41
Worlds Best Work Force Maple River Schools

Maple River Schools · SR - School Readiness/Preschool Classrooms at Minnesota Lake site, Mapleton site and Good Thunder site. Increase in preschoolers from 76 in 2008-09 to 95 this

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Maple River Schools · SR - School Readiness/Preschool Classrooms at Minnesota Lake site, Mapleton site and Good Thunder site. Increase in preschoolers from 76 in 2008-09 to 95 this

Worlds BestWork Force

Maple River Schools

Page 2: Maple River Schools · SR - School Readiness/Preschool Classrooms at Minnesota Lake site, Mapleton site and Good Thunder site. Increase in preschoolers from 76 in 2008-09 to 95 this

Agenda

1) Welcome & Overview Superintendent Anderson2) MDE Video Mrs. Langworthy HS School Counselor3) What is Maple River doing? Mr. Bisel Principal & DAC● Learning Gap Mrs. Rengstorf Principal, Integration, & Title 1 ● Ready for K Ms. Walser ECFE Director● MR Literacy Plan Mrs. Stoltzman K-5 PLC Leader● Assessing & Evaluating Mrs. Burman 6-12 PLC Leader● 2014 MCA Results Mr. Griepentrog MS/HS Principal● Future Assessment Changes Mrs. Langworthy ● Ready for Postsecondary Mrs. Langworthy

4) Closing with Question/Answer Superintendent Anderson

Page 4: Maple River Schools · SR - School Readiness/Preschool Classrooms at Minnesota Lake site, Mapleton site and Good Thunder site. Increase in preschoolers from 76 in 2008-09 to 95 this

Learning GapMrs. Rengstorf

Page 5: Maple River Schools · SR - School Readiness/Preschool Classrooms at Minnesota Lake site, Mapleton site and Good Thunder site. Increase in preschoolers from 76 in 2008-09 to 95 this

Title One at the Elementary Level

Page 6: Maple River Schools · SR - School Readiness/Preschool Classrooms at Minnesota Lake site, Mapleton site and Good Thunder site. Increase in preschoolers from 76 in 2008-09 to 95 this

At Risk Elementary Reading and Math Students

Federally funded programming for at risk elementary reading and math students. Criteria used:● Teacher judgment based on classroom performance● Below 80% on classroom reading or math chapter assessment● Grades K-1 Below benchmarks on Early STAR reading or math assessments● Grades 2-5 Below benchmarks on STAR reading or math assessments● Grades 3-5 Partially Meets the Standards or Does not meet the standards on

the MCA tests● Grades K-5 Student RIT score is below the Norm grade level mean RIT score

on NWEA● Grades 1-2 Student is below 90% passing in Dolch word list● Grades 1-5 Student is below 90% passing in math fact practice

Page 7: Maple River Schools · SR - School Readiness/Preschool Classrooms at Minnesota Lake site, Mapleton site and Good Thunder site. Increase in preschoolers from 76 in 2008-09 to 95 this

Funding● Based on poverty levels at the elementary level ● East 35.4%● West 41.1%

● Identify achievement gap trend using MCA data in grades 3-5

● Close the math and reading achievement gap by 50% by the year 2017

Page 8: Maple River Schools · SR - School Readiness/Preschool Classrooms at Minnesota Lake site, Mapleton site and Good Thunder site. Increase in preschoolers from 76 in 2008-09 to 95 this

What has Maple River done to close the achievement gap?

● WIN time - What I Need reading and math interventions

● Utilize a pull in and push out program model● One certified teacher at each site ● Two highly qualified paraprofessionals at

each site ● Reading Corps at each site

Page 9: Maple River Schools · SR - School Readiness/Preschool Classrooms at Minnesota Lake site, Mapleton site and Good Thunder site. Increase in preschoolers from 76 in 2008-09 to 95 this
Page 10: Maple River Schools · SR - School Readiness/Preschool Classrooms at Minnesota Lake site, Mapleton site and Good Thunder site. Increase in preschoolers from 76 in 2008-09 to 95 this
Page 11: Maple River Schools · SR - School Readiness/Preschool Classrooms at Minnesota Lake site, Mapleton site and Good Thunder site. Increase in preschoolers from 76 in 2008-09 to 95 this

