44
For internal circulation of BSNL only E2-E3 E&WS Telecom Infrastructure

Marketing Mix - Bharat Sanchar Nigam Limited...Datacom, Aircel •Many others being explored •USO Infra sharing project For internal circulation of BSNL only Towers & Antenna 1

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Marketing Mix - Bharat Sanchar Nigam Limited...Datacom, Aircel •Many others being explored •USO Infra sharing project For internal circulation of BSNL only Towers & Antenna 1

For internal circulation of BSNL only

E2-E3

E&WSTelecom Infrastructure

Page 2: Marketing Mix - Bharat Sanchar Nigam Limited...Datacom, Aircel •Many others being explored •USO Infra sharing project For internal circulation of BSNL only Towers & Antenna 1

For internal circulation of BSNL only

WELCOME

• This is a presentation for the E2-E3 E &WS

Module for the Topic: Telecom Infrastructure

• Eligibility: Those who have got the Upgradation

from E2 to E3.

• This presentation is last updated on 23-3-2011.

• You can also visit the Digital library of BSNL to

see this topic.

Page 3: Marketing Mix - Bharat Sanchar Nigam Limited...Datacom, Aircel •Many others being explored •USO Infra sharing project For internal circulation of BSNL only Towers & Antenna 1

For internal circulation of BSNL only

Agenda

• Components of telecom infrastructure

• Revenue potential of passive infrastructure

• Key aspects of passive infrastructure elements

Page 4: Marketing Mix - Bharat Sanchar Nigam Limited...Datacom, Aircel •Many others being explored •USO Infra sharing project For internal circulation of BSNL only Towers & Antenna 1

For internal circulation of BSNL only

Components of Telecom Infrastructure

Mobile Network

Passive Infrastructure

Key Components-Steel tower/antenna - mounting structures- BTS shelter- Power supply- Battery bank- Invertors- Diesel generator (DG) - Air conditioner- Fire extinguisher- Security cabin, etc.

Backhaul-The backhaul part of

the network consists of the

intermediate links between the core

of the network and the various sub-networks

Active Infrastructure

Key Components

-Spectrum

- Base tower station

- Microwave radio

- Switches

- Antennas

- Transceivers

Page 5: Marketing Mix - Bharat Sanchar Nigam Limited...Datacom, Aircel •Many others being explored •USO Infra sharing project For internal circulation of BSNL only Towers & Antenna 1

For internal circulation of BSNL only

Revenue Potential

• Tower Asset base over Rs 40000

• Aim to get revenue of Rs 1000 crore in a year

• Four tie-up already done-Tata, Shyam,

Datacom, Aircel

• Many others being explored

• USO Infra sharing project

Page 6: Marketing Mix - Bharat Sanchar Nigam Limited...Datacom, Aircel •Many others being explored •USO Infra sharing project For internal circulation of BSNL only Towers & Antenna 1

For internal circulation of BSNL only

Towers & Antenna

1. Ground-Based Tower:

– Taller (typically 40m, 60m)

– Mostly used in rural and semi-urban areas

– GBTs involve a capital expenditure in the

range of Rs. 2.4 to 2.8 million, depending

on the height of the tower.

– May accommodate up to six tenants

Page 7: Marketing Mix - Bharat Sanchar Nigam Limited...Datacom, Aircel •Many others being explored •USO Infra sharing project For internal circulation of BSNL only Towers & Antenna 1

For internal circulation of BSNL only

Towers & Antenna

2 Roof-Top Tower (RTT):

– are shorter than GBTs (typically 13m, 21m,

27m)

– more common in urban and highly populated

areas

– Typically, these involve a capital expenditure

of Rs. 1.5 to 2 million

– May accommodate up to three tenants

Page 8: Marketing Mix - Bharat Sanchar Nigam Limited...Datacom, Aircel •Many others being explored •USO Infra sharing project For internal circulation of BSNL only Towers & Antenna 1

For internal circulation of BSNL only

Towers & Antenna

It is the height of a telecom tower that

determines the number of antennas that can

be accommodated, which in turn determines

the capacity of the towers, apart from factors

such as location and geographical conditions

(wind speeds, type of terrain, etc.).

