MASSA /WH-01-2014
NO. of Pages REV. NO DATE
39 pages 02/2014 1/11/2014
WWW.MASSACONSULTING.ORG
Page2
MASSA CONSULTING LTD is a private company established at 1999 working in the
field of consulting and inspection services and had been converted to LTD Company in 2004.
The company has a wide range of experience in supervision, execution of inspection services
our inspection works history is categorized as following:
Third Party, Supervision, Consultation, Manpower Supply & Client Representation -1
Plant Inspection -2
Electrical Power Stations and Steam Boilers -3
Natural Gas and Oil Pipe Lines -4
and Storage Tanks InspectionPiping -5
Pressure Vessels (ASME Stamped) -6
Steel Structure -7
Petrochemical, Chemical, Fertilizing & Paper Factories-8
Offshore and Ships -9
Heat Treatment -10
Lifting Equipment Inspection -11
Training –12
ltants Quality Assurance Consu -13
Outside Egypt-14
WWW.MASSACONSULTING.ORG
Page3
Third Party, Supervision, Consultation, Manpower Supply & Client Representation -1
1.1
Company/ client Egyptian Airports Co.
Engineering Dar Al-Handasah
Main Contractor LIMAK
Sub Contractor Al-Majd Warner Lewis
Date Feb. 2013 till Now
Project Egyptian International Airport
Location Cairo.
Activities
description
Material receiving , qc plan , procedures review ,welders qualification , fabrication
control ( cutting , fit up , welding ) dimensional control , NDT review , hydrostatic
test witness & painting inspection
1.2
Company/ client Egyptian Liquefied Natural Gas Company.
Date Mar. 2014 Till Now
Project Plant inspection
Location Rashid – Alexandria.
Activities
description
Provide API Inspectors, senior inspectors & inspectors to carry out the scheduled
factory shut down (visual inspection, corrosion monitoring, ultrasonic thickness
measurements & PT) for tanks, piping, boilers, towers, drums & vessels with issuing
of all reports, recommendations & evaluations
WWW.MASSACONSULTING.ORG
Page4
1.3
Consult./ client (Egyptian Basic Industries Company) EBIC
Date Sep. 2012 Till Dec. 2013
Project Basic Industries factory construction
Location El SOKHNA –SUEZ
Activities
description
Third Party Inspection As EBIC Representatives To Supervision NDT & Welding
Inspection Activities Done By The Contractor & sub-contractors And Approve
Testing Results.
1.4
Company/ client Egyptian Airports Co.
Engineering Dar Al-Handasah
Main Contractor Saudi Binladin Group
Sub Contractor Al-Majd Warner Lewis & ENERGYA Steel Solutions
Date August. 2011 Till Now
Project Hurghada International Airport
Location Hurghada
Activities
description
Material receiving , qc plan , procedures review ,welders qualification , fabrication
control ( cutting , fit up , welding ) dimensional control , NDT review , hydrostatic
test witness & painting inspection
WWW.MASSACONSULTING.ORG
Page5
1.5
Consult./ client (Egyptian Basic Industries Company) EBIC
Contractors KBR – DSD Ferrometallco
Date January 2007 to March 2008
Project Basic Industries factory construction
Location El SOKHNA –SUEZ
Activities
description
Third Party Inspection As EBIC Representatives To Review The Inspection
Activities Done By The Contractor & sub-contractors (KBR ) And Approve Testing
Results, Introduce The Updated Situation For The Client And The Percentage Of
The Completed Jobs, Discus And Approve The Non Conformity And Its Correction
Actions,…….
1.6
Consult./ client NACO-ECG / Cairo Airport Co. (CAC)
Contractors TAV- Holding Co. JV / EGYPT GAS-Warner Lewis JV
Project brief
Construct the fuel hydrant system project of Terminal Building 3 with total pipe
lines length about 22 Km & required equipments & tools with estimated cost # 40
million USD
Date March 2006 to April 2008
Project Terminal Building 3 Fuel Hydrant System (system for jet fuel providing)
Location Cairo International air port
Activities
description
Provide QA/ QC Crew (QA/QC Manager & QA/QC Engineers) as a third party for
supervision of the activities carried out by the contractors & insure its compliance to
specs & codes for the final acceptance & approval of the client & consultant, the
activities including but not limited to the following:
Follow up, witness, supervise & approve : WPS, PQR, WQT implementation of the
Inspection & test plan of the project, Construction activities (Material receiving,
stringing, welding, NDT, coating, excavation, laying, backfilling, installation of
valves & equipments, Pits installation, inspection valve & traps rooms.
