Upload
lammien
View
223
Download
5
Embed Size (px)
Citation preview
Marine energy: A new global industry
Marine Energy Industry Challenge
TRL 1-3
Proof of Concept
TRL 3 – 5
Concept Development
TRL 6 -7
Prototype Demonstration
TRL 8-9
Full Scale/Array Demonstration
£100-150K £0.5-3m £10m + £20-40m + £100m +
Commercial
Deployment
Commercial
Proven technology
Warranty
Utility scale
Cost competitive
Mass manufacturing
Inn
ova
tion
V
a
l
l
e
y
o
f
D
e
a
t
h
• Clustering
• Target finance investment
• Access to energy resources
• Leverage assets and facilities
• Supply chain collaboration
• Planning and consenting
• Open international markets
• Public /private partnership
Marine Energy Parks
A business environment that will
foster business collaboration,
attract investment and
accelerate the commercial
development of the marine
energy sector.
Magnet for investment and growth
• Promote and represent the south west marine
energy industry
• enable access to marine energy resources and
de-risk project investment
• Attract finance and secure funding
• invest in port, grid and manufacturing
infrastructure
• provide world class facilities for technology
development
• build a collaborative supply chain and skills base
• access international markets and investment
A business environment that will foster business collaboration,
attract investment and accelerate the commercial development
of the marine energy sector.
South West MEP Launch 23rd Jan
Mojo
KML
GH GL ITP
UoP
Scotland Supacat
Regen Burges
Salmon
Pulse
PB
Wave
Hub
MCT Babcocks
Ricardo
A&P
DECC Crown Estate
UoE
South West Marine Energy Park
A physical and geographic zone with priority focus for marine
energy technology development, energy generation projects and
industry growth
Marine Energy Park Partnership
A collaborative
partnership between
local and national
government, LEPs,
technology developers,
academia and industry -
providing governance and
leadership for the marine
energy sector
Steering Board
Mike Reynolds – A&P Falmouth Ltd
Nicholas Ames – Supacat
Richard Guyatt – Bond Pearce
Diccon Rogers – Keynvor Morlift
Martin Murphy – Tidal Energy Ltd
Michael Huntingford – Zero Carbon Marine
Peter Hughes – PML Applications
Peter Kydd – Parsons Brinckerhoff
Richard Parkinson – Mojo Maritime
Rob Rawlinson-Smith – GL Garrad Hassan
Ross Fairley – Burges Salmon
Tore Gulli – Fred Olsen Renewables
Claire Gibson – Wave Hub
Adam Corney – Plymouth University
Lars Johanning – University of Exeter
TBC – University of Bristol
Mainly Private Sector Local Enterprise Partnerships
Plus reps from LA’s & Regen SW
Plus by invitation
+ others
Working Together
Exeter Uni
Garrad Hassan
BG
Renewables Burges Salmon
Owel
Fred Olsen
A&P
Falmouth
Divers
Exeter Uni
KML
Mojo
DECC
CMN
Regen
SW
Exeter Uni
Plymouth Uni
Coastline
Anaconda
A&P
ARGEN
PB
InvestinCprnwall
Crown Estate Regen
SW
PML
Babcock
Wave Hub
Falmouth
Harbour
Commissioners
Plymouth City
Council
Cornwall Council
South West MEP
Development Plan
South West Marine Energy Strategy
2002 >£100m invested 2012
South West Seapower
Establish South West as a
centre for technology
development and applied
research
Invest in demonstration and test
facilities – Wave Hub, Marine
Sciences Building, etc
Establish PRIMaRE
Support technology developers
– MCT, TGL, OPT, OWEl, FO,
Orecon etc
Supply chain support and
development
Hayle Harbour development
Progress
Technology
developers
Pathway for Technology Development
Wave Hub
New Assets and Facilities
Marine Sciences Building
Opening September 2012
Fred Olsen “Lifesaver” WEC deployed April 2012
Falmouth Bay test site - FaB Test
Areas of excellence
• Marine & sub-sea operations
• Marine engineering and fabrication
• Design engineering
• Advanced manufacturing
• Aerospace and composites
• Electrical, hydraulics and power
systems
• Environmental sciences
• Consultancy and support services
Supply Chain Capability
Ports and Facilities
Hayle
Plymouth
Falmouth
Portland
Bristol Appledore/ Yelland/
Ilfracombe Ilfracombe
Ports and Infrastructure
South West Grid Transmission System
South West net import of electricity
with overall grid capacity
Low grid transmission and
connection charges
Transmission Network Use of
System TNUoS low £8.50 per KW
Last sub-station connection study
2008 – suggested that 250 MW
could be connected without major
investment. This needs to be
updated.
