Manoa Elementary School. Amanda Cronauer Faculty Advisor: Dr. William Bahnfleth 14 April 2010. Presentation Overview. Spring 2010. Project Background Existing Mechanical Summary Design Objectives Alternative Descriptions Ground Source Heat Pumps Air Source Heat Pumps - PowerPoint PPT Presentation

Citation preview

Page 1: Manoa  Elementary School

Manoa Elementary School

Amanda Cronauer

Faculty Advisor: Dr. William Bahnfleth14 April 2010

Page 2: Manoa  Elementary School

Project BackgroundExisting Mechanical SummaryDesign ObjectivesAlternative DescriptionsGround Source Heat PumpsAir Source Heat PumpsSystem ComparisonFinal Recommendations

Presentation Overview

Amanda Cronauer │ Mechanical Option

Spring 2010

Page 3: Manoa  Elementary School

Project Background

Existing Mechanical Summary

Design Objectives

Alternative Descriptions

Ground Source Heat Pumps

Air Source Heat Pumps

System Comparison

Final Recommendations

Project BackgroundProject Information:

Project Size: 85,355 sfLocation: Havertown, PACost: $21.2 millionStories: Classroom [3], Administration [1]Construction Dates: May 2007-November 2008Delivery Method: Design-Bid-Build

Amanda Cronauer │ Mechanical Option

Spring 2010

Project Team:Owner: Haverford School DistrictArchitect: McKissick Associates ArchitectsGeneral Contractor: John S. McManus, Inc.Structural Engineer: Baker Ingram & Associates, Inc.MEP Engineer: H.F. Lenz Company

Page 4: Manoa  Elementary School

Building Layout

Amanda Cronauer │ Mechanical Option

Spring 2010Project Background

Existing Mechanical Summary

Design Objectives

Alternative Descriptions

Ground Source Heat Pumps

Air Source Heat Pumps

System Comparison

Final Recommendations

Page 5: Manoa  Elementary School

Building Layout

Amanda Cronauer │ Mechanical Option

Spring 2010Project Background

Existing Mechanical Summary

Design Objectives

Alternative Descriptions

Ground Source Heat Pumps

Air Source Heat Pumps

System Comparison

Final Recommendations

Page 6: Manoa  Elementary School

Building Layout

Amanda Cronauer │ Mechanical Option

Spring 2010Project Background

Existing Mechanical Summary

Design Objectives

Alternative Descriptions

Ground Source Heat Pumps

Air Source Heat Pumps

System Comparison

Final Recommendations

Page 7: Manoa  Elementary School

Building Layout

Amanda Cronauer │ Mechanical Option

Spring 2010Project Background

Existing Mechanical Summary

Design Objectives

Alternative Descriptions

Ground Source Heat Pumps

Air Source Heat Pumps

System Comparison

Final Recommendations

Page 8: Manoa  Elementary School

Building Layout

Amanda Cronauer │ Mechanical Option

Spring 2010Project Background

Existing Mechanical Summary

Design Objectives

Alternative Descriptions

Ground Source Heat Pumps

Air Source Heat Pumps

System Comparison

Final Recommendations

Page 9: Manoa  Elementary School

Building Layout

Amanda Cronauer │ Mechanical Option

Spring 2010Project Background

Existing Mechanical Summary

Design Objectives

Alternative Descriptions

Ground Source Heat Pumps

Air Source Heat Pumps

System Comparison

Final Recommendations

Page 10: Manoa  Elementary School

Existing Mechanical System

Amanda Cronauer │ Mechanical Option

Spring 2010

Third Floor

Second Floor

First Floor

AHU-1AHU-2

Classroom Wing: [2] Rooftop Variable Air Volume Units Direct Expansion Cooling Hot Water Perimeter Heating Energy Recovery Ventilators [2] Air Cooled Condensing Units

Administration Wing: Rooftop VAV Unit with Energy Recovery Ventilator [AHU-3] [2] Rooftop Constant Volume Units Direct Expansion Cooling Hot Water Heating [3] Air Cooled Condensing Units

