12
217 ACCESORIOS BAÑOS EDICIÓN 169 DICIEMBRE 2013 - FEBRERO 2014 ANÁLISIS UM CANT. BOGOTÁ CALI B/QUILLA MEDELLÍN ANÁLISIS UM CANT. BOGOTÁ CALI B/QUILLA MEDELLÍN DETALLADOS GENERALES 0.25 0.25 ANÁLISIS UM CANT. BOGOTÁ CALI B/QUILLA MEDELLÍN MAMPOSTERÍA ALFAJÍAS CONCRETO 0.15 M m ALAMBRE NEGRO NO.18 (RECOCIDO) kg 0.02 53 53 53 53 ARENA DE PEÑA 0.01 696 696 696 696 CEMENTO GRIS kg 0.71 364 334 348 341 CONCRETO CORRIENTE 2500 PSI 0.02 6,444 6,409 5,614 6,409 DURMIENTE 4 X 4 CM X 2.90 M - ORDINARIO un 0.12 426 426 426 426 HIERRO FIG G-60 1/2” kg 0.73 1,338 1,372 1,355 1,338 MANO DE OBRA AA hc 0.77 13,208 13,208 13,208 13,208 TABLA CHAPA 10 X 2.0 CM X 2.90 M - ORD. un 0.06 274 274 274 274 22,802 22,771 21,973 22,745 ALFAJÍAS CONCRETO 0.25 M m ALAMBRE NEGRO NO.18 (RECOCIDO) kg 0.03 80 80 80 80 ARENA DE PEÑA 0.01 696 696 696 696 CEMENTO GRIS kg 1.19 609 559 583 571 CONCRETO CORRIENTE 2500 PSI 0.02 6,444 6,409 5,614 6,409 DURMIENTE 4 X 4 CM X 2.90 M - ORDINARIO un 0.12 426 426 426 426 HIERRO FIG G-60 1/2” kg 1.00 1,833 1,879 1,856 1,833 MANO DE OBRA AA hc 1.59 27,273 27,273 27,273 27,273 TABLA CHAPA 10 X 2.0 CM X 2.90 M - ORD. un 0.06 274 274 274 274 37,635 37,596 36,802 37,562 ALFAJÍAS EN TABLÓN m AGUA lt 0.60 12 12 12 12 ARENA DE PEÑA 0.01 696 696 696 696 CEMENTO GRIS kg 0.93 476 437 456 446 MANO DE OBRA AA hc 0.77 13,208 13,208 13,208 13,208 TABLÓN TONO NATURAL 0.26 3,978 3,978 3,978 3,978 18,370 18,331 18,349 18,340 ALFAJÍAS LADRILLO MACIZO PRENSADO m AGUA lt 1.42 28 28 28 28 ARENA DE PEÑA 0.01 696 696 696 696 CEMENTO GRIS kg 2.39 1,224 1,123 1,171 1,147 LADRILLO MACIZO PRENSADO 24.5X12X5.5 un 12.87 8,481 10,669 12,046 11,750 MANO DE OBRA AA hc 0.86 14,752 14,752 14,751 14,751 25,181 27,269 28,693 28,373 CHIMENEAS 0.80 un AGUA lt 52.32 1,046 1,046 1,046 1,046 ALAMBRE NEGRO NO.18 (RECOCIDO) kg 0.16 427 427 427 427 ARENA DE PEÑA 0.06 4,176 4,176 4,176 4,176 ARENA LAVADA DE PEÑA 0.06 1,810 1,810 1,810 1,810 ARENA LAVADA DE RÍO 0.07 2,030 2,030 2,030 2,030 CEMENTO GRIS kg 62.58 32,041 29,413 30,664 30,038 GRAVA CANTO RODADO 1/2” 0.01 782 782 782 782 GRAVILLA DE RÍO 0.01 986 986 986 986 GRAVILLA FINA 1/2” 0.01 322 322 322 322 HIERRO FIG G-60 1/2” kg 5.28 9,678 9,921 9,800 9,678 LADRILLO MACIZO COMÚN REC. 20X10X6 un 159.60 63,840 54,264 54,264 63,840 LADRILLO P-V PRENSADO LIV. 7 CM 24X12X7 un 73.50 44,835 55,860 63,210 61,740 MANO DE OBRA AA hc 25.00 428,825 428,825 428,823 428,823 590,797 589,861 598,339 605,697

MAMPOSTERÍA - Construdata.com pdf... · 218 construdata anÁlisis um cant. bogotÁ cali b/quilla medellÍn anÁlisis um cant. bogotÁ cali b/quilla medellÍn detallados generales

  • Upload
    vutram

  • View
    249

  • Download
    2

Embed Size (px)

Citation preview

Page 1: MAMPOSTERÍA - Construdata.com pdf... · 218 construdata anÁlisis um cant. bogotÁ cali b/quilla medellÍn anÁlisis um cant. bogotÁ cali b/quilla medellÍn detallados generales

217

ACCESORIOS BAÑOS

EDICIÓN 169 DICIEMBRE 2013 - FEBRERO 2014

ANÁLISIS UM CANT. BOGOTÁ CALI B/QUILLA MEDELLÍNANÁLISIS UM CANT. BOGOTÁ CALI B/QUILLA MEDELLÍN

DE

TA

LLA

DO

S

GE

NE

RA

LE

S

0.25

0.25

ANÁLISIS UM CANT. BOGOTÁ CALI B/QUILLA MEDELLÍN

MAMPOSTERÍA

CD159_PORTADILLAS.indd 306 23/05/11 17:35

ALFAJÍAS CONCRETO 0.15 M mALAMBRE NEGRO NO.18 (RECOCIDO) kg 0.02 53 53 53 53ARENA DE PEÑA m³ 0.01 696 696 696 696CEMENTO GRIS kg 0.71 364 334 348 341CONCRETO CORRIENTE 2500 PSI m³ 0.02 6,444 6,409 5,614 6,409DURMIENTE 4 X 4 CM X 2.90 M - ORDINARIO un 0.12 426 426 426 426HIERRO FIG G-60 1/2” kg 0.73 1,338 1,372 1,355 1,338MANO DE OBRA AA hc 0.77 13,208 13,208 13,208 13,208TABLA CHAPA 10 X 2.0 CM X 2.90 M - ORD. un 0.06 274 274 274 274 22,802 22,771 21,973 22,745

ALFAJÍAS CONCRETO 0.25 M mALAMBRE NEGRO NO.18 (RECOCIDO) kg 0.03 80 80 80 80ARENA DE PEÑA m³ 0.01 696 696 696 696CEMENTO GRIS kg 1.19 609 559 583 571CONCRETO CORRIENTE 2500 PSI m³ 0.02 6,444 6,409 5,614 6,409DURMIENTE 4 X 4 CM X 2.90 M - ORDINARIO un 0.12 426 426 426 426HIERRO FIG G-60 1/2” kg 1.00 1,833 1,879 1,856 1,833MANO DE OBRA AA hc 1.59 27,273 27,273 27,273 27,273TABLA CHAPA 10 X 2.0 CM X 2.90 M - ORD. un 0.06 274 274 274 274 37,635 37,596 36,802 37,562

ALFAJÍAS EN TABLÓN mAGUA lt 0.60 12 12 12 12ARENA DE PEÑA m³ 0.01 696 696 696 696CEMENTO GRIS kg 0.93 476 437 456 446MANO DE OBRA AA hc 0.77 13,208 13,208 13,208 13,208TABLÓN TONO NATURAL m² 0.26 3,978 3,978 3,978 3,978 18,370 18,331 18,349 18,340

ALFAJÍAS LADRILLO MACIZO PRENSADO mAGUA lt 1.42 28 28 28 28ARENA DE PEÑA m³ 0.01 696 696 696 696CEMENTO GRIS kg 2.39 1,224 1,123 1,171 1,147LADRILLO MACIZO PRENSADO 24.5X12X5.5 un 12.87 8,481 10,669 12,046 11,750MANO DE OBRA AA hc 0.86 14,752 14,752 14,751 14,751 25,181 27,269 28,693 28,373

CHIMENEAS 0.80 unAGUA lt 52.32 1,046 1,046 1,046 1,046ALAMBRE NEGRO NO.18 (RECOCIDO) kg 0.16 427 427 427 427ARENA DE PEÑA m³ 0.06 4,176 4,176 4,176 4,176ARENA LAVADA DE PEÑA m³ 0.06 1,810 1,810 1,810 1,810ARENA LAVADA DE RÍO m³ 0.07 2,030 2,030 2,030 2,030CEMENTO GRIS kg 62.58 32,041 29,413 30,664 30,038GRAVA CANTO RODADO 1/2” m³ 0.01 782 782 782 782GRAVILLA DE RÍO m³ 0.01 986 986 986 986GRAVILLA FINA 1/2” m³ 0.01 322 322 322 322HIERRO FIG G-60 1/2” kg 5.28 9,678 9,921 9,800 9,678LADRILLO MACIZO COMÚN REC. 20X10X6 un 159.60 63,840 54,264 54,264 63,840LADRILLO P-V PRENSADO LIV. 7 CM 24X12X7 un 73.50 44,835 55,860 63,210 61,740MANO DE OBRA AA hc 25.00 428,825 428,825 428,823 428,823 590,797 589,861 598,339 605,697

Page 2: MAMPOSTERÍA - Construdata.com pdf... · 218 construdata anÁlisis um cant. bogotÁ cali b/quilla medellÍn anÁlisis um cant. bogotÁ cali b/quilla medellÍn detallados generales

218 CONSTRUDATA

ANÁLISIS UM CANT. BOGOTÁ CALI B/QUILLA MEDELLÍNANÁLISIS UM CANT. BOGOTÁ CALI B/QUILLA MEDELLÍN

DE

TA

LLA

DO

S

GE

NE

RA

LE

S

MAMPOSTERÍA

DINTELES CONCRETO 15 X 20 CM mALAMBRE NEGRO NO.18 (RECOCIDO) kg 0.11 293 293 293 293CONCRETO CORRIENTE 2500 PSI m³ 0.03 9,666 9,614 8,421 9,614HIERRO FIG G-60 1/2” kg 2.90 5,316 5,449 5,382 5,316MANO DE OBRA AA hc 1.00 17,153 17,153 17,153 17,153TABLA BURRA 10 X 2.7CM X 2.90 M - ORD. un 0.05 305 305 305 305 32,733 32,814 31,554 32,681

DINTELES EN BLOQUE P-H N. 5 STANDAR ESTRIADO 12 CM mAGUA lt 2.66 53 53 53 53ARENA DE PEÑA m³ 0.02 1,392 1,392 1,392 1,392ARENA LAVADA DE RÍO m³ 0.02 580 580 580 580BLOQUE P-H N.5 STANDAR 30X12X20 un 3.60 3,204 3,060 5,364 3,060CEMENTO GRIS kg 3.15 1,613 1,481 1,544 1,512HIERRO FIG G-60 1/2” kg 1.41 2,585 2,649 2,617 2,585MANO DE OBRA AA hc 0.45 7,719 7,719 7,719 7,719 17,145 16,934 19,268 16,901

DINTELES EN VARILLA mAGUA lt 1.77 35 35 35 35ARENA DE PEÑA m³ 0.01 696 696 696 696ARENA LAVADA DE RÍO m³ 0.01 290 290 290 290CEMENTO GRIS kg 2.10 1,075 987 1,029 1,008HIERRO FIG G-60 1/2” kg 2.25 4,124 4,228 4,176 4,124MANO DE OBRA AA hc 0.45 7,719 7,719 7,719 7,719TABLA CHAPA 30 X 2.0 CM X 2.90 M - ORD. un 0.07 772 772 772 772VARA DE CLAVO Ø 8 CM X 3.00 M - EUCALIPTO un 0.14 693 693 693 693 15,404 15,420 15,410 15,337

ENCHAPES LADRILLO MACIZO PRENSADO m²AGUA lt 5.20 104 104 104 104ARENA LAVADA DE PEÑA m³ 0.04 1,206 1,206 1,206 1,206CEMENTO GRIS kg 8.05 4,122 3,784 3,945 3,864CORTADORA DE LADRILLO d 0.05 1,392 1,392 1,392 1,392DISCO DIAMANTE un 0.25 18,850 18,850 18,850 18,850LADRILLO MACIZO PRENSADO 24.5X12X5.5 un 31.00 20,429 25,699 29,016 28,303MANO DE OBRA AA hc 1.10 18,868 18,868 18,868 18,868 64,971 69,903 73,381 72,588

INSTALACIÓN CARPINTERÍA METÁLICA m²MANO DE OBRA AA hc 0.96 16,467 16,467 16,467 16,467MORTERO ARENA LAVADA 1:3 m³ 0.01 3,957 3,756 3,852 3,804 20,424 20,223 20,319 20,271

MESONES EN CONCRETO m²ALAMBRE NEGRO NO.18 (RECOCIDO) kg 0.24 640 640 640 640CERCO 8 X 8 CM X 2.90 M - ORDINARIO un 0.22 3,124 3,124 3,124 3,124CONCRETO CORRIENTE 2500 PSI m³ 0.10 32,220 32,045 28,069 32,045HIERRO FIG G-60 1/2” kg 8.00 14,664 15,032 14,848 14,664MANO DE OBRA AA hc 1.95 33,448 33,448 33,448 33,448PUNTILLA CON CABEZA 2” lb 0.19 485 485 540 485TABLA CHAPA 10 X 2.0 CM X 2.90 M - ORD. un 0.16 730 730 730 730 85,311 85,504 81,399 85,136

