1 | P a g e
CO
MP
AN
Y P
RO
FIL
E
20
15
MA
PS
GE
OS
YS
TE
M
Survey, Planning, Design Drawing and Estimate
Power transmission lines, Pipeline ,Solar Power Project
Highways, rail, roads, Irrigation, Airport
Topographic survey, Land survey, Building survey
MAPS GEOSYSTEM
6UGF,PARSVNATH PANCHVATI
PLAZA,TAJNAGRI PHASE-II
AGRA (U.P.) 282001
PH: 0562-2481200
Mob: 09760779742
2
MAPS GEOSYSTEM Consulting Engineers
Engineering Planning and Mapping Services
6UGF,PARSVNATH PANCHVATI PLAZA,
TAJNAGRI PHASE-II AGRA (U.P.) 282001
PH: 0562-2481200
Mob: 09760779742
Mail:[email protected]
COMPANY PROFILE
Spectrum of Services:
Roads/Highways
Infrastructure Development Projects
Transmission Line
Master Plan/Town Planning
Solar Power/Substation
Hydro-Electric Power Projects
Gas Pipe Line Projects
Railway Line
Building Survey/Utilities
Irrigation Projects
Volume Calculation/Quantity Calculation
Cross-Section/CADD Service
3
Profile:
The firm has been established in 2003 under the name of M/S MAPS GEOSYSTEM. With the head office in AGRA UTTER PRADESH NOTRH INDIA.
The Firm is well equipped to handle the design of various jobs of various natures and various magnitudes. We have Topographic survey, Detail survey, Control Survey and Contour Survey of sites and landscapes using total station. Topographic and Close Contour Survey of sites and landscapes using using DGPS. Site girding using GPS and DGPS. We have Excellency in the field of Highways, Irrigation, Water resources, railways, and town planning. We have latest equipment, and skilled manpower to carry out any quantum of Topographical, Hydrological Survey, Geotechnical Investigation, and other investigation works. Apart from that, we had provided many project management experts for the various clients on various jobs.
The company is short listed by various government departments, public sectors, and leading private agencies. We have carried out lot of jobs for NTPC, PGCIL,MPPTCL,UPPTCL, UP PWD,UP JAL NIGAM, Larsen Turbo,WAAREE, Development Authority, RITES and RES. M/S MAPS GEOSYSTEM have extensive knowledge and expertise in planning and design of engineering systems of highways railways, irrigation, water resources and any other jobs related to water. Our design staff is supported by advance computer technology and latest software in the related fields of expertise to meet the standard of today's competitive environment. Our objects are to achieve the best design management and engineering solution. We are constantly evaluating new technology to supplement our well equipped computational facilities and also expending our network of task, specific lab, and workshop so that our requirement meets the stringent requirement of quality. The firm has engaged for detailed project report, consultant from the state highways, irrigation, and railways under the superintendence of our technical director Mr.S.P.SINGH and technical Advisor Mr.Ranveer Singh Chohan resume and brief qualifications are attached with the profile. Apart from that, the company is growing under the planning and management of Mr. Rajendra Singh. Quality Policy MAPS GEOSYSTEM is committed to attain excellence in Roadways, Railways, Bridge, Urban Development, Water Resources & Architecture, and to meet consultancy requirements. Quality Management System for ensuring superior business solution, creation of technically strong, responsive, and innovative organization. Recruitment and Training The company also maintains a roll of all suitable experienced and qualified personnel in the field of engineering and management as well as in the field of skilled and semi-skilled workers and provides their services on regular or contract basis employment to the clients as per needs. The company has the specialization and expertise for selection and recruitment of the client both domestic & from the national market. Manpower and company personnel
Administration and facility management Project consultants Computer personnel and support staff Sr. Survey engineers Surveyors & Draft men Assistants and helpers Consultants on call/retention
Infrastructure facilities The company has its full-fledged and the latest support facilities of computer services, equipment and manpower for surveying and official equipments for preparation of plan and reports.
Financial Resources Company has its own financial resources to meet day-to-day working and other capital expenses. Most of
equipments and building are company owned with substantial saving in operation cost
4
Dgps Survey (Different Global Positioning System)
RTK Positioning Real Time Kinematic Based on the use of carrier phase (GPS, Glonass, Galileo, etc.)
Normal – compare pseudorandom signal from satellite to internally generated copy of the same signal. Since they
do not line up properly, by delaying local signal more and more they eventually line up. Delay is time need for the
satellite to reach the receiver. Accuracy is approx. 1% of band with (i.e. C/A code send bit every 0.96 microsecond
(3m). Other C/A signal errors can add up to approx. 15 m.