AHU-3

AHU-4

AHU-5

Project Background

Existing Mechanical Summary

Design Objectives

Alternative Descriptions

Ground Source Heat Pumps

Air Source Heat Pumps

System Comparison

Final Recommendations

Page 11: Manoa  Elementary School

Design Objectives

Amanda Cronauer │ Mechanical Option

Spring 2010Project Background

Existing Mechanical Summary

Design Objectives

Alternative Descriptions

Ground Source Heat Pumps

Air Source Heat Pumps

System Comparison

Final Recommendations

Improve System PerformanceEnergy ConsumptionEmissionsTotal System Cost

Comparison of Proposed System Performance

Page 12: Manoa  Elementary School

Alternatives

Amanda Cronauer │ Mechanical Option

Spring 2010Project Background

Existing Mechanical Summary

Design Objectives

Alternative Descriptions

Ground Source Heat Pumps

Air Source Heat Pumps

System Comparison

Final Recommendations

Ground Source Heat Pumps:[+] Decentralized System[+] Higher System Efficiencies[+] Lower Greenhouse Gas Emissions

[-] Increased Construction Costs [-] Impact of Loop on Ecosystem

Air Source Heat Pumps:[+] Decentralized System[+] Higher System Efficiencies[+] Lower Greenhouse Gas Emissions[+] No Extensive Excavation

[-] Utilizes Electricity

Dedicated Outdoor Air:[+] Reduce Load on Heat Pumps[+] Smaller

[-] Utilizes Electricity

Page 13: Manoa  Elementary School

Vertical Loop Analysis

Amanda Cronauer │ Mechanical Option

Spring 2010Project Background

Existing Mechanical Summary

Design Objectives

Alternative Descriptions

Ground Source Heat Pumps

Air Source Heat Pumps

System Comparison

Final Recommendations

Systems to be Replaced:

Series Fan Powered Boxes Heat Pump

Rooftop Air Handling Units Dedicated Outdoor Air Unit

Vertical Loop Analysis Systems to be Replaced Assumptions Loop Sizing Loop Optimization

[Construction Management Breadth]

Results Horizontal Loop Analysis

Systems to be Replaced Assumptions Loop Sizing Results

Page 14: Manoa  Elementary School

Vertical Loop Analysis

Amanda Cronauer │ Mechanical Option

Spring 2010Project Background

Existing Mechanical Summary

Design Objectives

Alternative Descriptions

Ground Source Heat Pumps

Air Source Heat Pumps

System Comparison

Final Recommendations

Assumptions:Zoning

Heat Pumps

DOAS Units

Vertical Loop Analysis Systems to be Replaced Assumptions Loop Sizing Loop Optimization

[Construction Management Breadth]

Results Horizontal Loop Analysis

Systems to be Replaced Assumptions Loop Sizing Results

Page 15: Manoa  Elementary School

Vertical Loop Analysis

Amanda Cronauer │ Mechanical Option

Spring 2010Project Background

Existing Mechanical Summary

Design Objectives

Alternative Descriptions

Ground Source Heat Pumps

Air Source Heat Pumps

System Comparison

Final Recommendations

Loop Sizing: Vertical Loop Analysis

Systems to be Replaced Assumptions Loop Sizing Loop Optimization

[Construction Management Breadth]

Results Horizontal Loop Analysis

Systems to be Replaced Assumptions Loop Sizing Results

Page 16: Manoa  Elementary School

Vertical Loop Analysis

Amanda Cronauer │ Mechanical Option

Spring 2010Project Background

Existing Mechanical Summary

Design Objectives

Alternative Descriptions

Ground Source Heat Pumps

Air Source Heat Pumps

System Comparison

Final Recommendations

Loop Sizing: Vertical Loop Analysis

Systems to be Replaced Assumptions Loop Sizing Loop Optimization

[Construction Management Breadth]

Results Horizontal Loop Analysis

Systems to be Replaced Assumptions Loop Sizing Results

Entering Water Temperature (°F)

Leaving Water Temperature (°F)

Cooling Load (MBH)

