15
Managing a Road Network on the Eyre Peninsula John Tillack District Council of Streaky Bay Roads and Works Conference Port Lincoln 28 August 2014

Managing a Road Network on the Eyre Peninsula

Embed Size (px)

DESCRIPTION

Roads and Works Conference Port Lincoln 28 August 2014. Managing a Road Network on the Eyre Peninsula. John Tillack District Council of Streaky Bay. DC Streaky Bay. DCSBCCS Area6232 km 2 5557 ha Population2200105000 Roads1600 km550 km Budget$8.5 M$95.7 M - PowerPoint PPT Presentation

Citation preview

Page 1: Managing a Road Network on the Eyre Peninsula

Managing a Road Network

on the Eyre Peninsula

John TillackDistrict Council of Streaky Bay

Roads and Works Conference Port Lincoln 28 August 2014

Page 2: Managing a Road Network on the Eyre Peninsula

DC Streaky Bay

DCSBCCS

Area 6232 km2 5557 ha Population 2200

105000 Roads 1600 km 550

km Budget $8.5 M $95.7

M Staff 25 449

Port Lincoln

Page 3: Managing a Road Network on the Eyre Peninsula

Roads

Page 4: Managing a Road Network on the Eyre Peninsula

Expectations versus Reality

Page 5: Managing a Road Network on the Eyre Peninsula

Expectations versus Reality

Reported

Page 6: Managing a Road Network on the Eyre Peninsula

Expectations versus Reality

Reported

Actual

Page 7: Managing a Road Network on the Eyre Peninsula

Expectations versus Reality

Reported

Actual

Expected

Page 8: Managing a Road Network on the Eyre Peninsula

Heirarchy

Cat 1 – Major collector Cat 2 – Minor collector Cat 3 – Local access Cat 4 – Property access Cat (5) - Unmade

Page 9: Managing a Road Network on the Eyre Peninsula

Sins of the Past & Present

Concentration on rural roads to exclusion of other assets

Sets false community expectation Out of date LTFP / IAMP & community

acceptance of updated plans

Page 10: Managing a Road Network on the Eyre Peninsula

Challenges for the Future

Reduction of $210K supplementary road funding

FAG indexation reduction $50K plus 30% plus of budget grant funded 40% plus of budget allocated to roads Legislative compliance costs Skilled labour & contractors Material availability/Landowner consent

Page 11: Managing a Road Network on the Eyre Peninsula

Challenges for the Future

Standardisation of:› Classification› Inspection› Reporting› Specifications

ie Business Partners Program

Page 12: Managing a Road Network on the Eyre Peninsula

Business Partners

Page 13: Managing a Road Network on the Eyre Peninsula

Summary

Consistent specifications, inspections etc

Maintenance and renewal schedules Labour and materials

availability/suitability Community expectations balanced

with financial capacity Planning for the long term MOST IMPORTANT – a thick skin and a

sense of humour.

Page 14: Managing a Road Network on the Eyre Peninsula

Your next holiday destination !

Streaky Bay

Page 15: Managing a Road Network on the Eyre Peninsula

let’s go out with a bang!