Page 9: Marketing Mix - Bharat Sanchar Nigam Limited...Datacom, Aircel •Many others being explored •USO Infra sharing project For internal circulation of BSNL only Towers & Antenna 1

For internal circulation of BSNL only

Key Maintenance tips

• Visual check of bolts/nuts and sample check of

their tightness,

• Greasing on foundation bolts to be done.

• Check the Antenna connectors and their

tightness.

• Check for tightness of antenna fixtures, u clamps

etc..

• Check for ingress of water (condition of weather

proofing in waveguide) etc

Page 10: Marketing Mix - Bharat Sanchar Nigam Limited...Datacom, Aircel •Many others being explored •USO Infra sharing project For internal circulation of BSNL only Towers & Antenna 1

For internal circulation of BSNL only

Key Maintenance tips

• Check the orientation of antenna of each sector

and compare with the old records.

• Check for the down tilt of antennae which also

may be compared with old records.

• If any disparity is observed, reinstate in

consultation with Optimization team/RP wing.

• Record the checks & changes done and report

the changes to RP wing/Optimization team.

• Check functioning of aviation lamp

Page 11: Marketing Mix - Bharat Sanchar Nigam Limited...Datacom, Aircel •Many others being explored •USO Infra sharing project For internal circulation of BSNL only Towers & Antenna 1

For internal circulation of BSNL only

VRLA Battery

Life of Battery

• Batteries up to 200AH: 4 Years

• Batteries more than 200 AH: 6 years

Page 12: Marketing Mix - Bharat Sanchar Nigam Limited...Datacom, Aircel •Many others being explored •USO Infra sharing project For internal circulation of BSNL only Towers & Antenna 1

For internal circulation of BSNL only

VRLA Battery

1. Periodic physical inspection of each cell of thebattery for cracks and leaking etc.

2. Discharge of battery for a short duration andrecording the voltages of each cell.

3. Measurement of a mark deviation (>30%) in theimpedance or conductance of the cell whencharger is on as compared to the one recordedat the time of commissioning.

4. Measurement & recording of cell tempperiodically.

5. Float Voltage of cells & its comparison with themid point voltage.

6. Float current in fully charged battery.

Page 13: Marketing Mix - Bharat Sanchar Nigam Limited...Datacom, Aircel •Many others being explored •USO Infra sharing project For internal circulation of BSNL only Towers & Antenna 1

For internal circulation of BSNL only

VRLA Maintenance schedule

• Daily: Temperature and voltage of a pilot cell and all the

cells as far as possible. The pilot cell should be cyclically

selected on monthly basis.

• Monthly: Voltage of each cell during partial discharge.

Float current measurement

Physical verification

• Quarterly: Ensure the tightness of terminal bolts to 11Nm

/100Lb inch Conductance measurement

Apply boost charge for 24Hrs.

• Yearly: Test discharge the batteries @ C10 and measure

the time battery sustains the load till any of the cells falls

to 1.75V.

Page 14: Marketing Mix - Bharat Sanchar Nigam Limited...Datacom, Aircel •Many others being explored •USO Infra sharing project For internal circulation of BSNL only Towers & Antenna 1

For internal circulation of BSNL only

Dos for VRLA battery

• Clean the batteries as and when dust

accumulates.

• Keep the batteries away from heat source,

sparks, fire etc.,

• Keep the battery room neat and clean

• Charge the batteries once in every six months @

2.30 vpc for 24hrs, if stored for longer periods

• Wherever cables are used ensure using proper

cable size and crimping of the lug to the cable.

Page 15: Marketing Mix - Bharat Sanchar Nigam Limited...Datacom, Aircel •Many others being explored •USO Infra sharing project For internal circulation of BSNL only Towers & Antenna 1

For internal circulation of BSNL only

Dos for VRLA battery

• Tighten all terminal bolts to 11 Nm (100 Lb.-inch)

• Re- torque all the terminal bolts once in every six

months.

• After any discharge, recharge the batteries when

power restores.

• Always use calibrated instruments for

measurements.

• Keep the batteries in Air-conditioned environment,

wherever possible.

Page 16: Marketing Mix - Bharat Sanchar Nigam Limited...Datacom, Aircel •Many others being explored •USO Infra sharing project For internal circulation of BSNL only Towers & Antenna 1

For internal circulation of BSNL only

Don’ts for VRLA battery

• Do not add water or acid.

