WWW.MASSACONSULTING.ORG

Page1

MASSA /WH-01-2014

NO. of Pages REV. NO DATE

39 pages 02/2014 1/11/2014

Page 2: MASSA /WH-01-2014 - massaconsulting.orgmassaconsulting.org/uploads/aboutus/massa_projects.pdfMASSA /WH-01-2014 DATE REV. NO NO ... 2- Plant Inspection 3- Electrical Power Stations

WWW.MASSACONSULTING.ORG

Page2

MASSA CONSULTING LTD is a private company established at 1999 working in the

field of consulting and inspection services and had been converted to LTD Company in 2004.

The company has a wide range of experience in supervision, execution of inspection services

our inspection works history is categorized as following:

Third Party, Supervision, Consultation, Manpower Supply & Client Representation -1

Plant Inspection -2

Electrical Power Stations and Steam Boilers -3

Natural Gas and Oil Pipe Lines -4

and Storage Tanks InspectionPiping -5

Pressure Vessels (ASME Stamped) -6

Steel Structure -7

Petrochemical, Chemical, Fertilizing & Paper Factories-8

Offshore and Ships -9

Heat Treatment -10

Lifting Equipment Inspection -11

Training –12

ltants Quality Assurance Consu -13

Outside Egypt-14

Page 3: MASSA /WH-01-2014 - massaconsulting.orgmassaconsulting.org/uploads/aboutus/massa_projects.pdfMASSA /WH-01-2014 DATE REV. NO NO ... 2- Plant Inspection 3- Electrical Power Stations

WWW.MASSACONSULTING.ORG

Page3

Third Party, Supervision, Consultation, Manpower Supply & Client Representation -1

1.1

Company/ client Egyptian Airports Co.

Engineering Dar Al-Handasah

Main Contractor LIMAK

Sub Contractor Al-Majd Warner Lewis

Date Feb. 2013 till Now

Project Egyptian International Airport

Location Cairo.

Activities

description

Material receiving , qc plan , procedures review ,welders qualification , fabrication

control ( cutting , fit up , welding ) dimensional control , NDT review , hydrostatic

test witness & painting inspection

1.2

Company/ client Egyptian Liquefied Natural Gas Company.

Date Mar. 2014 Till Now

Project Plant inspection

Location Rashid – Alexandria.

Activities

description

Provide API Inspectors, senior inspectors & inspectors to carry out the scheduled

factory shut down (visual inspection, corrosion monitoring, ultrasonic thickness

measurements & PT) for tanks, piping, boilers, towers, drums & vessels with issuing

of all reports, recommendations & evaluations

Page 4: MASSA /WH-01-2014 - massaconsulting.orgmassaconsulting.org/uploads/aboutus/massa_projects.pdfMASSA /WH-01-2014 DATE REV. NO NO ... 2- Plant Inspection 3- Electrical Power Stations

WWW.MASSACONSULTING.ORG

Page4

1.3

Consult./ client (Egyptian Basic Industries Company) EBIC

Date Sep. 2012 Till Dec. 2013

Project Basic Industries factory construction

Location El SOKHNA –SUEZ

Activities

description

Third Party Inspection As EBIC Representatives To Supervision NDT & Welding

Inspection Activities Done By The Contractor & sub-contractors And Approve

Testing Results.

1.4

Company/ client Egyptian Airports Co.

Engineering Dar Al-Handasah

Main Contractor Saudi Binladin Group

Sub Contractor Al-Majd Warner Lewis & ENERGYA Steel Solutions

Date August. 2011 Till Now

Project Hurghada International Airport

Location Hurghada

Activities

description

Material receiving , qc plan , procedures review ,welders qualification , fabrication

control ( cutting , fit up , welding ) dimensional control , NDT review , hydrostatic

test witness & painting inspection

Page 5: MASSA /WH-01-2014 - massaconsulting.orgmassaconsulting.org/uploads/aboutus/massa_projects.pdfMASSA /WH-01-2014 DATE REV. NO NO ... 2- Plant Inspection 3- Electrical Power Stations

WWW.MASSACONSULTING.ORG

Page5

1.5

Consult./ client (Egyptian Basic Industries Company) EBIC

Contractors KBR – DSD Ferrometallco

Date January 2007 to March 2008

Project Basic Industries factory construction

Location El SOKHNA –SUEZ

Activities

description

Third Party Inspection As EBIC Representatives To Review The Inspection

Activities Done By The Contractor & sub-contractors (KBR ) And Approve Testing

Results, Introduce The Updated Situation For The Client And The Percentage Of

The Completed Jobs, Discus And Approve The Non Conformity And Its Correction

Actions,…….

1.6

Consult./ client NACO-ECG / Cairo Airport Co. (CAC)

Contractors TAV- Holding Co. JV / EGYPT GAS-Warner Lewis JV

Project brief

Construct the fuel hydrant system project of Terminal Building 3 with total pipe

lines length about 22 Km & required equipments & tools with estimated cost # 40

million USD

Date March 2006 to April 2008

Project Terminal Building 3 Fuel Hydrant System (system for jet fuel providing)

Location Cairo International air port

Activities

description

Provide QA/ QC Crew (QA/QC Manager & QA/QC Engineers) as a third party for

supervision of the activities carried out by the contractors & insure its compliance to

specs & codes for the final acceptance & approval of the client & consultant, the

activities including but not limited to the following:

Follow up, witness, supervise & approve : WPS, PQR, WQT implementation of the

Inspection & test plan of the project, Construction activities (Material receiving,

stringing, welding, NDT, coating, excavation, laying, backfilling, installation of

valves & equipments, Pits installation, inspection valve & traps rooms.