WWW.MASSACONSULTING.ORG
Page6
1.7
Company/ client Helwan Fertilizing company (HFC) / Uhde
Contractor ORASCOM Construction Industries (OCI)
Project brief Construction of Ammonia/Urea fertilizer plant
Date June 2005 to February 2007
Project Ammonia/ Urea Fertilizer Project – Helwan
Location Helwan – Cairo
Activities
description
Provide QA/ QC Crew (QA/QC Manager & QA/QC Engineers covering inspection
activities for all construction phases the crew is consists of 16 engineers (manager ,
workshop inspectors, steel structure inspector , painting inspector , site piping
erection team , boiler inspector , storage tanks inspectors, test package team and
document controllers team)
Our scope is welding inspection marking , traceability ,visual inspection , NDT
requests and results review , post weld heat treatment and pre-heating activities ,
WPS,S PQR,S & WPQ,S , welding maps , punch lists, hydrostatic tests , dialy
weekly and monthly reports , revealing status , attending all quality meeting with
client
1.8
Company/ client EFC (Egyptian Fertilizing Co.)
Date MARCH 2005 TO December 2007
Project Ammonia /Urea Fertilizer Plan Phase II
Location El SOKHNA –SUEZ
Activities
description
Third Party Inspection As EFC Representatives To Review The Inspection Activities
Done By The Contractor & sub-contractors (Uhde, ORASCOM.) And Approve
Testing Results, Introduce The Updated Situation For The Client And The
Percentage Of The Completed Jobs, Discus And Approve The Non Conformity And
Its Correction Actions,……
WWW.MASSACONSULTING.ORG
Page7
1.9
Company/ client Smart Villages Co /GAS COOL / GASCO
Contractor Egypt Gas Co.
Project brief
The first project of its kind in Egypt, Middle East, & Africa aims to provide hot &
chilled water for air conditioning system by using natural gas in a sort circulation
using Chillers, cooling towers, pump & piping network with total weight# 560 ton
& total Dia/Inch Welding# 50,000 inch with total network length 42km up to 48"
diameter
Date June. 2005 to February 2006
Project Smart Village District Cooling & HVAC plant
Location Smart Village - & Abu Rawash work shop
Activities
description
Supervise, witness & approve the construction activities including Material
receiving , QC plan , procedures review ,welders qualification , fabrication control (
cutting , fit up , welding ) dimensional control , NDT review , equipments
installation (8 chillers, 8 cooling towers, 24 pumps, 8 expansion tanks, 40 ton steel
structure) piping network & natural gas pipeline, hydrostatic test witness & painting
inspection
1.10
Company/ client Nubaria Gas Co. / Actaris / Shlemberger
Contractor Egypt gas
Date Sept. 2004 to December 2004
Project Nubaria natural gas pressure reduction & metering station
Location Abu Rawash work shop
Activities
description
Material receiving , qc plan , procedures review ,welders qualification , fabrication
control ( cutting , fit up , welding ) dimensional control , NDT review , hydrostatic
test witness & painting inspection
WWW.MASSACONSULTING.ORG
Page8
1.11
Company/ client El WASTANI petroleum company
Date October 2004 to now
Project CPF construction supervision of Phase II and III.
Location El WASTANI
Activities
description
Client representative during construction of the Different piping systems and tanks
materials, supervise on all material receiving phases ,project documentation
,fabrication , welding , NDT tests , painting , hydrostatic testing , dewatering ,
flushing , pre commissioning & commissioning
1.12
Company/ client Esh El Malaha Petroleum Company (Eshpetco)
Date May 2003 to AUJUST 2003
Project Storage tank fabrication third party
Location Ziet bay
Activities
description
Third party activities during construction, procedures review, welding and welder's
qualification, testing in accordance to API 650, sand Blasting and painting.
1.13
Company/ client East gas / ABB petroleum technology
Date June 2001 – august 2002
Project 250 km 36" diameter natural gas pipe line
Location Arish - Taba – Aquaba
Activities
description
supervision (client rep) on 250 km 36 inch diameter gas pipe line, the super vision
team works were 15 engineers as following
6 welding inspector, 2 NDT inspectors, 2 hydrostatic testing engineers, 2 mechanical
construction engineers, 2 civil works engineers, 1 documents controller
participate in the project management , attendance of all daily , weekly meetings ,
monitoring of works progress , documents review and represent all the project
parties with the certification body ( germaniscer Lloyd )
WWW.MASSACONSULTING.ORG
Page9
1.14
Company/ client Germanischer Lloyd
Date November 2003 to now
Project Two Tanks construction supervision
location Summed ( Tabin – Sedi Krir )
Activities
description
Providing welding inspector to cover third parties activities during maintenance of
storage tanks for material receiving , traceability , construction , testing , painting ,
document review till final release stage.