Total Borehole Length (feet)

75 85 1,434 23,959

Cooling Design Information

Entering Water Temperature (°F)

Leaving Water Temperature (°F)

Heating Load (MBH)

Total Borehole Length (feet)

45 35 1,153 25,052

Heating Design Information

Page 17: Manoa  Elementary School

Vertical Loop Analysis

Amanda Cronauer │ Mechanical Option

Spring 2010Project Background

Existing Mechanical Summary

Design Objectives

Alternative Descriptions

Ground Source Heat Pumps

Air Source Heat Pumps

System Comparison

Final Recommendations

Loop Sizing: Vertical Loop Analysis

Systems to be Replaced Assumptions Loop Sizing Loop Optimization

[Construction Management Breadth]

Results Horizontal Loop Analysis

Systems to be Replaced Assumptions Loop Sizing Results

Entering Water Temperature (°F)

Leaving Water Temperature (°F)

Heating Load (MBH)

Total Borehole Length (feet)

45 35 1,153 25,052

Heating Design Information

Page 18: Manoa  Elementary School

Vertical Loop Analysis

Amanda Cronauer │ Mechanical Option

Spring 2010Project Background

Existing Mechanical Summary

Design Objectives

Alternative Descriptions

Ground Source Heat Pumps

Air Source Heat Pumps

System Comparison

Final Recommendations

Goals:Meet Mechanical Load

Minimize Construction Cost

Vertical Loop Analysis Systems to be Replaced Assumptions Loop Sizing Loop Optimization

[Construction Management Breadth]

Results Horizontal Loop Analysis

Systems to be Replaced Assumptions Loop Sizing Results

Page 19: Manoa  Elementary School

Vertical Loop Analysis

Amanda Cronauer │ Mechanical Option

Spring 2010Project Background

Existing Mechanical Summary

Design Objectives

Alternative Descriptions

Ground Source Heat Pumps

Air Source Heat Pumps

System Comparison

Final Recommendations

Assumptions: Piping 1” High Density Polyethylene [HDPE]

$0.53 per linear foot 40 foot lengths $4.79 per weld $40.25 per day for welding machine

Grout Constant Price of $5,937 regardless Miscellaneous Site Costs Specified by Number of Boreholes Borehole Driller

Vertical Loop Analysis Systems to be Replaced Assumptions Loop Sizing Loop Optimization

[Construction Management Breadth]

Results Horizontal Loop Analysis

Systems to be Replaced Assumptions Loop Sizing Results

Bore Length Rent Output

(feet) ($/day) (feet/day)

< 225 12190 1800

225 ≤ Lbore ≤ 325 14840 1200

> 325 12190 900

Earth Auger Data

Page 20: Manoa  Elementary School

Vertical Loop Analysis

Amanda Cronauer │ Mechanical Option

Spring 2010Project Background

Existing Mechanical Summary

Design Objectives

Alternative Descriptions

Ground Source Heat Pumps

Air Source Heat Pumps

System Comparison

Final Recommendations

Results: Vertical Loop Analysis

Systems to be Replaced Assumptions Loop Sizing Loop Optimization

[Construction Management Breadth]

Results Horizontal Loop Analysis

Systems to be Replaced Assumptions Loop Sizing Results

$80,000

$90,000

$100,000

$110,000

$120,000

$130,000

$140,000

$150,000

$160,000

25 45 65 85 105 125 145

A

B

C

Page 21: Manoa  Elementary School

Vertical Loop Analysis

Amanda Cronauer │ Mechanical Option

Spring 2010Project Background

Existing Mechanical Summary

Design Objectives

Alternative Descriptions

Ground Source Heat Pumps

Air Source Heat Pumps

System Comparison

Final Recommendations

Results: Vertical Loop Analysis

Systems to be Replaced Assumptions Loop Sizing Loop Optimization

[Construction Management Breadth]