RTK same concept, but uses much smaller wavelength carrier signals, not messages within. L1 Carrier 1.023 MHz – l =
0.19m, thus + = 1.9 mm. Resolution of integer ambiguity requires sophisticated statistical software and access to
multiple satellites. RTK single base station receiver – re-broadcast signals it receives to a number of mobile receivers
(UHF most popular). Typical accuracy of dual frequency systems: 1 cm 2ppm horizontally 2 cm 2ppm vertically
Gps Survey:
GPS was rapidly adapted for surveying, as it can give a position (Latitude, Longitude and Height) directly, without
the need to measure angles and distances between intermediate points. Survey control could now be established
almost anywhere and it was only necessary to have a clear view of the sky so the signal from the GPS satellites could
be received clearly.GPS is similar in some ways to the Trilateration and EDM previously discussed, except that the
known positions are now the GPS satellites (and their orbits) 20,000 km in space. The equipment and calculations
are extremely complex, but for the user the process is generally very simple.In the commonly available receivers, the
GPS receiver almost instantly works out its position (Latitude, Longitude and Height) with an uncertainty of a few
meters, from the data broadcast by the satellites. This data includes a description of the satellites changing position
(its orbit) and the time the data was transmitted. Typical accuracy of GPS systems: 1M TO 3M.
Electronic Total Station:
The primary function of surveying instruments is to measure distances, angles and heights. The total station employs
the electro-optical distance metering method, emitting laser beams to a target and detecting light reflected off it. It
takes measurements by calculating the deviation of the wavelength of the reflected light. Total stations are able to
measure distances to an accuracy of 2-3 millimeters per kilometer, and angles to 1-second (1°/3,600°) accuracy.
One second in an angle is equivalent to the width of pencil lead at 100 meters. Even small-size surveying instruments
are remarkably accurate. The two types are used according to application. Total stations when extremely high
accuracy is required, such as in building and bridge construction. Advantage of Total Station surveying is it
globosity, efficiency, optimum accuracy, efficiency. Use in a geodesy, cartography, geography, land management, a ground cadastre, an agriculture, auto-, air-, sea navigation.
Digital Automatic Level:
Digital automatic levels are a precise instruments used for precise leveling. Operation of digital levels is based on the
digital processing of video indications of a coded staff. At the beginning of measurement a visual pointing of the
instrument into the surface of leveling meter is performed. After that the instrument automatically points the focus of
its optical system on the surface of the meter and then a rough correlation calculation is performed followed by the
precise correlation. According to the data received in the processor of the instrument an exact distance from the
axes of the instrument to the surface of the level meter is calculated. According to the information received by
decoding the data from the photoelectric matrix the height of the level placing is calculated in the processor.
During this operation the coded view of the meter is compared with information that saved in the memory of the
instrument. The scope if this work includes resort of digital automatic levels and impact of their accuracy on
construction measurements.
auto Level:
A G.T.S. (Great Trigonometrical Survey) benchmark is a permanently fixed reference survey station (or point), having
known elevation with respect to a standard datum (mean sea level). These are established all over India by Survey
of India department with greater precision. A benchmark value is quite essential at any survey area, especially for
reduction of observed sea level with respect to mean sea level or chart datum (CD). While carrying out bathymetric
survey of a survey area, the datum referenced values thus obtained are used to compute the final depth contours
of the survey area (with respect to CD). So, a benchmark, having known elevation is quite essential at the survey
area, without which, preparation of a bathymetric chart is impossible. In some places, GTS benchmarks are
available within a kilometer distance and can be easily transferred to the survey area by fly leveling using an
automatic Level instrument and a graduated leveling staff. But in most of the cases, GTS benchmarks may be at far
away distance from the area to be surveyed. In these cases, the most common traditional method of transferring