1.15
Company/ client Sea gas / Egypt gas
Date February 2004 to june 2004
Project Pressure reduction station (million m3 /hr.)
location Demiatta
Activities
description
construction and fabrication of the station installation , preparing all related
documents ( providing Qc , material receiving , welding inspectors )
1.16
Company/ client GASCO / PETROMAINT
Date January 2001 To Now
Project NATURAL GAS PIPE LINES
location Helwan – Alexandria - Talkha – El Obour - Ismailia
Activities
description
Providing quality control and welding inspectors to represent gasco in the above
locations to supervise and act as client in the field during construction of pipe lines
WWW.MASSACONSULTING.ORG
Page10
1.17
Company/ client EGYPT GAS
Date March 2010 Till Now
Project Gas Stations Fabrication
location El-Warrak Cairo
Activities
description
construction and fabrication of the station installation , preparing all related
documents ( providing Qc , material receiving , welding inspectors )
1.18
Company/ client MISR PETROLEUM COMPANY
Date August . 2009 till January 2010
Project Sharm El-Sheikh Airport Storage Tanks
location Sharm El-Sheikh
Activities
description
Material receiving , qc plan , procedures review ,welders qualification , fabrication
control ( cutting , fit up , welding ) dimensional control , NDT review , hydrostatic
test witness & painting inspection
1.19
Company/ client DANA GAS
Contractor EMC
Date August . 2010 till January 2011
Project EL-Baraka Storage Tanks
location Suez
Activities
description
Material receiving , qc plan , procedures review ,welders qualification , fabrication
control ( cutting , fit up , welding ) dimensional control , NDT review , hydrostatic
test witness & painting inspection
WWW.MASSACONSULTING.ORG
Page11
1.20
Company/ client GIS
Date Feb. 2010 Till Aug. 2010
Project GIS plant chimneys
location Suez
Activities
description
Third party activities during construction, procedures review, welding and welder's
qualification, testing, sand Blasting and painting.
1.21
Company/ client PETRODARA
Contractor EMC
Date May 2008 till Dec. 2008
Project PETRODARA Storage Tanks
location Suez
Activities
description
Third party activities during construction of 14 tanks in EMC workshop, procedures
review, welding and welder's qualification, testing, sand Blasting and painting
1.22
Company/ client GAS COOL
Contractor El-Amal
Date August . 2010 till January 2011
Project Smart village cooling system extention
location Cairo
Activities
description
Third party activities during construction of all piping loops, procedures review,
welding and welder's qualification, testing, sand Blasting and painting
WWW.MASSACONSULTING.ORG
Page12
Plant inspection -2
2.1
Company/ client NLSupervision
Date Mar. 2012 Till Now
Project Plant inspection
location All Cement Factories.
Activities
description
Provide API Inspectors, senior inspectors & inspectors to carry out the scheduled
factory shut down (visual inspection, corrosion monitoring, ultrasonic thickness
measurements & PT) piping, boilers, towers, drums & vessels with issuing of all
reports, recommendations & evaluations
2.2
Company/ client Midoom / fosterwiller / QSG
Date September 2001 To November 2003
Project Oil refinery plant inspection
location Alexandria
Activities
description
Contract of plant inspection services covering
routine daily inspection, thickness survey of units, corrosion monitoring, cathodic
protection monitoring, lifting equipment inspection, NDT services
internal and external inspection of pressure vessels , heaters , steam boiler , heat
exchangers & storage tanks
2.3
Company/ client EBIC
Date Dec. 2010 Till Jan.2011 & Sep. 2012 Till Dec. 2013.
Project Plant inspection
location Suez – Ain El Sokhna
Activities
description
Contracted as plant inspection and NDT services on call bases in maintenance &
shut down stages for vessels , equipment ,heaters , heat exchangers for different
materials carbon steel , stainless steel , inconel , inkle base alloys , low alloy steel.,
Thickness gauging , corrosion monitoring , radiography , ultrasonic flaw detection
hardness testing &
WWW.MASSACONSULTING.ORG
Page13
2.4
Company/ client Scimitar Production Egypt Ltd
Date March 2008 To Now
Project Plant inspection
location Gharib – Hurgada
Activities
description
Turn around inspection for field tanks by API Authorized inspectors (visual ,
Thickness, PT…etc) evaluations, repair & reconstruction supervision
2.5
Company/ client Helwan Fertilizing Company (HFC)
Date April 2008 till 12 2010
Project Plant inspection
Location Urea- Ammonia Factory
Activities
description
Provide API Inspectors, senior inspectors & inspectors to carry out the scheduled
factory shut down (visual inspection, corrosion monitoring, ultrasonic thickness
measurements & PT) for tanks, piping, boilers, towers, drums & vessels with issuing
of all reports, recommendations & evaluations
WWW.MASSACONSULTING.ORG
Page14
3- Electrical Power Stations And Steam Boilers
3.1
Company/ client Matito
Date Jan. 2014Till May. 2014
Project Power Station Utilities
location ELATTA Power Station.