MAIC Integration Collaborative

Page 12: Maple River Schools · SR - School Readiness/Preschool Classrooms at Minnesota Lake site, Mapleton site and Good Thunder site. Increase in preschoolers from 76 in 2008-09 to 95 this

Madelia Area Integration Collaborative

● Integration collaborative between Madelia, Truman, Maple River and Lake Crystal Wellcome Memorial schools

● Original intent of integration law was to engage students from racially isolated districts (Madelia) with students in adjoining districts

Page 13: Maple River Schools · SR - School Readiness/Preschool Classrooms at Minnesota Lake site, Mapleton site and Good Thunder site. Increase in preschoolers from 76 in 2008-09 to 95 this

MAIC goals1. Academic achievement - Mathematics was identified as a common achievement gap in all MAIC districts● Identify achievement gap trends using the MCA, MOD

and MTAS math data in grades K-11● Close the math achievement gap by 50% by the year

2017

2. Integration

Page 14: Maple River Schools · SR - School Readiness/Preschool Classrooms at Minnesota Lake site, Mapleton site and Good Thunder site. Increase in preschoolers from 76 in 2008-09 to 95 this
Page 15: Maple River Schools · SR - School Readiness/Preschool Classrooms at Minnesota Lake site, Mapleton site and Good Thunder site. Increase in preschoolers from 76 in 2008-09 to 95 this

Integration Funds to Close the Achievement Gap Elementary Level

● Hired a full time elementary math interventionist

● Math interventions (IXL) at each site to reinforce math academic standards

Page 16: Maple River Schools · SR - School Readiness/Preschool Classrooms at Minnesota Lake site, Mapleton site and Good Thunder site. Increase in preschoolers from 76 in 2008-09 to 95 this

Integration Funds to Close the Achievement Gap Secondary Level

● Credit Recovery Program in the Middle School (Code Blue)● ICU program in the Middle School and High School● Math Academy

○ 8 days in the summer of 2014○ Students in grades 4-8 ○ Did Not Meet or Partially Met the Math MCA standards.

Page 17: Maple River Schools · SR - School Readiness/Preschool Classrooms at Minnesota Lake site, Mapleton site and Good Thunder site. Increase in preschoolers from 76 in 2008-09 to 95 this

Maple River Ready for K

Ms. Walser

Page 18: Maple River Schools · SR - School Readiness/Preschool Classrooms at Minnesota Lake site, Mapleton site and Good Thunder site. Increase in preschoolers from 76 in 2008-09 to 95 this

● ECFE - Early Childhood Family Education● SR - School Readiness/Preschool

○ Classrooms at Minnesota Lake site, Mapleton site and Good Thunder site.

○ Increase in preschoolers from 76 in 2008-09 to 95 this year.○ Increase in amount of preschool time offered from half day

preschool to having full day class options.○ Program has implemented state aligned curriculum,

implemented assessment with on-line portfolios, participate in PLC’s and has a 4-star Parent Aware rating.

○ 46 of the 82 projected incoming Kindergartners are enrolled in our program. 38 of them are in our full day program.

Early Childhood Program

Page 19: Maple River Schools · SR - School Readiness/Preschool Classrooms at Minnesota Lake site, Mapleton site and Good Thunder site. Increase in preschoolers from 76 in 2008-09 to 95 this

Class Offerings● Half day/multi-age class in Good Thunder and

Minnesota Lake● Age specific classes in Mapleton

○ 3 year old class/half days○ 4 year old class/half days○ 4 year old class full days

● Classes are usually full. We added a GT class last year and a full day class this year to accommodate the interest.

Page 20: Maple River Schools · SR - School Readiness/Preschool Classrooms at Minnesota Lake site, Mapleton site and Good Thunder site. Increase in preschoolers from 76 in 2008-09 to 95 this

Every Child Ready?● National, state and local studies have shown the more time in

preschool the more school readiness skills that are in place.● Full day class is in high demand and is what parents want.● Our program is helping more and more kids in our district be

ready for Kindergarten but we are still not reaching every child with the amount of preschool needed to prepare for Kindergarten.