the benchmark value using an automatic level instrument is a difficult task, consuming enormous amount of time
and labour. To eliminate this process, a method is suggested in this technical report to transfer GTS benchmark from
any far distance to the survey area.
5
Recently Project in hand: 400KV D/C Transmission Line Chek Survey Sambha –Amargarh(Pacage-3) Project in Jammu and Kashmir State. Client: Starlite Transmission Company Delhi 220KV and 132KV Transmission Line Route Survey, Deatail Survey Appox-2400KM in Various District in Uttar Pradesh Client: Archon Engicon Lucknow DGPS survey, Topographic survey, Traversing, Transfer of TBM, Detail engineering survey, preparation of drawing and field investigation
Client: Pell Frischmann Limited Mumbai
CONSTRUCTION OF 2/4 LANING OF TALCHAR- DUBARI- CHANDIKHOLE SECTION OF NH-200 FROM KM 301.89 TO KM 427.885 INCLUDING KM 8.500 TO KM 14.866 OF NH-23 IN THE STATE OF ODISHA Approx Length 53km Client: CORSAN CORVIAM CONSTRUCCION GURGAON Survey & Complete DPR for Madhya Pradesh Chief Minister Launch New Dream project Mukhyamantri khet khalihan gram sadak yodna in Chhatarpur Approx 300km Client: JANPAD PANCHAYAT MORENA (RES) Survey & Complete DPR for Madhya Pradesh Chief Minister Launch New Dream project Mukhyamantri khet khalihan gram sadak yodna in Chhatarpur Approx 400km Client: JANPAD PANCHAYAT SATNA (RES) Survey & Complete DPR for Madhya Pradesh Chief Minister Launch New Dream project Mukhyamantri khet khalihan gram sadak yodna in Chhatarpur Approx 350km Client: JANPAD PANCHAYAT SAGAR (RES) Survey & Complete DPR for Madhya Pradesh Chief Minister Launch New Dream project Mukhyamantri khet khalihan gram sadak yodna in Chhatarpur Approx 350km Client: JANPAD PANCHAYAT DAMOH (RES) ANUPPUR-JAIPUR ROAD TOPOGRAPHAY SURVEY, TRAVESSING, TBM SIFFTING for MDR ROAD Convert in State Highway in SHAHDOL DISTRIC FOR MPRDC Approx Length 50km Client: AICON ENGINNERS BHOPAL RAJENDRAGRAM-JAITHARI-KOTMA ROAD TOPOGRAPHAY SURVEY, TRAVESSING, TBM SIFFTING for MDR ROAD Convert in State Highway in ANUPPUR DISTRIC FOR MPRDC Approx Length 55km Client: AICON ENGINNERS BHOPAL BEOHARI-MANPUR ROAD TOPOGRAPHAY SURVEY, TRAVESSING, TBM SIFFTING for MDR ROAD Convert in State Highway in UMARIA DISTRIC FOR MPRDC Approx Length 46km Client: AICON ENGINNERS BHOPAL BEOHARI-MANPUR ROAD TOPOGRAPHAY SURVEY, TRAVESSING, TBM SIFFTING for MDR ROAD Convert in State Highway in UMARIA DISTRIC FOR MPRDC Approx Length 46km Client: AICON ENGINNERS BHOPAL PARSONA-MADA-RAMGARH ROAD TOPOGRAPHAY SURVEY, TRAVESSING, TBM SIFFTING for MDR ROAD Convert in State Highway in SINGRAULI DISTRIC FOR MPRDC Approx Length 46km Client: AICON ENGINNERS BHOPAL SIDHI-TIKRI ROAD TOPOGRAPHAY SURVEY, TRAVESSING, TBM SIFFTING for MDR ROAD Convert in State Highway in SINGRAULI DISTRIC FOR MPRDC Approx Length 34km Client: AICON ENGINNERS BHOPAL MEERUT-MORADABAD ROAD TOPOGRAPHAY SURVEY,DGPS, TRAVESSING, TBM SIFFTING for NH-24 CH-58+00 TO 78+00 HAPUR BYPASS Client: BALAJI TESTING FARIDABAD 220 KV D/C Transmissions Line ADARDP PROJECT TRANSSMISION LINE IN BATALA,GURUDASPUR,TARANTARAN,PATHANKOT Approx Length-50km for PUNJAB STATE POWER CORPORATION LTD. Client: GODREJ & BOYCEMFG CO. LIMITED 220 KV D/C Transmissions Line ADARDP PROJECT TRANSSMISION LINE IN Ludhiyana,Amrtisar Approx Length-30km for PUNJAB STATE POWER CORPORATION LTD. Client: Larsen & Toubro
6
Recently Project complete: Topography Survey & Contour Survey for Implement for Water Pipe Line Project District Approx area 2500 hectare in CHHATARPUR (Madhya Pradesh) Client: Nagar Palika Chhatarpur 220 KV D/C Transmissions Line POOLING S/S REGEN WIND ENERGY TO Daloda S/S in Mandsuar District Madhya Pradesh Client: ION ENERGY INDORE 220 KV D/C Transmissions Line RENEW ENEERGY SOLAR POWER S/S TO BIJAYPUR 132KV S/S SHOREPUR District Madhya Pradesh Client: ION ENERGY INDORE TOPOGRAPHAY SURVEY FOR Water & Sewerage Planning Approx Length 120km in RUDRAPUR District in Uttarakhand Client: NAGAR PALIKA RUDRAPUR TOPOGRAPHAY SURVEY FOR Water & Sewerage Planning Approx Length 80km in KASHIPUR District in Uttarakhand Client: NAGAR PALIKA KASHIPUR TOPOGRAPHAY SURVEY FOR PMGSY ROAD IN ALIGARH DISTRICT Approx Length 100km Client: PWD ALIGARH TOPOGRAPHAY SURVEY FOR Water Supply in Block Level in JHANSI District Approx Length 120km Client: JAL NIGAM LUCKNOW 400 KV D/C Transmission Line Different Diversion Line For Dedicated Freight Corridors in Faridabad District Route Survey, Detail Survey and Profile & Tower Spotting and Total Survey Reports. Client: PGCIL BALLABHGARH 220 KV D/C Transmission Line Different Diversion Line For ROB in HATHRAS & ALIGARH District Route Survey, Detail Survey and Profile & Tower Spotting and Total Survey Reports. Client: NORTHEN RAILWAY AGRA 220 KV S/C Transmission Line Survey Dewas to Astha 85km,Prilimaniry Survey, Walk Over Survey, Route Survey, Detail Survey, Profile & Tower Spotting ,Cheek Survey and Total Survey Reports. Client: Kailash Construction Jabalpur