Activities
description
Contracting for NDT works in the project ( radiographic testing , ultrasonic testing ,
dye Penetrant testing & MPI ) its piping , utilities
Daily work , reporting according to ASME B 31.1
3.2
Company/ client HETACHI
Date July 2004 to December 2004 & May 2012 Till Jan. 2013
Project Power boiler
location Cairo north electrical power station
Activities
description
Contracting for NDT works in the project ( radiographic testing )
Daily work , reporting according to ASME B 31.1
3.3
Company/ client Kahromicka
Date April 2005 to may 2006
Project Nubaria power station
location Nubaria
Activities
description
Contracting for NDT works in the project ( radiographic testing , Ultrasonic testing
and magnetic particle testing )
Daily work , reporting according to ASME B 31.1
WWW.MASSACONSULTING.ORG
Page15
3.4
Company/ client Kahromica
Date July 2004 to December 2004
Project Power boiler
location Cairo north power station (CNPS)
Activities
description
Contracting for NDT works in the project ( radiographic testing )
Daily work , reporting according to ASME B 31.1
3.5
Company/ client Suez oil processing Company (Sopc)/Babcock Spain/Kolaly Engineering
Date March 2001 – august 2003
Project Steam water tube boiler
location SOPC - Suez
Activities
description
Contracting for NDT works in the project ( radiographic testing , ultrasonic testing ,
dye Penetrant testing & MPI ) for the boiler , and its piping , utilities
Daily work , reporting according to ASME B 31.1 ,ASME B31.8 , ASME VIII &
AWS D1.1 for steel structure works
3.6
Company/ client Quena newspaper paper factory – Kolaly engineering
Date July 2000 – February 2001
Project Steam boiler
location Quena – kous
Activities
description
Contracting for NDT works in the project for boiler , super heater , paper machine
piping , water treatment piping
WWW.MASSACONSULTING.ORG
Page16
3.7
Project 6 Oct. Power Station Abu Rawash.
Company/ client Orascom
Date May 2013 Till May 2014
Company/ client El Krom Middle East
Date Jan. 2014 Till May 2014
Company/ client Ensaldo
Date Mar. 2014 Till May 2014
Activities
description
Contracting for NDT works in the project ( radiographic testing , ultrasonic testing ,
dye Penetrant testing & MPI ) its piping , utilities
Daily work , reporting according to ASME B 31.1
3.8
Company/ client Siemens
Date Jan. 2013 Till Now
Project Power Station
location EL-Kurimat Power Station
Activities
description
Contracting for NDT works in the project ( radiographic testing )
Daily work , reporting according to ASME B 31.1
WWW.MASSACONSULTING.ORG
Page17
Natural gas and oil pipe lines -4
4.1
Company / Client
House gas company
Date August 2000 to December now
Project Natural gas Pipe lines
location different
Activities
description
NDT ( RT – UT – MT – PT )
For the following projects
City gas
24" , 16" , 12" , 8" , 6" , 4" diameters feeding for the following clients :
Cermica Cleopatra – Ezz steel factory – oriental petrochemical compny – Egyptian
fertilizing company – EDF electrical power station – Ataka network
the total length of the above lines is 400 km
National gas Abou Hammad - belbes pipe line 12" diameter
Gasco /Amria
cement company 12" diameter pipe line
Town gas Natural Gas distribution network for bricks factories in Tabin – Helwan area to be
replaced instead of fuel oil for pollution purpose ( 20 factories )
Faum gas Natural gas pipe line ( 800 mt )
Desouk pipe line 15 KM Pipe Line from 1/2009 till 5/2009
EL-Sweedy pipe
line 6 KM Pipe Line from 12/2009 till 2/2010
WWW.MASSACONSULTING.ORG
Page18
4.2
Company/ client Egypt gas
Date September 2000 to now
Project Natural gas Pipe lines
location different
Activities
description
NDT ( RT – UT – MT – PT )
For the following projects
Shobra el khema
station Shobra el khema electrical power station gas distribution system
Amoc -alexandria 12" natural gas pipe line with length 14 km
Gas fill
Abou rawash
Piping Two spherical tanks 1000m3 each
H u factory
aswan Two spherical tanks 1000m3 each
Sedi krir power
station
24" diameter natural gas with length 8 km for feeding sedi kreer electrical power
station
Katamia 8" diameter natural gas pipe line
Abo-Kair power
station Feeding sedi kreer electrical power station with natural gas From 7/2009 till 5/2010
Gas stations
connections TALA, BERKET EL SABA, TOUKH, KALYOUB, NAG HAMADY
Faysal-El Fayoum
Pipe Line A Pipe line with diameters 8" &16" from 10/2010 till now
Sharm EL-Shikh Pipe Line with diameter 12" Length of 1.6 Km
El-Mansoura Pipe Line with diameter 8" Length of 3 Km
WWW.MASSACONSULTING.ORG
Page19
4.3
Company/ client Egyptian maintenance company ( EMC )
Date October 2000 to now
Project Natural gas Pipe lines
Activities
description
NDT ( RT – UT – MT – PT )
For the following projects
Gasco( octber
2000 to October
2001
Maintenance of Gasco gas pressure reduction stations in south suez road ( suez –
sokhna – zafarana – ras ghareb )
Nat gas 10" diameter n.g pipe line with length of 32 km
Gasco 20" gas pipe line for talkha power station gas feeding
national gas 12" gas pipeline kabari – alexanria 5 km
Khalda
"Ebo Elgharadie"
"Petro Sanan"
"El Razia"
Pipe Lines & all Facilities.
