MISCELLANEOUS STRUCTURAL REPAIRS INSIDE THE FORTMCHENRY TUNNEL - (C)
SPECIAL PROVISIONS Contract No. FT 2693-000-006R
STATE OF MARYLAND
DEPARTMENT OF LABOR, LICENSING AND REGULATIONDIVISION OF LABOR AND INDUSTRY
PREVAILING WAGE SECTION1100 N. Eutaw Street, Room 607
Baltimore, MD 21201(410) 767-2342
The wage rates to be paid laborers and mechanics for the locality described below is announced by order ofCommissioner of Labor and Industry.
It is mandatory upon the successful bidder and any subcontractor under him, to pay not less than the specific ratesto all workers employed by them in executing contracts in this locality. Reference: Annotated Code of MarylandState Finance and Procurement, Section 17-20·1 thru "17-226.
These wage rates were taken from the locality survey of 2012 for Baltimore City, issued pursuant to theCommissioner's authority under State Finance and Procurement Article Section '17-209, Annotated Code ofMaryland or subsequent modification.
"Note: If additional Prevailing 'Nage Rates are needed for this project beyond those listed below, contact thePrevailing Wage Unit Phone: (410) 767-2342, email: [email protected].
Name and Title of Requesting Officer:
Department, Agency or Bureau:
Jessica Mettle - Procurement OfficerMDTA
303 Authority Drive Baltimore, MD 21222Project Number
FT 2693-000-006R Location and Description of work:
Baltimore City: The scope of work includes, 1 Perform concrete repairs tothJ underside of the roadway slab and slab side walls supporting thero dv.ay slabs. 2) Miscellaneous structural repairs.Detenmination Number
MODIFICATION BASIC BORROWED FRINGEREASON HOURLY FROM BENEFIT
RATE PAYMENT
AD $22.00 58.00
AD $23.95 56.30
AD $34.60 516.0·1
AD $34.60 516.01
AD S26.88 51724
AD $26.88 005 51724
AD $21.00 55.B6
AD $18.56 001 5'15.05
AD $15.72 55.B5
AD $2U>O 55.86
AD $21.00 55.86
AD $15.32 55.85
AD $21.00 55.86
Page 4 of 6
20
"1761'1
Date of Issue: Oct '10, 20~3
HIGHWAY CONSTRUCTION
CLASSIRCATION
CARPENTER
CEMENT Mi\SON
ElEClRICIAN
ElEClRICIAN - STREET LIGHTING
IROM'VORKER - REINFORCING
IRONWORKER - STRUCTURAL
lABORER - AJRTOOl OPERATOR
~ER-ASPHALTPAVER
lABORER - ASPHALT RAKER
Lt;BORER - BlASTER - DYN.A.MITE
lABORER - BURNER
LABORER - COMMON OR UNSKILLED
Lt;BORER - CONCRETE PUDDLER
10110i2013 ·1:58PM
Maryland Transportation Authority
Maryland MISCELLANEOUS STRUCTURAL REPAIRS INSIDE THE FORTTransportation MCHENRY TUNNEL - (C)
Authority
SPECIAL PROVISIONS Contract No. FT 2693-000-006R
LABORER - CONCRETE SURFACER AD $21.00 55.86
~RER-CONCRETETENDER AD $21.00 55.86lJ\BORER - CONCRETE VI8RA TOR AD $21.00 55.86
lABORER - DENSITY GAUGE AD $21.00 55.86
LABORER - FLAGGER AD $'15,05 03'1 56.97
LABORER - GRADE CHECKER AD $21.00 55.-66
LA.BORER - HAND ROLLER AD $21.00 55,86
lJ\BORER - HAZARDOUS MATERIAL HANDLER AD $21,00 55,86LABORER - JACKHAMMER AD $2'1.00 55.86
LABORER - LANDSCAPING AD $14.28 03'1 50.25LABORER - LAYOUT AD $21.00 55.86lJ\BORER - LUTEMAN AD $15.77 55.85
LABORER - MASON TENDER AD $2'1.00 55,86
LABORER - MORTAR MIXER AD $2'1,00 55.86
LABORER - PIPELAYER AD $21.00 55.86
lABORER - PLASTERER - HANDLER AD $21.00 55_86
LABORER - SCAFFOLD BUILDER AD $21.00 55.86LABORER- TAMPER AD $21,00 55,86
MILLVVRIGHT AD $27.96 512.30PAINTER - BRIDGE AD $31.86 58.97
PILEDRIVER AD $26.04 58.28
PLUMBER AD $38.17 031 515.82
POWER EQUIPMENT OPERATOR - ASPI-LALTDISTRIBUTOR AD $23.78 031 56,87
PO'NER EQUIPMENT OPERATOR - BACKHOE AD $25]5 Sll.80
POWER EQUIPMENT OPERATOR - BOBCAT AD $22.34 511.55
POvVER EQUIPMENT OPERATOR - BOOM TRUCK AD $25.75 511.80
POWER EQUIPMENT OPERATOR - BROOM TRUCK AD $24,85 005 5'11.80 a
POWER EQUIPMENT OPERA TOR - BULlDOZER AD $25.75 511.80POWER EQUIPMENT OPERATOR - CRANE AD $29.30 515.05