Results Horizontal Loop Analysis

Systems to be Replaced Assumptions Loop Sizing Results

$80,000

$90,000

$100,000

$110,000

$120,000

$130,000

$140,000

$150,000

$160,000

25 45 65 85 105 125 145

A

B

C

Page 22: Manoa  Elementary School

Vertical Loop Analysis

Amanda Cronauer │ Mechanical Option

Spring 2010Project Background

Existing Mechanical Summary

Design Objectives

Alternative Descriptions

Ground Source Heat Pumps

Air Source Heat Pumps

System Comparison

Final Recommendations

Results:[115] Boreholes[218] feet per borehole$86,889 Total Installed Cost

Vertical Loop Analysis Systems to be Replaced Assumptions Loop Sizing Loop Optimization

[Construction Management Breadth]

Results Horizontal Loop Analysis

Systems to be Replaced Assumptions Loop Sizing Results

DaysRental Weeks

Cost NumberRental Days

Cost

25,052 115 218 25,070 14 3 $36,570 $13,287 627 2 $3,095 $5,937 $28,000 $86,889

Total Cost

Drill C: Depths Less than 225 feet

Calculated Length

# Boreholes

Length per bore

Actual Length

Dril l ingPipe Cost

Welding Grouting Cost Miscellaneous

Cost

Page 23: Manoa  Elementary School

Vertical Loop Analysis

Amanda Cronauer │ Mechanical Option

Spring 2010Project Background

Existing Mechanical Summary

Design Objectives

Alternative Descriptions

Ground Source Heat Pumps

Air Source Heat Pumps

System Comparison

Final Recommendations

Vertical Loop Analysis Systems to be Replaced Assumptions Loop Sizing Loop Optimization

[Construction Management Breadth]

Results Horizontal Loop Analysis

Systems to be Replaced Assumptions Loop Sizing Results

Page 24: Manoa  Elementary School

Vertical Loop Analysis

Amanda Cronauer │ Mechanical Option

Spring 2010Project Background

Existing Mechanical Summary

Design Objectives

Alternative Descriptions

Ground Source Heat Pumps

Air Source Heat Pumps

System Comparison

Final Recommendations

Vertical Loop Analysis Systems to be Replaced Assumptions Loop Sizing Loop Optimization

[Construction Management Breadth]

Results Horizontal Loop Analysis

Systems to be Replaced Assumptions Loop Sizing Results

$87,

273

$85,

923

$91,

792

$37,

556

$26,

970

$2,3

57

$0

$20,000

$40,000

$60,000

$80,000

$100,000

$120,000

$140,000

1 2 3

Gas

Electricity

AHSRAE Baseline System Redesigned SystemDesigned System

Page 25: Manoa  Elementary School

Vertical Loop Analysis

Amanda Cronauer │ Mechanical Option

Spring 2010Project Background

Existing Mechanical Summary

Design Objectives

Alternative Descriptions

Ground Source Heat Pumps

Air Source Heat Pumps

System Comparison

Final Recommendations

Vertical Loop Analysis Systems to be Replaced Assumptions Loop Sizing Loop Optimization

[Construction Management Breadth]

Results Horizontal Loop Analysis

Systems to be Replaced Assumptions Loop Sizing Results

2,96

6

3,21

1

3,31

9

1,32

0

918

61

0

500

1000

1500

2000

2500

3000

3500

4000

4500

5000

ASHRAE Baseline As Designed Proposed Redesign

MBH Gas

Electricity

Page 26: Manoa  Elementary School

Vertical Loop Analysis

Amanda Cronauer │ Mechanical Option

Spring 2010Project Background

Existing Mechanical Summary

Design Objectives

Alternative Descriptions

Ground Source Heat Pumps

Air Source Heat Pumps

System Comparison

Final Recommendations

Vertical Loop Analysis Systems to be Replaced Assumptions Loop Sizing Loop Optimization

[Construction Management Breadth]

Results Horizontal Loop Analysis

Systems to be Replaced Assumptions Loop Sizing Results

% $ % $

As Designed 9.56 11,936

Redesign 24.58 30,680 19.91 18,744

Savings Over Baseline

Savings Over Designed

System Energy Savings Comparison

CO2 NOX SOXTotal

Redesign Savings

(lbm/year) (lbm/year) (lbm/year) (lbm/year)