Page 6: MASSA /WH-01-2014 - massaconsulting.orgmassaconsulting.org/uploads/aboutus/massa_projects.pdfMASSA /WH-01-2014 DATE REV. NO NO ... 2- Plant Inspection 3- Electrical Power Stations

WWW.MASSACONSULTING.ORG

Page6

1.7

Company/ client Helwan Fertilizing company (HFC) / Uhde

Contractor ORASCOM Construction Industries (OCI)

Project brief Construction of Ammonia/Urea fertilizer plant

Date June 2005 to February 2007

Project Ammonia/ Urea Fertilizer Project – Helwan

Location Helwan – Cairo

Activities

description

Provide QA/ QC Crew (QA/QC Manager & QA/QC Engineers covering inspection

activities for all construction phases the crew is consists of 16 engineers (manager ,

workshop inspectors, steel structure inspector , painting inspector , site piping

erection team , boiler inspector , storage tanks inspectors, test package team and

document controllers team)

Our scope is welding inspection marking , traceability ,visual inspection , NDT

requests and results review , post weld heat treatment and pre-heating activities ,

WPS,S PQR,S & WPQ,S , welding maps , punch lists, hydrostatic tests , dialy

weekly and monthly reports , revealing status , attending all quality meeting with

client

1.8

Company/ client EFC (Egyptian Fertilizing Co.)

Date MARCH 2005 TO December 2007

Project Ammonia /Urea Fertilizer Plan Phase II

Location El SOKHNA –SUEZ

Activities

description

Third Party Inspection As EFC Representatives To Review The Inspection Activities

Done By The Contractor & sub-contractors (Uhde, ORASCOM.) And Approve

Testing Results, Introduce The Updated Situation For The Client And The

Percentage Of The Completed Jobs, Discus And Approve The Non Conformity And

Its Correction Actions,……

Page 7: MASSA /WH-01-2014 - massaconsulting.orgmassaconsulting.org/uploads/aboutus/massa_projects.pdfMASSA /WH-01-2014 DATE REV. NO NO ... 2- Plant Inspection 3- Electrical Power Stations

WWW.MASSACONSULTING.ORG

Page7

1.9

Company/ client Smart Villages Co /GAS COOL / GASCO

Contractor Egypt Gas Co.

Project brief

The first project of its kind in Egypt, Middle East, & Africa aims to provide hot &

chilled water for air conditioning system by using natural gas in a sort circulation

using Chillers, cooling towers, pump & piping network with total weight# 560 ton

& total Dia/Inch Welding# 50,000 inch with total network length 42km up to 48"

diameter

Date June. 2005 to February 2006

Project Smart Village District Cooling & HVAC plant

Location Smart Village - & Abu Rawash work shop

Activities

description

Supervise, witness & approve the construction activities including Material

receiving , QC plan , procedures review ,welders qualification , fabrication control (

cutting , fit up , welding ) dimensional control , NDT review , equipments

installation (8 chillers, 8 cooling towers, 24 pumps, 8 expansion tanks, 40 ton steel

structure) piping network & natural gas pipeline, hydrostatic test witness & painting

inspection

1.10

Company/ client Nubaria Gas Co. / Actaris / Shlemberger

Contractor Egypt gas

Date Sept. 2004 to December 2004

Project Nubaria natural gas pressure reduction & metering station

Location Abu Rawash work shop

Activities

description

Material receiving , qc plan , procedures review ,welders qualification , fabrication

control ( cutting , fit up , welding ) dimensional control , NDT review , hydrostatic

test witness & painting inspection

Page 8: MASSA /WH-01-2014 - massaconsulting.orgmassaconsulting.org/uploads/aboutus/massa_projects.pdfMASSA /WH-01-2014 DATE REV. NO NO ... 2- Plant Inspection 3- Electrical Power Stations

WWW.MASSACONSULTING.ORG

Page8

1.11

Company/ client El WASTANI petroleum company

Date October 2004 to now

Project CPF construction supervision of Phase II and III.

Location El WASTANI

Activities

description

Client representative during construction of the Different piping systems and tanks

materials, supervise on all material receiving phases ,project documentation

,fabrication , welding , NDT tests , painting , hydrostatic testing , dewatering ,

flushing , pre commissioning & commissioning

1.12

Company/ client Esh El Malaha Petroleum Company (Eshpetco)

Date May 2003 to AUJUST 2003

Project Storage tank fabrication third party

Location Ziet bay

Activities

description

Third party activities during construction, procedures review, welding and welder's

qualification, testing in accordance to API 650, sand Blasting and painting.

1.13

Company/ client East gas / ABB petroleum technology

Date June 2001 – august 2002

Project 250 km 36" diameter natural gas pipe line

Location Arish - Taba – Aquaba

Activities

description

supervision (client rep) on 250 km 36 inch diameter gas pipe line, the super vision

team works were 15 engineers as following

6 welding inspector, 2 NDT inspectors, 2 hydrostatic testing engineers, 2 mechanical

construction engineers, 2 civil works engineers, 1 documents controller

participate in the project management , attendance of all daily , weekly meetings ,

monitoring of works progress , documents review and represent all the project

parties with the certification body ( germaniscer Lloyd )

Page 9: MASSA /WH-01-2014 - massaconsulting.orgmassaconsulting.org/uploads/aboutus/massa_projects.pdfMASSA /WH-01-2014 DATE REV. NO NO ... 2- Plant Inspection 3- Electrical Power Stations

WWW.MASSACONSULTING.ORG

Page9

1.14

Company/ client Germanischer Lloyd

Date November 2003 to now

Project Two Tanks construction supervision

location Summed ( Tabin – Sedi Krir )

Activities

description

Providing welding inspector to cover third parties activities during maintenance of

storage tanks for material receiving , traceability , construction , testing , painting ,

document review till final release stage.