● Biggest hurdle for parents is cost and transportation.● State scholarships have helped with the cost of preschool for

low-income families.

Page 21: Maple River Schools · SR - School Readiness/Preschool Classrooms at Minnesota Lake site, Mapleton site and Good Thunder site. Increase in preschoolers from 76 in 2008-09 to 95 this

Maple River Literacy Plan

Mrs. Stoltzman

Page 22: Maple River Schools · SR - School Readiness/Preschool Classrooms at Minnesota Lake site, Mapleton site and Good Thunder site. Increase in preschoolers from 76 in 2008-09 to 95 this

Read Well by Grade 31. To accelerate student progress until students are competent readers based on the MCA and NWEA test results 2. To have in place an intervention system that accomplishes this acceleration. The intervention system results in individualized planning for each student. 3. To continue to support the intervention process until each student has accelerated his/her reading achievement to the point of competence. 4. The Maple River goal for reading instruction is to have 100% of students reading at grade level at the end of grade three.

Page 23: Maple River Schools · SR - School Readiness/Preschool Classrooms at Minnesota Lake site, Mapleton site and Good Thunder site. Increase in preschoolers from 76 in 2008-09 to 95 this

Learn to Read by Grade 3K-3 Reading Test Results NWEA Spring 2014

Grade Level Number of students Tested

Number of students At or Above Grade

% at Grade Level or Above in Reading

East K 38 25 65.7%

East 1st 27 18 66.6%

East 2nd 20 18 90.0%

East 3rd 26 22 84.6%

West K 42 19 45.2%

West 1st 39 23 58.9%

West 2nd 36 22 61.1%

West 3rd 45 33 73.3 %

Page 24: Maple River Schools · SR - School Readiness/Preschool Classrooms at Minnesota Lake site, Mapleton site and Good Thunder site. Increase in preschoolers from 76 in 2008-09 to 95 this

Assessing and Evaluating

Student LearningMrs. Burman

Page 25: Maple River Schools · SR - School Readiness/Preschool Classrooms at Minnesota Lake site, Mapleton site and Good Thunder site. Increase in preschoolers from 76 in 2008-09 to 95 this

Process for Assessing and Evaluating Student Learning

Professional Learning Community● Data analysis through collaborative work in

PLC● Drill down to content and skills

strengths/weaknesses within populations.

Page 26: Maple River Schools · SR - School Readiness/Preschool Classrooms at Minnesota Lake site, Mapleton site and Good Thunder site. Increase in preschoolers from 76 in 2008-09 to 95 this

Process for Assessing and Evaluating Student Learning

Types of Data explored● MCA (grades 3-11: Reading, Math, Science,

Writing)● ACT (grades 8,10,11)● NWEA (grades 4-8)● Chapter formative & summative

assessments

Page 27: Maple River Schools · SR - School Readiness/Preschool Classrooms at Minnesota Lake site, Mapleton site and Good Thunder site. Increase in preschoolers from 76 in 2008-09 to 95 this

Process for Assessing and Evaluating Student Learning

All assessments are aligned to Standards at the State and National levels.

Page 28: Maple River Schools · SR - School Readiness/Preschool Classrooms at Minnesota Lake site, Mapleton site and Good Thunder site. Increase in preschoolers from 76 in 2008-09 to 95 this

Process of Assessing and Evaluating Student Learning

Goal setting to recognize strengths and weaknesses.

● District● PLC● Classroom ● Students levels.

