Masdar Headquarters Building Abu Dhabi, U.A.E. 2009 Thornton Tomasetti Annual Meeting Wincy Law, Project Engineer, LEED AP May 8, 2009

Masdar Headquarters Building - Thornton Tomasetti · Masdar Headquarters Building Abu Dhabi, U.A.E. 2009 Thornton Tomasetti Annual Meeting Wincy Law, Project Engineer, LEED AP May

Embed Size (px)

Citation preview

Masdar Headquarters Building Abu Dhabi, U.A.E. 

2009 Thornton Tomasetti Annual Meeting Wincy Law, Project Engineer, LEED AP May 8, 2009

Masdar Headquarters Building Abu Dhabi, U.A.E. 

RWDI: Wind Tunnel Test 1:300 Model

Masdar Headquarters Building Abu Dhabi, U.A.E. 

Isometric View from Revit

Structural Components 

Cones

Structural Components 

Cones Lower Trellis: Peel

Structural Components 

Cones Lower Trellis: Peel Lower Trellis: Mesh

Structural Components 

Cones Lower Trellis: Peel Lower Trellis: Mesh Truss

Structural Components 

Cones Lower Trellis: Peel Lower Trellis: Mesh Truss Upper Trellis: Top Chord Bracing

Geometry: Upper Trellis §  Max cantilever = 57m §  Upper Trellis = 7 acres 

57m 

57m 

53m 

34m 

31.5m 

194m (637ft) 

285m (935ft) 

120m

 (394ft) 

187ft 

187ft 

103ft 

112ft 

174ft

Geometry: Upper Trellis §  Max cantilever = 57m §  Upper Trellis = 7 acres 

57m 

57m 

53m 

34m 

31.5m 

194m (637ft) 

285m (935ft) 

120m

 (394ft) 

(≈ 3 X Wrigley Field) 

187ft 

187ft 

103ft 

112ft 

174ft

Connection Design §  ANSYS

Site Photos 

Courtesy of RWA

Site Photos 

Courtesy of RWA

Masdar Headquarters 

Courtesy of Adrian Smith + Gordon Gill Architecture