1.15

Company/ client Sea gas / Egypt gas

Date February 2004 to june 2004

Project Pressure reduction station (million m3 /hr.)

location Demiatta

Activities

description

construction and fabrication of the station installation , preparing all related

documents ( providing Qc , material receiving , welding inspectors )

1.16

Company/ client GASCO / PETROMAINT

Date January 2001 To Now

Project NATURAL GAS PIPE LINES

location Helwan – Alexandria - Talkha – El Obour - Ismailia

Activities

description

Providing quality control and welding inspectors to represent gasco in the above

locations to supervise and act as client in the field during construction of pipe lines

Page 10: MASSA /WH-01-2014 - massaconsulting.orgmassaconsulting.org/uploads/aboutus/massa_projects.pdfMASSA /WH-01-2014 DATE REV. NO NO ... 2- Plant Inspection 3- Electrical Power Stations

WWW.MASSACONSULTING.ORG

Page10

1.17

Company/ client EGYPT GAS

Date March 2010 Till Now

Project Gas Stations Fabrication

location El-Warrak Cairo

Activities

description

construction and fabrication of the station installation , preparing all related

documents ( providing Qc , material receiving , welding inspectors )

1.18

Company/ client MISR PETROLEUM COMPANY

Date August . 2009 till January 2010

Project Sharm El-Sheikh Airport Storage Tanks

location Sharm El-Sheikh

Activities

description

Material receiving , qc plan , procedures review ,welders qualification , fabrication

control ( cutting , fit up , welding ) dimensional control , NDT review , hydrostatic

test witness & painting inspection

1.19

Company/ client DANA GAS

Contractor EMC

Date August . 2010 till January 2011

Project EL-Baraka Storage Tanks

location Suez

Activities

description

Material receiving , qc plan , procedures review ,welders qualification , fabrication

control ( cutting , fit up , welding ) dimensional control , NDT review , hydrostatic

test witness & painting inspection

Page 11: MASSA /WH-01-2014 - massaconsulting.orgmassaconsulting.org/uploads/aboutus/massa_projects.pdfMASSA /WH-01-2014 DATE REV. NO NO ... 2- Plant Inspection 3- Electrical Power Stations

WWW.MASSACONSULTING.ORG

Page11

1.20

Company/ client GIS

Date Feb. 2010 Till Aug. 2010

Project GIS plant chimneys

location Suez

Activities

description

Third party activities during construction, procedures review, welding and welder's

qualification, testing, sand Blasting and painting.

1.21

Company/ client PETRODARA

Contractor EMC

Date May 2008 till Dec. 2008

Project PETRODARA Storage Tanks

location Suez

Activities

description

Third party activities during construction of 14 tanks in EMC workshop, procedures

review, welding and welder's qualification, testing, sand Blasting and painting

1.22

Company/ client GAS COOL

Contractor El-Amal

Date August . 2010 till January 2011

Project Smart village cooling system extention

location Cairo

Activities

description

Third party activities during construction of all piping loops, procedures review,

welding and welder's qualification, testing, sand Blasting and painting

Page 12: MASSA /WH-01-2014 - massaconsulting.orgmassaconsulting.org/uploads/aboutus/massa_projects.pdfMASSA /WH-01-2014 DATE REV. NO NO ... 2- Plant Inspection 3- Electrical Power Stations

WWW.MASSACONSULTING.ORG

Page12

Plant inspection -2

2.1

Company/ client NLSupervision

Date Mar. 2012 Till Now

Project Plant inspection

location All Cement Factories.

Activities

description

Provide API Inspectors, senior inspectors & inspectors to carry out the scheduled

factory shut down (visual inspection, corrosion monitoring, ultrasonic thickness

measurements & PT) piping, boilers, towers, drums & vessels with issuing of all

reports, recommendations & evaluations

2.2

Company/ client Midoom / fosterwiller / QSG

Date September 2001 To November 2003

Project Oil refinery plant inspection

location Alexandria

Activities

description

Contract of plant inspection services covering

routine daily inspection, thickness survey of units, corrosion monitoring, cathodic

protection monitoring, lifting equipment inspection, NDT services

internal and external inspection of pressure vessels , heaters , steam boiler , heat

exchangers & storage tanks

2.3

Company/ client EBIC

Date Dec. 2010 Till Jan.2011 & Sep. 2012 Till Dec. 2013.

Project Plant inspection

location Suez – Ain El Sokhna

Activities

description

Contracted as plant inspection and NDT services on call bases in maintenance &

shut down stages for vessels , equipment ,heaters , heat exchangers for different

materials carbon steel , stainless steel , inconel , inkle base alloys , low alloy steel.,

Thickness gauging , corrosion monitoring , radiography , ultrasonic flaw detection

hardness testing &

Page 13: MASSA /WH-01-2014 - massaconsulting.orgmassaconsulting.org/uploads/aboutus/massa_projects.pdfMASSA /WH-01-2014 DATE REV. NO NO ... 2- Plant Inspection 3- Electrical Power Stations

WWW.MASSACONSULTING.ORG

Page13

2.4

Company/ client Scimitar Production Egypt Ltd

Date March 2008 To Now

Project Plant inspection

location Gharib – Hurgada

Activities

description

Turn around inspection for field tanks by API Authorized inspectors (visual ,

Thickness, PT…etc) evaluations, repair & reconstruction supervision

2.5

Company/ client Helwan Fertilizing Company (HFC)

Date April 2008 till 12 2010

Project Plant inspection

Location Urea- Ammonia Factory

Activities

description

Provide API Inspectors, senior inspectors & inspectors to carry out the scheduled

factory shut down (visual inspection, corrosion monitoring, ultrasonic thickness

measurements & PT) for tanks, piping, boilers, towers, drums & vessels with issuing

of all reports, recommendations & evaluations

Page 14: MASSA /WH-01-2014 - massaconsulting.orgmassaconsulting.org/uploads/aboutus/massa_projects.pdfMASSA /WH-01-2014 DATE REV. NO NO ... 2- Plant Inspection 3- Electrical Power Stations

WWW.MASSACONSULTING.ORG

Page14

3- Electrical Power Stations And Steam Boilers

3.1

Company/ client Matito

Date Jan. 2014Till May. 2014

Project Power Station Utilities

location ELATTA Power Station.

