ATTENDANCERepublic of the PhilippinesCaraga Region XlllPROVINCE OF SURIGAO DEL NORTEGov. Jose C. Sering Road, Surigao City, 8400Email Address: [email protected]: www.surigaodelnorteph.com

PROVINCIAL PLANNING AND DEVELOPMENT OFFICE

1. 2. Charin M. Peril3. Juliet O. Cabaton4. Zosima D. Naraga5. Fernando/Emily Ensie6. Ailyn L. Terio7. Melquiades Mevero8. Kendreil N. Ojel9. Ensebia M. Moreno10. Benjamin Urquia11. Larry M. Urquia12. Marilyn E. Pono13. Eulalia M. Urquia14. Benjamin E. Urquia15. Clara A. Moncano16. Julieto W. Samoya, Sr.17. Analisa L. Samoya18. Catherine B. Lumanga19. Tita Mordido20. Jerito M. Dano21. Glecerio Piedad22. Josephine Eco23. Mery Anne Danapa24. Lalang Danapa25. Renica Botat26. Edgar Dayong27. Marvin Danapa28. Nenita P. Tulang29. Argeles B. Ojel30. Jo Ana Mariz L. Florino31. Margarita D. Nalam32. Maricel N. Dano33. Medy F. Banzon34. Patria T. Banzon35. Jose M. Apolinaria36. Benjie L. Bendex37. Runaldo M. Florino38. Crescenciana M. Damacula39. Juliana Danapa40. Carmina D. Mayag41. Ester M. Danapa42. Laie A. Mayag43. Edgar M. Jamero44. Sulpecio M. Donor45. Serapion Mantong46. Sulpecio M. Parejo47. Vivian G. Galindez48. Girlie E. Patagan49. Soter A. Longay50. Jocelyn M. Iden

Highlights of the minutes of the Barangay Consultation in Barangay Marayag for the Rehabilitation/Concreting of Magsaysay-Bobonaon Spur Sta. Cruz-Paco FMR held last November 4, 2015, 2:30 pm at Brgy Marayag Multi-Purpose Hall. The meeting was attended by the memebers of the Provincial Project Management and Implementing Unit (PPMIU). The meeting was started by Brgy Captain Larry M. Peril, who welcomed all the participants in the consultation. It was followed by the rationale of the project which was given by Engr. Marilyn E. Pono. She explained that the project costs over 200 million and as a requirement, PRDP wants to ensure the social acceptance of the project that is why a barangay consultation is a necessity. PRDP wants to get the feedback of the community regarding the concreting project. She further explained that the province had already conducted a barangay consultation with the barangay officials last June 15, 2015, however, the NPCO has commented that the residents should be included in the consultation. She highlighted that the establishment of the road right of way (RROW) would affect a number of households in the area based from the survey conducted. She emphasized that PRDP is very strict in their requirements that is why the PPMIU would need every residents support for the project. Lastly, she encouraged everyone to ask any queries they have and actively join the workshop.The discussion was followed by Engr. Longay Soter, who discussed the details of the project. He explained that his role was to make the plan of the concreting project and he encountered problems regarding the establishment of the 10-meter RROW. He stated that the project is complete with canals and cross drains. A resident from Brgy Marayag, questioned if its possible to change the curve pathways into a straight line. Engr. Soter answered that in the plan, the existing curve pathways will be followed. The discussion of the RROW was done by Mr. Walter Andit from the Provincial Assessors Office. He showed the result of the survey and explained that there were 16 identified households that will be affected in the establishment of the RROW. He explained that the affected households will be asked to sign the quitclaims as part of the legal documents needed by the PRDP. He asked all the present participants if they all want for the implementation of the project. All of the participants raised their hands to show their support for the project. The names of the affected households were each called and identified. The consultation was then followed by the workshop, Engr. Pono lead the workshop. The intention of the workshop was to ask the stakeholders; opinions, suggestions and concerns. They were tasked to provide answers to six questions originally formulated in vernacular. These were as follows;1. What is the current situation of your lives or livelihood with the existing condition of the road?2. Do you need and support the rehabilitation and concreting of the road from Magsaysay-Bobonaon Spur Sta, Cruz-Paco FMR?3. What are the prevalent impacts on your lives or livelihood once the road is restored?4. There are problems or hindrances in making proposal or feasibility study like the road right of way, what else do you think you can do to resolve such problems?5. During the implementation of the project, what else do you think you can contribute to make the construction as smooth as possible?6. If there are complaints, as barangay official or citizen, what can you do about it?The participants were grouped into three groups. One group was for the Mamanwa who were present in the consultation. Each group was made to answer all aforementioned questions. Every member of the group was encouraged to present their opinions on the questions through provided metacards and pasted on a Manila paper. After the given time for the group to discuss, each group was given the chance to present their consolidated outputs.GROUP 1 1. Lisod pagtransport sa produkto.