Topography Survey Unauthorized Colony in Rajasthan Housing Board in Bharatpur District 35 Colonies, Aprrox Area: 2000 Hectare Client: UIT BHARATPUR (Raj.) Contour, cross-section, L-Section, Leveling Work for Sewerage Planning in BIHAR State Approx Area-500 sqkm Client: Map My India Proposed 100MW Reliance MSP Solar Power Substation Stub Marking Layout (Approx Point::100000) in POKHRAN. Client: L&T Power Proposed 132kv D/C Welspun Power Project (Bhagwanpura) to Ratangarh S/S 23.0km Transmission Line Route & Details Survey. Client: ION ENERGY INFRA INDORE Proposed 75MW Zigma Software PV Solar Power Project Topography & Contours Survey in Sardarsahar (Churu) Rajasthan Client: Zigma Software Calcutta Proposed 25MW Mahindra PV Solar Power Project Topography & Contours Survey in BAAP (PHALODI) Rajasthan Client: L&T Power Proposed 22MW PV Solar Power Project Topography & Contours Survey in BADLA, BAP (PHALODI) Rajasthan Client: L&T Power Proposed 35MW MALPANI GROUP PV Solar Power Project Topography & Contours Survey in BAAP (PHALODI) Rajasthan Client: L&T Power Proposed 100MW Reliance PV Solar Power Project Topography & Contours Survey (Approx area 1200 Hect.) in POKHRAN Rajasthan Client: L&T Power TBM Sifting, Traversing, Center Line Marking & OGL Taking of NH-75 Bameetha-Satna road in Madhya Pradesh. Client: concost infratech Delhi.
7 | P a g e
Transmission Line Project:
PRELIMINARY SURVEY Route alignment on Topo sheets, Three Route alternatives comparison and decision on best alternative, Fixing of Angle points and section length, Collection of crossing details, Modification of the map details, Walkover by using GPS and toposheets
DETAILED SURVEY Modification in preliminary route alignment, Chainage of line route, Adjustment in section details to achieve better average span, Maximum details for forest, power and railway crossing, Actual field data along the selected route, Ground level with respect to benchmark or reference. Detailed along the route within ROW. Crossing details of major obstacles. Enumeration of trees.
Tower Spotting & Tower Schedule: Profiling of field data for spotting of suspension tower. Ground profile and level. Ground clearance curve & obstacle height, Spots for Tangent towers with extensions. Line corridor with position of obstacles. Weight and Wind span for conductors. Preparation of tower schedule, Contour Grid for Tower Footing and earth work quantity.
Assignment Name Brief Scope of Work Name of Client Duration
400 KV D/C Transmission Line Different Diversion Line For Dedicated Freight Corridors
Route Survey, Detail Survey, Profile & Tower Spotting in PLS-CAD and Total Survey Reports.
PGCIL JUN 2013
220 KV D/C ACHHALIYA-Vyanktpura Transmission Line Survey 35km
Preliminary Survey, Walk Over Survey, Route Survey, Detail Survey,Superempose Khasra Map, Profile & Tower Spotting in PLS-CAD, Cheak Survey and Total Survey Reports.
GETCO GUJRAT
FEB 2013
220 KV S/C Transmission Line Survey Dewas to Astha 85km
Preliminary Survey, Walk Over Survey, Route Survey, Detail Survey, Profile & Tower Spotting, Cheek Survey and Total Survey Reports.
MPPTCL SEP 2012
220 KV S/C Transmission Line Survey SAGAR to BANDA 30km
Preliminary Survey, Walk Over Survey, Route Survey, Detail Survey, Profile & Tower Spotting, Cheek Survey and Total Survey Reports.
MPPTCL JUN 2012
220 KV D/C Transmission Line Survey Sidhi to Katni 210km
Preliminary Survey, Walk Over Survey, Route Survey and Total Survey Reports.
MPPTCL FEB 2012
220 KV S/C Transmission Line Survey Chhatarpur to Nawgoan 25km
Preliminary Survey, Walk Over Survey, Route Survey, Detail Survey, Profile & Tower Spotting and Total Survey Reports.
MPPTCL NOV 2011
765 KV D/C Transmission Line Survey Lucknow to Bareilly 135km
Preliminary Survey, Walk Over Survey, Route Survey, Detail Survey, Profile & Tower Spotting in PLS-CAD, Cheak Survey and Total Survey Reports.
EMC POWER Calcutta
OCT 2011
765 KV Transmission Line from Dhramjaigarh to Jabalpur 386 km
Preliminary Survey, Walk Over Survey, Route Survey, Detail Survey, Profile & Tower Spotting in PLS-CAD, Total Survey Reports.
L&T PFC
DECMBER 2010
440 KV Double Circuit Transmission Line Survey from HAZIRA to GANDHAR(Gujarat) 48 km
Transmission Line Survey by using Total Station for Data Collection of Route Alignment, Details Survey, Profile and Tower Spotting in cad and Related Data & Drawing. Check Survey & Approved Work by Clint and Consultant.