Activities

description

Contracting for NDT works in the project ( radiographic testing , ultrasonic testing ,

dye Penetrant testing & MPI ) its piping , utilities

Daily work , reporting according to ASME B 31.1

3.2

Company/ client HETACHI

Date July 2004 to December 2004 & May 2012 Till Jan. 2013

Project Power boiler

location Cairo north electrical power station

Activities

description

Contracting for NDT works in the project ( radiographic testing )

Daily work , reporting according to ASME B 31.1

3.3

Company/ client Kahromicka

Date April 2005 to may 2006

Project Nubaria power station

location Nubaria

Activities

description

Contracting for NDT works in the project ( radiographic testing , Ultrasonic testing

and magnetic particle testing )

Daily work , reporting according to ASME B 31.1

Page 15: MASSA /WH-01-2014 - massaconsulting.orgmassaconsulting.org/uploads/aboutus/massa_projects.pdfMASSA /WH-01-2014 DATE REV. NO NO ... 2- Plant Inspection 3- Electrical Power Stations

WWW.MASSACONSULTING.ORG

Page15

3.4

Company/ client Kahromica

Date July 2004 to December 2004

Project Power boiler

location Cairo north power station (CNPS)

Activities

description

Contracting for NDT works in the project ( radiographic testing )

Daily work , reporting according to ASME B 31.1

3.5

Company/ client Suez oil processing Company (Sopc)/Babcock Spain/Kolaly Engineering

Date March 2001 – august 2003

Project Steam water tube boiler

location SOPC - Suez

Activities

description

Contracting for NDT works in the project ( radiographic testing , ultrasonic testing ,

dye Penetrant testing & MPI ) for the boiler , and its piping , utilities

Daily work , reporting according to ASME B 31.1 ,ASME B31.8 , ASME VIII &

AWS D1.1 for steel structure works

3.6

Company/ client Quena newspaper paper factory – Kolaly engineering

Date July 2000 – February 2001

Project Steam boiler

location Quena – kous

Activities

description

Contracting for NDT works in the project for boiler , super heater , paper machine

piping , water treatment piping

Page 16: MASSA /WH-01-2014 - massaconsulting.orgmassaconsulting.org/uploads/aboutus/massa_projects.pdfMASSA /WH-01-2014 DATE REV. NO NO ... 2- Plant Inspection 3- Electrical Power Stations

WWW.MASSACONSULTING.ORG

Page16

3.7

Project 6 Oct. Power Station Abu Rawash.

Company/ client Orascom

Date May 2013 Till May 2014

Company/ client El Krom Middle East

Date Jan. 2014 Till May 2014

Company/ client Ensaldo

Date Mar. 2014 Till May 2014

Activities

description

Contracting for NDT works in the project ( radiographic testing , ultrasonic testing ,

dye Penetrant testing & MPI ) its piping , utilities

Daily work , reporting according to ASME B 31.1

3.8

Company/ client Siemens

Date Jan. 2013 Till Now

Project Power Station

location EL-Kurimat Power Station

Activities

description

Contracting for NDT works in the project ( radiographic testing )

Daily work , reporting according to ASME B 31.1

Page 17: MASSA /WH-01-2014 - massaconsulting.orgmassaconsulting.org/uploads/aboutus/massa_projects.pdfMASSA /WH-01-2014 DATE REV. NO NO ... 2- Plant Inspection 3- Electrical Power Stations

WWW.MASSACONSULTING.ORG

Page17

Natural gas and oil pipe lines -4

4.1

Company / Client

House gas company

Date August 2000 to December now

Project Natural gas Pipe lines

location different

Activities

description

NDT ( RT – UT – MT – PT )

For the following projects

City gas

24" , 16" , 12" , 8" , 6" , 4" diameters feeding for the following clients :

Cermica Cleopatra – Ezz steel factory – oriental petrochemical compny – Egyptian

fertilizing company – EDF electrical power station – Ataka network

the total length of the above lines is 400 km

National gas Abou Hammad - belbes pipe line 12" diameter

Gasco /Amria

cement company 12" diameter pipe line

Town gas Natural Gas distribution network for bricks factories in Tabin – Helwan area to be

replaced instead of fuel oil for pollution purpose ( 20 factories )

Faum gas Natural gas pipe line ( 800 mt )

Desouk pipe line 15 KM Pipe Line from 1/2009 till 5/2009

EL-Sweedy pipe

line 6 KM Pipe Line from 12/2009 till 2/2010

Page 18: MASSA /WH-01-2014 - massaconsulting.orgmassaconsulting.org/uploads/aboutus/massa_projects.pdfMASSA /WH-01-2014 DATE REV. NO NO ... 2- Plant Inspection 3- Electrical Power Stations

WWW.MASSACONSULTING.ORG

Page18

4.2

Company/ client Egypt gas

Date September 2000 to now

Project Natural gas Pipe lines

location different

Activities

description

NDT ( RT – UT – MT – PT )

For the following projects

Shobra el khema

station Shobra el khema electrical power station gas distribution system

Amoc -alexandria 12" natural gas pipe line with length 14 km

Gas fill

Abou rawash

Piping Two spherical tanks 1000m3 each

H u factory

aswan Two spherical tanks 1000m3 each

Sedi krir power

station

24" diameter natural gas with length 8 km for feeding sedi kreer electrical power

station

Katamia 8" diameter natural gas pipe line

Abo-Kair power

station Feeding sedi kreer electrical power station with natural gas From 7/2009 till 5/2010

Gas stations

connections TALA, BERKET EL SABA, TOUKH, KALYOUB, NAG HAMADY

Faysal-El Fayoum

Pipe Line A Pipe line with diameters 8" &16" from 10/2010 till now

Sharm EL-Shikh Pipe Line with diameter 12" Length of 1.6 Km

El-Mansoura Pipe Line with diameter 8" Length of 3 Km

Page 19: MASSA /WH-01-2014 - massaconsulting.orgmassaconsulting.org/uploads/aboutus/massa_projects.pdfMASSA /WH-01-2014 DATE REV. NO NO ... 2- Plant Inspection 3- Electrical Power Stations

WWW.MASSACONSULTING.ORG

Page19

4.3

Company/ client Egyptian maintenance company ( EMC )

Date October 2000 to now

Project Natural gas Pipe lines

Activities

description

NDT ( RT – UT – MT – PT )

For the following projects

Gasco( octber

2000 to October

2001

Maintenance of Gasco gas pressure reduction stations in south suez road ( suez –

sokhna – zafarana – ras ghareb )

Nat gas 10" diameter n.g pipe line with length of 32 km

Gasco 20" gas pipe line for talkha power station gas feeding

national gas 12" gas pipeline kabari – alexanria 5 km

Khalda

"Ebo Elgharadie"

"Petro Sanan"

"El Razia"

Pipe Lines & all Facilities.

