Corporate Headquarters 1060 Hensley Street, Richmond, CA 94801
Ph: 510-233-2500 Fax: 510-233-2901
March 1, 2008 Covanta Energy PO Box 550 13500 Pond Road Delano, CA 93215-550 Attention: Jeff Ruoss Subject: Delano Phase II Unit 1 Refractory Outage Report Reference: Phases I & II Outage Jeff: The following is a summary of the refractory repairs performed during Phase II Unit 1 December 2007 Outage. Appendix A shows the refractory map of the replaced refractory and the recommended replacement in the upcoming outages. Appendix B shows pictures of the refractory repairs performed during the outage. I. Scope of Work Combustor Roof
1. We removed the entire combustor roof refractory back to the steel from the East Wall all the way to the vertical tubes. The total refractory removed on the combustor roof was 850 sf. See the sketch in Appendix A for a map of the refractory replaced and pictures in Appendix B.
2. We removed the existing anchoring system. 3. We performed approximately 130 sf. of steel repairs on the combustor roof. 4. We installed a new 310SS anchoring system. 5. We insulated against the steel shell with 5” of insulating gunite. 6. We installed 4” of high temperature abrasion resistant gunite with 2% 310SS needles.
North Wall
1. We removed a total of 246 sf. on the combustor North wall back to the steel. See the sketch in Appendix A for a map of the refractory replaced and pictures in Appendix B.
2. We removed the existing anchoring system. 3. We performed approximately 120 sf. of steel repairs on the combustor North wall. 4. We installed a new 310SS anchoring system.
Covanta Delano Page 2 of 31
5. We insulated against the steel shell with 5” of insulating gunite. 6. We installed 4” of high temperature abrasion resistant gunite.
East Wall
1. We removed a total of 195 sf. on the combustor East wall back to the steel. See the sketch in Appendix A for a map of the refractory replaced.
2. We removed the existing anchoring system. 3. We installed a new 310SS anchoring system. 4. We insulated against the steel shell with 5” of insulating gunite. 5. We installed 4” of high temperature abrasion resistant gunite.
South Wall
1. We removed a total of 69 sf. on the combustor South wall back to the steel. See the sketch in Appendix A for a map of the refractory replaced.
2. We removed the existing anchoring system. 3. We installed a new 310SS anchoring system. 4. We insulated against the steel shell with 5” of insulating gunite. 5. We installed 4” of high temperature abrasion resistant gunite.
West Wall
1. We removed a total of 45 sf. on the combustor West wall back to the steel. See the sketch in Appendix A for a map of the refractory replaced.
2. We removed the existing anchoring system. 3. We installed a new 310SS anchoring system. 4. We insulated against the steel shell with 5” of insulating gunite. 5. We installed 4” of high temperature abrasion resistant gunite.
Vapor Space Roof
1. We removed a total of 425 sf. on the Vapor Space Roof back to the steel. See the sketch in Appendix A for a map of the refractory replaced.
2. We removed the existing anchoring system. 3. We installed a new 310SS anchoring system. 4. We insulated against the steel shell with 4” of insulating gunite on the Vapor Space side
of the expansion joint and 5” of insulating gunite on the Combustor side of the expansion joint.
5. We installed 4” of high temperature abrasion resistant gunite with 2% 310SS needles on both sides of the expansion joint.
Covanta Delano Page 3 of 31
North Wall
1. We removed a total of 105 sf. on the Vapor Space North wall back to the steel. See the sketch in Appendix A for a map of the refractory replaced and pictures in Appendix B.
2. We removed the existing anchoring system. 3. We installed a new 310SS anchoring system. 4. We insulated against the steel shell with 4” of insulating gunite. 5. We installed 4” of high temperature abrasion resistant gunite.
South Wall
1. We removed a total of 32 sf. on the Vapor Space South wall back to the steel. See the sketch in Appendix A for a map of the refractory replaced and pictures in Appendix B.
2. We removed the existing anchoring system. 3. We installed a new 310SS anchoring system. 4. We insulated against the steel shell with 4” of insulating gunite. 5. We installed 4” of high temperature abrasion resistant gunite.