• Do not tamper the safety valves.

• Do not over tighten the terminal bolts.

• Do not allow any metal objects to rest on the battery or fall across the battery terminals.

• Do not mix the batteries of different capacities or makes.

• Do not combine ordinary conventional batteries with VRLA batteries.

• Do not install physically damaged cells.

• Do not dump any waste materials in the battery room.

Page 17: Marketing Mix - Bharat Sanchar Nigam Limited...Datacom, Aircel •Many others being explored •USO Infra sharing project For internal circulation of BSNL only Towers & Antenna 1

For internal circulation of BSNL only

SMPS power plant

Life of power plant

• Static P/P : 15 years

• SMPS P/P: 15 years

Page 18: Marketing Mix - Bharat Sanchar Nigam Limited...Datacom, Aircel •Many others being explored •USO Infra sharing project For internal circulation of BSNL only Towers & Antenna 1

For internal circulation of BSNL only

SMPS advantages

• Due to high frequency the size oftransformers and chokes is reduced to 10 to15% of the conventional SCR/Thyristorcontrolled power plants. Compactness savesfloor area.

• SMPS Power Plants employ micro-processorcontrol techniques for temperaturecompensation logic to take care oftemperature effect on battery.

• Being small and light in weight, fit perfectly inmodular concept.

Page 19: Marketing Mix - Bharat Sanchar Nigam Limited...Datacom, Aircel •Many others being explored •USO Infra sharing project For internal circulation of BSNL only Towers & Antenna 1

For internal circulation of BSNL only

SMPS advantages

• Modular system, easy up-gradation of thecapacity, simply plugging-in the additionalmodules adds to the capacity,

• Very high reliability and therefore are lessprone to faults, which result in low operatingcost.

• Very improved Power Factor (near unity)making the system more efficient and makeeasy to comply with state electricity board’sP.F. norms.

• Suitable for VRLA batteries.

Page 20: Marketing Mix - Bharat Sanchar Nigam Limited...Datacom, Aircel •Many others being explored •USO Infra sharing project For internal circulation of BSNL only Towers & Antenna 1

For internal circulation of BSNL only

Earthing

• Reduction of Crosstalk and Noise.

• Protection of costly apparatus and personsagainst foreign voltages and leakage currentsfrom power wirings touching the metallic frameof the equipment.

• Protection of buildings and equipments fromlightning strikes.

• Earthing of power supply systems is used toensure reliability of power as it helps to providestability of voltage conditions preventing excessfluctuations and providing a measure ofprotection against lightning.

Page 21: Marketing Mix - Bharat Sanchar Nigam Limited...Datacom, Aircel •Many others being explored •USO Infra sharing project For internal circulation of BSNL only Towers & Antenna 1

For internal circulation of BSNL only

Earthing types

• Spike electrodes: are used where space is not aproblem.

• Plate electrodes: Where there is not much spacebut digging is not a problem.

• Strip electrodes: In hilly areas where diggingbeyond 2-3ft depth is not possible and space isavailable.

• Nowadays Chemical Earth is also being made inwhich a chemical paste is deposited between theplates, which helps in maintaining the required levelof moisture and is also known as maintenance freeearth. It is specifically useful for hilly areas.

Page 22: Marketing Mix - Bharat Sanchar Nigam Limited...Datacom, Aircel •Many others being explored •USO Infra sharing project For internal circulation of BSNL only Towers & Antenna 1

For internal circulation of BSNL only

Tips for Good Earthing practices

• RING EARTH to be provided surrounding the

building

• All other individual earth connections that is of

Power room, Transmission, Switch room ,E/A etc

should be first terminated on separate earth

distribution plates (edp) (Single Point Earth

connectors) and then to be extended to the ring

earth. One EDP should be provided outside the

building to terminate earth from external

connections like cable sheath.

Page 23: Marketing Mix - Bharat Sanchar Nigam Limited...Datacom, Aircel •Many others being explored •USO Infra sharing project For internal circulation of BSNL only Towers & Antenna 1

For internal circulation of BSNL only

Tips for Good Earthing practices

• Earth resistance should be less than 0.5 Ώ for

electronic exchanges

• Earth resistance is to be measured every six

months & One dry season must be included in

these two occasions.