Page 3: MAMPOSTERÍA - Construdata.com pdf... · 218 construdata anÁlisis um cant. bogotÁ cali b/quilla medellÍn anÁlisis um cant. bogotÁ cali b/quilla medellÍn detallados generales

219EDICIÓN 169 DICIEMBRE 2013 - FEBRERO 2014

ANÁLISIS UM CANT. BOGOTÁ CALI B/QUILLA MEDELLÍNANÁLISIS UM CANT. BOGOTÁ CALI B/QUILLA MEDELLÍN

DE

TA

LLA

DO

S

GE

NE

RA

LE

S

MAMPOSTERÍA

MURO DRYWALL - DOBLE CARA E/12 CMS m²CANAL B 9 X 2.44 CAL 26 un 0.35 2,660 2,660 2,730 2,730CARGA FULMINANTE FUERTE+CLAVO 5/16” 1” un 1.61 564 564 612 612CINTA DE PAPEL SUPERCINTA 250 rl 0.07 630 735 735 665LAMINA DRYWALL 1/2” SUPERPLACA un 0.71 15,478 12,141 13,064 15,194LIJA DE AGUA 150 SÚPER un 0.42 378 420 420 378MANO DE OBRA MURO DE DRYWALL m² 1.00 14,500 14,500 14,500 14,500MASILLA SUPERMATICO 5 GALONES un 0.09 3,150 3,465 3,330 3,492MASTER 1 IMPERM. INTEGRAL LIQUÍDO kg 0.07 487 487 487 487PARAL B9 X 2.44 CAL 26 un 0.71 5,325 5,325 5,325 5,325TORNILLO 7 X 7/16 un 2.82 71 71 71 71TORNILLO GRABBER 6X 1” un 27.22 572 572 572 327 43,814 40,939 41,845 43,780

MURO DRYWALL DOBLE CARA E/10 CM m²CANAL B 6 X 2.44 CAL 26 un 0.35 2,100 2,100 2,135 2,135CARGA FULMINANTE FUERTE+CLAVO 5/16” 1” un 1.61 564 564 612 612CINTA DE PAPEL SUPERCINTA 250 rl 0.07 630 735 735 665LAMINA DRYWALL 1/2” SUPERPLACA un 0.71 15,478 12,141 13,064 15,194LIJA DE AGUA 150 SÚPER un 0.42 378 420 420 378MANO DE OBRA MURO DE DRYWALL m² 1.00 14,500 14,500 14,500 14,500MASILLA SUPERMATICO 5 GALONES un 0.09 3,150 3,465 3,330 3,492MASTER 1 IMPERM. INTEGRAL LIQUÍDO kg 0.07 487 487 487 487PARAL B6 X 2.44 CAL 26 un 0.71 4,331 4,331 4,473 4,473TORNILLO 7 X 7/16 un 2.82 71 71 71 71TORNILLO GRABBER 6X 1” un 27.22 572 572 572 327 42,260 39,385 40,398 42,333

MURO EN BLOQUE CONCRETO 0.10 m²BLOQUE CONCRETO 9X19X39 un 13.27 26,474 22,824 22,824 15,552MANO DE OBRA AA hc 0.72 12,350 12,350 12,350 12,350MORTERO 1:4 m³ 0.01 2,642 2,482 2,558 2,520 41,466 37,657 37,733 30,423

MURO EN BLOQUE CONCRETO 0.20 m²BLOQUE CONCRETO 20X20X40 un 11.49 31,598 31,598 31,598 25,519MANO DE OBRA AA hc 1.12 19,211 19,211 19,211 19,211MORTERO 1:4 m³ 0.05 13,212 12,410 12,792 12,601 64,021 63,219 63,601 57,331

MURO EN BLOQUE NO.4 P-H STANDAR ESTRIADO 10 CM m²BLOQUE P-H N.4 STANDAR 30X10X20 un 12.36 9,023 9,517 9,641 9,517MANO DE OBRA AA hc 1.19 20,412 20,412 20,412 20,412MORTERO 1:4 m³ 0.02 5,285 4,964 5,117 5,040 34,720 34,893 35,169 34,969

MURO EN BLOQUE NO.5 P-H TRADICIONAL ESTRIADO 12 CM m²BLOQUE P-H N.5 TRADICIONAL 33X11.5X23 un 13.27 14,597 19,255 22,187 21,550MANO DE OBRA AA hc 0.75 12,865 12,865 12,865 12,865MORTERO 1:4 m³ 0.01 2,642 2,482 2,558 2,520 30,104 34,601 37,610 36,935

0.10

0.12

Page 4: MAMPOSTERÍA - Construdata.com pdf... · 218 construdata anÁlisis um cant. bogotÁ cali b/quilla medellÍn anÁlisis um cant. bogotÁ cali b/quilla medellÍn detallados generales

222 CONSTRUDATA

ANÁLISIS UM CANT. BOGOTÁ CALI B/QUILLA MEDELLÍNANÁLISIS UM CANT. BOGOTÁ CALI B/QUILLA MEDELLÍN

DE

TA

LLA

DO

S

GE

NE

RA

LE

S

MAMPOSTERÍA

MURO EN BLOQUE NO.5 P-H TRADICIONAL ESTRIADO 23CM m²BLOQUE P-H N.5 TRADICIONAL 33X11.5X23 un 26.65 29,315 38,669 44,559 43,280MANO DE OBRA AA hc 1.15 19,726 19,726 19,726 19,726MORTERO 1:4 m³ 0.02 5,285 4,964 5,117 5,040 54,326 63,359 69,401 68,046

MURO EN LADRILLO MACIZO PRENSADO 12 CM m²LADRILLO MACIZO PRENSADO 24.5X12X5.5 un 60.00 39,540 49,740 56,160 54,780MANO DE OBRA AA hc 1.06 18,182 18,182 18,182 18,182MORTERO PREMEZCLADO 1:5 m³ 0.03 6,213 6,171 6,387 6,273 63,935 74,093 80,729 79,235

MURO EN LADRILLO PORTANTE PRENSADO P-V 15 CM m²AGUA lt 5.25 105 105 105 105ARENA LAVADA DE RÍO m³ 0.02 580 580 580 580CAL NARE kg 0.50 445 445 320 445CEMENTO GRIS kg 9.53 4,879 4,479 4,670 4,574LAD. PORTANTE PRENSADO P-V 29X14.5X9 un 33.30 36,264 46,787 53,447 51,981MANO DE OBRA AA hc 1.00 17,153 17,153 17,153 17,153SIKA-2 (5.5 KG) kg 0.30 3,550 3,550 3,550 3,550 62,976 73,098 79,824 78,388

MURO TERMOACÚSTICO CON PAÑETE m²ACCESORIO UNIÓN TIPO CANASTILLA RGU un 0.30 1,544 1,544 1,544 1,544ACCESORIO UNIÓN TIPO MALLA PLANA RG2 un 0.30 882 882 882 882ACCESORIO PARA UNIÓN TIPO ORTOGONAL un 0.30 1,286 1,286 1,286 1,286ALAMBRE NEGRO NO. 14 kg 0.05 148 148 148 148ANCLAJE ESTRUCTURAL PLATINA ¼” un 1.70 7,336 7,336 7,336 7,336DURAPANEL TIPO PSMC50 (5CM EPS) m² 1.05 34,110 34,110 34,110 34,110MANO DE OBRA AA hc 0.35 6,004 6,004 6,004 6,004MANO DE OBRA DD hc 0.77 15,849 15,849 15,849 15,849MORTERO PREMEZCLADO 1:5 m³ 0.04 8,698 8,639 8,942 8,782 75,857 75,798 76,101 75,941

REMATES LADRILLO MACIZO PRENSADO mAGUA lt 1.75 35 35 35 35ARENA LAVADA DE PEÑA m³ 0.01 302 302 302 302CEMENTO GRIS kg 2.94 1,505 1,382 1,441 1,411LADRILLO MACIZO PRENSADO 24.5X12X5.5 un 16.00 10,544 13,264 14,976 14,608MANO DE OBRA AA hc 0.88 15,095 15,095 15,095 15,095 27,481 30,077 31,848 31,450

SOBRECIMIENTOS 0.15 mAGUA lt 4.63 93 93 93 93ARENA LAVADA DE PEÑA m³ 0.03 905 905 905 905CEMENTO GRIS kg 11.69 5,985 5,494 5,728 5,611LADRILLO MACIZO COMÚN REC. 20X10X6 un 12.10 4,840 4,114 4,114 4,840MANO DE OBRA AA hc 0.80 13,722 13,722 13,722 13,722SIKA-2 (5.5 KG) kg 0.35 4,141 4,141 4,141 4,141 29,686 28,469 28,703 29,312

SOBRECIMIENTOS 0.25 mAGUA lt 7.04 141 141 141 141ARENA DE PEÑA m³ 0.04 2,784 2,784 2,784 2,784CEMENTO GRIS kg 17.77 9,098 8,352 8,707 8,530LADRILLO MACIZO COMÚN REC. 20X10X6 un 24.21 9,684 8,231 8,231 9,684MANO DE OBRA AA hc 1.12 19,211 19,211 19,211 19,211SIKA-2 (5.5 KG) kg 0.53 6,271 6,271 6,271 6,271 47,189 44,990 45,346 46,621

1.20 m

3.10m

.10 m

0.065m

0.15

0.15

Page 5: MAMPOSTERÍA - Construdata.com pdf... · 218 construdata anÁlisis um cant. bogotÁ cali b/quilla medellÍn anÁlisis um cant. bogotÁ cali b/quilla medellÍn detallados generales

223EDICIÓN 169 DICIEMBRE 2013 - FEBRERO 2014

ANÁLISIS UM CANT. BOGOTÁ CALI B/QUILLA MEDELLÍNANÁLISIS UM CANT. BOGOTÁ CALI B/QUILLA MEDELLÍN

DE

TA

LLA

DO

S

GE

NE

RA

LE

S

MORTEROS Y CONCRETOS

MORTEROS Y CONCRETOS

CONCRETO 1:2:2 m³AGUA lt 230.00 4,600 4,600 4,600 4,600ARENA DE PEÑA m³ 0.74 51,504 51,504 51,504 51,504ARENA LAVADA DE RÍO m³ 0.74 21,460 21,460 21,460 21,460AYUDANTE ALBAÑILERÍA (A) hh 2.00 12,626 12,626 12,626 12,626CEMENTO GRIS kg 441.00 225,792 207,270 216,090 211,680GRAVA CANTO RODADO 1/2” m³ 0.74 57,856 57,856 57,856 57,856GRAVA DE 3/4” m³ 0.74 28,894 28,894 28,894 28,894GRAVILLA DE RÍO m³ 0.74 72,964 72,964 72,964 72,964MEZCLADORA A GASOLINA d 0.06 2,227 2,227 2,227 2,227OFICIAL ALBAÑILERÍA (A) hh 0.50 5,420 5,420 5,420 5,420 483,343 464,821 473,641 469,231

CONCRETO 1:2:3 m³AGUA lt 210.00 4,200 4,200 4,200 4,200ARENA DE PEÑA m³ 0.92 64,032 64,032 64,032 64,032ARENA LAVADA DE RÍO m³ 0.61 17,690 17,690 17,690 17,690AYUDANTE ALBAÑILERÍA (A) hh 2.00 12,626 12,626 12,626 12,626CEMENTO GRIS kg 367.50 188,160 172,725 180,075 176,400GRAVA CANTO RODADO 1/2” m³ 0.92 71,929 71,929 71,929 71,929GRAVA DE 3/4” m³ 0.92 35,922 35,922 35,922 35,922GRAVILLA DE RÍO m³ 0.92 90,712 90,712 90,712 90,712MEZCLADORA A GASOLINA d 0.06 2,227 2,227 2,227 2,227OFICIAL ALBAÑILERÍA (A) hh 0.50 5,420 5,420 5,420 5,420 492,919 477,484 484,834 481,159

CONCRETO 1:2:4 m³AGUA lt 305.00 6,100 6,100 6,100 6,100ARENA DE PEÑA m³ 0.48 33,408 33,408 33,408 33,408ARENA LAVADA DE RÍO m³ 0.53 15,370 15,370 15,370 15,370AYUDANTE ALBAÑILERÍA (A) hh 2.00 12,626 12,626 12,626 12,626CEMENTO GRIS kg 315.00 161,280 148,050 154,350 151,200GRAVA CANTO RODADO 1/2” m³ 1.05 82,093 82,093 82,093 82,093GRAVA DE 3/4” m³ 1.05 40,998 40,998 40,998 40,998GRAVILLA DE RÍO m³ 1.05 103,530 103,530 103,530 103,530MEZCLADORA A GASOLINA d 0.06 2,227 2,227 2,227 2,227OFICIAL ALBAÑILERÍA (A) hh 0.50 5,420 5,420 5,420 5,420 463,053 449,823 456,123 452,973