ASHRAE Baseline 2.02E+04 3.05E+01 1.64E+03 1.56E+04

As Designed 1.59E+04 2.47E+01 1.15E+03 1.08E+04

Redesign 6.15E+03 1.10E+01 1.03E+02

Greenhouse Gas Emission Data

25% Reduction =

7/19 LEED Points [EA Credit 1]

Page 27: Manoa  Elementary School

Vertical Loop Analysis

Amanda Cronauer │ Mechanical Option

Spring 2010Project Background

Existing Mechanical Summary

Design Objectives

Alternative Descriptions

Ground Source Heat Pumps

Air Source Heat Pumps

System Comparison

Final Recommendations

Vertical Loop Analysis Systems to be Replaced Assumptions Loop Sizing Loop Optimization

[Construction Management Breadth]

Results Horizontal Loop Analysis

Systems to be Replaced Assumptions Loop Sizing Results

Simple Payback Period:

Redesign:• [67] Heat Pumps= $420,050• [5] DOAS Units= $82,042• Vertical Loop= $86,889• Utility=$94,129

Design: [5] Rooftop AHU’s =$280,000 [5] ACCU’s= $12,000 Utility= $112,893

Simple Payback Period: 10.76 years

Page 28: Manoa  Elementary School

Vertical Loop Analysis

Amanda Cronauer │ Mechanical Option

Spring 2010Project Background

Existing Mechanical Summary

Design Objectives

Alternative Descriptions

Ground Source Heat Pumps

Air Source Heat Pumps

System Comparison

Final Recommendations

Vertical Loop Analysis Systems to be Replaced Assumptions Loop Sizing Loop Optimization

[Construction Management Breadth]

Results Horizontal Loop Analysis

Systems to be Replaced Assumptions Loop Sizing Results

Simple Payback Period:

Redesign:• [67] Heat Pumps= $420,050• [5] DOAS Units= $82,042• Vertical Loop= $86,889• Ductwork= $74,531• Utility= $94,129

Design: [5] Rooftop AHU’s =$280,000 [5] ACCU’s= $12,000 Utility= $112,893 Ductwork= $319,850

Simple Payback Period: 1.2 years

Page 29: Manoa  Elementary School

Horizontal Loop Analysis

Amanda Cronauer │ Mechanical Option

Spring 2010Project Background

Existing Mechanical Summary

Design Objectives

Alternative Descriptions

Ground Source Heat Pumps

Air Source Heat Pumps

System Comparison

Final Recommendations

Vertical Loop Analysis Systems to be Replaced Assumptions Loop Sizing Loop Optimization

[Construction Management Breadth]

Results Horizontal Loop Analysis

Systems to be Replaced Assumptions Loop Sizing Results

Systems to be Replaced:

Series Fan Powered Boxes Heat Pump

Rooftop Air Handling Units Dedicated Outdoor Air Unit

Page 30: Manoa  Elementary School

Horizontal Loop Analysis

Amanda Cronauer │ Mechanical Option

Spring 2010Project Background

Existing Mechanical Summary

Design Objectives

Alternative Descriptions

Ground Source Heat Pumps

Air Source Heat Pumps

System Comparison

Final Recommendations

Vertical Loop Analysis Systems to be Replaced Assumptions Loop Sizing Loop Optimization

[Construction Management Breadth]

Results Horizontal Loop Analysis

Systems to be Replaced Assumptions Loop Sizing Results

Assumptions:Zoning

Heat Pumps

DOAS Units

Page 31: Manoa  Elementary School

Horizontal Loop Analysis

Amanda Cronauer │ Mechanical Option

Spring 2010Project Background

Existing Mechanical Summary

Design Objectives

Alternative Descriptions

Ground Source Heat Pumps

Air Source Heat Pumps

System Comparison

Final Recommendations

Vertical Loop Analysis Systems to be Replaced Assumptions Loop Sizing Loop Optimization

[Construction Management Breadth]