KPTL ESSAR
IN HAND 2011
400 KV D/C Transmission Line, In the Hilly Terrains Himachal Pradesh,
Detailed Survey Using GPS, Total Work Station, profiling & Tower Spotting etc. Digitized Contouring at undulated / hilly locations.
RRV LIMITED NCC LIMITED
IN HAND 2011
400 KV S/C Transmission Line Bareily to Saharnpur Route Diversion on Ramganga River
Data Collection of Route Alignment, Details Survey, Profile and Tower Spotting
PGCIL Bareilly
September 2010
400 KV D/C Aravali to Mundka Transmission Line
440 KV Double Circuit Transmission Line Survey by using Total Station for Data Collection of Route Alignment, Details Survey, Profile and Tower Spotting & Drawing. Check Survey & Approved Work by Clint and Consultant.
Bajaj Electrical July 2009
440 KV D/C Nagda to Dehgam Transmission Line
Preliminary Survey, Route Alignment, Detail Survey, Profile Tower Spotting and Collection of the relevant data necessary for the Construction of the Transmission Line.
KEC February 2005
400 KV S/C Diversion For NH-2
Data Collection of Route Alignment, Details Survey, Profile and Tower Spotting
PGCIL ALLAHABD
Dec 2004
8
Solar Power/Substation Project:
Assignment Name Brief Scope of Work Name of Client Duration Proposed 22MW PV Solar Power Project Topography & Contours Survey in BADLA, BAP (PHALODI) Rajasthan
Topography Survey and Contour Survey Reference by control Point coordinate and level. Ground Spot levels taken on a grid of 5x5 m.
L&T Power JUN 2013
Proposed 35MW PV Solar Power Project Topography & Contours Survey in BAAP (PHALODI) Rajasthan
Topography Survey and Contour Survey Reference by control Point coordinate and level. Ground Spot levels taken on a grid of 5x5 m.
L&T Power OCT 2012
Proposed 100MW PV Solar Power Project Topography & Contours Survey in POKHRAN Rajasthan
Topography Survey and Contour Survey Reference by control Point coordinate and level. Ground Spot levels taken on a grid of 5x5 m.
L&T Power SEP 2012
Proposed 25MW Mahindra Solar PV Solar Power Project Topography & Contours Survey in BAAP (PHALODI) Rajasthan
Topography Survey and Contour Survey Reference by control Point coordinate and level. Ground Spot levels taken on a grid of 5x5 m.
L&T Power JUN 2012
120MG CSP SOLAR POWER PROJECT IN POKHRAN
Pilling Layout, Pipe Racking Layout Boundary Marking, Road Marking And Area Leveling.
L&T Power MAY 2012 TO Till Date
Proposed 40MW Reliance PV Solar Power Substation in POKHRAN. The total Plot area to be surveyed is about 126.598 Hectare
Topography Survey and Contour Survey Reference by control Point coordinate and level. Ground Spot levels taken on a grid of 10x10 m.
L&T Power Delhi
September 2011
Proposed 10MW PV Solar Power Substation in Phalodi (RAJ)
Topography survey & Contour Survey of Solar Power Substation.
L&T Power Delhi
August 2011
Proposed 2MW Solar Power Substation in Phagi Jaipur (RAJ)
Topography survey & Contour Survey of Solar Power Substation.
L&T Power Delhi
August 2011
Proposed 5MW Solar Power Substation in Sirohi (RAJ)
Topography survey & Contour Survey of Solar Power Substation.
L&T Power Delhi
July 2011
Proposed 2MW Solar Power Substation in Jhansi (U.P.)
Topography survey & Contour Survey of Solar Power Substation.
L&T Power Delhi
May 2011
Proposed 1MW Solar Power Substation in Barabanki (U.P.)
Topography survey & Contour Survey of Solar Power Substation.
L&T Power Delhi
May 2011
400 KV GIS Substation in Guman near Shimla (H.P.)
Topography survey & Contour Survey of 400 KV Substation.
L&T Power Chennai
January 2012
800/765 KV Substation in AGRA (U.P.)
Topography survey & Contour Survey and Earthwork Quantity Calculation.
Power grid Agra
February 2012
400 KV Substation in Sohawal(Faizabad)
Topography survey & Contour Survey and Earthwork Quantity Calculation.