CONCRETO 1:3:3 m³AGUA lt 200.00 4,000 4,000 4,000 4,000ARENA DE PEÑA m³ 0.79 54,984 54,984 54,984 54,984ARENA LAVADA DE RÍO m³ 0.79 22,910 22,910 22,910 22,910AYUDANTE ALBAÑILERÍA (A) hh 2.00 12,626 12,626 12,626 12,626CEMENTO GRIS kg 315.00 161,280 148,050 154,350 151,200GRAVA CANTO RODADO 1/2” m³ 0.79 61,765 61,765 61,765 61,765GRAVA DE 3/4” m³ 0.79 30,846 30,846 30,846 30,846GRAVILLA DE RÍO m³ 0.79 77,894 77,894 77,894 77,894MEZCLADORA A GASOLINA d 0.06 2,227 2,227 2,227 2,227OFICIAL ALBAÑILERÍA (A) hh 0.50 5,420 5,420 5,420 5,420 433,953 420,723 427,023 423,873

CONCRETO 1:3:4 m³AGUA lt 198.00 3,960 3,960 3,960 3,960ARENA DE PEÑA m³ 0.69 48,024 48,024 48,024 48,024ARENA LAVADA DE RÍO m³ 0.69 20,010 20,010 20,010 20,010AYUDANTE ALBAÑILERÍA (A) hh 2.00 12,626 12,626 12,626 12,626CEMENTO GRIS kg 273.00 139,776 128,310 133,770 131,040GRAVA CANTO RODADO 1/2” m³ 0.92 71,929 71,929 71,929 71,929GRAVA DE 3/4” m³ 0.92 35,922 35,922 35,922 35,922GRAVILLA DE RÍO m³ 0.92 90,712 90,712 90,712 90,712MEZCLADORA A GASOLINA d 0.06 2,227 2,227 2,227 2,227OFICIAL ALBAÑILERÍA (A) hh 0.50 5,420 5,420 5,420 5,420 430,607 419,141 424,601 421,871

CONCRETO 1:3:5 m³AGUA lt 196.00 3,920 3,920 3,920 3,920ARENA DE PEÑA m³ 0.62 43,152 43,152 43,152 43,152ARENA LAVADA DE RÍO m³ 0.62 17,980 17,980 17,980 17,980AYUDANTE ALBAÑILERÍA (A) hh 2.00 12,626 12,626 12,626 12,626CEMENTO GRIS kg 241.50 123,648 113,505 118,335 115,920GRAVA CANTO RODADO 1/2” m³ 1.01 78,966 78,966 78,966 78,966GRAVA DE 3/4” m³ 1.01 39,436 39,436 39,436 39,436GRAVILLA DE RÍO m³ 1.01 99,586 99,586 99,586 99,586MEZCLADORA A GASOLINA d 0.06 2,227 2,227 2,227 2,227OFICIAL ALBAÑILERÍA (A) hh 0.50 5,420 5,420 5,420 5,420 426,961 416,818 421,648 419,233

MORTERO 1:10 m³AGUA lt 230.00 4,600 4,600 4,600 4,600ARENA LAVADA DE PEÑA m³ 1.38 41,621 41,621 41,621 41,621AYUDANTE ALBAÑILERÍA (A) hh 4.00 25,252 25,252 25,252 25,252CEMENTO GRIS kg 174.00 89,088 81,780 85,260 83,520 160,561 153,253 156,733 154,993

MORTERO 1:4 m³AGUA lt 240.00 4,800 4,800 4,800 4,800ARENA LAVADA DE PEÑA m³ 1.28 38,605 38,605 38,605 38,605AYUDANTE ALBAÑILERÍA (A) hh 4.00 25,252 25,252 25,252 25,252CEMENTO GRIS kg 382.00 195,584 179,540 187,180 183,360 264,241 248,197 255,837 252,017

MORTERO 1:5 m³AGUA lt 240.00 4,800 4,800 4,800 4,800ARENA LAVADA DE PEÑA m³ 1.32 39,811 39,811 39,811 39,811AYUDANTE ALBAÑILERÍA (A) hh 4.00 25,252 25,252 25,252 25,252CEMENTO GRIS kg 317.00 162,304 148,990 155,330 152,160 232,167 218,853 225,193 222,023

MORTERO 1:6 m³AGUA lt 235.00 4,700 4,700 4,700 4,700ARENA LAVADA DE PEÑA m³ 1.32 39,811 39,811 39,811 39,811AYUDANTE ALBAÑILERÍA (A) hh 4.00 25,252 25,252 25,252 25,252CEMENTO GRIS kg 274.00 140,288 128,780 134,260 131,520 210,051 198,543 204,023 201,283

MORTERO ARENA LAVADA 1:2 m³AGUA lt 250.00 5,000 5,000 5,000 5,000ARENA LAVADA DE PEÑA m³ 1.07 32,271 32,271 32,271 32,271AYUDANTE ALBAÑILERÍA (A) hh 4.00 25,252 25,252 25,252 25,252CEMENTO GRIS kg 640.00 327,680 300,800 313,600 307,200 390,203 363,323 376,123 369,723

MORTERO ARENA LAVADA 1:3 m³AGUA lt 250.00 5,000 5,000 5,000 5,000ARENA DE RÍO m³ 1.00 85,000 85,000 85,000 85,000ARENA LAVADA DE PEÑA m³ 1.20 36,192 36,192 36,192 36,192AYUDANTE ALBAÑILERÍA (A) hh 4.00 25,252 25,252 25,252 25,252CEMENTO GRIS kg 477.00 244,224 224,190 233,730 228,960 395,668 375,634 385,174 380,404

PAÑETES

ASEO GENERAL m²ASEO GENERAL - 3 HS SAL. MÍNIMO m² 1.00 3,684 3,684 3,684 3,684 3,684 3,684 3,684 3,684

ENTRAMADO MADERA CIELO RASO m²MANO DE OBRA AA hc 0.55 9,434 9,434 9,434 9,434PUNTILLA CON CABEZA 2” lb 0.08 204 204 227 204REPISA 8 X 4 CM X 2.90 M - ORDINARIO un 0.74 5,254 5,254 5,254 5,254 14,892 14,892 14,915 14,892

ESTUCO ACRILICO m²MANO DE OBRA AA hc 0.20 3,431 3,431 3,431 3,431PLASTER EXTERIOR gl 1.00 63,000 63,000 63,000 63,000 66,431 66,431 66,431 66,431

FILOS Y DILATACIONES mAGUA lt 1.50 30 30 30 30ARENA DE PEÑA m³ 0.01 696 696 696 696CEMENTO GRIS kg 1.50 768 705 735 720MANO DE OBRA CC hc 0.16 3,156 3,156 3,156 3,156 4,650 4,587 4,617 4,602

GOTERAS mAGUA lt 1.45 29 29 29 29ARENA DE PEÑA m³ 0.01 696 696 696 696CEMENTO GRIS kg 3.00 1,536 1,410 1,470 1,440MANO DE OBRA AA hc 0.23 3,945 3,945 3,945 3,945 6,206 6,080 6,140 6,110

GUADUA BAJO ENTRAMADO m²ALAMBRE NEGRO NO.18 (RECOCIDO) kg 0.05 133 133 133 133ESTERILLA GUADUA ANCHO 30 CM X 4.00 M un 1.00 6,950 6,950 6,950 6,950MANO DE OBRA AA hc 0.50 8,577 8,577 8,576 8,576PUNTILLA CON CABEZA 2” lb 0.20 510 510 568 510 16,170 16,170 16,228 16,170

Page 6: MAMPOSTERÍA - Construdata.com pdf... · 218 construdata anÁlisis um cant. bogotÁ cali b/quilla medellÍn anÁlisis um cant. bogotÁ cali b/quilla medellÍn detallados generales

224 CONSTRUDATA

ANÁLISIS UM CANT. BOGOTÁ CALI B/QUILLA MEDELLÍNANÁLISIS UM CANT. BOGOTÁ CALI B/QUILLA MEDELLÍN

DE

TA

LLA

DO

S

GE

NE

RA

LE

S

PAÑETES

IMPERMEABILIZACIÓN INTEGRAL MORTERO SIKA m²MANO DE OBRA AA hc 0.10 1,715 1,715 1,715 1,715SIKA-2 (5.5 KG) kg 0.21 2,485 2,485 2,485 2,485 4,200 4,200 4,200 4,200

IMPERMEABILIZACIÓN INTEGRAL MORTERO TOXEMENT m²MANO DE OBRA AA hc 0.10 1,715 1,715 1,715 1,715TOXEMENT 1-A IMPERMEABILIZANTE INTEGRAL kg 0.21 1,483 1,483 1,483 1,483 3,199 3,199 3,199 3,199

MALLA BAJO ENTRAMADO m²MALLA CON VENA 0.60X2.00 un 0.73 2,947 2,946 2,947 2,947MANO DE OBRA AA hc 0.40 6,861 6,861 6,861 6,861PUNTILLA CON CABEZA 2” lb 0.04 102 102 114 102 9,910 9,910 9,922 9,910

PAÑETE ACRILICO PREPARADO m²MANO DE OBRA AA hc 0.45 7,719 7,719 7,719 7,719RECOL REPELLO 16 KG un 1.00 24,594 31,445 33,017 32,231 32,313 39,164 40,736 39,950

PAÑETE BAJO GUADUA 1:5 m²AGUA lt 5.90 118 118 118 118ARENA DE PEÑA m³ 0.03 2,088 2,088 2,088 2,088CEMENTO GRIS kg 6.85 3,507 3,288 3,357 3,288MANO DE OBRA AA hc 0.90 15,438 15,438 15,438 15,438 21,151 20,863 21,000 20,932

PAÑETE BAJO MALLA 1:4 m²AGUA lt 5.00 100 100 100 100ARENA DE PEÑA m³ 0.03 2,088 2,088 2,088 2,088CEMENTO GRIS kg 10.20 5,222 4,794 4,998 4,896MANO DE OBRA AA hc 0.60 10,292 10,292 10,292 10,292 17,702 17,274 17,478 17,376

PAÑETE BAJO MALLA 1:5 m²AGUA lt 4.17 83 83 83 83ARENA DE PEÑA m³ 0.03 2,088 2,088 2,088 2,088CEMENTO GRIS kg 8.45 4,326 3,972 4,141 4,056MANO DE OBRA AA hc 0.60 10,292 10,292 10,292 10,292 16,790 16,435 16,604 16,519

PAÑETE BAJO MALLA 1:6 m²AGUA lt 3.60 72 72 72 72ARENA DE PEÑA m³ 0.03 2,088 2,088 2,088 2,088CEMENTO GRIS kg 7.30 3,738 3,431 3,577 3,504MANO DE OBRA AA hc 0.60 10,292 10,292 10,292 10,292 16,189 15,883 16,029 15,956

PAÑETE CULATAS 1:4 m²AGUA lt 6.98 140 140 140 140ARENA DE PEÑA m³ 0.05 3,480 3,480 3,480 3,480CEMENTO GRIS kg 14.13 7,235 6,641 6,924 6,782MANO DE OBRA AA hc 0.52 8,920 8,920 8,920 8,920 19,774 19,181 19,464 19,322

PAÑETE CULATAS 1:6 m²AGUA lt 6.00 120 120 120 120ARENA DE PEÑA m³ 0.03 2,088 2,088 2,088 2,088CEMENTO GRIS kg 10.20 5,222 4,794 4,998 4,896MANO DE OBRA AA hc 0.52 8,920 8,920 8,920 8,920SIKA-2 (5.5 KG) kg 0.80 9,466 9,466 9,466 9,466 25,816 25,388 25,592 25,490

PAÑETE IMPERMEABILIZADO MUROS 1:3 m²AGUA lt 7.50 150 150 150 150ARENA DE PEÑA m³ 0.03 2,088 2,088 2,088 2,088CEMENTO GRIS kg 14.30 7,322 6,721 7,007 6,864MANO DE OBRA AA hc 0.48 8,233 8,233 8,233 8,233TOXEMENT 1-A IMPERMEABILIZANTE INTEGRAL kg 0.70 4,945 4,945 4,945 4,945 22,738 22,137 22,423 22,280

PAÑETE LISO MUROS 1:4 m²AGUA lt 4.80 96 96 96 96ARENA DE PEÑA m³ 0.03 2,088 2,088 2,088 2,088CEMENTO GRIS kg 7.60 3,891 3,572 3,724 3,648MANO DE OBRA AA hc 0.46 7,890 7,890 7,890 7,890 13,966 13,646 13,798 13,722

PAÑETE LISO MUROS 1:5 m²AGUA lt 4.80 96 96 96 96ARENA DE PEÑA m³ 0.03 2,088 2,088 2,088 2,088CEMENTO GRIS kg 6.34 3,246 2,980 3,107 3,043MANO DE OBRA AA hc 0.46 7,890 7,890 7,890 7,890 13,320 13,054 13,181 13,117

PAÑETE LISO MUROS 1:6 m²AGUA lt 2.09 42 42 42 42ARENA DE PEÑA m³ 0.03 2,088 2,088 2,088 2,088CEMENTO GRIS kg 5.48 2,806 2,576 2,685 2,630MANO DE OBRA AA hc 0.46 7,890 7,890 7,890 7,890 12,826 12,596 12,705 12,650

PAÑETE LISO PLACAS 1:4 m²AGUA lt 5.00 100 100 100 100ARENA DE PEÑA m³ 0.02 1,392 1,392 1,392 1,392CEMENTO GRIS kg 7.60 3,891 3,572 3,724 3,648MANO DE OBRA AA hc 0.48 8,233 8,233 8,233 8,233 13,617 13,297 13,449 13,373