Gasco
"Abo Rawash" 6 Oct. Power Station 14" Diameter pipe line & all Piping utilities.
Sopc Pipe Lines & all Facilities.
4.4
Company/ client ABB petroleum technology / El Waha petroleum company ( OWAPCO )
Date Jan 2001 – June 2001
Project Natural gas Pipe lines
location Zit bay
Activities
description
NDT ( RT – UT – MT – PT ) and welding inspection , coating inspection for 8" pipe
line with length 21 k
WWW.MASSACONSULTING.ORG
Page20
Piping and storage tanks inspection-5
5.1
Company/ client UNEPP.
Date APR. 2014 to now
Project
Natural Gas Pipe Line & Compression Station Piping Utilities.
"WASCO","NAT GAS"
Activities
description
– QA/Qc Engineers
– NDT ( RT , UT , MT , PT )
– welding inspection
– painting inspections
5.2
Company/ client EMC.
Date APR. 2000 to Dec. 2014
Project Natural Gas Pipe Line & Storage Tank.
"GPC","KHALDA EL-Salam","ABB","GASCO"
Activities
description
– QA/Qc Engineers
– NDT ( RT , UT , MT , PT )
– welding inspection
– painting inspections
WWW.MASSACONSULTING.ORG
Page21
5.3
Company/ client SCIMITAR
Date Nov. 2006 to now
Project
ISSRAN field development The field development include
flow lines
central production fealties
storage tanks
Activities
description
– QA/Qc Engineers
– NDT ( RT , UT , MT , PT )
– welding inspection
– painting inspections
– Vacuum Box
5.4
Company/ client Egyptian fertilizing co. ( EFC )
Date August 2001 to February 2002
Project 160 ton storage tank and its piping connections
Activities
description
Complete inspection on all tank construction stages according to AUDE
specifications starting with civil works , material receiving , welding , testing ,
hydrostatic test , sand blasting , painting
5.5
Company/ client PETROBEL / PETROMAINT )
Date April 2004
Project Crude oil storage tank / abu redis field
Activities
description
Complete inspection on all tank construction stages, welding , testing , hydrostatic
test , sand blasting , painting
WWW.MASSACONSULTING.ORG
Page22
5. 6
Company/ client MISR PETROLEUM COMPANY
Contractor EL-Majd
Date March. 2009 till July 2009
Project Hurghada Airport Storage Tanks
location Hurghada
Activities
description
Complete inspection on all tank construction stages according to specifications
starting with civil works , material receiving , welding , testing , hydrostatic test ,
sand blasting , painting
5.7
Company/ client SANMAR
Contractor MIKEEWY
Date July 2008 till Feb 2009
Project SANMAR Petrochemical Plant Stage 2
location Port-said
Activities
description
Material receiving , qc plan , procedures review ,welders qualification , fabrication
control ( cutting , fit up , welding ) dimensional control , NDT review , hydrostatic
test witness & painting inspection
WWW.MASSACONSULTING.ORG
Page23
Pressure vessels (ASME stamped) -6
6.1
Company/ client Khalda Petroleum Co/ Petrofac
Date 2007/2008
Project El Salam Train 3, 4
Activities
description
Supervise PETROJET for construction of 24 pressure vessels with ASME Stamp
6.2
Company/ client ARESCO / ASEC
Date 2003
Project Demonstration vessel
Activities
description
Acting as NDT subcontractor for fabrication of pressure vessel to get ASME stamp
including Rt ,Ut ,Mt & Pt
6.3
Company/ client ASF (el sweedy ) / HEBI
Date 2003
Project Pressure vessels
Activities
description
Acting as NDT subcontractor for fabrication of pressure vessels including Rt ,Ut ,Mt
& Pt
WWW.MASSACONSULTING.ORG
Page24
Steel structure -7
7.1
Company/ client ASF (el sweedy )
Date 2003
Project Armed forces stadium columns
Location of Ramadan thASF factory workshop at 10
Activities
description
Carrying out visual inspection & ultrasonic testing on the columns according to
AWS D1.1
7.2
Company/ client House Gas
Date 2004
Project Arab engineers co umbrella pillars
Location Bader city
Activities
description Carrying out visual inspection, Penetrant testing & MPI according to AWS D1.1
7.3
Company/ client ARESCO ASEC
Date 2003
Project Edco piles
Location Aresco work shop / eltebin
Activities
description
24 hours shifts ultrasonic inspection for longitudinal & circumference seam welds of
Edco piles according to AWS D1.1
WWW.MASSACONSULTING.ORG
Page25
7.4
Company/ client Dar El-Handasah /Bin Ladin
Contractor ENERGYA
Date Nov. 2010 till now
Project Hurghada International Airport
location 10th Ramadan / Hurghada
Activities
description
Complete inspection on all steel construction stages according AWS D1.1 applying-
Ultrasonic & dye penetrant testing.