Results Horizontal Loop Analysis

Systems to be Replaced Assumptions Loop Sizing Results

Assumptions: Sizing Method Applicable

Horizontal, 6-Pipe Coil

Ground Temperature

Page 32: Manoa  Elementary School

Horizontal Loop Analysis

Amanda Cronauer │ Mechanical Option

Spring 2010Project Background

Existing Mechanical Summary

Design Objectives

Alternative Descriptions

Ground Source Heat Pumps

Air Source Heat Pumps

System Comparison

Final Recommendations

Vertical Loop Analysis Systems to be Replaced Assumptions Loop Sizing Loop Optimization

[Construction Management Breadth]

Results Horizontal Loop Analysis

Systems to be Replaced Assumptions Loop Sizing Results

Results:[150] foot per ton loop recommended

[17,925] feet of length required

Page 33: Manoa  Elementary School

Horizontal Loop Analysis

Amanda Cronauer │ Mechanical Option

Spring 2010Project Background

Existing Mechanical Summary

Design Objectives

Alternative Descriptions

Ground Source Heat Pumps

Air Source Heat Pumps

System Comparison

Final Recommendations

Vertical Loop Analysis Systems to be Replaced Assumptions Loop Sizing Loop Optimization

[Construction Management Breadth]

Results Horizontal Loop Analysis

Systems to be Replaced Assumptions Loop Sizing Results

$87,

273

$85,

923

$106

,856

$37,

556

$26,

970

$2,9

08

$0

$20,000

$40,000

$60,000

$80,000

$100,000

$120,000

$140,000

1 2 3

Gas

Electricity

AHSRAE Baseline Redesign SystemDesigned System

Page 34: Manoa  Elementary School

Horizontal Loop Analysis

Amanda Cronauer │ Mechanical Option

Spring 2010Project Background

Existing Mechanical Summary

Design Objectives

Alternative Descriptions

Ground Source Heat Pumps

Air Source Heat Pumps

System Comparison

Final Recommendations

Vertical Loop Analysis Systems to be Replaced Assumptions Loop Sizing Loop Optimization

[Construction Management Breadth]

Results Horizontal Loop Analysis

Systems to be Replaced Assumptions Loop Sizing Results

2,96

6

3,21

1 3,94

5

1,32

0

918 80

0

500

1000

1500

2000

2500

3000

3500

4000

4500

5000

ASHRAE Baseline As Designed Proposed Redesign

MBH Gas

Electricity

Page 35: Manoa  Elementary School

Horizontal Loop Analysis

Amanda Cronauer │ Mechanical Option

Spring 2010Project Background

Existing Mechanical Summary

Design Objectives

Alternative Descriptions

Ground Source Heat Pumps

Air Source Heat Pumps

System Comparison

Final Recommendations

Vertical Loop Analysis Systems to be Replaced Assumptions Loop Sizing Loop Optimization

[Construction Management Breadth]

Results Horizontal Loop Analysis

Systems to be Replaced Assumptions Loop Sizing Results

% $ % $

As Designed 9.56 11,936

Redesign 12.07 15,065 2.85 3,129

Savings Over Baseline

Savings Over Designed

System Energy Savings Comparison 12% Reduction =

1/19 LEED Point [EA Credit 1]

CO2 NOX SOXTotal

Redesign Savings

(lbm/year) (lbm/year) (lbm/year) (lbm/year)

ASHRAE Baseline 2.02E+04 3.05E+01 1.64E+03 1.43E+04

As Designed 1.59E+04 2.47E+01 1.15E+03 9.55E+03

Redesign 7.40E+03 1.31E+01 1.31E+02

Greenhouse Gas Emission Data

Page 36: Manoa  Elementary School

Horizontal Loop Analysis

Amanda Cronauer │ Mechanical Option

Spring 2010Project Background

Existing Mechanical Summary

Design Objectives

Alternative Descriptions

Ground Source Heat Pumps

Air Source Heat Pumps

System Comparison

Final Recommendations

Vertical Loop Analysis Systems to be Replaced Assumptions Loop Sizing Loop Optimization

[Construction Management Breadth]