Power grid Lucknow
August 2011
400 KV Substation in Sahajanpur(U.P) Topography survey & Contour Survey. Power grid Lucknow
October 2011
400 KV Substation in Bagpat (U.P.) Topography survey & Contour Survey. Power grid Bagpat
February 2012
400 KV Substation in Kotputli (RAJ.) Topography survey & Contour Survey. Power grid Kotputli
January 2012
9
Highway/Road Survey Project:
Pre Construction Establishing GPS control for the command area based on National Network of Control Extension of primary control by Total Station based on coordinates of GPS control points Providing bench marks and connection of the same to the National Datum Topographical survey of the entire area including cross sections and longitudinal sections Computer aided downloading, processing, digitization, development of Digital Terrain Model (DTM), Preparation of horizontal and vertical profile on selected centerline
During Construction Checking the stability of control points Setting out of co-ordinates of the final road centerline Checking coordinates and levels for foundation, substructure, bearing and superstructure as per construction drawing. Prepare Working Drawing and Project Quantity & Cross-section
Project Name Type Of Work Client Duration
Construction of NH-75 bameetha-Satna Road Project in Madhya Pradesh
Checking the stability of control points, setting out of co-ordinates of the final road centerline. Checking coordinates and levels for foundation,
Concast infratech Delhi
JUN 2013
Topography survey using total station for SH-33 Proposed Four Lanning Bhogoan-Pilibhit Road in (U.P.)KM-194
DGPS survey, Topographic survey, Traversing, Transfer of TBM, Detail engineering survey, preparation of drawing and field investigation
AICON Engineering Bhopal
MARCH 2013
Topography survey using total station for SH-29 Proposed Four Lanning Bareilly-Mathura Road in (U.P.)KM-234
DGPS survey, Topographic survey, Traversing, Transfer of TBM, Detail engineering survey, preparation of drawing and field investigation
AICON Engineering Bhopal
JAN 2013
Upgradetion & Rehabilitation SH-57 MUJJAFARNAGAR-SAHARANPUR Road in (U.P.)
DGPS survey, Topographic survey, Traversing, Transfer of TBM, Detail engineering survey, preparation of drawing and field investigation
AICON Engineering Bhopal
AUGUST 2012
Upgradetion & Rehabilitation SH-9 Sahdol-Pandriya Road in (M.P.)
Topographical survey of the entire area including cross sections and longitudinal section Preparation of horizontal and vertical profile on selected centerline, setting out of co-ordinates of the final road centerline
AICON Engineering Bhopal
March 2011
Badarpur to Ashram Road Section) of NH-2 Road of DELHI STATE
Traversing, Transfer of TBM, Detail engineering survey, preparation of drawing and report.
Egis consulting Engineers
SEP 2010
existing 2 lane road to 4 lane Divided Carriageway Bareilly to Sitapur section of NH-24 from Km.262.00 to Km. 395.00 in the state of Utter Pradesh
Detailed Topographical Survey for the Preparation of Feasibility Study and Detailed Project Report
ERA INFRA Engg. LTD. FERBURY
2011
Rehabilitation Chandigarh-Sirhind Road SH-11A Road Project
Fixing of alignment, establishing of bench mark, Topographical survey, preparation of drawing and report.
PWD B&R MOHALI
AUGUST 2007
Widening & Strengthing of road section dividing sector 54-55 from U.T. Boundary up to the end section 75-75
Topography Survey and Road Improvement Drawing & Quantity Calculation
GAMADA MOHALI
OCT. 2008
Six Laning of Gurgaon - Kotputli - Jaipur Section of NH - 8 (Ch. 42+700 to 73+000)
Checking the stability of control points, setting out of co-ordinates of the final road centerline. Checking coordinates and levels for foundation, Prepare Working Drawing and Project Quantity & Cross-section
Totem Infrastructures Ltd.
MARCH 2010
10
URBAN DEVLOPMEN / UTILITY SURVE: Engineering survey and investigation, Land use analysis, conceptual and layout plan Design of approach roads and internal road network Design of water supply scheme, storm water and under ground drainage (UGD) system Design of power supply and distribution network Environmental impact study and rehabilitation
Type Of Work Location Area Client Duration
Detail survey work of existing building Road, Drain, Electric/Telephone Line with Consumer Details for Telecom Project
BHATINDA PUNJAB
2500 Hectare
HFCL INFOTECH MOHALI
Feb. 2004
Detail survey work of existing building Road, Drain, Electric/Telephone Line with Consumer Details for Telecom Project
JAITO MANDI Punjab
2200 Hectare
HFCL INFOTECH MOHALI
MARCH 2004
Detail survey work of existing building Road, Drain, Electric/Telephone Line with Consumer Details for Telecom Project
NAGAL PUNJAB 1800 Hectare
HFCL INFOTECH MOHALI
AUGUST 2004
Detail survey work of existing building Road, Drain, Electric/Telephone Line with Consumer Details for Electric Project
NORTH DEHLI 5000 Hectare
SGS INFOTECH Sep. 2004
Topographic Survey for Drainage Project For Water and Sewerage Planning
MURADABAD 250 KM Liner
Jal Nigam Moradabad
August 2008
Topography Survey for each level of Colony development such as contour survey, Demarcation of Road, Plot, Pipe line and other activity related to New Sector Developed.
GRATER MOHALI
1500 Hectare
GAMADA MOHLI Dec. 2005
Topography Survey for each level of Colony development such as contour survey, Demarcation of Road, Plot, Pipe line, Sewerage Line and other activity related to New Colony Developed.