Super Heater Walls & Roof
1. We removed a total of 250 sf. in the Super Heater walls & Roof back to the steel shell. 2. We removed the existing anchoring system. 3. We installed a new 310SS anchoring system. 4. We insulated against the steel shell with 4” of insulating gunite. 5. We installed 4” of high temperature abrasion resistant gunite.
Exhaust Duct Back Wall
1. We installed 1” of high strength corrosion resistant castable refractory against 450 sf. on the back wall of the exhaust duct.
Covanta Delano Page 4 of 31
II. Upcoming Repairs/Recommendations Based on our inspections and repairs during this outage we would recommend the following repairs during the next several outages. The recommended repairs are shown in Appendix A along with the refractory repaired during this outage. The pictures in Appendix C show several locations with potential repairs during the coming outages. Combustor North Wall As seen in the pictures in Appendix C, the refractory surrounding the repairs is down to approximately 2” of hotface. In addition, most of the wall panels are cracked and starting to loosen. It is our recommendation to start a planned replacement of the entire Combustor North wall. See the sketch in Appendix A for a map of the recommended refractory replacement. Combustor East Wall As seen in the pictures in Appendix C, the refractory surrounding the repairs (particularly around the South side repairs) is down to approximately 2” of hotface. Most of the panels are cracked and starting to loosen. In the lower section surrounding the feeders and below, the flash coating is starting to peel and exposing the failing refractory. It is our recommendation to start a planned replacement of the entire Combustor East Wall. See Appendix A for a map of the recommended refractory replacement. Combustor South Wall As seen in the pictures in Appendix C, the refractory surrounding the repairs (particularly around the East side repairs) is down to approximately 2” of hotface. In addition, most of the panels are cracked and starting to loosen. It is our recommendation to start a planned replacement of the entire Combustor South wall. See Appendix A for a map of the recommended refractory replacement. Combustor West Wall As seen in the pictures in Appendix C, the refractory along the entire West wall is cracked and pulling away from the steel. The condition of the refractory may not allow flash coating to protect it anymore. It is our recommendation to replace the entire West wall. See Appendix A for a map of the recommended refractory replacement. Vapor Space Roof During this outage, the entire Vapor Space roof was replaced from the expansion joint to the Superheater. Only a small section of the Vapor Space roof from the expansion joint to the Combustor was replaced along the North side. The multiple flash coatings on the Vapor Space roof from the expansion joint to the combustor is starting to peel exposing the failing refractory. It is our recommendation to replace the failing refractory between the expansion joint and the Combustor. See Appendix A for a map of the recommended refractory replacement.
Covanta Delano Page 5 of 31
Vapor Space North Wall As seen in the pictures in Appendix C, there are several miscellaneous locations that will be in need of repair during the next outage. The flash coating on the East side of the wall is still in tact. It is our recommendation to plan on patching as required the Vapor Space North wall. Vapor Space South Wall As seen in the pictures in Appendix C, there are several miscellaneous locations that will be in need of repair during the next outage. The flash coating on the East side of the wall is still in tact. It is our recommendation to plan on patching as required the Vapor Space South wall. Vapor Space Slant Floor As