- Painting inspection and Supervision as a third party for protective coating,
Intumescent fire proofing and Cementations fire proofing.
Key persons :-
Dr Adel Gabra Dar El-handasah Consultant 01090144494
Eng Maged Sabry Bin Ladin Groub Main Cont. 01002159683
Eng Tamer Elsakhawy International Paints Paint Manuf. 01000430541
Eng Saber Energya Steel Sub-cont. 01000409660
WWW.MASSACONSULTING.ORG
Page26
Fertilizing & Paper FactoriesPetrochemical, Chemical, -8
8.1
Company/ client EBIT
Main Contractor ENERGYA Steel Solutions
Third Party Enpi
Sub Contractor Pioneer , El-Mahad , El-Hashimia
Date April 2011 to may 2013
Project Petrochemical Plant
location Sokhna
Activities
description
Contracting for NDT works in the project ( radiographic testing , Ultrasonic testing
and magnetic particle testing )
Daily work , reporting according to ASME B 31.3
8.2
Company Uni kima
Date 2003
Project Cosmetic Factory construction (Portsaid industrial zone)
Activities
description
Acting as NDT subcontractor for fabrication of pressure vessels & tank farms (48 tank)
including RT ,UT ,MT & PT
8.3
Company Trust group
Date 2003 to now
WWW.MASSACONSULTING.ORG
Page27
Project Petrochemical factory (port said) industrial zone
Activities
description
Acting as NDT subcontractor for fabrication of pressure vessels Tanks & pipng network
including Rt ,Ut ,Mt & Pt
8.4
Company Quena news paper factory / kolaly engineereing
Date 1999- 2000
Project Paper factory
Activities
description
Acting as NDT subcontractor for fabrication of two water tube boilers , five storage tanks ,
piping system , steel structure , stainless steel tanks , titanium piping , heat treatment ,
vaccum box , hardness,…..
8.5
Company Oriental petrochemical company / Samsung heavy industries / nilcon
Date 2001
Project Inspection during construction of polypropylene factory which is consists of three spherical
tanks , three storage tanks , steel structure and piping system
Activities
description
Quality control for welding , radiographic testing , mpi during and after welding , before and
after post weld heat treatment ,the activities is under Bureau Veritas certification ( BV )
8.6
Company/ client SANMAR / Lloyd's Register (LR)
Contractor PIONEERS CONSTRUCTION COMPANY
Date May 2009 till July 2010
Project SANMAR Petrochemical Plant Stage 2
location Port-said
Activities
description
-Providing total Q/A Q/C system have the following activities:-
Material receiving , qc plan , procedures review ,welders qualification , fabrication
control ( cutting , fit up , welding ) dimensional control , NDT review , hydrostatic
test witness & painting inspection
- Applying all RT activities
WWW.MASSACONSULTING.ORG
Page28
8.7
Company/ client SANMAR
Contractor EL-BASMALA CONSTRUCTION COMPANY
Date April 2010 till NOW
Project SANMAR Petrochemical Plant Stage 2
location Port-said
Activities
description
-Providing total Q/A Q/C system have the following activities:-
Material receiving , qc plan , procedures review ,welders qualification , fabrication
control ( cutting , fit up , welding ) dimensional control , NDT review , hydrostatic
test witness & painting inspection
- Applying all RT activities
WWW.MASSACONSULTING.ORG
Page29
Offshore and ships -9
9.1
Company/ client GUPCO/ BP
Contractors Petroleum Marine Services (PMS)/ UMAX (UK)
Date 2007
Project Taurt project /Offshore Pipeline 24” 45 KM
Location Port Said Red Sea
Activities
description
QA/QC & welding inspection for welding process (automatic welding). Logistics &
supplying of all required material. Monitoring of activities (welding, radio graphing,
coating, laying)
9.2
Company/ client North Sinai Petroleum Co. (NOSPCO)
Contractors Petroleum Marine Services (PMS)/ UMAX (UK)
Date 2005
Project NOSPCO Offshore Pipeline 22” 65 KM
Location Port Said Red Sea
Activities
description
QA/QC & welding inspection for welding process (automatic welding). Logistics &
supplying of all required material. Monitoring of activities (welding, radio graphing,
coating, laying)
9.3
Company/ client Stolt offshore
Date 2003
Project Scarab Saffron Development
WWW.MASSACONSULTING.ORG
Page30
Location Port Said (AUGUEST Barge)
Activities
description
Acting as NDT subcontractor for testing of Excavators Fastening, 2 Winch