Page 29: Maple River Schools · SR - School Readiness/Preschool Classrooms at Minnesota Lake site, Mapleton site and Good Thunder site. Increase in preschoolers from 76 in 2008-09 to 95 this

MCA ResultsMr. Griepentrog

Page 30: Maple River Schools · SR - School Readiness/Preschool Classrooms at Minnesota Lake site, Mapleton site and Good Thunder site. Increase in preschoolers from 76 in 2008-09 to 95 this
Page 31: Maple River Schools · SR - School Readiness/Preschool Classrooms at Minnesota Lake site, Mapleton site and Good Thunder site. Increase in preschoolers from 76 in 2008-09 to 95 this
Page 32: Maple River Schools · SR - School Readiness/Preschool Classrooms at Minnesota Lake site, Mapleton site and Good Thunder site. Increase in preschoolers from 76 in 2008-09 to 95 this
Page 33: Maple River Schools · SR - School Readiness/Preschool Classrooms at Minnesota Lake site, Mapleton site and Good Thunder site. Increase in preschoolers from 76 in 2008-09 to 95 this

Future Assessment

ChangesMrs. Langworthy

Page 34: Maple River Schools · SR - School Readiness/Preschool Classrooms at Minnesota Lake site, Mapleton site and Good Thunder site. Increase in preschoolers from 76 in 2008-09 to 95 this

Changes in Assessments:State Legislative Requirements forMinnesota Assessment System• Grade 8– Mathematics, Reading, and WritingPredictive of College Entrance Exam (EXPLORE)Career Exploration elements

• Grade 10– Mathematics, Reading, and WritingPredictive of College Entrance Exam (PLAN)Career Exploration elements

Page 35: Maple River Schools · SR - School Readiness/Preschool Classrooms at Minnesota Lake site, Mapleton site and Good Thunder site. Increase in preschoolers from 76 in 2008-09 to 95 this

Changes in Assessments:• Grade 10-11College Placement Diagnostic Test (Compass)– College Placement Diagnostic Test (Compass) for select students – For students who are deemed not career and college-ready after having taken the PLAN test– Provides information for targeted instruction

• Grade 11– Mathematics, Reading and Writing– College Entrance Exam (ACT)

Page 36: Maple River Schools · SR - School Readiness/Preschool Classrooms at Minnesota Lake site, Mapleton site and Good Thunder site. Increase in preschoolers from 76 in 2008-09 to 95 this

Ready for Post Secondary

Mrs. Langworthy

Page 37: Maple River Schools · SR - School Readiness/Preschool Classrooms at Minnesota Lake site, Mapleton site and Good Thunder site. Increase in preschoolers from 76 in 2008-09 to 95 this

What does “Career and College Ready” mean?  For purposes of statewide accountability, "career and college ready" means a high school graduate has the knowledge, skills, and competencies to successfully pursue a career pathway including postsecondary credit leading to a degree, diploma, certificate, or industry-recognized credential and employment.2

Page 38: Maple River Schools · SR - School Readiness/Preschool Classrooms at Minnesota Lake site, Mapleton site and Good Thunder site. Increase in preschoolers from 76 in 2008-09 to 95 this

“Career and College Ready”:Students who are career and college ready are able to successfully complete credit-bearing coursework at a two- or four-year college or university or other credit-bearing postsecondary program without need for remediation.

Page 39: Maple River Schools · SR - School Readiness/Preschool Classrooms at Minnesota Lake site, Mapleton site and Good Thunder site. Increase in preschoolers from 76 in 2008-09 to 95 this

What Does Minnesota Law Say?Minnesota Statutes 2014, section 120B.125 PLANNING FOR STUDENTS’ SUCCESSFUL TRANSITION TO POSTSECONDARY EDUCATION AND EMPLOYMENT; PERSONAL LEARNING PLANS School Districts must assist all students by no later than grade 9 to explore their educational, college and career interests, aptitudes, and aspirations and develop a plan for a smooth and successful transition to postsecondary education or employment.

Page 40: Maple River Schools · SR - School Readiness/Preschool Classrooms at Minnesota Lake site, Mapleton site and Good Thunder site. Increase in preschoolers from 76 in 2008-09 to 95 this

Helping Students Reach Their Goals - Frank

Page 41: Maple River Schools · SR - School Readiness/Preschool Classrooms at Minnesota Lake site, Mapleton site and Good Thunder site. Increase in preschoolers from 76 in 2008-09 to 95 this

Questions