Gasco

"Abo Rawash" 6 Oct. Power Station 14" Diameter pipe line & all Piping utilities.

Sopc Pipe Lines & all Facilities.

4.4

Company/ client ABB petroleum technology / El Waha petroleum company ( OWAPCO )

Date Jan 2001 – June 2001

Project Natural gas Pipe lines

location Zit bay

Activities

description

NDT ( RT – UT – MT – PT ) and welding inspection , coating inspection for 8" pipe

line with length 21 k

Page 20: MASSA /WH-01-2014 - massaconsulting.orgmassaconsulting.org/uploads/aboutus/massa_projects.pdfMASSA /WH-01-2014 DATE REV. NO NO ... 2- Plant Inspection 3- Electrical Power Stations

WWW.MASSACONSULTING.ORG

Page20

Piping and storage tanks inspection-5

5.1

Company/ client UNEPP.

Date APR. 2014 to now

Project

Natural Gas Pipe Line & Compression Station Piping Utilities.

"WASCO","NAT GAS"

Activities

description

– QA/Qc Engineers

– NDT ( RT , UT , MT , PT )

– welding inspection

– painting inspections

5.2

Company/ client EMC.

Date APR. 2000 to Dec. 2014

Project Natural Gas Pipe Line & Storage Tank.

"GPC","KHALDA EL-Salam","ABB","GASCO"

Activities

description

– QA/Qc Engineers

– NDT ( RT , UT , MT , PT )

– welding inspection

– painting inspections

Page 21: MASSA /WH-01-2014 - massaconsulting.orgmassaconsulting.org/uploads/aboutus/massa_projects.pdfMASSA /WH-01-2014 DATE REV. NO NO ... 2- Plant Inspection 3- Electrical Power Stations

WWW.MASSACONSULTING.ORG

Page21

5.3

Company/ client SCIMITAR

Date Nov. 2006 to now

Project

ISSRAN field development The field development include

flow lines

central production fealties

storage tanks

Activities

description

– QA/Qc Engineers

– NDT ( RT , UT , MT , PT )

– welding inspection

– painting inspections

– Vacuum Box

5.4

Company/ client Egyptian fertilizing co. ( EFC )

Date August 2001 to February 2002

Project 160 ton storage tank and its piping connections

Activities

description

Complete inspection on all tank construction stages according to AUDE

specifications starting with civil works , material receiving , welding , testing ,

hydrostatic test , sand blasting , painting

5.5

Company/ client PETROBEL / PETROMAINT )

Date April 2004

Project Crude oil storage tank / abu redis field

Activities

description

Complete inspection on all tank construction stages, welding , testing , hydrostatic

test , sand blasting , painting

Page 22: MASSA /WH-01-2014 - massaconsulting.orgmassaconsulting.org/uploads/aboutus/massa_projects.pdfMASSA /WH-01-2014 DATE REV. NO NO ... 2- Plant Inspection 3- Electrical Power Stations

WWW.MASSACONSULTING.ORG

Page22

5. 6

Company/ client MISR PETROLEUM COMPANY

Contractor EL-Majd

Date March. 2009 till July 2009

Project Hurghada Airport Storage Tanks

location Hurghada

Activities

description

Complete inspection on all tank construction stages according to specifications

starting with civil works , material receiving , welding , testing , hydrostatic test ,

sand blasting , painting

5.7

Company/ client SANMAR

Contractor MIKEEWY

Date July 2008 till Feb 2009

Project SANMAR Petrochemical Plant Stage 2

location Port-said

Activities

description

Material receiving , qc plan , procedures review ,welders qualification , fabrication

control ( cutting , fit up , welding ) dimensional control , NDT review , hydrostatic

test witness & painting inspection

Page 23: MASSA /WH-01-2014 - massaconsulting.orgmassaconsulting.org/uploads/aboutus/massa_projects.pdfMASSA /WH-01-2014 DATE REV. NO NO ... 2- Plant Inspection 3- Electrical Power Stations

WWW.MASSACONSULTING.ORG

Page23

Pressure vessels (ASME stamped) -6

6.1

Company/ client Khalda Petroleum Co/ Petrofac

Date 2007/2008

Project El Salam Train 3, 4

Activities

description

Supervise PETROJET for construction of 24 pressure vessels with ASME Stamp

6.2

Company/ client ARESCO / ASEC

Date 2003

Project Demonstration vessel

Activities

description

Acting as NDT subcontractor for fabrication of pressure vessel to get ASME stamp

including Rt ,Ut ,Mt & Pt

6.3

Company/ client ASF (el sweedy ) / HEBI

Date 2003

Project Pressure vessels

Activities

description

Acting as NDT subcontractor for fabrication of pressure vessels including Rt ,Ut ,Mt

& Pt

Page 24: MASSA /WH-01-2014 - massaconsulting.orgmassaconsulting.org/uploads/aboutus/massa_projects.pdfMASSA /WH-01-2014 DATE REV. NO NO ... 2- Plant Inspection 3- Electrical Power Stations

WWW.MASSACONSULTING.ORG

Page24

Steel structure -7

7.1

Company/ client ASF (el sweedy )

