2
Malicounda Power plant CASE STUDY A Wärtsilä Flexicycle™ power plant will increase Senegal’s energy production and lower the country’s energy costs. On a broader scale, the thermal plant will provide needed flexibility to enable the integration of intermittent renewable energy into Senegal’s grid. With 450 MW of installed capacity in Senegal, Wärtsilä is the country’s leading provider of power generation equipment. The Matelec company placed an order for the delivery of an energy efficient 130 MW Flexicycle™ power plant. This investment will enable Senegal to achieve its goal of reducing consumer electricity pricing. Flexicycle plant improves electricity access at lower cost “We needed a reliable and quali- fied partner to engineer and provide a flexible and reliable energy system now, and later as our energy infrastructure evolves. With its global and Pan-African experience, Wärtsilä fully meets the project requirements. This is a major energy project that is very important for Senegal.” Sami Soughayar, CEO, Matelec Group. “Wärtsilä has a well-established footprint in Senegal and through- out West Africa, and our global references provide ample proof of our capabilities in delivering efficient, reliable and flexible solu- tions. We are proud to have been selected as the equipment provi- der for this important project.” Arnaud Gouet, Regional Director, Africa West, Wärtsilä Energy Solutions. 6 / 2018

Malicounda Power plant · the total output of the power plant is 130 MW. The electricity generated will be fed into the grid through an existing distribution substation. The Malicounda

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Malicounda Power plant · the total output of the power plant is 130 MW. The electricity generated will be fed into the grid through an existing distribution substation. The Malicounda

MalicoundaPower plantCASE STUDY

A Wärtsilä Flexicycle™ power plant will increase Senegal’s energy production and lower the country’s energy costs. On a broader scale, the thermal plant will provide needed flexibility to enable the integration of intermittent renewable energy into Senegal’s grid.

With 450 MW of installed capacity in Senegal, Wärtsilä is the country’s leading provider of power generation equipment. The Matelec company placed an order for the delivery of an energy efficient 130 MW Flexicycle™ power plant. This investment will enable Senegal to achieve its goal of reducing consumer electricity pricing.

Flexicycle™ plant improves electricity access at lower cost

“We needed a reliable and quali-f ied par tner to engineer and provide a f lexible and reliable energy system now, and later as our energy infrastructure evolves. With its global and Pan-African experience, Wärtsilä fully meets the project requirements. This is a major energy project that is very important for Senegal.”

Sami Soughayar, CEO, Matelec Group.

“Wärtsilä has a well-established footprint in Senegal and through-out West Afr ica, and our global references provide ample proof of our capabil ities in delivering ef f icient, reliable and f lexible solu-tions. We are proud to have been selected as the equipment provi-der for this important project.”

Arnaud Gouet, Regional Director, Africa West, Wärtsilä Energy Solutions.6 / 2018

Page 2: Malicounda Power plant · the total output of the power plant is 130 MW. The electricity generated will be fed into the grid through an existing distribution substation. The Malicounda

A flexible power plant with high reliability

Matelec is the EPC contractor (engineering, procurement and construction) for the independent power producer (IPP) Melec Power Gen, with whom Senelec has signed a 120 MW power purchase agreement (PPA). The 20-year PPA is a direct follow-up to a previous development agreement between Senelec, the state power utility, and Africa50, the infrastructure fund for Africa, for the selection of an IPP to develop a 120 MW combined cycle thermal power plant.

Wärtsilä will engineer, manufacture and deliver the Malicounda power project to the Mbour region, 85 km south of the country’s capital Dakar. The plant is expected to become operational in 2020.

The scope of Wärtsilä’s contract comprises (in addition to the seven engines) a turbine, auxiliary system, control system, engineering, supervision of the erection, and commissioning of the plant. The output of each genset is 17 MW, and the total output of the power plant is 130 MW. The electricity generated will be fed into the grid through an existing distribution substation.

The Malicounda power plant will initially operate on seven Wärtsilä 18V50 engines running on heavy fuel oil (HFO). There is, however, an option to convert the engines to gas operation as soon as gas becomes available in Senegal.

Matelec will operate the plant to help satisfy baseload needs in Senegal, and a 10-year maintenance agreement with Wärtsilä will guarantee the high availability and reliability of the plant.

Towards increased electricity access

Wärtsilä Flexicycle™ power plants combine the benefits of a flexible, simple-cycle plant with the

outstanding efficiency of a combined cycle plant. The Flexicycle™ solution is based on gas, multi-fuel, or liquid fuel power plants combined with a steam turbine. Flexicycle™ power plants can operate in a highly-efficient combined cycle mode as well as in a dynamic rapid simple-cycle mode.

The Government of Senegal has prioritised the development of the power sector, making it a central part of its Plan Sénégal Emergent (PSE), in which Senegal aims to become an emerging economy by 2025 and provide electricity access for everyone.

Senegal has substantial potential to develop solar and wind power and its offshore natural gas resources. For the renewables, the country is also exploring other crucial technologies including energy storage.

The Malicounda project is further proof of Wärtsilä’s understanding of the constraints and way of working of IPP’s.

Providing a solution that enables lower electricity

prices for consumers

A 130 MW Flexicycle™ power plant with seven Wärtsilä 18V50 engines

for baseload power production

Improved consumer access to electricity at a lower price

Allowing a high return on investment for the project

sponsors

A 10-year maintenance agreement that guarantees availability and

reliability

Operational flexibility for the integration of intermittent

renewable energy into Senegal’s network

Guaranteed availability of the power plant through a 10-year

maintenance agreement

Ensuring high availability, efficiency and reliability

of the power plant

Engineered equipment delivery (EEQ)

High power availability enabling fulfilment of a 120 MW PPA through

reliable baseload generation

CHALLENGE WÄRTSILÄ’S SOLUTION BENEFIT

KEY DATA

CUSTOMERMatelec Group

TYPEWärtsilä 50 based Flexicycle™ power plant

OPERATING MODEBaseload power production for the national grid.

GENSETS 7 X Wärtsilä 18V50

TOTAL OUTPUT 130 MW

FUEL Heavy fuel oil (option to convert to gas when available)

SCOPE EEQ and a 10-year maintenance agreement.

DELIVERY Operational in 2020

Matelec Group, founded in 1974 and based in Lebanon, is a producer of distribution transformers. The group has grown into a diversified actor on the electricity market. The wholly

owned Melec Power Gen Inc is a developer, builder, owner and operator of power plants throughout Africa.

WÄRTSILÄ® is a registered trademark. Copyright © 2018 Wärtsilä Corporation.Specifications are subject to change without prior notice.

wartsila.com