seen in the pictures in Appendix C, there are several miscellaneous locations that will be in need of repair during the next outage. The flash coating is beginning to fail. It is our recommendation to plan on patching as required the Vapor Space slant floor with a planned entire replacement in the coming outages. If you have any questions or require any additional information please feel free to call us at 510/233-2500. Thank you very much for allowing us to perform this work for you. We appreciate your continued confidence and trust. Very truly yours, J.T. THORPE & SON, INC. Tony Swager Project Manager
Covanta Delano Page 6 of 31
DELANO PHASE II UNIT I OUTAGE REPORT
APPENDIX A:
Refractory Map for Unit 1
(sketches are not to scale)
Covanta Delano Page 7 of 31
Combustor Roof (850 sf)
8” 310SS HV anchors 5” insulating gunite
4” high temperature abrasion resistant gunite w/ 2% 310SS needles
850 sf
Refractory Repaired Recommended Refractory Repairs
Covanta Delano Page 8 of 31
Combustor North Wall (246 sf)
8” 310SS HV anchors 5” insulating gunite
4” high temperature abrasion resistant gunite
55 sf
145 sf
46 sf
Refractory Repaired
Recommended Refractory Repairs
Covanta Delano Page 9 of 31
Combustor East Wall (195 sf)
8” 310SS HV anchors 5” insulating gunite
4” high temperature abrasion resistant gunite
144 sf
3 sf
18 sf
5`sf 8`sf 6 sf 4`sf 2`sf
6 sf
Refractory Repaired
Recommended Refractory Repairs
Covanta Delano Page 10 of 31
Combustor South Wall (69 sf)
8” 310SS HV anchors 5” insulating gunite
4” high temperature abrasion resistant
3 sf
5 sf
9 sf
45 sf
7 sf
Refractory Repaired
Recommended Refractory Repairs
Covanta Delano Page 11 of 31
Combustor West Wall (45 sf)
8” 310SS HV anchors 5” insulating gunite
4” high temperature abrasion resistant gunite
4`sf 12 sf
5`sf
3`sf
1`sf
15 sf
5`sf
Refractory Repaired
Recommended Refractory Repairs
Covanta Delano Page 12 of 31
Vapor Space Roof (425 sf)
Combustor Side of Expansion Joint Vapor Space Side of Expansion Joint
8” 310SS HV anchors 7” 310SS HV anchors 5” insulating gunite 4” insulating gunite
4” high temperature abrasion resistant gunite 4” high temperature abrasion resistant
425 sf
Refractory Repaired Recommended Refractory Repairs
Covanta Delano Page 13 of 31
Vapor Space North Wall (105 sf)
7” 310SS HV anchors 4” insulating gunite
4” high temperature abrasion resistant gunite
Misc.
Patches
80 sf 25 sf
Refractory Repaired
Recommended Refractory Repairs
Covanta Delano Page 14 of 31
Vapor Space South Wall (32 sf)
7” 310SS HV anchors 4” insulating gunite
4” high temperature abrasion resistant gunite
Misc. Patches
3 sf
29 sf
Refractory Repaired
Recommended Refractory Repairs
Covanta Delano Page 15 of 31
DELANO PHASE II UNIT I OUTAGE REPORT
APPENDIX B:
Unit 1 Refractory Pictures
Covanta Delano Page 16 of 31
COMBUSTOR ROOF STEEL REPAIR
Covanta Delano Page 17 of 31
COMBUSTOR ROOF REFRACTORY
Covanta Delano Page 18 of 31
COMBUSTOR NORTH WALL
Covanta Delano Page 19 of 31
COMBUSTOR EAST WALL
Covanta Delano Page 20 of 31
COMBUSTOR SOUTH WALL
Covanta Delano Page 21 of 31
COMBUSTOR WEST WALL
Covanta Delano Page 22 of 31
VAPOR SPACE ROOF
Covanta Delano Page 23 of 31
VAPOR SPACE NORTH WALL
Covanta Delano Page 24 of 31
VAPOR SPACE SOUTH WALL
Covanta Delano Page 25 of 31
DELANO PHASE II UNIT I OUTAGE REPORT
APPENDIX C:
Unit 1 Potential Repairs
Covanta Delano Page 26 of 31
POTENTIAL REPAIRS COMBUSTOR NORTH WALL
Covanta Delano Page 27 of 31
POTENTIAL REPAIRS COMBUSTOR EAST WALL
Covanta Delano Page 28 of 31
POTENTIAL REPAIRS COMBUSTOR SOUTH WALL
Covanta Delano Page 29 of 31
POTENTIAL REPAIRS COMBUSTOR WEST WALL
Covanta Delano Page 30 of 31
POTENTIAL REPAIRS VAPOR SPACE ROOF
POTENTIAL REPAIRS VAPOR SPACE NORTH WALL
Covanta Delano Page 31 of 31
POTENTIAL REPAIRS VAPOR SPACE SOUTH WALL
POTENTIAL REPAIRS VAPOR SPACE SLANT FLOOR