PAÑETE LISO PLACAS 1:5 m²AGUA lt 4.80 96 96 96 96ARENA LAVADA DE PEÑA m³ 0.03 905 905 905 905CEMENTO GRIS kg 6.30 3,226 2,961 3,087 3,024MANO DE OBRA AA hc 0.48 8,233 8,233 8,233 8,233 12,460 12,195 12,321 12,258

PAÑETE LISO PLACAS 1:6 m²AGUA lt 4.70 94 94 94 94ARENA LAVADA DE PEÑA m³ 0.03 905 905 905 905CEMENTO GRIS kg 5.48 2,806 2,576 2,685 2,630MANO DE OBRA AA hc 0.48 8,233 8,233 8,233 8,233 12,038 11,808 11,917 11,862

PAÑETE RUSTICO MUROS 1:5 m²AGUA lt 3.22 64 64 64 64ARENA LAVADA DE PEÑA m³ 0.03 905 905 905 905CEMENTO GRIS kg 6.52 3,338 3,064 3,195 3,130MANO DE OBRA AA hc 0.56 9,606 9,606 9,606 9,606 13,913 13,639 13,770 13,705

PAÑETE RUSTICO PLACAS 1:5 m²AGUA lt 7.20 144 144 144 144ARENA LAVADA DE PEÑA m³ 0.04 1,206 1,206 1,206 1,206CEMENTO GRIS kg 9.50 4,864 4,465 4,655 4,560MANO DE OBRA AA hc 0.61 10,463 10,463 10,463 10,463 16,678 16,278 16,468 16,373

PAÑETE Y PINTURA DOS CARAS m²ESTUCO Y VINILO 3 MANOS m² 2.00 21,347 21,318 22,641 21,323PAÑETE LISO MUROS 1:4 m² 2.00 27,931 27,293 27,597 27,445 49,278 48,611 50,238 48,767

PAÑETE Y PINTURA UNA CARA m²ESTUCO Y VINILO 3 MANOS m² 1.00 10,673 10,659 11,320 10,661PAÑETE LISO MUROS 1:4 m² 1.00 13,966 13,646 13,798 13,722 24,639 24,305 25,119 24,384

PINTURA

ANTI HUMEDAD FACHADA m²MANO DE OBRA AA hc 0.30 5,146 5,146 5,146 5,146SIKA TRANSPARENTE 10 (5 GL) gl 0.15 6,612 6,612 6,612 6,612SUB-CONTRATO PINTURA % 45.00 5,291 5,291 5,291 5,291 17,049 17,049 17,049 17,049

ANTICORROSIVO SOBRE LÁMINA LINEAL mANTICORROSIVO ROJO CLARO gl 0.01 368 368 368 368DISOLVENTE THINNER gl 0.01 100 100 100 100MANO DE OBRA CC hc 0.19 3,748 3,748 3,748 3,748PABMERIL PLIEGO 9” X 11” un 0.63 882 914 945 882SUB-CONTRATO PINTURA % 45.00 2,294 2,308 2,322 2,294 7,392 7,437 7,483 7,392

ANTICORROSIVO SOBRE LÁMINA LLENA m²ANTICORROSIVO ROJO CLARO gl 0.03 1,104 1,104 1,104 1,104DISOLVENTE THINNER gl 0.01 100 100 100 100MANO DE OBRA CC hc 0.33 6,509 6,509 6,509 6,509PABMERIL PLIEGO 9” X 11” un 1.05 1,470 1,523 1,575 1,470SUB-CONTRATO PINTURA % 45.00 4,133 4,156 4,180 4,133 13,316 13,392 13,468 13,316

BARNIZ SOBRE MUEBLES m²BARNEX NOGAL gl 0.11 7,590 7,590 7,590 7,590BARNIZ BRILLANTE EXTERIOR gl 0.28 15,932 15,932 15,932 15,932MANO DE OBRA CC hc 1.23 24,262 24,262 24,262 24,262PABMERIL PLIEGO 9” X 11” un 3.15 4,410 4,568 4,725 4,410SUB-CONTRATO PINTURA % 45.00 23,487 23,558 23,629 23,487 75,681 75,910 76,138 75,681

Page 7: MAMPOSTERÍA - Construdata.com pdf... · 218 construdata anÁlisis um cant. bogotÁ cali b/quilla medellÍn anÁlisis um cant. bogotÁ cali b/quilla medellÍn detallados generales

225EDICIÓN 169 DICIEMBRE 2013 - FEBRERO 2014

ANÁLISIS UM CANT. BOGOTÁ CALI B/QUILLA MEDELLÍNANÁLISIS UM CANT. BOGOTÁ CALI B/QUILLA MEDELLÍN

DE

TA

LLA

DO

S

GE

NE

RA

LE

S

PINTURA

CARBURO SOBRE PAÑETE m²AGUA lt 0.20 4 4 4 4CAL kg 1.50 1,335 1,515 960 1,365MANO DE OBRA CC hc 0.18 3,551 3,551 3,551 3,551SUB-CONTRATO PINTURA % 45.00 2,200 2,281 2,032 2,214 7,090 7,351 6,546 7,133

COLORPLAST FACHADA m²RUSTIPLAST m² 1.03 71,997 73,130 71,997 71,997 71,997 73,130 71,997 71,997

DEMARCACIÓN CON MARMOLINA mMANO DE OBRA AA hc 0.10 1,715 1,715 1,715 1,715MARMOLINA bt 0.05 425 440 435 430SUB CONTRATO PINTURA % 45.00 963 970 968 965 3,103 3,125 3,118 3,111

ESGRAFIADO FACHADA m²DECORA PLAST m² 1.00 11,700 12,000 11,700 11,700 11,700 12,000 11,700 11,700

ESMALTE SOBRE LÁMINA LINEAL mDISOLVENTE THINNER gl 0.01 100 100 100 100ESMALTE SUPERLUX gl 0.01 590 590 590 590MANO DE OBRA CC hc 0.20 3,945 3,945 3,945 3,945PABMERIL PLIEGO 9” X 11” un 0.16 224 232 240 224SUB-CONTRATO PINTURA % 45.00 2,187 2,190 2,194 2,187 7,046 7,057 7,069 7,046

ESMALTE SOBRE LÁMINA LLENA m²DISOLVENTE THINNER gl 0.03 300 300 300 300ESMALTE SUPERLUX gl 0.04 2,360 2,360 2,360 2,360MANO DE OBRA CC hc 0.33 6,509 6,509 6,509 6,509PABMERIL PLIEGO 9” X 11” un 1.05 1,470 1,523 1,575 1,470SUB-CONTRATO PINTURA % 45.00 4,788 4,811 4,835 4,788 15,427 15,503 15,579 15,427

ESMALTE SOBRE MADERA LINEAL mBARNEX NOGAL gl 0.01 690 690 690 690DISOLVENTE THINNER gl 0.01 100 100 100 100ESMALTE BLANCO MATE gl 0.01 549 549 544 529MANO DE OBRA CC hc 0.07 1,381 1,381 1,381 1,381PABMERIL PLIEGO 9” X 11” un 0.16 224 232 240 224SUB-CONTRATO PINTURA % 45.00 1,325 1,328 1,330 1,316 4,268 4,280 4,284 4,239

ESMALTE SOBRE MADERA LLENA m²BARNEX NOGAL gl 0.02 1,380 1,380 1,380 1,380DISOLVENTE THINNER gl 0.02 200 200 200 200ESMALTE BLANCO MATE gl 0.04 2,196 2,196 2,176 2,116MANO DE OBRA CC hc 0.33 6,509 6,509 6,509 6,509PABMERIL PLIEGO 9” X 11” un 1.05 1,470 1,523 1,575 1,470SUB-CONTRATO PINTURA % 45.00 5,290 5,314 5,328 5,254 17,045 17,121 17,169 16,929

ESMALTE SOBRE MARCOS LÁMINA mDISOLVENTE THINNER gl 0.02 200 200 200 200ESMALTE SUPERLUX gl 0.02 1,180 1,180 1,180 1,180MANO DE OBRA CC hc 0.17 3,353 3,353 3,353 3,353PABMERIL PLIEGO 9” X 11” un 0.60 840 870 900 840SUB-CONTRATO PINTURA % 45.00 2,508 2,521 2,535 2,508 8,081 8,125 8,168 8,081

ESMALTE SOBRE MARCOS MADERA m²BARNEX NOGAL gl 0.01 690 690 690 690DISOLVENTE THINNER gl 0.01 100 100 100 100ESMALTE BLANCO MATE gl 0.02 1,098 1,098 1,088 1,058MANO DE OBRA CC hc 0.17 3,353 3,353 3,353 3,353PABMERIL PLIEGO 9” X 11” un 0.60 840 870 900 840SUB-CONTRATO PINTURA % 45.00 2,737 2,750 2,759 2,719 8,818 8,861 8,891 8,760

ESMALTE SOBRE MUEBLES m²BARNEX NOGAL gl 0.11 7,590 7,590 7,590 7,590DISOLVENTE THINNER gl 0.12 1,200 1,200 1,200 1,200ESMALTE BLANCO MATE gl 0.14 7,686 7,686 7,617 7,406MANO DE OBRA CC hc 1.23 24,262 24,262 24,262 24,262PABMERIL PLIEGO 9” X 11” un 7.00 9,800 10,150 10,500 9,800SUB-CONTRATO PINTURA % 45.00 22,742 22,900 23,026 22,616 73,280 73,788 74,195 72,874

ESTUCO m²CAOLÍN bt 0.09 801 801 1,251 801CEMENTO GRIS kg 0.26 133 122 127 125MANO DE OBRA CC hc 0.16 3,156 3,156 3,156 3,156PABMERIL PLIEGO 9” X 11” un 0.02 28 29 30 28SUB-CONTRATO PINTURA % 45.00 1,923 1,918 2,124 1,919YESO CORRIENTE VENCEDOR X 25KG bt 0.01 155 155 155 155 6,196 6,182 6,843 6,184

ESTUCO Y VINILO 3 MANOS m²CAOLÍN bt 0.09 801 801 1,251 801CEMENTO GRIS kg 0.26 133 122 127 125MANO DE OBRA CC hc 0.25 4,931 4,931 4,931 4,931PABMERIL PLIEGO 9” X 11” un 0.02 28 29 30 28SUB-CONTRATO PINTURA % 45.00 3,312 3,308 3,513 3,309VINILUX gl 0.05 1,313 1,313 1,313 1,313YESO CORRIENTE VENCEDOR X 25KG bt 0.01 155 155 155 155 10,673 10,659 11,320 10,661

LACA PISOS MADERA m²BARNIZ VITRIFLEX A BASE DE AGUA gl 0.02 3,878 3,878 3,878 3,878DISOLVENTE THINNER gl 0.01 100 100 100 100MANO DE OBRA CC hc 1.23 24,262 24,262 24,262 24,262SUB-CONTRATO PINTURA % 45.00 12,708 12,708 12,708 12,708 40,948 40,948 40,948 40,948

LÍNEAS TRÁFICO 0.10 mBROCHA DE CERDA 4” un 0.05 475 495 495 495MANO DE OBRA CC hc 0.10 1,973 1,973 1,973 1,973PINTURA BLANCA PARA TRAFICO gl 0.01 668 668 668 668SUB-CONTRATO PINTURA % 45.00 1,402 1,411 1,411 1,411 4,517 4,546 4,546 4,546

MARMOLINA SOBRE PAÑETE m²AGUA lt 0.16 3 3 3 3CARBURO NO.2 kg 0.17 901 1,020 833 986CEMENTO BLANCO kg 1.05 1,160 1,208 1,089 1,127MANO DE OBRA CC hc 0.16 3,156 3,156 3,156 3,156MARMOLINA bt 0.36 3,060 3,168 3,132 3,096SUB-CONTRATO PINTURA % 45.00 3,726 3,850 3,696 3,766 12,007 12,404 11,909 12,133

MARMOPLAST FACHADA m²GRANICRIL gl 1.03 74,160 74,160 74,160 74,160 74,160 74,160 74,160 74,160

SILCOPLAST FACHADA m²CARAPLAST m² 1.03 8,240 0 9,270 0SILCOPLAST m² 1.03 0 28,737 0 29,324 8,240 28,737 9,270 29,324

TINTILLA SOBRE MADERA LINEAL mBARNEX NOGAL gl 0.01 690 690 690 690MANO DE OBRA CC hc 0.07 1,381 1,381 1,381 1,381PABMERIL PLIEGO 9” X 11” un 0.16 224 232 240 224SUB-CONTRATO PINTURA % 45.00 1,159 1,162 1,152 1,159TINTILLA PARA MADERA CAFÉ gl 0.01 280 280 250 280 3,733 3,745 3,713 3,733

TINTILLA SOBRE MADERA LLENA m²BARNEX NOGAL gl 0.02 1,380 1,380 1,380 1,380MANO DE OBRA CC hc 0.41 8,087 8,087 8,087 8,087PABMERIL PLIEGO 9” X 11” un 0.50 700 725 750 700SUB-CONTRATO PINTURA % 45.00 4,827 4,839 4,823 4,827TINTILLA PARA MADERA CAFÉ gl 0.02 560 560 500 560 15,555 15,591 15,540 15,555

TINTILLA SOBRE MUEBLES m²BARNEX NOGAL gl 0.11 7,590 7,590 7,590 7,590MANO DE OBRA CC hc 1.23 24,262 24,262 24,262 24,262PABMERIL PLIEGO 9” X 11” un 3.15 4,410 4,568 4,725 4,410SUB-CONTRATO PINTURA % 45.00 18,586 18,657 18,485 18,586TINTILLA PARA MADERA CAFÉ gl 0.18 5,040 5,040 4,500 5,040 59,888 60,116 59,562 59,888

