29
Managing PO operating environment Guidelines 1.5.1

Managing PO operating environment Guidelines 1.5.1

Embed Size (px)

Citation preview

Page 1: Managing PO operating environment Guidelines 1.5.1

Managing PO operating environment

Guidelines

1.5.1

Page 2: Managing PO operating environment Guidelines 1.5.1

DMSL and MDW

1.5.2

Page 3: Managing PO operating environment Guidelines 1.5.1

DMSL

• Due mail and sorting list shows– The due mail lists of receipt and despatch of bags

• Indicating the hours of receipt and despatch

– Letter mail sorting list– Registered and parcel mail sorting list

• Prepared in form M-9• The mails branch is guided by the Due mail list in

preparing the mail bags and receipt thereof• DMSL should be kept up to date – changes required to

be communicated immediately to supplying authority for corrections

1.5.3

Page 4: Managing PO operating environment Guidelines 1.5.1

Discussion

• Study the sample DMSL given• Discuss the role of PO in preparation of mail

list correctly with reference to due mail list• Discuss the sorting pattern in view of the

changes brought in by L1 and L2 concept

1.5.4

Page 5: Managing PO operating environment Guidelines 1.5.1

MDW

• Memo of distribution of work– Prepared for offices with more than one assistant– Shows

• The designation of officials employed in each branch• Hours of attendance• Duties assigned

• Postmaster prepares and the Divisional head approves• Should be kept in prominent place and brought to the notice of concerned• Distribution should be strictly adhered to• In computerised offices, the tasks to be performed on computers should

also be incorporated• Should be kept up to date;

– whenever changes are required, revised memorandum to be submitted for approval

1.5.5

Page 6: Managing PO operating environment Guidelines 1.5.1

Group exercise

• Working in groups draft the MDW for a LSG computerised office– Group 1 – prepare the MDW for the Point of sale counter

including IMTS, epayment(one counter only) – Group 2 – Prepare the MDW for the Sanchay Post

counter(1 counter)– Group 3 – MDW for Delivery branch using Postman module

and eMO– Group 4 – MDW for sub accounts and treasury branch– Group 5 – MDW for the supervisor(Postmaster) indicating

supervisor’s role in all module

1.5.6

Page 7: Managing PO operating environment Guidelines 1.5.1

Stock register

1.5.7

Page 8: Managing PO operating environment Guidelines 1.5.1

General

• Head of the office is personally responsible for correct maintenance of stock

• General stock maintained in form SK 1• Stock book of forms, books and petty articles maintained in

form SK 1(b) (except passbooks – separate register prescribed)• Stock books should be updated with all the events

– Receipt of stock whether supplied by PSD or otherwise or through local purchase

– Retirement• Indents for articles of stock to be made in SK2 and

countersigned by Divisional office

1.5.8

Page 9: Managing PO operating environment Guidelines 1.5.1

Materials required

• Forms and publications• General stationeries and uniforms• Stamps and seals• Postal stationery and Postage stamps

1.5.9

Page 10: Managing PO operating environment Guidelines 1.5.1

Supply

• Supply of forms to POs is standardised based on the status on a six monthly schedule

• Automatic supply is made on the basis of this by PSDs• Supplementary indents can be made when required• For general stores indents can be sent by POs• Uniforms – PSD works out and supplies with reference to

information received from POs• Stamps and seals – PSD Aligarh supplies based on indents• Postal stamps and stationery – CSD supplies to HOs

based on weekly indents; HOs supply to SOs

1.5.10

Page 11: Managing PO operating environment Guidelines 1.5.1

Storage

• Materials procured to be stored safely• First in first out method to be followed for supply• Protection against theft to be ensured through

proper locking and custody as prescribed• Protection against fire to be ensured through fire

prevention systems• Unserviceable items to be destroyed by fire in the

presence of SP/SSP at the time of inspection

1.5.11

Page 12: Managing PO operating environment Guidelines 1.5.1

Stock of computers and peripherals

• History sheet to be maintained in the form prescribed

• Stock of all computers, equipment and peripherals should be maintained and history sheet available for each; History sheet to be updated with all events

• Up to date list of all the equipments to be available

1.5.12

Page 13: Managing PO operating environment Guidelines 1.5.1

Discussion

• Study the history sheet of computers and peripherals given

• Discuss the issues involved in correct maintenance of stock

• Faculty will facilitate the discussion and moderate

1.5.13

Page 14: Managing PO operating environment Guidelines 1.5.1

Establishment review

1.5.14

Page 15: Managing PO operating environment Guidelines 1.5.1

Periodical review of estt

• Periodical review is carried out at prescribed intervals as below to assess worload – All GPOs/HOs/MDGs – Every year– All types of SOs – Every 3 years– Branch offices – Every 3 years