Date 2003

Project Armed forces stadium columns

Location of Ramadan thASF factory workshop at 10

Activities

description

Carrying out visual inspection & ultrasonic testing on the columns according to

AWS D1.1

7.2

Company/ client House Gas

Date 2004

Project Arab engineers co umbrella pillars

Location Bader city

Activities

description Carrying out visual inspection, Penetrant testing & MPI according to AWS D1.1

7.3

Company/ client ARESCO ASEC

Date 2003

Project Edco piles

Location Aresco work shop / eltebin

Activities

description

24 hours shifts ultrasonic inspection for longitudinal & circumference seam welds of

Edco piles according to AWS D1.1

Page 25: MASSA /WH-01-2014 - massaconsulting.orgmassaconsulting.org/uploads/aboutus/massa_projects.pdfMASSA /WH-01-2014 DATE REV. NO NO ... 2- Plant Inspection 3- Electrical Power Stations

WWW.MASSACONSULTING.ORG

Page25

7.4

Company/ client Dar El-Handasah /Bin Ladin

Contractor ENERGYA

Date Nov. 2010 till now

Project Hurghada International Airport

location 10th Ramadan / Hurghada

Activities

description

Complete inspection on all steel construction stages according AWS D1.1 applying-

Ultrasonic & dye penetrant testing.

- Painting inspection and Supervision as a third party for protective coating,

Intumescent fire proofing and Cementations fire proofing.

Key persons :-

Dr Adel Gabra Dar El-handasah Consultant 01090144494

Eng Maged Sabry Bin Ladin Groub Main Cont. 01002159683

Eng Tamer Elsakhawy International Paints Paint Manuf. 01000430541

Eng Saber Energya Steel Sub-cont. 01000409660

Page 26: MASSA /WH-01-2014 - massaconsulting.orgmassaconsulting.org/uploads/aboutus/massa_projects.pdfMASSA /WH-01-2014 DATE REV. NO NO ... 2- Plant Inspection 3- Electrical Power Stations

WWW.MASSACONSULTING.ORG

Page26

Fertilizing & Paper FactoriesPetrochemical, Chemical, -8

8.1

Company/ client EBIT

Main Contractor ENERGYA Steel Solutions

Third Party Enpi

Sub Contractor Pioneer , El-Mahad , El-Hashimia

Date April 2011 to may 2013

Project Petrochemical Plant

location Sokhna

Activities

description

Contracting for NDT works in the project ( radiographic testing , Ultrasonic testing

and magnetic particle testing )

Daily work , reporting according to ASME B 31.3

8.2

Company Uni kima

Date 2003

Project Cosmetic Factory construction (Portsaid industrial zone)

Activities

description

Acting as NDT subcontractor for fabrication of pressure vessels & tank farms (48 tank)

including RT ,UT ,MT & PT

8.3

Company Trust group

Date 2003 to now

Page 27: MASSA /WH-01-2014 - massaconsulting.orgmassaconsulting.org/uploads/aboutus/massa_projects.pdfMASSA /WH-01-2014 DATE REV. NO NO ... 2- Plant Inspection 3- Electrical Power Stations

WWW.MASSACONSULTING.ORG

Page27

Project Petrochemical factory (port said) industrial zone

Activities

description

Acting as NDT subcontractor for fabrication of pressure vessels Tanks & pipng network

including Rt ,Ut ,Mt & Pt

8.4

Company Quena news paper factory / kolaly engineereing

Date 1999- 2000

Project Paper factory

Activities

description

Acting as NDT subcontractor for fabrication of two water tube boilers , five storage tanks ,

piping system , steel structure , stainless steel tanks , titanium piping , heat treatment ,

vaccum box , hardness,…..

8.5

Company Oriental petrochemical company / Samsung heavy industries / nilcon

Date 2001

Project Inspection during construction of polypropylene factory which is consists of three spherical

tanks , three storage tanks , steel structure and piping system

Activities

description

Quality control for welding , radiographic testing , mpi during and after welding , before and

after post weld heat treatment ,the activities is under Bureau Veritas certification ( BV )

8.6

Company/ client SANMAR / Lloyd's Register (LR)

Contractor PIONEERS CONSTRUCTION COMPANY

Date May 2009 till July 2010

Project SANMAR Petrochemical Plant Stage 2

location Port-said

Activities

description

-Providing total Q/A Q/C system have the following activities:-

Material receiving , qc plan , procedures review ,welders qualification , fabrication

control ( cutting , fit up , welding ) dimensional control , NDT review , hydrostatic

test witness & painting inspection

- Applying all RT activities

Page 28: MASSA /WH-01-2014 - massaconsulting.orgmassaconsulting.org/uploads/aboutus/massa_projects.pdfMASSA /WH-01-2014 DATE REV. NO NO ... 2- Plant Inspection 3- Electrical Power Stations

WWW.MASSACONSULTING.ORG

Page28

8.7

Company/ client SANMAR

Contractor EL-BASMALA CONSTRUCTION COMPANY

Date April 2010 till NOW

Project SANMAR Petrochemical Plant Stage 2

location Port-said

Activities

description

-Providing total Q/A Q/C system have the following activities:-

Material receiving , qc plan , procedures review ,welders qualification , fabrication

control ( cutting , fit up , welding ) dimensional control , NDT review , hydrostatic

test witness & painting inspection

- Applying all RT activities

Page 29: MASSA /WH-01-2014 - massaconsulting.orgmassaconsulting.org/uploads/aboutus/massa_projects.pdfMASSA /WH-01-2014 DATE REV. NO NO ... 2- Plant Inspection 3- Electrical Power Stations

WWW.MASSACONSULTING.ORG

Page29

Offshore and ships -9

9.1

Company/ client GUPCO/ BP

Contractors Petroleum Marine Services (PMS)/ UMAX (UK)