VINILO SOBRE PAÑETE 2 MANOS m²MANO DE OBRA CC hc 0.13 2,564 2,564 2,564 2,564SUB-CONTRATO PINTURA % 45.00 1,626 1,626 1,626 1,626VINILUX gl 0.04 1,050 1,050 1,050 1,050 5,241 5,241 5,241 5,241

Page 8: MAMPOSTERÍA - Construdata.com pdf... · 218 construdata anÁlisis um cant. bogotÁ cali b/quilla medellÍn anÁlisis um cant. bogotÁ cali b/quilla medellÍn detallados generales

226 CONSTRUDATA

ANÁLISIS UM CANT. BOGOTÁ CALI B/QUILLA MEDELLÍNANÁLISIS UM CANT. BOGOTÁ CALI B/QUILLA MEDELLÍN

DE

TA

LLA

DO

S

GE

NE

RA

LE

S

PINTURA

WASH-PRIMER SOBRE ALUMINIO m²MANO DE OBRA CC hc 0.50 9,863 9,863 9,863 9,863PABMERIL PLIEGO 9” X 11” un 1.05 1,470 1,523 1,575 1,470SUB-CONTRATO PINTURA % 45.00 37,824 37,847 37,871 40,492WASH PRIMER A PINTURA gl 0.48 28,560 28,560 28,560 28,560WASH PRIMER B CATALIZADOR gl 0.48 44,160 44,160 44,160 50,089 121,876 121,952 122,029 130,474

PISOS - ACABADOS

ADOQUÍN CONCRETO 6 CM m²ADOQUÍN CONCRETO TRÁF. PEATONAL A-25 m² 50.00 1,745,000 1,745,000 1,745,000 1,745,000AGUA lt 2.85 57 57 57 57ARENA LAVADA DE PEÑA m³ 0.02 603 603 603 603MANO DE OBRA AA hc 1.00 17,153 17,153 17,153 17,153 1,762,813 1,762,813 1,762,813 1,762,813

ADOQUÍN CONCRETO 8 CM m²ADOQUÍN CONCRETO TRÁF. VEHICULAR A-25 un 50.00 1,880,000 1,880,000 1,880,000 1,880,000AGUA lt 2.85 57 57 57 57ARENA LAVADA DE PEÑA m³ 0.02 603 603 603 603MANO DE OBRA AA hc 1.00 17,153 17,153 17,153 17,153 1,897,813 1,897,813 1,897,813 1,897,813

ADOQUÍN GRES PEATONAL m²AGUA lt 2.85 57 57 57 57ARENA LAVADA DE PEÑA m³ 0.02 603 603 603 603COLOR MINERAL kg 1.03 11,948 3,605 9,991 2,884LADRILLO10X20X3.5 TONO NATURAL m² 1.03 33,574 33,574 33,574 33,574MANO DE OBRA AA hc 1.05 18,011 18,011 18,011 18,011 64,193 55,850 62,236 55,129

ADOQUÍN GRES VEHICULAR m²AGUA lt 4.53 91 91 91 91ARENA LAVADA DE PEÑA m³ 0.03 905 905 905 905COLOR MINERAL kg 1.03 11,948 3,605 9,991 2,884LADRILLO10X20X3.5 TONO NATURAL m² 1.03 33,574 33,574 33,574 33,574MANO DE OBRA AA hc 1.05 18,011 18,011 18,011 18,011 64,528 56,185 62,571 55,464

BALDOSIN MATIZ GRANITO 30 X 30 m²AGUA lt 2.85 57 57 57 57ARENA LAVADA DE PEÑA m³ 0.02 603 603 603 603BALDOSA MATIZ GRANITO 30 X 30 CM m² 1.03 55,732 55,732 55,732 55,732CEMENTO BLANCO kg 1.03 1,138 1,185 1,068 1,105CEMENTO GRIS kg 6.27 3,210 2,947 3,072 3,010MANO DE OBRA AA hc 0.95 16,295 16,295 16,295 16,295 77,036 76,819 76,828 76,803

CRISTANAC ESPECIAL m²AGUA lt 0.50 10 10 10 10BASE DECORADA SELENE AZUL 19X29 CM m² 1.03 15,347 15,347 15,347 15,347CEMENTO BLANCO kg 3.91 4,321 4,497 4,055 4,195COLOR MINERAL kg 0.01 116 35 97 28MANO DE OBRA AA hc 1.00 17,153 17,153 17,153 17,153 36,947 37,042 36,662 36,733

DECORAL DECOTURF II m²RECUBRIMIENTO SINTÉTICO TIPO A m² 1.00 25,404 25,404 25,404 25,404 25,404 25,404 25,404 25,404

ENCHAPE EGEO BLANCO 33.8 X 33.8 CM m²AGUA lt 2.85 57 57 57 57ARENA LAVADA DE PEÑA m³ 0.02 603 603 603 603CEMENTO BLANCO kg 0.51 564 587 529 547CEMENTO GRIS kg 6.27 3,210 2,947 3,072 3,010MANO DE OBRA AA hc 0.85 14,580 14,580 14,580 14,580PISO-PARED EGEO BLANCO 25 X 35 CM m² 1.03 17,819 17,819 17,819 17,819 36,833 36,593 36,660 36,616

GRADAS EN GRAVILLA mAGUA lt 1.59 32 32 32 32ARENA DE PEÑA m³ 0.01 696 696 696 696CEMENTO GRIS kg 3.50 1,792 1,645 1,715 1,680GRAVA DE 3/4” m³ 0.01 390 390 390 390GRAVILLA DE RÍO m³ 0.01 986 986 986 986MANO DE OBRA AA hc 2.50 42,883 42,883 42,882 42,882 46,779 46,632 46,702 46,667

GRANITO m²AGUA lt 7.41 148 148 148 148ARENA DE PEÑA m³ 0.09 6,264 6,264 6,264 6,264

CEMENTO BLANCO kg 21.00 23,205 24,150 21,777 22,533CEMENTO GRIS kg 18.70 9,574 8,789 9,163 8,976COLOR MINERAL kg 0.33 3,828 1,155 3,201 924DILATACIÓN EN BRONCE PC09 m 1.36 10,325 10,325 10,325 10,325GRANITO N.2 bt 0.75 21,675 21,675 21,675 21,675MANO DE OBRA AA hc 1.50 25,730 25,730 25,729 25,729MARMOLINA bt 0.50 4,250 4,400 4,350 4,300 104,999 102,636 102,633 100,875

GRAVILLA LAVADA m²AGUA lt 3.18 64 64 64 64ARENA LAVADA DE PEÑA m³ 0.03 905 905 905 905CEMENTO GRIS kg 6.98 3,574 3,281 3,420 3,350DILATACIÓN EN BRONCE PC09 m 0.80 6,074 6,074 6,074 6,074GRAVILLA FINA 1/2” m³ 0.02 643 643 643 643MANO DE OBRA AA hc 2.50 42,883 42,883 42,882 42,882 54,141 53,848 53,988 53,918

GUARDAESCOBA CEDRO BLANCO 8 X 1 CM mGUARDAESCOBA 8 X 1 CM X 2.70 M - CEDRO un 0.39 24,987 24,987 24,987 24,987MANO DE OBRA AA hc 0.20 3,431 3,431 3,431 3,431PUNTILLA SIN CABEZA 1” lb 0.01 28 27 28 27 28,446 28,445 28,446 28,445

GUARDAESCOBA GRANITO mCEMENTO BLANCO kg 4.00 4,420 4,600 4,148 4,292GRANITO N.2 bt 0.06 1,734 1,734 1,734 1,734MANO DE OBRA AA hc 1.20 20,584 20,584 20,583 20,583MARMOLINA bt 0.10 850 880 870 860PULIDA PISOS GRANITO m² 0.40 14,394 14,394 14,394 14,394 41,981 42,191 41,729 41,863

GUARDAESCOBA GRAVILLA mAGUA lt 0.32 6 6 6 6ARENA LAVADA DE PEÑA m³ 0.01 302 302 302 302CEMENTO GRIS kg 0.70 358 329 343 336GRAVILLA FINA 1/2” m³ 0.01 322 322 322 322MANO DE OBRA AA hc 1.00 17,153 17,153 17,153 17,153 18,141 18,112 18,125 18,118

GUARDAESCOBA PISOPAK 7 CM mGUARDAESCOBA VINISOL m 1.00 0 7,150 7,150 7,150MANO DE OBRA AA hc 0.06 1,029 1,029 1,029 1,029 1,029 8,179 8,179 8,179

GUARDAESCOBA VINISOL 6.8 MM mGUARDAESCOBA VINISOL 6.8 CM m 1.03 3,914 3,914 3,986 3,914MANO DE OBRA AA hc 0.06 1,029 1,029 1,029 1,029 4,943 4,943 5,015 4,943

PASO ESCALERA GRANITO mAGUA lt 3.70 74 74 74 74ARENA DE REVOQUE m³ 0.07 0 0 0 1,340ARENA LAVADA DE PEÑA m³ 0.07 2,111 2,111 2,111 2,111CEMENTO BLANCO kg 10.50 11,603 12,075 10,889 11,267CEMENTO GRIS kg 12.00 6,144 5,640 5,880 5,760COLOR MINERAL kg 0.15 1,740 525 1,455 420DILATACIÓN EN BRONCE PC09 m 0.20 1,518 1,518 1,518 1,518GRANITO N.2 bt 0.38 10,982 10,982 10,982 10,982MANO DE OBRA AA hc 2.30 39,452 39,452 39,452 39,452MARMOLINA bt 0.25 2,125 2,200 2,175 2,150PIRLAN ALUMINIO DORADO m 0.80 1,410 1,410 1,410 1,410 77,159 75,987 75,945 76,483

PASOS ESCALERA VINILO unPASOS ESCALERA VINILO un 1.03 85,003 85,003 85,003 85,003 85,003 85,003 85,003 85,003

PIRLAN EN LADRILLO MACIZO PRENSADO mARENA LAVADA DE PEÑA m³ 0.02 603 603 603 603CEMENTO GRIS kg 3.32 1,700 1,560 1,627 1,594LADRILLO MACIZO PRENSADO 24.5X12X5.5 un 15.84 10,439 13,131 14,826 14,462MANO DE OBRA AA hc 0.84 14,409 14,409 14,408 14,408 27,150 29,703 31,465 31,067

PIRLANES ALUMINIO mMANO DE OBRA AA hc 0.30 5,146 5,146 5,146 5,146PIRLAN ALUMINIO DORADO m 0.17 300 300 300 300TORNILLO PARA MADERA 1” NO. 6 un 3.09 71 124 71 71 5,517 5,569 5,516 5,516

Page 9: MAMPOSTERÍA - Construdata.com pdf... · 218 construdata anÁlisis um cant. bogotÁ cali b/quilla medellÍn anÁlisis um cant. bogotÁ cali b/quilla medellÍn detallados generales

227EDICIÓN 169 DICIEMBRE 2013 - FEBRERO 2014

ANÁLISIS UM CANT. BOGOTÁ CALI B/QUILLA MEDELLÍNANÁLISIS UM CANT. BOGOTÁ CALI B/QUILLA MEDELLÍN

DE

TA

LLA

DO

S

GE

NE

RA

LE

S

PISOS - ACABADOS

PISO CERÁMICO 45.5 X 45.5 CM m²AGUA lt 2.85 57 57 57 57ARENA LAVADA DE PEÑA m³ 0.02 603 603 603 603CEMENTO BLANCO kg 0.51 564 587 529 547CEMENTO GRIS kg 6.27 3,210 2,947 3,072 3,010MANO DE OBRA AA hc 0.85 14,580 14,580 14,580 14,580PISO CERAMICO COTA BEIGE 45.5X45.5 CM m² 1.03 26,368 26,368 26,368 26,368 45,382 45,142 45,209 45,165

PISO CERÁMICO ARUBA ARENA 28.6 X 57.2 CM m²AGUA lt 2.85 57 57 57 57MANO DE OBRA AA hc 0.85 14,580 14,580 14,580 14,580PEGACOR INTERIORES BLANCO kg 6.27 8,088 8,088 8,088 8,088PISO CERAMICO ARUBA ARENA 30 X 60 CM m² 1.03 28,737 28,737 28,737 28,737 51,462 51,462 51,462 51,462

PISO EN GRAMA m²GRAMA (SEMILLA) m² 1.10 3,454 3,454 3,454 3,454MANO DE OBRA AA hc 0.10 1,715 1,715 1,715 1,715 5,169 5,169 5,169 5,169

PISO EN LISTÓN GRANADILLO 8 X 1.5 CM m²DURMIENTE 4 X 4 CM X 2.90 M - ORDINARIO un 0.14 497 497 497 497LISTÓN PARA PISO 8 X 1.5 CM - GRANADILLO m² 1.10 94,490 94,490 94,490 94,490MALLA CON VENA 0.53X2.40 un 0.40 1,615 1,615 1,615 1,615MANO DE OBRA AA hc 1.20 20,584 20,584 20,583 20,583PUNTILLA CON CABEZA 2” lb 0.27 689 689 767 689 117,874 117,874 117,953 117,874