ANSAL TOWN MOHALI
200 Hectare
ANSAL HOUSING MARH 2006
Topographical Survey of Triveni Rangoli Township Area, Agar Mathura Road AGRA
Treveni Rangoli Colony
23 Hectare
Triveni Infrastructure Development
APRIL 2008
Topographical Survey,Countour,Earth Volume Calculation for proposed sub station 200/400kv at SOHAWAL
Sohawal NTPC 67 Hectare
Powergrid Lucknow
February 2011
Topographical Survey,Countour,Earth Volume Calculation sub station 200/400kv at Saharanpur
Sahajanpur NTPC
18 Hectare
Powergrid Lucknow
March 2011
Countour,cross-section,L-Section, Leveling Work For Sewerage Planning in BIHAR State Approx Area-500 sqkm
Bihar Development Board
50000 Hectare
MAP MYINDIA In Hand March 2012
Topography Survey Unauthorized Colony in Rajasthan Housing Board in Bharatpur District 35 Colonies,
BHARATPUR 2000 Hectare
UIT BHARATPUR In Hand FEB 2012
Topography Survey & Contour Survey for Implement for Water Pipe Line Project in Lidhora Khas
Tikamgarh (M.P.)
25 KM RES Tikamgarh MAY 2013
Topography Survey & Contour Survey for Implement for Water Pipe Line Project in Badagoan
Lalitpur(M.P.) 40km RES Tikamgarh JUNE 2013
11
Railway line/Gas Pipe Line/Other Project:
Description of Work Location Length Client Completion
Topographical Survey for Gas Pipe Line Project of Sangrur to Batinda in Punjab State, for Detailed Project Report for improvement Gas Pipe Line Traversing, TBM Sifting, alignment marking and Land Area Calculate By revenue map System.
Sangrur to Batinda
50 km GAIL INDIA 2004
Topography Survey for Railway project of 200 Km. from Khurja to Tapri Khas for preparation of DPR for dedicated high axle load Freight Corridor, including new alignment of diversion routes.Section-10& 11
Meerut 200 KM RITES LTD. 2005
Topography Survey for Railway project of 100 Km. from Dadari to Rewari for preparation of DPR for dedicated high axle load Freight Corridor, including new alignment of diversion routes. Section-15
Greter Noida Palwal
100 KM RITES LTD. 2006
Detailed Topographical Survey for the Preparation of Feasibility Study and Detailed Project Report RAMGANGA RIVER and Design Alignment of Road, L-Section, Cross- Section and Calculated Embankment and Filling area. For Dam and Road Moradabad Bypass
Moradabad 20 KM MDA Moradabad
2006
Topographical Survey for Water & sewerage Development Project of some village in rupnagar District Punjab State, for Preparation of Feasibility Study and Detailed Project Report for Sewerage improvement System.
Rupnagar 50 KM Water & sewerage Deppt. Punjab
2006
Bridge alignment road center lines, Horizontal curve, Transsion Curve and Approved by Chief Engineer PWD Utter Pradesh. Well Foundation Layout, Checking the Well Tilling & Sifting of Ganga River bridge kachla ghat Kasganj in U.P.
Badayu 1 km PWD Mathura 2005
Detailed Topographical Survey Project Report Irrigation Dep’t. New dam & canal alignment, Traversing, TBM Sifting to GTS to GTS and Preparation L-Section, Cross- Section and Calculated irrigated area 2500 sq km survey in Samsabad Tahsil
Viidisha 35 km Vidisha Irrigation deptt.
2004
GIS DATA COLLECTION for Electrical Network 66kv, 33kv, 11kv and Transformer Location, Consumer Details, Meter No and Collect The all Information Retaliated of the Consumer
Lucknow 300 KM SGS INFOTECH
IN HAND
Topography Survey for Fly ash Dam in Sakti nagar Singhroli
Singhroli 50 Hectare
Subhash Construction
2009
GIS DATA COLLECTION for Electrical Network 66kv, 33kv, 11kv and Transformer Location, Consumer Details, Meter No and Collect The all Information Retaliated of the Consumer in North Delhi District Area NARELA,Nagloi,
North Delhi Power Limited
50000 Consumer
SGS INFOTECH
2005
12
Tools & EQIPMENT : (a) Precision Survey Instruments
Sl. No. Name Of Instrument Quantity Name Of Company
Model No. (if any)
1. DGPS RTK (DUAL frequency) 1 Topcon
2. Total Station with Accessories, Prisms, Reflectors etc.
4 Sending
3. Total Station with Accessories, Prisms, Reflectors etc.
2 South
4. Total Station with Accessories, Prisms, Reflectors etc.
4 Foif
4. Auto Level With Tripod,Leval Staff 10 Sokkia
5. GPS GS20 with ± 1.5m 5 Magellan
6. Plane Table 5 ----- -------
7.. Surveyor Compass 2 ------- -------
8. Steel Measuring Tape 5 ----- -------
9. Laser Distance Measure 2 ----- -------
(b) Computer
No. Description and Make Quantity Remarks
1
Personal Computers- Intel Pentium, AMD Anthon,
10 Nos.
2 Laptop Computer
4 NOS.
3 HP LASER Printer 1020 1 Nos. 4 HP SCANNER 1 Nos. 5 UPS 4 Nos. 6 CD Writer – HP, LG 4 Nos. 7 External Hard Disc 320 GB 2 Nos. 8 Inkjet Printer - EPSON 1 Nos. 9 HP DeskJet F2418 1 Nos.