Foreword & Deck Port on the barge including Mt & Pt testing
9.4
Company/ client MARI DIVE Offshore Projects
Date 2003
Project Barge & cranes supports
Location Alexandria (Abu Kier)
Activities
description
Carrying out NDT activities on the Barge cranes & supports of it (including
Magnetic Particle & Dye Penetrant Test)
9.5
Company/ client Suez Ship Yard (SSY)
Date 2004
Project Ships Building
Location Suez
Activities
description
Carrying out NDT activities for the Ships Ruder & body fabrication (including
Radiographic, Ultrasonic, Magnetic Particle & Dye Penetrant Tests)
9.6
Company/ client TRANSOCEAN
Contractor BORHANCO
Date Nov. 2010 till Jan. 2011
Project TRANSOCEAN Rig Shutdown
location Alexandria
Activities
description
-Applying MT , UT & Thickness measurements activities
WWW.MASSACONSULTING.ORG
Page32
Heat treatment -10
10.1
Company/ client EFC (Egyptian Fertilizing Co)
Date 2000 to now
Project Annual shutdown
Activities
description
Post weld heat treatment during the shutdown for the joints of alloy steel , two
machine delivered during the shut down for 21 day
10.2
Company/ client Sinai manganese company
Date 2004
Project Gypsum oven
Activities
description
Post weld heat treatment for the oven structure after welding as per the specification
rules using two local heat treatment machines
WWW.MASSACONSULTING.ORG
Page33
Lifting equipment inspection -11
11.1
Company/ client Total solution / BP / TRANSOCEAN
Date 2006 TO Now
Project Steel Manufacturing
Activities
description
Visual inspection and magnetic particle testing for carrying cargo units
manufactured by total solution for different client
All test are carried out by qualified inspectors according to ASNT – TC-1A level II
Training –12
12.1
Company/ client Scimitar Production Egypt Ltd
Date 2008
Project Safety Courses
Activities
description
Provide Safety course for company candidates in (Defensive Driving & H2S
hazards), as sole agent & partner of Serimax Training Ltd (UK)
12.2
Company/ client ENPPI – EFC- HOUSE GAS – NAT GAS – UNI KIMA – OPCO – WELDING
ACCADEMY – ARESCO ASEC- BAPETCO -
Date 2000 TO now
Project personnel qualification
Activities
description
RT , UT , MT , PT according to ASNT –SNT- TC-1A
Welding technology – painting inspection
WWW.MASSACONSULTING.ORG
Page34
12.3
Company/ client Homs Refinery Company (HRC)
Date 2/2010
Location Homs / Syria
Activities
description
Welding Technology & MT
Quality Assurance Consultants-13
13.1
Company/ client MASS- S CONTRACTING
Date 2005- 2006
Project ISO 9001 -2000 & 18001 & 14001
Activities
description
consultant for the company to get the ISO certificates in the field of electrometrical
projects construction by the following
- gab analysis
- awareness for company personnel
- Establishment of manual, procedures, work instruction, testing…
- internal auditors training
- management review
- attending external audit up to certification completion
- periodical audit and renewal certificate
13.2
Company/ client Nile pharos cruise
Date 2006
Project ISO 9001 -2000
Activities
description
consultant for the company to get the ISO certificates by the following
- gab analysis
- awareness for company personnel
- Establishment of manual, procedures, work instruction, testing…
- internal auditors training
- management review
- attending external audit up to certification completion
- periodical audit and renewal certificate
WWW.MASSACONSULTING.ORG
Page35
13.3
Company/ client ALAZAB FURNITURE FACTORY – DOIATTA
Date 2005
Project ISO 9001 -2000
Activities
description
consultant for the company to get the ISO certificates for furniture manufacturing
by the following
- gab analysis
- awareness for company personnel
- Establishment of manual, procedures, work instruction, testing…
- internal auditors training
- management review
- attending external audit up to certification completion
- periodical audit and renewal certificate
13.4
Company/ client SALAMA GROUP INDUSTRIES
Date 2005
Project ISO 9001 -2000
Activities
description
consultant for the company to get the ISO certificates for marble and granite by the
following
- gab analysis
- awareness for company personnel
- Establishment of manual, procedures, work instruction, testing…
- internal auditors training
