19
Management Review ISO 9001:2008 10 th December 2015

Management Review ISO 9001:2008 10 th December 2015

Embed Size (px)

Citation preview

Page 1: Management Review ISO 9001:2008 10 th December 2015

Management ReviewISO 9001:2008 10th December 2015

Page 2: Management Review ISO 9001:2008 10 th December 2015

No. Review Input

1 Quality Objectives for each department

2. Audit results (internal)

3. 2015 Performance & 2016 Planning

4. ISO 1st Surveillance Task Force

Page 3: Management Review ISO 9001:2008 10 th December 2015

Quality Objectives

• Academic ▫ To release the exam results maximum of 2 weeks after the

exam is conducted. - Achieved• Student Affairs

▫ To organize minimum 80% of the planned students activities. - Achieved

• Public relations ▫ To ensure all licenses and permits are valid and renewed on

timely basis. - Achieved• Academic

▫ Lecturer to obtain minimum 80% of student review evaluation. –

▫ Achieved• Academic

▫ Lecturer to obtain minimum 80% of peer review evaluation. - Achieved

Page 4: Management Review ISO 9001:2008 10 th December 2015

• Marketing ▫Undertake all tasks for promotion & advertisement

in the recruitment of students as approved by the Management Committee - Achieved

• Library ▫To ensure that all library collections are monitored

and maintained by having 2 stock take in a year - Achieved

• Account▫To accurately

process all general accounting transactions and activities on timely basis. - Achieved

Quality Objectives

Page 5: Management Review ISO 9001:2008 10 th December 2015

• Project Development▫To ensure all project developed are progressing on

timely basis. - Achieved

• Information Technology (IT) ▫To design and maintain all portals and computer

hardware on timely basis - Achieved

Quality Objectives

Page 6: Management Review ISO 9001:2008 10 th December 2015

Internal Audit (7 Oct 2015)

Auditor Area/ Department/ Process Auditee

Faiz Aizat / Mohd Zharif

Secretary: Nabihah

Quality Management Representative (QMR) Faiz

Document Controller (DCC) Zharif

Academic Dept. Zharif

Student Affairs Dept. Lin

Lecturer Lola/Muiz

Marketing Dept. Jamilah

Public Relation Nabihah

IT Suhaizad

Account Atiqa

Page 7: Management Review ISO 9001:2008 10 th December 2015

Internal Audit Findings

Academic Findings Corrective Action

• NCR:Checked the process of selecting questions from the system. Find out that the question set from the system is more than 24 hours

• Decided to revoke all Monday morning written exam to English Speaking test or Project Paper Presentation

Page 8: Management Review ISO 9001:2008 10 th December 2015

Account Findings Corrective Action

• NCR:All account receivable are not endorsed by director in May 2015

• Endorsement by AD on behalf of SAD absence.

Internal Audit Findings

Page 9: Management Review ISO 9001:2008 10 th December 2015

IT Findings Corrective Action

• NCR:Checked all the data backup of student portal are not complete for November 2015

• Annual Checklist for monthly student portal backup execution

Internal Audit Findings

Page 10: Management Review ISO 9001:2008 10 th December 2015

Lecturer Findings Corrective Action

• OBS:Lecturer as part of attendance updating, lecturer are required to provide a weekly attendance log endorsed and submitted to Academic Executive

• Create a template for attendance endorsed by AE on weekly basis

Internal Audit Findings

Page 11: Management Review ISO 9001:2008 10 th December 2015

Library Findings Corrective Action

• OBS:Create a checklist for all new registered books for better control system and planning

• Create a checklist for new book registration.

Internal Audit Findings

Page 12: Management Review ISO 9001:2008 10 th December 2015

•Summarization:

• NCR = 3 findings • OSB = 2 suggested. • All NCR are closed and action have been

taken.

Internal Audit Findings

Page 13: Management Review ISO 9001:2008 10 th December 2015

2015 Performance & 2016 Planning

Performance for 2015 (Subject to Audit)Existing Products (Total : 9)

1) DAM2) DOFM3) DATM4) DOM5) DAFM6) DAMET * New program 2015

7) BAAM (Bucks) 8) MBAAM (OUM) * New program 2015

9) DASM (Subject to MOHE) * New program 2015

New product DCCHM (Subject to MQA)

Page 14: Management Review ISO 9001:2008 10 th December 2015

2015 Performance & 2016 Planning

Students IntakeDiploma March 20 (-10%)

July 63 (-27%)November 14 (-16 %) Total 97 (-40%)

BAAM April 23 (-39%) Total 23 Grand total 120 (-32.5%)

Foreign student 3 (+66.6%)Convocation 80 students (+ 33%) Total Sales RM 2,800,000 (+10%)Total profits (before tax) RM 300,000 (+0%)New Campus Project Status: 95% (+26%)

Page 15: Management Review ISO 9001:2008 10 th December 2015

2015 Performance & 2016 Planning

2016 PlansProducts (6 new programs) 1) Diploma Business Admin (UPM)

2) Bachelor od Arts English Language (UPM)3) Diploma in Event Management4) Diploma in TESL5) Diploma HRM6) Diploma Multimedia Creative 7) Bachelor Multimedia Creative (UTEM)

TVET1) Cabin Crew & Ticketing Passenger Services 2) Composite Skin Repairer 3) Unmanned Aerial Vehicle Pilot 4) Aircraft Load Master 5) Aircraft Ramp Services 6) Helicopter Landing Officer

Moving to our New Campus:Increase in Man PowerIncrease in StudentsIncrease in Sales (Target RM 3,800,000)

Page 16: Management Review ISO 9001:2008 10 th December 2015

ISO 1st Surveillance Task Force

Auditor Area/ Department/ Process Auditee

Mr. Sivabalan Thavarajah

Quality Management Representative (QMR) Faiz

Document Controller (DCC) Zharif

Academic Dept. Zharif

Student Affairs Dept. Lin

Lecturer Lola/Muiz

Marketing Dept. Jamilah

Public Relation Bieha/Faiz

IT Suhaizad

Account Atiqa

• Audit Date: 7 Jan 2015, Thursday, 9am – 6pm

Page 17: Management Review ISO 9001:2008 10 th December 2015

ISO 1st Surveillance Task Force • Audit Date: 7 Jan 2015, Thursday, 9am – 6pm

All Staffs

Faiz

Zharif

Related Departments

Page 18: Management Review ISO 9001:2008 10 th December 2015

ISO 1st Surveillance Task Force • Audit Date: 7 Jan 2015, Thursday, 9am – 6pm

Lin, Jam, Lola

Related Departments

Faiz & Zharif

All Staffs

Page 19: Management Review ISO 9001:2008 10 th December 2015

•Summarization:

• All official documents – Fully filled, signed and approved

• Course File, forms and communication (letters and emails) stored and filed properly

• Know the detail process flow with evidence to support your points.

ISO 1st Surveillance Task Force