• Statistics is maintained on the working of various branches

• Submitted to DO in prescribed proforma (EST-2)

1.5.15

Page 16: Managing PO operating environment Guidelines 1.5.1

EST 6(a)

• Drawn up in connection with proposals for – Opening, retention, permanency and closure of

experimental Post Offices– Revision of establishment of BOs, EDSOs and Class III

SOs– Upgrading branch offices– Increase cost of mail lines that affect branch offices

only• For assessing the income of a non delivery Post

office1.5.16

Page 17: Managing PO operating environment Guidelines 1.5.1

Exercise on compilation of data

Attempt exercise with given data

1.5.17

Page 18: Managing PO operating environment Guidelines 1.5.1

Discussion on EST-2

• Obtain the proforma of EST-2 from instructor and study the same

• Each group has to present the process and care to be taken in collecting statistics of various branches– Group 1 – Ordinary mail– Group 2 – Registered and speed post– Group 3 – Money orders– Group 4 – Savings branch– Group 5 - Treasury

1.5.18

Page 19: Managing PO operating environment Guidelines 1.5.1

Action in case of loss/theft

1.5.19

Page 20: Managing PO operating environment Guidelines 1.5.1

Case where required

• Burglary/theft/Loss in Post office– Cases of break open overnight or otherwise– Immediate complaint(FIR) to be lodged with

jurisdictional police– Also to be reported to the divisional head at once– Staff not to enter the office or touch any article at

the scene of crime till police investigation commences

– Full co-operation with Police

1.5.20

Page 21: Managing PO operating environment Guidelines 1.5.1

Action to be taken

• Quantify loss of cash and stamps and charge to UCP in day’s account

• Trace if loss of certificates/IPOs are lost and report to investigating IP/ASP for further action

• Secure the records (stock book, invoice through which received and other relevant materials)

• Get all the locks replaced and repair doors, if required

• Loss of date stamps, oblong stamps or round MO stamps to be reported

1.5.21

Page 22: Managing PO operating environment Guidelines 1.5.1

Exercise

• Draft a police complaint to report instance of theft of the PO on the night of 10/02/2014 at Model PO with following inputs– The PO is a LSG quartered SO in account with Training HO– SPM is staying in the quarters but on 10/02/14 he had gone to

his native with permission– Theft noticed at 0700 hours on 11/02 by SPM when he came to

open office– The cash chest is opened and valuables stolen– Inventory preparation after initial investigation by Police shows

loss of cash of Rs. 30000/-; No other items are lost– Imagine other facts

1.5.22

Page 23: Managing PO operating environment Guidelines 1.5.1

Discipline functions

1.5.23

Page 24: Managing PO operating environment Guidelines 1.5.1

Involves

• Identifying the lapses prima facie• Need for prosecution• Need for suspension• Disciplinary action

1.5.24

Page 25: Managing PO operating environment Guidelines 1.5.1

Need for prosecution

• This will be examined by the divisional head

1.5.25

Page 26: Managing PO operating environment Guidelines 1.5.1

Initial investigation

• Based on vigilance of fraud or loss or theft• Assess the loss based on the vigilance or

complaint received• Identify the person/s responsible, if possible• Collect the relevant material exhibits

immediately and preserve in safe custody• Submit immediate report to the head of the

division

1.5.26

Page 27: Managing PO operating environment Guidelines 1.5.1

Disciplinary action

• Disciplinary proceedings on Government servants to award penalties listed in Rule 11 of CCS(CCA) Rules, 1965

• Penalties classified into minor and major penalties• Appropriate disciplinary authority to initiate

proceedings• Proceedings under Rule 16 of CCS(CCA) Rules,

1965 for minor penalties• Proceedings under Rule 14 ibid for major penalties

1.5.27

Page 28: Managing PO operating environment Guidelines 1.5.1

Safeguard under constitution

• Article 311 of constitution of India requires that– No dismissal or removal by an authority lower

than the appointing authority– No dismissal or removal or reduction without

giving reasonable opportunity– …..subject to certain exceptions

1.5.28

Page 29: Managing PO operating environment Guidelines 1.5.1

Thank you

1.5.29