• For lightning prone areas, it should be measured

every month.

• Chemical treatment of the earth is not

recommended.

• In lightning prone areas use copper instead of

G.I. to form ring earth.

Page 24: Marketing Mix - Bharat Sanchar Nigam Limited...Datacom, Aircel •Many others being explored •USO Infra sharing project For internal circulation of BSNL only Towers & Antenna 1

For internal circulation of BSNL only

Tips for Good Earthing practices

• Earth distribution plate should be insulated from the

wall of the building.

• Coiling of earth conductor should be avoided.

• Bending radius of conductor should have at least 1m

radius.

• The earthing conductor should not pass through any

metallic conduit.

• All joints should be water proof.

• For GI to GI joints proper surface contact should be

ensured by inserting lead strip in between.

• Aviation lamp & lighting arrestors of the tower to be

looped to tower ring earth.

Page 25: Marketing Mix - Bharat Sanchar Nigam Limited...Datacom, Aircel •Many others being explored •USO Infra sharing project For internal circulation of BSNL only Towers & Antenna 1

For internal circulation of BSNL only

Tips for Good Earthing practices

• Roof top tower is also to be ring earthed.

• Each leg of the tower should be separately

connected to the tower ring earth & should be

connected to one of the plates of the plate earth.

• Transformer neutral to be earthed separately from

ring earth at a minimum distance of 6 m.

• The frame of EA can be connected to ring earth.

• E/A Neutral to be earthed separately & looped to

ring earth.

• Wet the earth pits during dry weather to keep the

earth resistance within limits

Page 26: Marketing Mix - Bharat Sanchar Nigam Limited...Datacom, Aircel •Many others being explored •USO Infra sharing project For internal circulation of BSNL only Towers & Antenna 1

For internal circulation of BSNL only

Invertors

• In most of the telecom installations, inverters are

installed to provide uninterrupted AC supply to OMC

terminals. Capacity of invertors used varies from 1KVA

to 10KVA depending on the connected AC load. The

basic precautions for installation is that inverter should

be installed as close to battery room as possible so as to

reduce DC voltage loss due to cabling. The inverters

may not be loaded beyond 80% of its rated capacity and

initial start up load also needs to be taken into account.

Only essential equipment may be connected to inverter

output. Except few emergency lightings, rest light fittings

should be fed from Engine alternator set for backup.

Page 27: Marketing Mix - Bharat Sanchar Nigam Limited...Datacom, Aircel •Many others being explored •USO Infra sharing project For internal circulation of BSNL only Towers & Antenna 1

For internal circulation of BSNL only

Airconditioining

• Window Type Units

• Split Type Units.

• Package Type unit

• Central Air-conditioning System

Page 28: Marketing Mix - Bharat Sanchar Nigam Limited...Datacom, Aircel •Many others being explored •USO Infra sharing project For internal circulation of BSNL only Towers & Antenna 1

For internal circulation of BSNL only

Window/Split AC maintenance

Important Daily Checks

– Check for room temperature.

– Check for any abnormal sound/vibration.

Important Monthly Checks

– Clean cooling & condenser coil periodically and comb

mashed fins

– Check filters and clean/ change if required

– Ensure proper charging of refrigerant

– Check for tripping of compressor by thermostat

– Eliminate obstructions in front of condenser, if any

Important Yearly Checks

– Complete Servicing and testing of Window / split AC

unit.

Page 29: Marketing Mix - Bharat Sanchar Nigam Limited...Datacom, Aircel •Many others being explored •USO Infra sharing project For internal circulation of BSNL only Towers & Antenna 1

For internal circulation of BSNL only

Package/Central AC maintenance

Important Daily Checks

– Check for any vibration in AC unit equipments

– Check for discharge & suction pressure

– Check V-Belt tension of Blower Motor/

condenser motor.

– Check for any frosting at coil

– Check working of fresh air fan.

Page 30: Marketing Mix - Bharat Sanchar Nigam Limited...Datacom, Aircel •Many others being explored •USO Infra sharing project For internal circulation of BSNL only Towers & Antenna 1

For internal circulation of BSNL only

Package/Central AC maintenance

Important Monthly Checks

– Micro –filter Cleaning.

– Fresh Air Filter cleaning.

