C. EUROCONSTRUCT S.A “The structure of the seminar was really well thought out. The interactive tools used generated
lively discussions and I found this to be a highly effective method for sharing valuable information. The overall quality of the seminar was simply outstanding and I feel that I gained a much better
understanding of FIDIC and construction disputes in a short space of time. Dragos Iacob Attorney-at-Law
WOLF THEISS