Date 2007

Project Taurt project /Offshore Pipeline 24” 45 KM

Location Port Said Red Sea

Activities

description

QA/QC & welding inspection for welding process (automatic welding). Logistics &

supplying of all required material. Monitoring of activities (welding, radio graphing,

coating, laying)

9.2

Company/ client North Sinai Petroleum Co. (NOSPCO)

Contractors Petroleum Marine Services (PMS)/ UMAX (UK)

Date 2005

Project NOSPCO Offshore Pipeline 22” 65 KM

Location Port Said Red Sea

Activities

description

QA/QC & welding inspection for welding process (automatic welding). Logistics &

supplying of all required material. Monitoring of activities (welding, radio graphing,

coating, laying)

9.3

Company/ client Stolt offshore

Date 2003

Project Scarab Saffron Development

Page 30: MASSA /WH-01-2014 - massaconsulting.orgmassaconsulting.org/uploads/aboutus/massa_projects.pdfMASSA /WH-01-2014 DATE REV. NO NO ... 2- Plant Inspection 3- Electrical Power Stations

WWW.MASSACONSULTING.ORG

Page30

Location Port Said (AUGUEST Barge)

Activities

description

Acting as NDT subcontractor for testing of Excavators Fastening, 2 Winch

Foreword & Deck Port on the barge including Mt & Pt testing

9.4

Company/ client MARI DIVE Offshore Projects

Date 2003

Project Barge & cranes supports

Location Alexandria (Abu Kier)

Activities

description

Carrying out NDT activities on the Barge cranes & supports of it (including

Magnetic Particle & Dye Penetrant Test)

9.5

Company/ client Suez Ship Yard (SSY)

Date 2004

Project Ships Building

Location Suez

Activities

description

Carrying out NDT activities for the Ships Ruder & body fabrication (including

Radiographic, Ultrasonic, Magnetic Particle & Dye Penetrant Tests)

9.6

Company/ client TRANSOCEAN

Contractor BORHANCO

Date Nov. 2010 till Jan. 2011

Project TRANSOCEAN Rig Shutdown

location Alexandria

Activities

description

-Applying MT , UT & Thickness measurements activities

Page 32: MASSA /WH-01-2014 - massaconsulting.orgmassaconsulting.org/uploads/aboutus/massa_projects.pdfMASSA /WH-01-2014 DATE REV. NO NO ... 2- Plant Inspection 3- Electrical Power Stations

WWW.MASSACONSULTING.ORG

Page32

Heat treatment -10

10.1

Company/ client EFC (Egyptian Fertilizing Co)

Date 2000 to now

Project Annual shutdown

Activities

description

Post weld heat treatment during the shutdown for the joints of alloy steel , two

machine delivered during the shut down for 21 day

10.2

Company/ client Sinai manganese company

Date 2004

Project Gypsum oven

Activities

description

Post weld heat treatment for the oven structure after welding as per the specification

rules using two local heat treatment machines

Page 33: MASSA /WH-01-2014 - massaconsulting.orgmassaconsulting.org/uploads/aboutus/massa_projects.pdfMASSA /WH-01-2014 DATE REV. NO NO ... 2- Plant Inspection 3- Electrical Power Stations

WWW.MASSACONSULTING.ORG

Page33

Lifting equipment inspection -11

11.1

Company/ client Total solution / BP / TRANSOCEAN

Date 2006 TO Now

Project Steel Manufacturing

Activities

description

Visual inspection and magnetic particle testing for carrying cargo units

manufactured by total solution for different client

All test are carried out by qualified inspectors according to ASNT – TC-1A level II

Training –12

12.1

Company/ client Scimitar Production Egypt Ltd

Date 2008

Project Safety Courses

Activities

description

Provide Safety course for company candidates in (Defensive Driving & H2S

hazards), as sole agent & partner of Serimax Training Ltd (UK)

12.2

Company/ client ENPPI – EFC- HOUSE GAS – NAT GAS – UNI KIMA – OPCO – WELDING

ACCADEMY – ARESCO ASEC- BAPETCO -

Date 2000 TO now

Project personnel qualification

Activities

description

RT , UT , MT , PT according to ASNT –SNT- TC-1A

Welding technology – painting inspection

Page 34: MASSA /WH-01-2014 - massaconsulting.orgmassaconsulting.org/uploads/aboutus/massa_projects.pdfMASSA /WH-01-2014 DATE REV. NO NO ... 2- Plant Inspection 3- Electrical Power Stations

WWW.MASSACONSULTING.ORG

Page34

12.3

Company/ client Homs Refinery Company (HRC)

Date 2/2010

Location Homs / Syria

Activities

description

Welding Technology & MT

Quality Assurance Consultants-13

13.1

Company/ client MASS- S CONTRACTING

Date 2005- 2006

Project ISO 9001 -2000 & 18001 & 14001

Activities

description

consultant for the company to get the ISO certificates in the field of electrometrical

projects construction by the following

- gab analysis

- awareness for company personnel

- Establishment of manual, procedures, work instruction, testing…

- internal auditors training

- management review

- attending external audit up to certification completion

- periodical audit and renewal certificate

13.2

Company/ client Nile pharos cruise

Date 2006

Project ISO 9001 -2000

Activities

description

consultant for the company to get the ISO certificates by the following

- gab analysis

- awareness for company personnel

- Establishment of manual, procedures, work instruction, testing…

- internal auditors training

- management review

- attending external audit up to certification completion

- periodical audit and renewal certificate

Page 35: MASSA /WH-01-2014 - massaconsulting.orgmassaconsulting.org/uploads/aboutus/massa_projects.pdfMASSA /WH-01-2014 DATE REV. NO NO ... 2- Plant Inspection 3- Electrical Power Stations