PISO EN LISTÓN SAPÁN 8 X 1.5 CM m²DURMIENTE 4 X 4 CM X 2.90 M - ORDINARIO un 0.14 497 497 497 497LISTÓN PARA PISO 10 X 1.5 CM - SAPÁN m² 1.10 84,590 84,590 84,590 84,590MALLA CON VENA 0.53X2.40 un 0.40 1,615 1,615 1,615 1,615MANO DE OBRA AA hc 1.20 20,584 20,584 20,583 20,583PUNTILLA CON CABEZA 2” lb 0.27 689 689 767 689 107,974 107,974 108,053 107,974

PISO EN POLVO DE LADRILLO m²MANO DE OBRA AA hc 0.70 12,007 12,007 12,007 12,007POLVO DE LADRILLO m² 1.20 5,846 5,846 5,846 5,846VIBROCOMPACTADOR A GASOLINA d 0.04 1,021 1,021 1,021 1,021 18,874 18,874 18,874 18,874

PISO PARQUET GUAYACÁN m²GRANADILLO DE 10CM ANCHO POR E: 1.6 CM m² 1.00 75,400 75,400 75,400 75,400 75,400 75,400 75,400 75,400

PISO SINTÉTICO TENISLEIBO m²CANCHA MÚLTIPLE TENISLEIBO m² 1.00 104,400 104,400 104,400 104,400 104,400 104,400 104,400 104,400

PISO SINTÉTICO TENISSINCO m²CANCHA TENIS TENISSINCO m² 1.00 85,500 95,500 95,500 95,500 85,500 95,500 95,500 95,500

PISO VINILO PISOPAK 1.6MM m²INSTALACIÓN PISO VINILO CON PEGANTE m² 1.00 6,500 6,600 6,500 6,500PISOPAK RESIDENCIAL 1.6MM m² 1.00 20,540 20,540 20,540 20,540 27,040 27,140 27,040 27,040

PISO VINILO PISOPAK 3 MM m²INSTALACIÓN PISO VINILO CON PEGANTE m² 1.00 6,500 6,600 6,500 6,500PISOPAK TRÁFICO PESADO 3 MM m² 1.00 35,693 35,693 35,693 35,693 42,193 42,293 42,193 42,193

PLANCHUELA MÁRMOL BOTICCINO m²AGUA lt 2.85 57 57 57 57ARENA LAVADA DE PEÑA m³ 0.02 603 603 603 603CEMENTO BLANCO kg 0.51 564 587 529 547CEMENTO GRIS kg 6.27 3,210 2,947 3,072 3,010MANO DE OBRA AA hc 1.30 22,299 22,299 22,299 22,299MÁRMOL BOTTICINO m² 1.03 0 0 0 0 26,733 26,493 26,560 26,516

PLANCHUELA MÁRMOL GRIS m²AGUA lt 2.85 57 57 57 57ARENA LAVADA DE PEÑA m³ 0.02 603 603 603 603CEMENTO BLANCO kg 0.51 564 587 529 547CEMENTO GRIS kg 6.27 3,210 2,947 3,072 3,010MANO DE OBRA AA hc 1.30 22,299 22,299 22,299 22,299MÁRMOL CREMA MARFIL m² 1.03 285,318 285,318 285,318 285,318 312,051 311,811 311,878 311,834

PLANCHUELA TRAVERTINO ROMANO m²AGUA lt 2.85 57 57 57 57ARENA LAVADA DE PEÑA m³ 0.02 603 603 603 603CEMENTO BLANCO kg 0.51 564 587 529 547CEMENTO GRIS kg 6.27 3,210 2,947 3,072 3,010MANO DE OBRA AA hc 1.30 22,299 22,299 22,299 22,299MÁRMOL TRAVERTINO ROMANO m² 1.03 463,941 463,941 463,941 463,941 490,674 490,433 490,501 490,457

POLISEC m²MANO DE OBRA AA hc 0.10 1,715 1,715 1,715 1,715POLISEC m² 1.13 678 678 678 678 2,393 2,393 2,393 2,393

PULIDA LACADA PISO MADERA m²BARNIZ VITRIFLEX A BASE DE AGUA gl 0.10 19,390 19,390 19,390 19,390MANO DE OBRA PULIDA / LACADA PISO MAD. m² 1.00 15,000 15,000 15,000 15,000 34,390 34,390 34,390 34,390

PULIDA PLOMO PISO GRANITO m²PULIDA PISOS GRANITO m² 1.00 35,984 35,984 35,984 35,984 35,984 35,984 35,984 35,984

RECUBRIMIENTO SINTÉTICO MULTITRUFLEX m²RECUBRIMIENTO MULTITRUFLEX T-MT m² 1.00 29,000 32,480 32,480 32,480 29,000 32,480 32,480 32,480

RECUBRIMIENTO SINTÉTICO TRUFLEX CANCHA DE TENIS m²RECUBRIMIENTO TRUFLEX m² 1.00 23,850 23,850 23,850 23,850 23,850 23,850 23,850 23,850

TABLETA DE GRES 20 X 10 m²AGUA lt 3.00 60 60 60 60ARENA LAVADA DE PEÑA m³ 0.02 603 603 603 603CEMENTO GRIS kg 6.59 3,374 3,097 3,229 3,163MANO DE OBRA AA hc 0.85 14,580 14,580 14,580 14,580TABLETA GUAYACAN CAFE 20X10-1 (NL) m² 1.03 9,579 9,579 9,579 9,579 28,196 27,920 28,051 27,985

TABLÓN DE GRES 30.5 X 15 CM m²AGUA lt 6.48 130 130 130 130ARENA LAVADA DE PEÑA m³ 0.04 1,206 1,206 1,206 1,206CEMENTO GRIS kg 9.41 4,818 4,423 4,611 4,517MANO DE OBRA AA hc 0.85 14,580 14,580 14,580 14,580TABLÓN PORTAL ROJO 30.5 X 15 CM TRÁF. 5 m² 1.03 27,089 27,089 27,089 27,089 47,823 47,428 47,616 47,522

TABLÓN LISO 33X33 m²AGUA lt 6.48 130 130 130 130ARENA LAVADA DE PEÑA m³ 0.04 1,206 1,206 1,206 1,206CEMENTO GRIS kg 9.41 4,818 4,423 4,611 4,517MANO DE OBRA AA hc 0.85 14,580 14,580 14,580 14,580TABLON TRADICION ROJO 30X30 -1 m² 1.05 27,930 27,930 27,930 27,930 48,664 48,269 48,457 48,363

VINISOL 2.0 MM m²VINISOL ROCAS - TAMIZ - MARMOL 30X30 m² 1.03 26,490 26,490 26,490 26,490 26,490 26,490 26,490 26,490

ZÓCALO MEDIA CAÑA ROJO 15 X 15 CM mAGUA lt 0.45 9 9 9 9ARENA LAVADA DE PEÑA m³ 0.01 302 302 302 302CEMENTO BLANCO kg 0.10 111 115 104 107CEMENTO GRIS kg 0.98 502 461 480 470MANO DE OBRA AA hc 0.80 13,722 13,722 13,722 13,722ZÓCALO MEDIA CAÑA ROJO 15 X 15 CM m 7.00 92,505 92,505 92,505 92,505 107,150 107,114 107,122 107,116

ZÓCALO PARA TABLETA 7.5 CM mAGUA lt 0.29 6 6 6 6ARENA DE PEÑA m³ 0.01 696 696 696 696CEMENTO GRIS kg 0.63 323 296 309 302MANO DE OBRA AA hc 0.50 8,577 8,577 8,576 8,576TABLÓN TUNEZ ROJO ABRAS 15X15 TRAF 1 m² 1.05 22,365 22,365 22,365 22,365 31,966 31,939 31,952 31,946

PISOS - BASES

ALISTADO ENDURECIDO m²AGUA lt 10.00 200 200 200 200ARENA LAVADA DE PEÑA m³ 0.05 1,508 1,508 1,508 1,508CEMENTO GRIS kg 19.00 9,728 8,930 9,310 9,120

Continúa

Page 10: MAMPOSTERÍA - Construdata.com pdf... · 218 construdata anÁlisis um cant. bogotÁ cali b/quilla medellÍn anÁlisis um cant. bogotÁ cali b/quilla medellÍn detallados generales

228 CONSTRUDATA

ANÁLISIS UM CANT. BOGOTÁ CALI B/QUILLA MEDELLÍNANÁLISIS UM CANT. BOGOTÁ CALI B/QUILLA MEDELLÍN

DE

TA

LLA

DO

S

GE

NE

RA

LE

S

PISOS - BASES

MANO DE OBRA AA hc 0.70 12,007 12,007 12,007 12,007ROCKTOP ROJO kg 3.50 5,726 5,726 5,726 5,726 29,169 28,371 28,751 28,561

ALISTADO IMPERMEABILIZADO PISOS 0.04 m²AGUA lt 10.00 200 200 200 200ARENA LAVADA DE PEÑA m³ 0.05 1,508 1,508 1,508 1,508CEMENTO GRIS kg 19.00 9,728 8,930 9,310 9,120MANO DE OBRA AA hc 0.45 7,719 7,719 7,719 7,719SIKA-2 (5.5 KG) kg 1.18 13,962 13,962 13,962 13,962 33,117 32,319 32,699 32,509

ALISTADO PARA PISO EN LISTÓN m²AGUA lt 0.55 11 11 11 11ARENA LAVADA DE PEÑA m³ 0.01 302 302 302 302CEMENTO GRIS kg 1.22 625 573 598 586LISTÓN 3 X 3 CM X 2.90 - SAJO un 1.03 3,296 3,296 3,296 3,296MALLA CON VENA 0.53X2.40 un 0.20 807 807 807 807MANO DE OBRA AA hc 0.40 6,861 6,861 6,861 6,861 11,902 11,851 11,875 11,863

ALISTADO PISOS 0.04 m²AGUA lt 10.00 200 200 200 200ARENA LAVADA DE PEÑA m³ 0.05 1,508 1,508 1,508 1,508CEMENTO GRIS kg 19.00 9,728 8,930 9,310 9,120MANO DE OBRA AA hc 0.40 6,861 6,861 6,861 6,861 18,297 17,499 17,879 17,689

ALISTADO TERRAZAS 0.08 m²AGUA lt 14.83 297 297 297 297ARENA DE PEÑA m³ 0.10 6,960 6,960 6,960 6,960CEMENTO GRIS kg 24.88 12,739 11,694 12,191 11,942MANO DE OBRA AA hc 0.60 10,292 10,292 10,292 10,292SIKA-2 (5.5 KG) kg 2.24 26,504 26,504 26,504 26,504 56,791 55,746 56,243 55,994

BASE EN GRAVA FINA 3/4” m³GRAVA DE 3/4” m³ 1.03 40,217 40,217 40,217 40,217MANO DE OBRA AA hc 0.70 12,007 12,007 12,007 12,007VIBROCOMPACTADOR A GASOLINA d 0.04 1,021 1,021 1,021 1,021 53,245 53,245 53,245 53,245

BASE EN GRAVA GRUESA 1” m³BASE GRANULAR m³ 0.40 13,456 13,456 13,456 13,456BASE GRANULAR B-200 m³ 0.40 13,333 13,333 13,333 13,333GRAVA DE 1” m³ 0.88 34,360 34,360 34,360 34,360MANO DE OBRA AA hc 0.70 12,007 12,007 12,007 12,007VIBROCOMPACTADOR A GASOLINA d 0.04 1,021 1,021 1,021 1,021 74,178 74,178 74,178 74,178

CAÑUELA CONCRETO 0.20 X 0.12 M mCONCRETO CORRIENTE 2000 PSI m³ 0.02 6,090 6,118 6,118 6,090MANO DE OBRA AA hc 0.80 13,722 13,722 13,722 13,722TABLA BURRA 30 X 2.7CM X 2.90 M - ORD. un 0.11 1,617 1,617 1,617 1,617 21,429 21,457 21,457 21,429

CONCRETO ANDENES 0.10 M m²CONCRETO CORRIENTE 2500 PSI m³ 0.11 35,442 35,250 30,876 35,250MANO DE OBRA AA hc 0.66 11,321 11,321 11,321 11,321TABLA CHAPA 10 X 2.0 CM X 2.90 M - ORD. un 0.35 1,596 1,596 1,596 1,596 48,359 48,166 43,793 48,166

CONCRETO BASE GRADAS m²CONCRETO CORRIENTE 2500 PSI m³ 0.10 32,220 32,045 28,069 32,045MANO DE OBRA AA hc 0.88 15,095 15,095 15,095 15,095TABLA CHAPA 10 X 2.0 CM X 2.90 M - ORD. un 1.02 4,651 4,651 4,651 4,651 51,966 51,791 47,815 51,791

CONCRETO ESTRIADO RAMPAS m²CONCRETO CORRIENTE 2500 PSI m³ 0.16 51,552 51,272 44,910 51,272MANO DE OBRA AA hc 0.88 15,095 15,095 15,095 15,095TABLA CHAPA 10 X 2.0 CM X 2.90 M - ORD. un 0.35 1,596 1,596 1,596 1,596 68,243 67,963 61,601 67,963

CONCRETO SARDINELES 0.40 mCONCRETO CORRIENTE 2500 PSI m³ 0.05 16,110 16,023 14,034 16,023FORMALETA SARDINEL d 0.05 40 40 40 40MANO DE OBRA AA hc 0.66 11,321 11,321 11,321 11,321VIBRADOR DE CONCRETO A GASOLINA d 0.03 835 835 835 835 28,306 28,219 26,231 28,219