- management review
- attending external audit up to certification completion
- periodical audit and renewal certificate
WWW.MASSACONSULTING.ORG
Page36
13.5
Company/ client ABU GHALI FOR PLASTICS COMPANY - DOMIATTA
Date 2005
Project ISO 9001 -2000
Activities
description
consultant for the company to get the ISO certificates in plastics production field by
the following
- gab analysis
- awareness for company personnel
- Establishment of manual, procedures, work instruction, testing…
- internal auditors training
- management review
- attending external audit up to certification completion
- periodical audit and renewal certificate
WWW.MASSACONSULTING.ORG
Page37
Outside Egypt-14
14.1
Company/ client Qatar Gas
Contractors Gamma Qatar/ Serimax (UK)
Date 2008/ 2009
Project Qatar Gas 3 & 4 Onshore Project
Location Qatar
Activities
description
Providing QA/QC, welding inspection, project Management & Project Coordination
for Serimax for welding different Corrosion Resistance Alloys (CRA) Materials
14.2
Company/ client Saudi ARAMCO
Contractors Petroleum Marine Services (PMS)/ Serimax (UK)
Date 2008/ 2009
Project Offshore Installation Facilities (pipelines 16”, 24”, 30”)
Location Arabian Gulf – Dammam- KSA
Activities
description
Providing QA/QC, welding inspectors & Project Coordination for Serimax for
executing different pipelines using semi automatic welding processes (GMAW/STT,
GTAW & FCAW)
14.3
Company/ client LIBO ITS
Date 2008
Project Plant Shut down
Location Libya
Activities
description
Providing API authorized Inspectors (5) to cover shutdown activities on different
equipments (tanks, piping, towers, vessels…etc)
WWW.MASSACONSULTING.ORG
Page38
14.4
Company/ client Tractable
Date 2005 to now
Project Arabic gas pipeline
Activities
description
Subcontractor for tractable Belgium for monitoring a cross country pipe line in
Jordan with length of 370 km from akaba to al rehab city in Jordan which is the
completion of the Egyptian line from arish – taba –akaba – al rehab
14.5
Company/ client Al Arabi contractors company – al Kuwait
Date 2006 to now
Project Gas plant
Activities
description
Providing QA/QC engineers to proceed construction contracts awarded to the
company
14.6
Company/ client Petrochemical industrial company ( PIC ) – Kuwait
Date 2006 to now
Project Gas plant
Activities
description
Providing 14 plant inspectors and three inspection engineers for planned shutdown
for the company , internal and external inspection for vessels , tanks , boilers, heat
exchangers , drums , piping and other equipments
WWW.MASSACONSULTING.ORG
Page39
14.7
Company/ client Egypt gas
Date 2003
Project East gas –Akaba – Jordan metering station and receiving station
Activities
description
Consultant for the project to quality control during certification of construction phase
of receiving station and metering station under certification of GL
14.8
Company/ client HOMS REFINARY COMPANY
Date Oct. 2009 till Feb. 2010
Project HOMS Coke Drums
location Homs / Syria
Activities
description
-Civil inspection for modifications & restorations.
-Providing total Q/A Q/C system have the following activities:-
Material receiving , qc plan , procedures review ,welders qualification , fabrication
control ( cutting , fit up , welding ) dimensional control , NDT review , hydrostatic
test witness.
-Painting & insulation inspection
14.9
Company/ client CCED / Triple-C
Contractor
SIGMA Construction & Supply Services
Date June 2010 till Aug. 2010
location OMAN
Activities
description
-Providing total Q/A Q/C system have the following activities:-
Material receiving , qc plan , procedures review ,welders qualification , fabrication
control ( cutting , fit up , welding ) dimensional control , NDT review , hydrostatic
test witness & painting inspection
WWW.MASSACONSULTING.ORG
Page40
14.9
Company/ client PETROCANADA
Contractor
SIGMA Construction & Supply Services
Date Nov. 2010 till Feb. 2011
location Syria
Activities
description
-Providing total Q/A Q/C system have the following activities:-
Material receiving , qc plan , procedures review ,welders qualification , fabrication
control ( cutting , fit up , welding ) dimensional control , NDT review , hydrostatic
test witness & painting inspection