– Check for leakage of conditioned air

– Check lubrication of all bearings

Important Yearly Checks

– Complete Servicing of A/C plant before

onset of summer

Page 31: Marketing Mix - Bharat Sanchar Nigam Limited...Datacom, Aircel •Many others being explored •USO Infra sharing project For internal circulation of BSNL only Towers & Antenna 1

For internal circulation of BSNL only

Engine Alternator

• IMPORTANT MAINTENANCE CHECKS FOR ENGINE

ALTERNATOR SET

Daily

• Check Engine oil level and leakage if any.

• Check Radiator for water level and leakage if any.

• Check fuel level.

• Check that battery charger is in trickle charging position.

• Check whether insulation of the Exhaust pipe is proper.

• Check that ventilation of the EA Room is proper.

• Check oil pressure.

• Check if lights and exhaust fan are working properly.

• Check physically before start for loose connection/nut bolt.

Page 32: Marketing Mix - Bharat Sanchar Nigam Limited...Datacom, Aircel •Many others being explored •USO Infra sharing project For internal circulation of BSNL only Towers & Antenna 1

For internal circulation of BSNL only

Engine Alternator

• Weekly

• Check Air line connection and filter.

• Check fan belt, and its tension.

• Fortnightly

• Check Battery voltage, Terminals, Electrolyte level (Top

up if necessary) .

• Check Specific Gravity of Electrolyte.

(After the above checks, start the Engine for No

Load/Connected Load and test for 10 minutes the

following)

• Check for any abnormal noise. Shut down the E/A

immediately and cause be examined.

Page 33: Marketing Mix - Bharat Sanchar Nigam Limited...Datacom, Aircel •Many others being explored •USO Infra sharing project For internal circulation of BSNL only Towers & Antenna 1

For internal circulation of BSNL only

Engine Alternator

• Check frequency and out put voltage.

• Check the colour of Exhaust gas

• Check working of the Indication Lamps.

• Check working of the Dynamo and Auto Cut off of the

Battery charger.

• Check for any Exhaust gas restriction.

• Check manual/ auto-changeover from commercial

supply on connected load.

• Record various readings in the logbook.

Page 34: Marketing Mix - Bharat Sanchar Nigam Limited...Datacom, Aircel •Many others being explored •USO Infra sharing project For internal circulation of BSNL only Towers & Antenna 1

For internal circulation of BSNL only

Engine Alternator

Monthly

• Check for tightness of connections in Engine and Control

Panel.

• Watering of earth pits and tightening of connections.

• Check functioning of safety devices.

• Check belt tensions.

• Check battery charger.

• Check for leakage of fuel line.

• Check for leakage in exhaust pipes.

• Inspect the manufacturer’s chart for due date of

maintenance.

Page 35: Marketing Mix - Bharat Sanchar Nigam Limited...Datacom, Aircel •Many others being explored •USO Infra sharing project For internal circulation of BSNL only Towers & Antenna 1

For internal circulation of BSNL only

Engine Alternator

• Half Yearly

• Cleaning of bus bars & chambers and tightening

of nut bolts.

• Checking of ACB/MCCB tripping mechanism.

• Earth testing and Meggering.

• Relays and other protection devices are working

properly.

Page 36: Marketing Mix - Bharat Sanchar Nigam Limited...Datacom, Aircel •Many others being explored •USO Infra sharing project For internal circulation of BSNL only Towers & Antenna 1

For internal circulation of BSNL only

Engine Alternator

Yearly

• Tighten all mounting, nut and bolt.

• Check crankshaft and float.

• Clean injector inlet screen.

• Clean and calibrate all injectors.

• Check fuel pump calibration.

• Replace fuel pump filter screen and magnet.

Page 37: Marketing Mix - Bharat Sanchar Nigam Limited...Datacom, Aircel •Many others being explored •USO Infra sharing project For internal circulation of BSNL only Towers & Antenna 1

For internal circulation of BSNL only

Fire Safety

PASSIVE FIRE PROTECTION: Passive fire protection

measures are those which are adopted at the planning

stage of the building or facility such as :

• Provision of adequate fire resistance of the structure.

• Provision of proper FAR, open spaces.

• Provision of adequate access to sufficient and readily

available water supply etc. for fire brigade.