Technology
Demonstration
Early Commercial
Arrays
Full Commercial
Projects
South West Industry Challenge
Proven technology
Utility scale
Cost competitive
Advanced manufacturing
Global
Utilities
OEMs
Get kit in water
Prove technology
Reliability
Secure investment
Technology Developers
Industrial partners
Competition
Leveraging our assets
Getting technology proven
Supporting larger projects
Setting out a clear
development plan
Access to Finance
Supporting infrastructure
Challenges
£10m-20m £20m-£50m+ £Hundreds M
South West MEP Programme
>2 GW portfolio
5000 + jobs
Large scale
manufacturing
Global centre for
research and knowledge
High Growth
export market
Significant investment in
grid and Infrastructure
Floating wind and new
technologies
Long term strategic goals – 2020 onwards
Build relationships
3-5 Year Plan – By 2017
50+ mw
Installed/planned
Commercial lease round
Tidal demonstrator
Portside infrastructure
investment
Grid investment plans
Manufacturing capability
R&D facilities full and expanding
Supply Chain - 1500 + jobs
South West MEP
Programme
Promote/represent
industry at National and
International level
Unlock resources
Secure Investment
South West MEP Programme
>2 GW portfolio
5000 + jobs
Large scale
manufacturing
Global centre for
research and knowledge
High Growth
export market
Significant investment in
grid and Infrastructure
Floating wind and new
technologies
Long term strategic goals – 2020 onwards
New market relationships
3-5 Year Plan – By 2017
50+ mw
Installed/planned
Commercial lease round
Tidal demonstrator
Portside infrastructure
investment
Grid investment plans
Manufacturing capability
R&D facilities full and expanding
Supply Chain - 1500 + jobs
12-18 Month Priorities
Promote/represent
South West Marine
Energy Industry
12-18 month priorities
Access to Energy
resources
Enhance Technology
Development Pathway
Grid, Ports and
Infrastructure
Supply chain,
Enterprise and Skills
Finance & investment
International markets
and inward
investment
Creating collaborative Partnership
Promoting the SW MEP
Building relationships @ national
Influence policy
Voice for the industry
Relationship with Crown Estate
Commercial development plan
Target Utilities and developers
Streamline Consents and planning
Ensure SW integrated UK offer
Attract and secure technology
developers
Target larger industrialists
Relationship with finance community
Secure SW MEP funding
Target EU, public and private investment
Growth Opportunities
Work with and support LEP,
and delivery partners
Build capability
Collaborate
Secure investment
GRID assessment
Support portside
developments
Secure investment
Work with and support
Inward Investment Teams
Target Tech developers and
utilities
South West MEP Governance and
Programme Management
Working together
South West MEP Governance and
Programme Management
MEPB
DECC/BIS
LA’s/LEPs
Industry
SW MEP Partnership
MEPB
DECC
LA’s
Crown Estate/MMO
Industry/utilities
SW MEP Partnership
Universities
TIC/TSB/ETI
DECC
LA’s
Industry
Consultancies
SW MEP Partnership
Regen SW
Universities
LEPs
MOR
Bristol Tidal Forum
Consultancies
SW MAS
Offshore Wind England
SW MEP Partnership
DECC/BIS
LEPs/GAIN
Universities
Local Authorities
Consultancies
SW MEP Partnership
LEPs
Ports
National Grid/DNO
Developers
Universities
Colleges
Consultancies
SW MEP Partnership
Access to Energy
resources
Enhance Technology
Development Pathway
Grid, Ports and
Infrastructure
Supply chain,
Enterprise and Skills
Finance & investment
International markets
and inward
investment
Promote/represent
South West Marine
Energy Industry
Outline Development Plan
Marine Spatial
Planning and
Prepare for Leasing
Crown Estate
Industry
Engagement
ORRAD
Analysis 1st SW Lease
Round
Lease Awards
2013 / 2014 2015 2017 2020 2022
Project(s)
Development
Project(s)
Construction
3-400
MW
Wave Hub 20 MW
Wave Hub Extension 30 MW
Lynmouth 5 MW Demo
Tidal Stream 10 -30 MW
Cornwall Near Shore 20 MW
IoS Community Wave 10 MW
Potential Demonstration & Early Commercial Projects
Target 50-70
MW by 2017
Prepare 2nd SW
Lease Round
Join the Partnership
Mojo
KML
GH GL ITP
UoP
Scotland Supacat
Regen Burges
Salmon
Pulse
PB
Wave
Hub
MCT Babcocks
Ricardo
A&P
DECC Crown Estate
UoE
Events and promotion
All Energy 2013 – joint pavillion
RUK Wave and Tidal Feb 2012
Bristol Tidal Energy Forum Feb 2012
Thank You
Johnny Gowdy [email protected]