Marine Licensing Signposts

Roger MayMarine Scotland, Marine Laboratory, Aberdeen

Page 2: Marine Licensing Signposts Roger May Marine Scotland, Marine Laboratory, Aberdeen

Today’s presentation- Signposts

• Decommissioning• MCA SAR• New SPA and SAC

Page 3: Marine Licensing Signposts Roger May Marine Scotland, Marine Laboratory, Aberdeen

Decommissioning• Issue decommissioning of renewables is not covered

fully by current legislation

• Decommissioning of offshore renewable energy installations under the Energy Act 2004

• The key decommissioning provisions in the Energy Act 2004 (Sections 105 to 114) are explained in Annex B. Broadly speaking, the Secretary of State may require a person who is responsible for an offshore renewable energy installation to prepare a costed decommissioning programme and ensure that it is (eventually) carried out. The Secretary of State can approve, modify or reject a programme, including any financial security provisions which the responsible person proposes to provide. The Secretary of State is required to review the programme from time to time.

• used (or will be used or have been used) for purposes connected with the production of energy from water or winds; and

• b) permanently rest on, or are permanently attached to, the bed of the waters; and

• c) are not connected with dry land by a permanent structure providing access at all times for all purposes.

Page 5: Marine Licensing Signposts Roger May Marine Scotland, Marine Laboratory, Aberdeen

What LOT is working on• Licences issued have been for deposit and maintenance of structures.

Conditions require final removal but do not consent it. Therefore need another licence to remove.

• Licenced removal of Open Hydro

• Working on Draft Marine Licence of Limpet• Draft Marine Licence for removal APL Oyster at EMEC• Draft Voith at EMEC• Robin Rigg remove two turbines and construct 2 new. Operation and

maintenance or decommissioning?)

• Issues legacy- reassign partial assets to EMEC with responsibility for decommissioning maintained. Assets remaining are defined in the removal licence and the licence can then be transferred.

Page 6: Marine Licensing Signposts Roger May Marine Scotland, Marine Laboratory, Aberdeen

MSLOT

• Working with DECC and TCE to ensure works are appropriately bonded.

• Working at EMEC to include assessment of decommissioning in the marine licence for deposit through joint consultation

at the licensing stage.• This will allow us to include a better link to decommissioning in our licences

Page 7: Marine Licensing Signposts Roger May Marine Scotland, Marine Laboratory, Aberdeen

MAC Search and Rescue• Issue SAR assessments had not taken place

during the application process.• Issue with windfarms Oct 2014• Letter to industry including wave and tide Jan

2015

Page 8: Marine Licensing Signposts Roger May Marine Scotland, Marine Laboratory, Aberdeen

Issues to Note

• Layouts need to be informed to MCA SAR very early in the process – before Geo Tech survey decisions.

• MCA noting increasing SAR risks and cumulative effects.

• MCA taking a more strategic view of wind farms as SAR problem.

• Adjacent wind farms need more careful analysis and may require aligned layouts.

Page 9: Marine Licensing Signposts Roger May Marine Scotland, Marine Laboratory, Aberdeen

Issues to Note

• Spacing between turbines for SAR helicopters.• Helicopter Airspace gap between adjacent

wind farms.• Other mitigation requirements may be needed

(AIS, radar, VHF DSC and Voice radio, real time weather).

Page 10: Marine Licensing Signposts Roger May Marine Scotland, Marine Laboratory, Aberdeen
Page 11: Marine Licensing Signposts Roger May Marine Scotland, Marine Laboratory, Aberdeen
Page 12: Marine Licensing Signposts Roger May Marine Scotland, Marine Laboratory, Aberdeen

Considerations

• Common alignment • Safe distance• Track spacing• High density boundary

Page 13: Marine Licensing Signposts Roger May Marine Scotland, Marine Laboratory, Aberdeen

Consent Methodology

• Complex and involves a number of government departments

with a variety of perspectives

• Historically emphasis has been on position and plan view of

development

• Positioning of individual structures just as important

• In future MCA needs be consulted much earlier and before

any investment on geotech work

Page 14: Marine Licensing Signposts Roger May Marine Scotland, Marine Laboratory, Aberdeen

Way ahead

• Working with developers on a case-by-case basis.

• MCA open to compromise as understanding develops

• MCA needs to be engaged much earlier in consent process –

discussions with DECC ongoing

• MCA guidance material (MGN 371 etc.) to be revised

• Bristow developing simulator model for training/assessment

• Helicopter doctrine and procedures to be developed

Page 15: Marine Licensing Signposts Roger May Marine Scotland, Marine Laboratory, Aberdeen

MS LOT - SAR

• Consented projects have provided layouts for assessment to MCA

• With new projects can an assessment take place during consent?

• Yes if fixed Design and Layout –Hywind.• No for most projects with design not complete –

requires consent condition that the assessment must be done and approved by MCA post consent (added risk).

Page 16: Marine Licensing Signposts Roger May Marine Scotland, Marine Laboratory, Aberdeen

New SPAs and SACs

• How and when is it appropriate to take new SPA and SAC into account

Rochdale envelope + Rochdale envelope + Rochdale EnvelopeIndividual development Other Developments management objectives New SAC SPA

Assessment =

Page 17: Marine Licensing Signposts Roger May Marine Scotland, Marine Laboratory, Aberdeen

New proposed SPAs

Timing• Consultation end July

2015• Designation likely end

2015

Page 18: Marine Licensing Signposts Roger May Marine Scotland, Marine Laboratory, Aberdeen

New Proposed SAC for Harbour Porpoise

• Consented developments have other drivers (CfD) which require closure on identified risks

Page 19: Marine Licensing Signposts Roger May Marine Scotland, Marine Laboratory, Aberdeen

Marine Scotland

• For new protected areas our policy is to look at protected areas once they have reached the proposed stage (at the point of consultation)

• For projects already consented we are looking at carrying out shadow appropriate assessments and have been discussing with SNCB to review these.

Page 20: Marine Licensing Signposts Roger May Marine Scotland, Marine Laboratory, Aberdeen

Conclusions• Marine Scotland is working with DECC and TCE to ensure suitable

safeguards in place to ensure renewable developments are decommissioned at end of life.

• Marine Scotland is working with developers and MCA to resolve issues of SAR assessment on consented projects and to include in assessment in new projects.

• Marine Scotland is working to address immediate concerns on new SPA/SAC of consented projects with respect to shadow assessments and is ensuring that new projects will take into account.

Page 21: Marine Licensing Signposts Roger May Marine Scotland, Marine Laboratory, Aberdeen

end

• Contacts:-• Marine Scotland – Licensing Operations Team• Marine Laboratory • 375 Victoria Road Aberdeen AB11 9DB• Direct Line +44 (0)1224 285579• Fax +44 (0) 1224295524• [email protected]• Web

http://www.scotland.gov.uk/Topics/marine/Licensing/marine/Applications