(c) Software
No. Description and Make Quantity Remarks
1 AUTO CAD 2004,2007,2010 4 Nos. For Drawing 2 GLOBAL MAPPER 1 Nos. For All Type Drawing 3 LAND DEVLOPMENT 1 Nos. Road Design 4 ROAD ESTIMTER 1 Nos. Road Quantity
5 Ozi Explorer 1 Nos. For Maps Super Impose 6 Sanding,Lieca Survey,sokkia 4 Nos. For Total Station Download 7 TCom,Topcon,Util,Nikon,Nts 4 Nos. For Total Station Download 8 Magellan 2 Nos. 9 CalQuan Land Development 3 Nos. Road Quantity, Cross-Section
13
TEAM COMPOSTION:
Name of Key Person
Name Designation Age
Date of
Joining in
the Firm
Qualification Year of
Passing
Exp.in
yrs.
Suraj Pal
Singh Managing Director 28 Since 2004
Diploma in Civil
Engineering 2003 12
CHANDAN
KUMAR Chief Surveyor 28 Since 2007
Diploma in Civil
Engineering 2007 7
Ranveer Singh
Chouhan Survey Consultant 62 January'2005
Diploma in Civil
Engineering
Retired. Survey of
India
1975 38
Baljinder
Singh
Sr. Survey Engineer
(Urban Development) 26 January'2006
Diploma in Civil
Engineering
2005 6
Yogendra
Singh
Senor Surveyor
(Sewerage project ) 24 Feb'2008 I.T.I. in Surveying 2007 3
RAJENDRA
SINGH
Senor Surveyor
(SOLAR PROJECT) 24 Feb'2008 I.T.I. in Surveying 2007 3
Naresh Pal
Singh
Senor Surveyor
(Building) 25 September'2007 2007 1997 4
Sunil Kumar
Sr.Manager(Electrical
Network & Consumer
Indexing)
35 12.12.2003 B. Sc. 1992 10
Basudev Singh Sr.Surveyor 28 Feb.2009 B. Sc. 2004 3
Sandeep
Sharma Surveyor August 2009 ITI Surveyor 2009 2
Bhupendra
Singh Surveyor 21 Jan.2011 ITI Surveyor 2012 2
Talewar Singh Surveyor 23 March 2012 ITI Surveyor ---- 1
Gopal Singh Surveyor 20 Sep.2010 ITI Surveyor ----- 1
Dharmendra
Kumar
Surveyor 22 Dec.2011 Intermediate ----- 1
Vijay Kumar Surveyor 25 March 2011 B.SC. 2011 1
Pawan Kumar Senior Surveyor
January'2006 ITI Surveyor 2006 5
Yogesh Sharma Cad -Operator
(Mapping) 24 August 2011 Draftsman, Civil 2009 2
Arjun Singh
Choudhary
Cad -Operator
(Sewerage)) 24 August 209 Draftsman, Civil 2009 2
Vishnu Singh Accountant August 2008 B. Sc. 2008 3
14
Topography survey for seawrage network in agra (u.p.):
Contour survey & Site layout of mayavan in vrindavan (u.p.):
15
Ramganga River Topography Survey for Water Fled, bandh & Proposed
Moradabad Bypass:
Topography Survey, Contour Survey for Proposed 2MW Solar Power
Substation in Jhansi (U.P.):
16
Quantity Calculation in Road-Estimator Software:
Quantity Calculation in CALQUAN Software:
17
Topography Survey for Water & Sewerage Development of rohera
(Aligarh):
Topography Survey for Water & Sewerage Development of Dholna
(Yamuna expressway):
18
Topography Survey Shastri Park Bharatpur (RAJ.):
765 substation topography survey in jind superimpose on the Google
earth
19
Profile & Tower Spotting of Bareilly Bypass Diverson 220 KV D/C Transmission
Line
220 KV D/C Transmission Line Detail route Survey sidhi to katni Approx
length 200km in Madhya Pradesh
20
Topography Survey for Unauthorized Colonies in Bharatpur:
Topography Survey Gurgaon-Sahajanpur NH-8 km-42 to km-103:
21
Topography Survey,Coutour Survey for 40mw Solar Power Project in
Pokhran:
220kv d/c transmission line survey in renew energy solar substation to
bijaypur substation in shorepur (m.p.):
22
CONTOUR SURVEY FOR SEAWRAGE TRETMENT PLANT SUNRAKH VAN IN
VRINDAVAN MATHURA
CONTOUR SURVEY FOR 2MG SOLAR PROJECT IN PHAGI JAIPUR
23
SURVEY FOR 5MG SOLAR PROJECT FOR KANORIYA CHEMICAL DELHI
CONTOUR SURVEY FOR 22MG SOLAR PROJECT IN BADLA JODHPUR
24
CONTOUR SURVEY FOR SWEAVRAGE & WATER SUPPLY IN BIHAR
CONTOUR SURVEY FOR SWEAVRAGE & WATER SUPPLY IN BIHAR