Results Horizontal Loop Analysis

Systems to be Replaced Assumptions Loop Sizing Results

Simple Payback Period:

Redesign:• [67] Heat Pumps= $420,050• [5] DOAS Units= $82,042• Horizontal Loop= $76,898• Ductwork= $74,531• Utility= $109,764

Design: [5] Rooftop AHU’s =$280,000 [5] ACCU’s= $12,000 Utility= $112,893 Ductwork= $319,850

Simple Payback Period: 0.95 years

Page 37: Manoa  Elementary School

Air Source Heat Pumps

Amanda Cronauer │ Mechanical Option

Spring 2010Project Background

Existing Mechanical Summary

Design Objectives

Alternative Descriptions

Ground Source Heat Pumps

Air Source Heat Pumps

System Comparison

Final Recommendations

Analysis Systems to be Replaced Assumptions Results

Systems to be Replaced:

Series Fan Powered Boxes Heat Pump

Rooftop Air Handling Units Dedicated Outdoor Air Unit

Page 38: Manoa  Elementary School

Air Source Heat Pumps

Amanda Cronauer │ Mechanical Option

Spring 2010Project Background

Existing Mechanical Summary

Design Objectives

Alternative Descriptions

Ground Source Heat Pumps

Air Source Heat Pumps

System Comparison

Final Recommendations

Analysis Systems to be Replaced Assumptions Results

Assumptions:Zoning

Heat Pumps

DOAS Units

Page 39: Manoa  Elementary School

Air Source Heat Pumps

Amanda Cronauer │ Mechanical Option

Spring 2010Project Background

Existing Mechanical Summary

Design Objectives

Alternative Descriptions

Ground Source Heat Pumps

Air Source Heat Pumps

System Comparison

Final Recommendations

Analysis Systems to be Replaced Assumptions Results

$87,

273

$85,

923

$83,

442

$37,

556

$26,

970

$19,

942

$0

$20,000

$40,000

$60,000

$80,000

$100,000

$120,000

$140,000

1 2 3

Gas

Electricity

AHSRAE Baseline System Redesign SystemDesigned System

Page 40: Manoa  Elementary School

Air Source Heat Pumps

Amanda Cronauer │ Mechanical Option

Spring 2010Project Background

Existing Mechanical Summary

Design Objectives

Alternative Descriptions

Ground Source Heat Pumps

Air Source Heat Pumps

System Comparison

Final Recommendations

Analysis Systems to be Replaced Assumptions Results

2,96

6

3,21

1

2,44

0

1,32

0

918

706

0

500

1000

1500

2000

2500

3000

3500

4000

4500

5000

ASHRAE Baseline As Designed Proposed Redesign

MBH Gas

Electricity

Page 41: Manoa  Elementary School

Air Source Heat Pumps

Amanda Cronauer │ Mechanical Option

Spring 2010Project Background

Existing Mechanical Summary

Design Objectives

Alternative Descriptions

Ground Source Heat Pumps

Air Source Heat Pumps

System Comparison

Final Recommendations

Analysis Systems to be Replaced Assumptions Results

% $ % $

As Designed 9.56 11,936

Redesign 17.18 21,445 9.20 9,509

Savings Over Baseline

Savings Over Designed

System Energy Savings Comparison17% Reduction =

3/19 LEED Points [EA Credit 1]

CO2 NOX SOXTotal

Redesign Savings

(lbm/year) (lbm/year) (lbm/year) (lbm/year)

ASHRAE Baseline 2.02E+04 3.05E+01 1.64E+03 8.75E+03

As Designed 1.59E+04 2.47E+01 1.15E+03 4.00E+03

Redesign 1.22E+04 1.89E+01 8.82E+02

Greenhouse Gas Emission Data

Page 42: Manoa  Elementary School

Air Source Heat Pumps

Amanda Cronauer │ Mechanical Option

Spring 2010Project Background

Existing Mechanical Summary

Design Objectives

Alternative Descriptions

Ground Source Heat Pumps

Air Source Heat Pumps

System Comparison

Final Recommendations

Analysis Systems to be Replaced Assumptions Results

Simple Payback Period:

Redesign:• [67] Heat Pumps= $211,403• [5] DOAS Units= $83,042• Ductwork= $74,531• Utility= $103,384

Design: [5] Rooftop AHU’s =$280,000 [5] ACCU’s= $12,000 Utility= $112,893 Ductwork= $319,850

Simple Payback Period: 0.65 years

Page 43: Manoa  Elementary School

System Comparison

Amanda Cronauer │ Mechanical Option

Spring 2010Project Background

Existing Mechanical Summary

Design Objectives

Alternative Descriptions

Ground Source Heat Pumps

Air Source Heat Pumps

System Comparison

Final Recommendations

$87,

273

$85,

923

$91,

792

$106

,856

$83,

442

$37,

556

$26,

970

$2,3

57

$2,9

08

$19,

942

$0

$20,000

$40,000

$60,000

$80,000

$100,000

$120,000

$140,000

Baseline As Designed Vertical Loop

Horizontal Loop

Air Source

Gas

Electricity

Page 44: Manoa  Elementary School

System Comparison

Amanda Cronauer │ Mechanical Option

Spring 2010Project Background

Existing Mechanical Summary

Design Objectives

Alternative Descriptions

Ground Source Heat Pumps

Air Source Heat Pumps

System Comparison

Final Recommendations

$87,

273

$85,

923

$91,

792

$106

,856

$83,

442

$37,

556

$26,

970

$2,3

57

$2,9

08

$19,

942

$0

$20,000

$40,000

$60,000

$80,000

$100,000

$120,000

$140,000

Baseline As Designed Vertical Loop

Horizontal Loop

Air Source

Gas

Electricity

2,96

6

3,21

1

3,31

9 3,94

5

2,44

0

1,32

0

918

61

80

706

0

500

1000

1500

2000

2500

3000

3500

4000

4500

5000

ASHRAE Baseline

As Designed Vertical Horizontal Air Source

MBH

Gas

Electricity

Page 45: Manoa  Elementary School

System Comparison

Amanda Cronauer │ Mechanical Option

Spring 2010Project Background

Existing Mechanical Summary

Design Objectives

Alternative Descriptions

Ground Source Heat Pumps

Air Source Heat Pumps

System Comparison

Final Recommendations

CO2 NOX SOXTotal

Emissions(lbm/year) (lbm/year) (lbm/year) (lbm/year)

ASHRAE Baseline 2.02E+04 3.05E+01 1.64E+03 2.18E+04

As Designed 1.59E+04 2.47E+01 1.15E+03 1.71E+04

Vertical Loop 6.15E+03 1.10E+01 1.03E+02 6.26E+03

Horizontal Loop 7.40E+03 1.31E+01 1.31E+02 7.54E+03

Air Source 1.22E+04 1.89E+01 8.82E+02 1.31E+04

Greenhouse Gas Emission DataSimple Payback Period:

• Vertical Loop GSHP = [1.2] years

• Horizontal Loop GSHP = [0.95] years

• Air Source Heat Pump= [0.65] years

Page 46: Manoa  Elementary School

Final Recommendations

Amanda Cronauer │ Mechanical Option

Spring 2010Project Background

Existing Mechanical Summary

Design Objectives

Alternative Descriptions

Ground Source Heat Pumps

Air Source Heat Pumps

System Comparison

Final Recommendations

Emissions and Fuel Consumption:Vertical Ground Source Heat Pump

Lowest First Cost:Air Source Heat Pump

Fastest Potential Payback:Air Source Heat Pump

LEED Points:Vertical Ground Source Heat Pump

Page 47: Manoa  Elementary School

QuestionsSpecial Thanks To:• Paul Cronauer, H.F. Lenz Contact• Verne McKissick, McKissick Architects Contact• Dr. Bahnfleth, Faculty Advisor• Penn State Architectural Engineering Mechanical Faculty• Family and Friends for all their support• Fellow AE Students• Jonah, moral support

Amanda Cronauer │ Mechanical Option