ENSAYOS DENSIDAD TERRENO unENSAYO DENSIDAD TERRENO un 1.00 43,500 43,500 23,200 43,500 43,500 43,500 23,200 43,500

ENSAYOS PROCTOR unENSAYO PROCTOR MODIFICADO un 1.00 111,882 67,000 81,200 111,882 111,882 67,000 81,200 111,882

MANTO FIBERGLASS 600 XT m²MANTO FIBERGLASS 600XT(10M2) rl 1.00 134,802 134,802 134,802 134,802SUB-CONTRATO INSTALACIÓN % 45.00 60,661 60,661 60,661 60,661 195,463 195,463 195,463 195,463

PEGANTE MORTERO-CONCRETO m²ADERCRIL - ADHERENTE X 4KG un 0.40 7,742 7,742 7,742 7,742AGUA lt 0.50 10 10 10 10CEMENTO GRIS kg 1.00 512 470 490 480MANO DE OBRA AA hc 0.50 8,577 8,577 8,576 8,576 16,841 16,799 16,818 16,808

PERMA PLY 2 CAPAS m²ASFALTO TIPO 190/220 200 KG kg 1.56 4,973 4,973 4,973 4,973MANO DE OBRA AA hc 0.66 11,321 11,321 11,321 11,321PERMA GLASS 6 FIBERGLASS m² 2.37 0 0 0 0 16,294 16,294 16,294 16,294

PLACA BASE CONCRETO 0.08 M m²CONCRETO CORRIENTE 2500 PSI m³ 0.09 28,998 28,841 25,262 28,841MANO DE OBRA AA hc 0.87 14,923 14,923 14,923 14,923TABLA CHAPA 10 X 2.0 CM X 2.90 M - ORD. un 0.18 821 821 821 821 44,742 44,584 41,006 44,584

PLACA BASE CONCRETO 0.10 M m²CONCRETO CORRIENTE 2500 PSI m³ 0.11 35,442 35,250 30,876 35,250MANO DE OBRA AA hc 0.66 11,321 11,321 11,321 11,321TABLA CHAPA 10 X 2.0 CM X 2.90 M - ORD. un 0.18 821 821 821 821 47,584 47,391 43,018 47,391

PLACA BASE CONCRETO 0.15 M m²CONCRETO CORRIENTE 2500 PSI m³ 0.17 54,774 54,477 47,717 54,477MANO DE OBRA AA hc 0.77 13,208 13,208 13,208 13,208TABLA CHAPA 10 X 2.0 CM X 2.90 M - ORD. un 0.35 1,596 1,596 1,596 1,596 69,578 69,280 62,521 69,280

RELLENOS AGREGADOS PÉTREO m³BASE GRANULAR m³ 1.34 45,078 45,078 45,078 45,078BASE GRANULAR B-200 m³ 1.34 44,666 44,666 44,666 44,666MANO DE OBRA AA hc 0.85 14,580 14,580 14,580 14,580VIBROCOMPACTADOR A GASOLINA d 0.04 1,021 1,021 1,021 1,021 105,345 105,345 105,345 105,345

SISTEMA PROTECCIÓN CONTRA INCENDIO

ACCESORIO ACERO CARBÓN ROSCADO 1” unCEMENTO SOLVENTE CPVC 1/4 GL un 0.05 5,021 5,021 5,021 5,021CODO ACERO NEGRO ROSCADO X150 S.C.I. 1” un 0.40 3,536 3,536 3,536 3,536MANO DE OBRA BB hc 0.25 4,717 4,717 4,717 4,717TEE REDUCIDA CAMPXCAMP 1”X1”X3/4” un 0.40 3,292 3,292 3,292 3,292TRANSPORTE % 0.30 52 52 52 52UNIÓN ACERO NEGRO X150 S.C.I. 1” un 0.20 860 860 860 860 17,479 17,479 17,479 17,479

ACCESORIO ACERO CARBÓN ROSCADO 1/2” unCODO ACERO NEGRO ROSC. X150 S.C.I. 1/2” un 0.40 2,688 2,688 2,688 2,688MANO DE OBRA BB hc 0.25 4,717 4,717 4,717 4,717TEE REDUCIDA CAMPXCAMP 2”X2”X3/4” un 0.40 11,667 11,667 11,667 11,667TRANSPORTE % 0.30 60 60 60 60UNIÓN ACERO NEGRO X150 S.C.I. 1/2” un 0.20 810 810 810 810 19,942 19,942 19,942 19,942

ACCESORIO ACERO CARBÓN ROSCADO 3/4” unCODO ACERO NEGRO ROSC. X150 S.C.I. 3/4” un 0.40 2,120 2,120 2,120 2,120MANO DE OBRA BB hc 0.25 4,717 4,717 4,717 4,717TEE REDUCIDA CAMPXCAMP 3”X3”X1-1/2” un 0.40 18,510 18,510 18,510 18,510TRANSPORTE % 0.30 78 78 78 78UNIÓN ACERO NEGRO X150 S.C.I. 3/4” un 0.20 778 778 778 778 26,203 26,203 26,203 26,203

ACCESORIO HIERRO DÚCTIL RANURADO 2” unACOPLE FLEX. RANURADO 2” un 0.20 2,036 2,036 2,036 2,036CODO 90 RANURADO HIERRO DUCTIL 2” un 0.40 24,128 24,128 24,128 24,128MANO DE OBRA BB hc 0.30 5,660 5,660 5,660 5,660TEE RANURADA HIERRO DUCTIL 2” un 0.40 4,232 4,232 4,232 4,232TRANSPORTE % 0.30 108 108 108 108 36,164 36,164 36,164 36,164

Page 11: MAMPOSTERÍA - Construdata.com pdf... · 218 construdata anÁlisis um cant. bogotÁ cali b/quilla medellÍn anÁlisis um cant. bogotÁ cali b/quilla medellÍn detallados generales

229EDICIÓN 169 DICIEMBRE 2013 - FEBRERO 2014

ANÁLISIS UM CANT. BOGOTÁ CALI B/QUILLA MEDELLÍNANÁLISIS UM CANT. BOGOTÁ CALI B/QUILLA MEDELLÍN

DE

TA

LLA

DO

S

GE

NE

RA

LE

S

SISTEMA PROTECCIÓN CONTRA INCENDIO

ACCESORIO HIERRO DÚCTIL RANURADO 3” unACOPLE FLEX. RANURADO 3” un 0.20 2,639 2,639 2,639 2,639CODO 90 RANURADO HIERRO DUCTIL 3” un 0.40 60,000 60,000 60,000 60,000MANO DE OBRA BB hc 0.30 5,660 5,660 5,660 5,660TEE RANURADA 3” un 0.40 12,818 12,818 12,818 12,818TRANSPORTE % 0.30 243 243 243 243 81,361 81,361 81,361 81,361

ACCESORIO HIERRO DÚCTIL RANURADO 4” unACOPLE FLEX. RANURADO 4” un 0.20 3,242 3,242 3,242 3,242CODO 90 RANURADO HIERRO DUCTIL 4” un 0.40 20,800 20,800 20,800 20,800MANO DE OBRA BB hc 0.30 5,660 5,660 5,660 5,660TEE RANURADA 4” un 0.40 18,096 18,096 18,096 18,096TRANSPORTE % 0.30 143 143 143 143 47,942 47,942 47,942 47,942

ACCESORIO SOLDADO CPVC UL/FM 1” unCODO 45 CPVC CAMP X CAMP 1” un 0.40 2,286 2,286 2,286 2,286MANO DE OBRA BB hc 0.25 4,717 4,717 4,717 4,717SOLDADURA LIQUIDA PARA CPVC 1/32 GL un 0.02 290 290 290 290TEE SOLD. CXC CPVC 1” un 0.40 3,712 3,712 3,712 3,712TRANSPORTE % 0.30 35 35 35 35UNIÓN SENCILLA CPVC CAMP X CAMP 1” un 0.20 798 798 798 798 11,839 11,839 11,839 11,839

ACCESORIO SOLDADO CPVC UL/FM 2” unCODO 45 CPVC CAMP X CAMP 2” un 0.40 5,805 5,805 5,805 5,805MANO DE OBRA BB hc 0.25 4,717 4,717 4,717 4,717SOLDADURA LIQUIDA PARA CPVC 1/32 GL un 0.02 290 290 290 290TEE SENCILLA CAMP X CAMP 2” un 0.40 12,680 12,680 12,680 12,680TRANSPORTE % 0.30 78 78 78 78UNIÓN SENCILLA CPVC CAMP X CAMP 2” un 0.20 2,563 2,563 2,563 2,563 26,133 26,133 26,133 26,133

ACCESORIO SOLDADO CPVC UL/FM 3” unCODO 45 CPVC CAMP X CAMP 3” un 0.40 14,959 14,959 14,959 14,959MANO DE OBRA BB hc 0.25 4,717 4,717 4,717 4,717SOLDADURA LIQUIDA PARA CPVC 1/32 GL un 0.02 290 290 290 290TEE SENCILLA CAMP X CAMP 3” un 0.40 24,322 24,322 24,322 24,322TRANSPORTE % 0.30 148 148 148 148UNIÓN SENCILLA CPVC CAMP X CAMP 3” un 0.20 5,072 5,072 5,072 5,072 49,509 49,509 49,509 49,509

ACCESORIO SOLDADO CPVC UL/FM 3/4” unCODO 45 CPVC UL/FM SOLXSOL 3/4” un 0.40 1,928 1,928 1,928 1,928MANO DE OBRA BB hc 0.25 4,717 4,717 4,717 4,717SOLDADURA LIQUIDA PARA CPVC 1/32 GL un 0.02 290 290 290 290TEE SENCILLA CAMP X CAMP 3/4” un 0.40 1,805 1,805 1,805 1,805TRANSPORTE % 0.30 28 28 28 28UNIÓN SENCILLA CPVC CAMP X CAMP 3/4” un 0.20 659 659 659 659 9,428 9,428 9,428 9,428

COUPLING HIERRO DUCTIL RANURADO FLEX. 2” unCOUPLING HIERRO DUCTIL RANURADO FLEX. 2” un 1.00 7,620 7,620 7,620 7,620MANO DE OBRA BB hc 0.15 2,830 2,830 2,830 2,830TRANSPORTE % 0.30 31 31 31 31 10,482 10,482 10,482 10,482

COUPLING HIERRO DUCTIL RANURADO FLEX. 3” unCOUPLING HIERRO DUCTIL RANURADO FLEX. 3” un 1.00 15,000 15,000 15,000 15,000MANO DE OBRA BB hc 0.30 5,660 5,660 5,660 5,660TRANSPORTE % 0.30 62 62 62 62 20,722 20,722 20,722 20,722

COUPLING HIERRO DUCTIL RANURADO FLEX. 4” unCOUPLING HIERRO DUCTIL RANURADO FLEX. 4” un 1.00 16,740 16,740 16,740 16,740MANO DE OBRA BB hc 0.30 5,660 5,660 5,660 5,660TRANSPORTE % 0.30 67 67 67 67 22,468 22,468 22,468 22,468

COUPLING HIERRO DUCTIL RANURADO FLEX. 6” unCOUPLING HIERRO DUCTIL RANURADO FLEX. 6” un 1.00 23,370 23,730 23,730 23,730MANO DE OBRA BB hc 0.30 5,660 5,660 5,660 5,660TRANSPORTE % 0.30 87 88 88 88 29,117 29,479 29,479 29,479

GABINETE CONTRA INCENDIO CLASE I unBOQUILLA CHORRO Y NIEBLA DE 1 1/2” NH BR. un 1.00 89,088 89,088 89,088 89,088EXTINTOR ABC DE 10 LB PQS un 1.00 50,112 50,112 50,112 50,112HACHAPICO DE 1.6 KG CABO MADERA 80 CM un 1.00 32,480 32,480 32,480 32,480LLAVE SPANNER EN HIERRO DOS SERVICIOS un 1.00 13,920 13,920 13,920 13,920MANO DE OBRA BB hc 1.20 22,642 22,642 22,642 22,642SOPORTE TIPO CANASTILLA PARA MANGUERA un 1.00 25,056 25,056 25,056 25,056

TRAMO DE MANGUERA DE 1-1/2”X100 un 1.00 162,400 162,400 162,400 162,400TRANSPORTE % 0.30 1,442 1,442 1,442 1,442VÁLVULA GLOBO BR. 1 1/2”X1 1/2” NPTXNH un 1.00 85,094 85,094 85,094 85,094 482,234 482,234 482,234 482,234

GABINETE CONTRA INCENDIO CLASE III unBOQUILLA CHORRO Y NIEBLA DE 1 1/2” NH BR. un 1.00 89,088 89,088 89,088 89,088EXTINTOR ABC DE 10 LB PQS un 1.00 50,112 50,112 50,112 50,112HACHAPICO DE 1.6 KG CABO MADERA 80 CM un 1.00 32,480 32,480 32,480 32,480LLAVE SPANNER EN HIERRO DOS SERVICIOS un 1.00 13,920 13,920 13,920 13,920MANO DE OBRA BB hc 0.20 3,774 3,774 3,774 3,774SOPORTE TIPO CANASTILLA PARA MANGUERA un 1.00 25,056 25,056 25,056 25,056TRAMO DE MANGUERA DE 1-1/2”X100 un 1.00 162,400 162,400 162,400 162,400TRANSPORTE % 0.30 2,063 2,063 2,063 2,063VÁLVULA GLOBO BR. 1 1/2”X1 1/2” NPTXNH un 1.00 85,094 85,094 85,094 85,094VÁLVULA GLOBO BR. 2 1/2”X2 1/2” NPTXNH un 1.00 225,687 225,687 225,687 225,687 689,673 689,673 689,673 689,673