POWER EQUIPMENT OPERATOR - DRilL - RIG AD $39.16 005 514.10POWER EQUIPMENT OPERATOR - EXCAVATOR AD $25,75 511.80
POWER EQUIPMENT OPERATOR - FORKLIFT AD $24.85 005 511.80PO'NER EQUIPMENT OPERATOR - GRADALL AD $26.75 511.80
PO'NER EQUIPMENT OPERATOR - GRADER I AD $26.30 511,55 a
POWER EQUIPMENT OPERATOR - GUARD RAIL POST DRIVER AD $2000 003 56.30
POWER EQUIPMENT OPERA TOR - LOADER I AD $25.75 511.80
POWER EQUIPMENT OPERATOR - f'v1ASTERMECHANIC AD $26.75 511,80POWER EQUIPMENT OPERATOR - MECHANIC I AD $25.75 511,80
POWER EQUIPMENT OPERI>,TOR- MILLING MACHINE AD 525.75 511,80
POWER EQUIPMENT OPERATOR - OILER I AD $19.73 511-55
POWER EQUIPMENT OPERATOR - PAVER AD $24,85 5'11.80
POWCR EQUIPMENT OPERA TOR - ROCK I STUMP TUB GRINDER AD $25.7~. S11.80
POWER EQUIPME T OPERATOR - ROLLER - ASPHALT AD $24.85 511,80
PO'NER EQUIPMENT OPERATOR - ROLLER - EARTH AD $24,85 511.80
POWER EQUIPMENT OPERATOR - SCRAPER - PAN AD $25.75 003 511.80 a
POWER EQUIPMENT OPERATOR - SCREED .AD $24,85 005 511.80
PO'NER EQUIPr••.1ENTOPERATOR - SWEEPER AD $24,85 511,80
POWER EQUIPMENT OPERATOR - TRENCHER AD 527,00 0'15 $4,17
SPRINKlERFITTER AD $30.53 035 517.72
TRUCK DRIVER - DUMP AD S17.15 52.59
10['10120131:58 PM Page 5 of G
Maryland Transportation Authority
MarylandTransportation
Authority
MISCELLANEOUS STRUCTURAL REPAIRS INSIDE THE FORTMCHENRY TUNNEL - (C)
SPECIAL PROVISIONS Contract No. FT 2693-000-006R
TRUCK DRIVER - FLATBED
TRUCK DRIVER - LOWBOYTRUCK DRIVER - TACKtTAR TRUCK
TRUCK DRIVER- WATER
AD
ADAD
AD
$20.22 003 55.70
$22.48 57.03$22.19 57.03
$15.00 041 SO.OO
FRINGE REFERENCES AS NOTED
a. PAID HOLIDAYS: New Year Day, Memorial Day, July 4th, Labor Day, Thanksgiving Day & Christmas Day
b. PAID VACATIONS: Employees with 'I year service - 1 week paid vacation;2 years service - 2 weeks paid vacation;10 years service - 3 weeks paid vacation.
These Informational Prevailing Wage Rates may not be substituted for the requirements ofpre-advertisement or onsite jou posting for a publiCwork contract that exceeds 5500,000 in value and either of the follOWing
criteria are met: (1ithe contracting body is a unit of State govemment Of an instrumentality of the State and there is any Statefunding for the project; or (2) the contracting boely is a political subdivision. agency, person or entity (such as a county) and the
State runes 50% or more of the project.
Modification Codes:
(AD) 17-209 Annual Determination from Survey Wage Data Received(CH) 17-211 Commissioners' Hearing(CR) '17·208Commissioners' Review(SR) 17-208 survey Review by Staff
EaCh"60rrowea Frod" county is iaentified v.,1ththe FIPS 3-digit county codeuntqu 1 for the specifiCjU.risdiclion in Mary1and.
For additional information ofl the FIPS (Federallnrormation ProceSSingStandard) COde,see http:l(Www.census..govlaatamapllipSliStiAIISLtxI
The Prevailing Wage rates appearing on this form •••••ere originally derived from Maryland's annual Wage Survey. TheCommissioner of Labor & Industry encourages all contractors and interested groups to participate in the VOluntaryWage Survey,detailing wage rates paid to workers on various ~'pes of construction throughout Maryland.
A mail list of both street and email addresses is ~aintalned by the Prevailing Wage Unit to enable up-to-date prevalling wageInformation, InCludingwage Survey notices to be sent to contractors and other interested parties. If you would like to be includedin the mailing list, please forward (1) your Name, (2) the name of your company (if applicable), (3) your complete postal mailingaddress, (4) your email address and (5) your telephone number to PWMAILlNGLlST@dIlLstate,md.us. Requests for inclusioncan also bemaliedto:PrevailingWage.1100 N. Eutaw Street- Room 607, Baltimore 1.,.1021201-2201.