Mahal ang pletehan.

Dugay-dugay ang pagbyahe.

Lisod ang dalan ug mahal ang pletehan sa tawo ng sa produkto.

2. 100% gikinahanglan gayud.

Oo gikinahanglan namo ang proyekto aron mamenusan ang amo mga pletehan, labi na sa amo mga produkto.

3. Muobos ang pletehan

Mudako ang income sa produkto kay dili na man mabun-og.

Hayahay ang pag-travel

Hapsay na ang pag-byahe sa mga sakyanan labi na sa mga pasahero nga mamalit lang sad ug habal-habal ang sakyan.

4. Pasabton pag-ayo ang tag-iya aron mutugot.

Mutabang sa pagpasabot o paghangyo sa mga tag-iya aron matuman ang proyekto.

5. Magsinabtanay ang tanang lumulupyo.

6. Ipaabot sa natungnang ahensya ug sa mga brgy. officials.GROUP 21. Lisod ang panginabuhi sa mga katawhan diri sa barangay guba kayo ang kalsada, ang mga motor maglisod pag-agi.

Sa pagkakaron, lisod gayud ang dayan labi na sa panahon sa ting-ulan maoy hinungdan sa pagkaguba sa dalan ug ang mga produkto lisod i-deliver.

Lisod ang panginabuhi labi na kay ubos ang presyo sa kopras. Lisod sab ang kondisyon sa dalan labi na sa panahon sa ting-ulan.

2. Gikinahanglan gajod namu, ug suportahan namu kining maong proyekto.

Gikinahanglan gayud namo ang proyekto ug musuporta gayud kami 100%.Oo, gikinanglan namo ang maong proyekto aron dili na maguba panahon sa ting-ulan kini ang suportahan kutob sa among mahimo.

3. Dili na maglisod pag-agi ang mga motor hapsay na ang panginabuhian.

Dili na lisud ug lugwa sa mga produkto ug malikayan na ang disgrasya ug daghan na pud mga turista nga mubisita dinhi sa maong tourist spot.

Kun kini nga proyekto ma-implementar, kini dako ug epekto sa among panginabuhian kay mapasayon na ang pagdala sa among mga ibaligya ngadto sa lungsod.

4. Ang maapektuhan ani nga proyekto hinaut unta nga muhatag unta sila ug pagtugot aron mahimo kini nga proyekto ug kini dako nga katabang sa mga katawhan.

Pinaagi sa pagtabang ug pagsuporta sa mga katawhan sa among barangay.

Kun adunay mahitabo nga problema sa plano kabahin sa Road Right Of Way kini i-agi ug pagpasabot sa hingtungdan.

5. Magtinabangay aron hapsay ang paghimo sa maong proyekto.

Musunod sa mga patakaran para hapsay ug hinlo ang proyekto.

6. Pasabtan ug tarong aron maangkon nato ang maong proyekto.

GROUP 3 (IPs)1. Mao gamay ra ang kita namo.

2. Yes, amo suportahan.

3. Hayahay na ang pagbyahe, daghan na ang buyer nga musulod ug mudako na ang kita.

4. Wala kay wala may amo lupa nga maagihan sa karsada.

5. Kung kinahanglan sa barangay ang among tabang, andam kami mutabang

6. Sulbaron kung unsa ang problema pinaagi sa dayalogo.

After the presentation, all the participants were asked to manifest their commitment and support by signing in the PANAAD, which states; Kami mga naghuya sa Brgy. Marayag nan Munisipyo nan Mainit, Probinsya nan Surigao del Norte diin himoon an proyekto sa pagdajaw ug pagsemento sa among dayan pinaagi sa Philippine Rural Development Project gikan sa Barangay Magsaysay-Bobonaon Spur Sta. Cruz-Paco, magasaad na kami mosuporta ug mahimo sa among matabang para mamahimong malampuson ang pag-implementar nan proyekto, hilabina ang paghatag sa saktong Road Right of Way.All of the participants affixed their signatures. The meeting was adjourned at 4:00 in the afternoon. Prepared by:Certified Correct:

ANALEE S. ALVERASTINEENGR. MARILYN E. PONOPlanning Officer IAsst. PPDCSecretariatI-PLAN Unit Head