WWW.MASSACONSULTING.ORG

Page35

13.3

Company/ client ALAZAB FURNITURE FACTORY – DOIATTA

Date 2005

Project ISO 9001 -2000

Activities

description

consultant for the company to get the ISO certificates for furniture manufacturing

by the following

- gab analysis

- awareness for company personnel

- Establishment of manual, procedures, work instruction, testing…

- internal auditors training

- management review

- attending external audit up to certification completion

- periodical audit and renewal certificate

13.4

Company/ client SALAMA GROUP INDUSTRIES

Date 2005

Project ISO 9001 -2000

Activities

description

consultant for the company to get the ISO certificates for marble and granite by the

following

- gab analysis

- awareness for company personnel

- Establishment of manual, procedures, work instruction, testing…

- internal auditors training

- management review

- attending external audit up to certification completion

- periodical audit and renewal certificate

Page 36: MASSA /WH-01-2014 - massaconsulting.orgmassaconsulting.org/uploads/aboutus/massa_projects.pdfMASSA /WH-01-2014 DATE REV. NO NO ... 2- Plant Inspection 3- Electrical Power Stations

WWW.MASSACONSULTING.ORG

Page36

13.5

Company/ client ABU GHALI FOR PLASTICS COMPANY - DOMIATTA

Date 2005

Project ISO 9001 -2000

Activities

description

consultant for the company to get the ISO certificates in plastics production field by

the following

- gab analysis

- awareness for company personnel

- Establishment of manual, procedures, work instruction, testing…

- internal auditors training

- management review

- attending external audit up to certification completion

- periodical audit and renewal certificate

Page 37: MASSA /WH-01-2014 - massaconsulting.orgmassaconsulting.org/uploads/aboutus/massa_projects.pdfMASSA /WH-01-2014 DATE REV. NO NO ... 2- Plant Inspection 3- Electrical Power Stations

WWW.MASSACONSULTING.ORG

Page37

Outside Egypt-14

14.1

Company/ client Qatar Gas

Contractors Gamma Qatar/ Serimax (UK)

Date 2008/ 2009

Project Qatar Gas 3 & 4 Onshore Project

Location Qatar

Activities

description

Providing QA/QC, welding inspection, project Management & Project Coordination

for Serimax for welding different Corrosion Resistance Alloys (CRA) Materials

14.2

Company/ client Saudi ARAMCO

Contractors Petroleum Marine Services (PMS)/ Serimax (UK)

Date 2008/ 2009

Project Offshore Installation Facilities (pipelines 16”, 24”, 30”)

Location Arabian Gulf – Dammam- KSA

Activities

description

Providing QA/QC, welding inspectors & Project Coordination for Serimax for

executing different pipelines using semi automatic welding processes (GMAW/STT,

GTAW & FCAW)

14.3

Company/ client LIBO ITS

Date 2008

Project Plant Shut down

Location Libya

Activities

description

Providing API authorized Inspectors (5) to cover shutdown activities on different

equipments (tanks, piping, towers, vessels…etc)

Page 38: MASSA /WH-01-2014 - massaconsulting.orgmassaconsulting.org/uploads/aboutus/massa_projects.pdfMASSA /WH-01-2014 DATE REV. NO NO ... 2- Plant Inspection 3- Electrical Power Stations

WWW.MASSACONSULTING.ORG

Page38

14.4

Company/ client Tractable

Date 2005 to now

Project Arabic gas pipeline

Activities

description

Subcontractor for tractable Belgium for monitoring a cross country pipe line in

Jordan with length of 370 km from akaba to al rehab city in Jordan which is the

completion of the Egyptian line from arish – taba –akaba – al rehab

14.5

Company/ client Al Arabi contractors company – al Kuwait

Date 2006 to now

Project Gas plant

Activities

description

Providing QA/QC engineers to proceed construction contracts awarded to the

company

14.6

Company/ client Petrochemical industrial company ( PIC ) – Kuwait

Date 2006 to now

Project Gas plant

Activities

description

Providing 14 plant inspectors and three inspection engineers for planned shutdown

for the company , internal and external inspection for vessels , tanks , boilers, heat

exchangers , drums , piping and other equipments

Page 39: MASSA /WH-01-2014 - massaconsulting.orgmassaconsulting.org/uploads/aboutus/massa_projects.pdfMASSA /WH-01-2014 DATE REV. NO NO ... 2- Plant Inspection 3- Electrical Power Stations

WWW.MASSACONSULTING.ORG

Page39

14.7

Company/ client Egypt gas

Date 2003

Project East gas –Akaba – Jordan metering station and receiving station

Activities

description

Consultant for the project to quality control during certification of construction phase

of receiving station and metering station under certification of GL

14.8

Company/ client HOMS REFINARY COMPANY

Date Oct. 2009 till Feb. 2010

Project HOMS Coke Drums

location Homs / Syria

Activities

description

-Civil inspection for modifications & restorations.

-Providing total Q/A Q/C system have the following activities:-

Material receiving , qc plan , procedures review ,welders qualification , fabrication

control ( cutting , fit up , welding ) dimensional control , NDT review , hydrostatic

test witness.

-Painting & insulation inspection

14.9

Company/ client CCED / Triple-C

Contractor

SIGMA Construction & Supply Services

Date June 2010 till Aug. 2010

location OMAN

Activities

description

-Providing total Q/A Q/C system have the following activities:-

Material receiving , qc plan , procedures review ,welders qualification , fabrication

control ( cutting , fit up , welding ) dimensional control , NDT review , hydrostatic

test witness & painting inspection

Page 40: MASSA /WH-01-2014 - massaconsulting.orgmassaconsulting.org/uploads/aboutus/massa_projects.pdfMASSA /WH-01-2014 DATE REV. NO NO ... 2- Plant Inspection 3- Electrical Power Stations

WWW.MASSACONSULTING.ORG

Page40

14.9

Company/ client PETROCANADA

Contractor

SIGMA Construction & Supply Services

Date Nov. 2010 till Feb. 2011

location Syria

Activities

description

-Providing total Q/A Q/C system have the following activities:-

Material receiving , qc plan , procedures review ,welders qualification , fabrication

control ( cutting , fit up , welding ) dimensional control , NDT review , hydrostatic

test witness & painting inspection