• Telephone exchange buildings have been classified as

E4 business buildings in the “National Building-Code of

India”. As such building Material(s) of suitable fire

retardant ability as mentioned therein shall only be

provided.

Page 38: Marketing Mix - Bharat Sanchar Nigam Limited...Datacom, Aircel •Many others being explored •USO Infra sharing project For internal circulation of BSNL only Towers & Antenna 1

For internal circulation of BSNL only

Fire Safety

ACTIVE FIRE PROTECTION MEASURES:

Active fire protection measures are those which

operate (manual/Automatic) in the event of out

break of fire such as:-

• Provision of suitable and adequate Fire detection

system with audio visual alarm.

• Wet riser & fire Extinguishers.

Page 39: Marketing Mix - Bharat Sanchar Nigam Limited...Datacom, Aircel •Many others being explored •USO Infra sharing project For internal circulation of BSNL only Towers & Antenna 1

For internal circulation of BSNL only

Automatic Fire Detection system

• All buildings above 15 m height and all Digital

Electronic exchanges and all the exchanges of 1K or

above . False floor plenum and false ceiling constitute

separate zones.

• The detectors shall be of rate of rise of temperature

type and smoke type. Wherever smoke detectors are

provided, a mixture of photoelectric and ionization

type will be used.

• A control indication panel to which detection circuits in

all the zones are connected, shall be installed in the

fire control room or in the main entrance lobby on the

ground floor of the building. Light indications on the

panels shall enable the identification of the fire site.

Page 40: Marketing Mix - Bharat Sanchar Nigam Limited...Datacom, Aircel •Many others being explored •USO Infra sharing project For internal circulation of BSNL only Towers & Antenna 1

For internal circulation of BSNL only

Automatic Fire Detection system

• The alarm system shall provide both alert system

and evacuation alarm with different distinctive

tones.

• The alarm system shall have a battery backup so

that in case of mains failure, the backup batteries

take over and feed the power to the system.

• A non exchange direct fire emergency magneto

telephone shall be provided in the equipment

room to all Telecom buildings for direct

communication with the fire brigade. Extension at

reception/sentry. To be tested daily.

Page 41: Marketing Mix - Bharat Sanchar Nigam Limited...Datacom, Aircel •Many others being explored •USO Infra sharing project For internal circulation of BSNL only Towers & Antenna 1

For internal circulation of BSNL only

Fire fighting readiness

• The operating instructions shall be clearly printed on the body of extinguishers.

• Sufficient quality of refills for the extinguishers shall be stored.

• For buildings above 15 mt. In height one wet riser for every 1000 sq. mtr or part therefore of floor area shall be provided. The hydrant shall be so located that it is not father than 30 mt. from any point in the area covered.

• In data centers, automatic flooding system is provided keeping in view the importance and fire risk involved.

• Two water buckets and too sand buckets shall be provided at each floor.

Page 42: Marketing Mix - Bharat Sanchar Nigam Limited...Datacom, Aircel •Many others being explored •USO Infra sharing project For internal circulation of BSNL only Towers & Antenna 1

For internal circulation of BSNL only

Fire classification

• CLASS A:Fire in ordinary combustible materials ( like wood, cloth, paper, rubber, etc.) Suitable fire extinguishers are WATER, FOAM

• CLASS B: Fire inflammable liquids, gasses etc. The fire extinguishers are FOAM, CO2, , DRY POWDER

• CLASS C: Fire in live electrical equipment. The fire extinguishers are CO2 , HALON

• CLASS D:Fire in reactive metals (Like Mg, Ti, Na, K, etc.). The fire extinguishers are SPECIAL DRY CHEMICAL POWDER .

Page 43: Marketing Mix - Bharat Sanchar Nigam Limited...Datacom, Aircel •Many others being explored •USO Infra sharing project For internal circulation of BSNL only Towers & Antenna 1

For internal circulation of BSNL only

Sum up

• Components of telecom infrastructure

• Revenue potential of passive infrastructure

• Key aspects of passive infrastructure elements

Page 44: Marketing Mix - Bharat Sanchar Nigam Limited...Datacom, Aircel •Many others being explored •USO Infra sharing project For internal circulation of BSNL only Towers & Antenna 1

For internal circulation of BSNL only