PUNTO ROCIADOR ACERO 1/2” unCEMENTO SOLVENTE CPVC 1/4 GL un 0.50 50,214 50,214 50,214 50,214COPA CONCÉNTRICA ROSCAR 1X1/2” un 1.00 22,780 22,780 22,780 22,780MANO DE OBRA BB hc 1.20 22,642 22,642 22,642 22,642TAPÓN MACHO ACERO CARBÓN 1/2” un 1.00 5,500 5,500 5,500 5,500TRANSPORTE % 0.30 343 343 343 343TUBERÍA ACERO CARBON C/C SCH 40 1” ml 1.20 13,250 13,250 13,250 13,250 114,729 114,729 114,729 114,729

PUNTO ROCIADOR ACERO 3/4” unCEMENTO SOLVENTE CPVC 1/4 GL un 0.50 50,214 50,214 50,214 50,214COPA CONCÉNTRICA ROSCAR 1X3/4” un 1.00 20,100 20,100 20,100 20,100MANO DE OBRA BB hc 1.20 22,642 22,642 22,642 22,642TAPÓN MACHO ACERO CARBÓN 3/4” un 1.00 2,690 2,690 2,690 2,690TRANSPORTE % 0.50 544 544 544 544TUBERÍA ACERO CARBON C/C SCH 40 1” ml 1.20 13,250 13,250 13,250 13,250 109,440 109,440 109,440 109,440

PUNTO ROCIADOR CPVC 1/2” unBUJE ROCIADOR INSERTO CAMPXROS 1”X1/2” un 1.00 9,016 9,016 9,016 9,016MANO DE OBRA BB hc 1.20 22,642 22,642 22,642 22,642SOLDADURA LIQUIDA PARA CPVC 1/32 GL un 0.02 290 290 290 290TAPÓN SOLDADO CAMPANA CPVC 1” un 1.00 2,716 2,716 2,716 2,716TRANSPORTE % 0.30 148 148 148 148TUBERÍA CPVC RDE 13 5 ESP 1” un 0.22 14,731 14,731 14,731 14,731 49,543 49,543 49,543 49,543

ROCIADOR PENDIENTE K=5.6 RESPUESTA RÁPIDA 3/4” unCEMENTO SOLVENTE CPVC 1/4 GL un 0.02 2,009 2,009 2,009 2,009ESCUDO PARA ROCIADOR BLANCO 1/2” un 1.00 4,534 4,534 4,534 4,534MANO DE OBRA BB hc 0.30 5,660 5,660 5,660 5,660ROCIADOR PEND. K=5 6 R. RÁPIDA Ø=3/4” un 1.00 22,657 22,657 22,657 22,657TRANSPORTE % 0.30 105 105 105 105 34,965 34,965 34,965 34,965

ROCIADOR PENDIENTE K=5.6 RESPUESTA RÁPIDA ½” unCEMENTO SOLVENTE CPVC 1/4 GL un 0.02 2,009 2,009 2,009 2,009ESCUDO PARA ROCIADOR BLANCO 1/2” un 1.00 4,534 4,534 4,534 4,534MANO DE OBRA BB hc 0.30 5,660 5,660 5,660 5,660ROCIADOR PEND. K=5 6 R. RÁPIDA Ø=1/2” un 1.00 18,125 18,125 18,125 18,125TRANSPORTE % 0.30 91 91 91 91 30,419 30,419 30,419 30,419

ROCIADOR SIDE WALL K=5.6 RESPUESTA RÁPIDA 3/4” unCEMENTO SOLVENTE CPVC 1/4 GL un 0.02 2,009 2,009 2,009 2,009ESCUDO PARA ROCIADOR BLANCO 1/2” un 1.00 4,534 4,534 4,534 4,534MANO DE OBRA BB hc 0.30 5,660 5,660 5,660 5,660ROCIADOR SIDE WALLK=5 6 R. RÁPIDA Ø=3/4” un 1.00 30,813 30,813 30,813 30,813TRANSPORTE % 0.30 129 129 129 129 43,145 43,145 43,145 43,145

ROCIADOR SIDE WALL K=5.6 RESPUESTA RÁPIDA ½” unCEMENTO SOLVENTE CPVC 1/4 GL un 0.20 20,085 20,085 20,085 20,085ESCUDO PARA ROCIADOR BLANCO 1/2” un 1.00 4,534 4,534 4,534 4,534MANO DE OBRA BB hc 0.30 5,660 5,660 5,660 5,660ROCIADOR SIDE WALLK=5 6 R. RÁPIDA Ø=1/2” un 1.00 24,650 24,650 24,650 24,650TRANSPORTE % 0.30 165 165 165 165 55,095 55,095 55,095 55,095

ROCIADOR UP RIGHT K=5.6 RESPUESTA RÁPIDA 1/2” unCEMENTO SOLVENTE CPVC 1/4 GL un 0.02 2,009 2,009 2,009 2,009MANO DE OBRA BB hc 0.30 5,660 5,660 5,660 5,660ROCIADOR MONTAN. K=5 6 R. RÁPIDA Ø=1/2” un 1.00 18,850 18,850 18,850 18,850TRANSPORTE % 0.30 80 80 80 80 26,598 26,598 26,598 26,598

Page 12: MAMPOSTERÍA - Construdata.com pdf... · 218 construdata anÁlisis um cant. bogotÁ cali b/quilla medellÍn anÁlisis um cant. bogotÁ cali b/quilla medellÍn detallados generales

230 CONSTRUDATA

ANÁLISIS UM CANT. BOGOTÁ CALI B/QUILLA MEDELLÍNANÁLISIS UM CANT. BOGOTÁ CALI B/QUILLA MEDELLÍN

DE

TA

LLA

DO

S

GE

NE

RA

LE

S

SISTEMA PROTECCIÓN CONTRA INCENDIO

ROCIADOR UP RIGHT K=5.6 RESPUESTA RÁPIDA 3/4” unCEMENTO SOLVENTE CPVC 1/4 GL un 0.02 2,009 2,009 2,009 2,009MANO DE OBRA BB hc 0.30 5,660 5,660 5,660 5,660ROCIADOR MONTAN. K=5 6 R. RÁPIDA Ø=3/4” un 1.00 23,563 23,563 23,563 23,563TRANSPORTE % 0.30 94 94 94 94 31,326 31,326 31,326 31,326

SIAMESA BRONCE 3”X2.1/2”X2.1/2” unMANO DE OBRA BB hc 0.30 5,660 5,660 5,660 5,660SIAMESA BRONCE 3”X2.1/2”X2.1/2” un 1.00 672,800 672,800 672,800 672,800TRANSPORTE % 0.30 2,035 2,035 2,035 2,035 680,496 680,496 680,496 680,496

SIAMESA BRONCE 4”X2.1/2”X2.1/2” unMANO DE OBRA BB hc 0.30 5,660 5,660 5,660 5,660SIAMESA BRONCE 4”X2.1/2”X2.1/2” un 1.00 633,824 633,824 633,824 633,824TRANSPORTE % 0.30 1,918 1,918 1,918 1,918 641,403 641,403 641,403 641,403

TUBERÍA ACERO CARBÓN C/C SCH 40 1” ROSCADA mABRAZADERA TIPO PERA O TRAPECIO 1” un 0.27 270 270 270 270CEMENTO SOLVENTE CPVC 1/4 GL un 0.05 5,021 5,021 5,021 5,021MANO DE OBRA BB hc 0.25 4,717 4,717 4,717 4,717TRANSPORTE % 0.30 65 65 65 65TUBERÍA ACERO CARBON C/C SCH 40 1” ml 1.05 11,594 11,594 11,594 11,594 21,667 21,667 21,667 21,667

TUBERÍA ACERO CARBÓN C/C SCH 40 1/2” ROSCADA mABRAZADERA TIPO PERA O TRAPECIO 1/2” un 0.66 659 659 659 659CEMENTO SOLVENTE CPVC 1/4 GL un 0.04 4,017 4,017 4,017 4,017MANO DE OBRA BB hc 0.25 4,717 4,717 4,717 4,717TRANSPORTE % 0.30 50 50 50 50TUBERÍA ACERO CARBON C/C SCH 40 1/2” ml 1.05 7,266 7,266 7,266 7,266 16,709 16,709 16,709 16,709

TUBERÍA ACERO CARBÓN C/C SCH 40 2” RANURADA mABRAZADERA TIPO PERA O TRAPECIO 2” un 0.22 370 370 370 370HERRAMIENTA MENOR (RANURADORA) % 0.70 192 192 192 192TRANSPORTE % 0.30 82 82 82 82TUBERÍA ACERO CARBÓN C/C SCH 40 2” ml 1.05 27,107 27,107 27,107 27,107 27,751 27,751 27,751 27,751

TUBERÍA ACERO CARBÓN C/C SCH 40 3” RANURADA mABRAZADERA TIPO PERA O TRAPECIO 3” un 0.22 400 400 400 400MANO DE OBRA BB hc 0.30 5,660 5,660 5,660 5,660TRANSPORTE % 0.30 190 190 190 190TUBERÍA ACERO CARBÓN C/C SCH 40 3” ml 1.05 57,152 57,152 57,152 57,152 63,402 63,402 63,402 63,402

TUBERÍA ACERO CARBÓN C/C SCH 40 3/4” ROSCADA mABRAZADERA TIPO PERA O TRAPECIO 3/4” un 0.60 570 570 570 570CEMENTO SOLVENTE CPVC 1/4 GL un 0.04 4,017 4,017 4,017 4,017

MANO DE OBRA BB hc 0.25 4,717 4,717 4,717 4,717TRANSPORTE % 0.30 53 53 53 53TUBERÍA ACERO CARBÓN C/C SCH 40 3/4” ml 1.05 8,491 8,491 8,491 8,491 17,849 17,849 17,849 17,849

TUBERÍA ACERO CARBÓN C/C SCH 40 4” RANURADA mABRAZADERA TIPO PERA O TRAPECIO 4” un 0.22 638 638 638 638MANO DE OBRA BB hc 0.30 5,660 5,660 5,660 5,660TRANSPORTE % 0.40 371 371 371 371TUBERÍA ACERO CARBÓN C/C SCH 40 4” ml 1.05 86,544 86,544 86,544 86,544 93,214 93,214 93,214 93,214

TUBERÍA ACERO CARBÓN C/C SCH 40 6” RANURADA mABRAZADERA TIPO PERA O TRAPECIO 6” un 0.22 638 638 638 638MANO DE OBRA BB hc 0.30 5,660 5,660 5,660 5,660TRANSPORTE % 0.40 580 580 580 580TUBERÍA ACERO CARBÓN C/C SCH 40 6” ml 1.05 138,796 138,796 138,796 138,796 145,675 145,675 145,675 145,675

TUBERÍA CPVC RDE 13 5 ESP 1” mABRAZADERA TIPO PERA O TRAPECIO 1” un 0.55 549 549 549 549MANO DE OBRA BB hc 0.25 4,717 4,717 4,717 4,717SOLDADURA LIQUIDA PARA CPVC 1/32 GL un 0.02 290 290 290 290TRANSPORTE % 0.30 61 61 61 61TUBERÍA CPVC RDE 13 5 ESP 1” un 0.22 14,731 14,731 14,731 14,731 20,349 20,349 20,349 20,349

TUBERÍA CPVC UL/FM RDE 13.5 ESP X ESP 2” mABRAZADERA TIPO PERA O TRAPECIO 2” un 0.42 706 706 706 706MANO DE OBRA BB hc 0.25 4,717 4,717 4,717 4,717SOLDADURA LIQUIDA PARA CPVC 1/32 GL un 0.02 290 290 290 290TRANSPORTE % 0.30 700 700 700 700TUBERÍA CPVC RDE 13 5 ESP 2” un 1.05 227,657 227,657 227,657 227,657 234,070 234,070 234,070 234,070

TUBERÍA CPVC UL/FM RDE 13.5 ESP X ESP 3” mABRAZADERA TIPO PERA O TRAPECIO 3” un 0.33 601 601 601 601MANO DE OBRA BB hc 0.25 4,717 4,717 4,717 4,717SOLDADURA LIQUIDA PARA CPVC 1/32 GL un 0.02 290 290 290 290TRANSPORTE % 0.30 1,906 1,906 1,906 1,906TUBERÍA CPVC RDE 13 5 ESP 3” un 1.05 629,710 629,710 629,710 629,710 637,224 637,224 637,224 637,224

TUBERÍA CPVC UL/FM RDE 13.5 ESP X ESP 3/4” mABRAZADERA TIPO PERA O TRAPECIO 3/4” un 0.60 570 570 570 570MANO DE OBRA BB hc 0.25 4,717 4,717 4,717 4,717SOLDADURA LIQUIDA PARA CPVC 1/32 GL un 0.02 290 290 290 290TRANSPORTE % 0.30 154 154 154 154TUBERÍA CPVC RDE 13 5 ESP 3/4” un 1.05 45,624 45,624 45,624 45,624 51,354 51,354 51,354 51,354

Revista

Suscríbase llamando al 425 52 01 o al 01 8000 510 [email protected]

www.construdata.com