MAK Water MBBR-0100-A-X-X-X · MAK Water MBBR-0100-A-X-X-X 100m³/day Moving Bed Bioreactor (MBBR) Plant Typical GA Drawing Civil Loads Item Load (kN) MBB Container 700 Class 'A

Embed Size (px)

Citation preview

Page 1: MAK Water MBBR-0100-A-X-X-X · MAK Water MBBR-0100-A-X-X-X 100m³/day Moving Bed Bioreactor (MBBR) Plant Typical GA Drawing Civil Loads Item Load (kN) MBB Container 700 Class 'A
Page 2: MAK Water MBBR-0100-A-X-X-X · MAK Water MBBR-0100-A-X-X-X 100m³/day Moving Bed Bioreactor (MBBR) Plant Typical GA Drawing Civil Loads Item Load (kN) MBB Container 700 Class 'A

Sheet

MBBR100-VA-A02 i0-

1 2 3 4 5 6 7 8 9 10 11 12

A

B

C

D

E

F

G

H

A

B

C

D

E

F

G

1 2 3 4 5 6 7 8 9 10 11

H

12

APPReference Drawing TitleReference Drawing No.

MAK Document No. : Rev:

CHKDRNDescriptionDateRev

Client Document No.:

Paper Size: A3Notes

This drawing remains the property of MAK Water and must not be manufactured from, copied, or transmitted to a third

party without prior written approval from MAK Water ABN 32 134 829 280 COPYRIGHT © - MAK Water 2015

PO Box 2625 Malaga WA 6944

Telephone: +61 8 9249 8007

Email: [email protected]

Web: www.makwater.com.au

Commercial in Confidence

2 of 4Scale: 1:50All dimensionsin mm

- ABMHRGi0 18/05/2016 Issued for Information

MAK Water MBBR-0100-A-X-X-X100m³/day Moving Bed Bioreactor (MBBR) Plant

Typical GA Drawing

Civil Loads

Item Load (kN)

MBB Container 700Class 'A' Tertiary Filtration & Sterilization Plant

50

Treated Effluent Pump Skid 0.5

Balance Tank 450

SAF Primary Tank 200

Feed/Mixing Pump Skid 0.5

Treated Effluent Tank 200

Sludge Tank 300

Sludge Pump Skid 0.5

Battery Limits

No. Description Connection Type

BL-01 Raw Sewage Supply from Sewage System DN80 Table 'E' Flange

BL-02 Raw Sewage Supply from Truck DN80 Table 'E' Flange

BL-03 Treated Water Out DN50 Table 'E' Flange

BL-04 Solid Waste to Bin N/A

BL-05 SAF Sludge Waste Pump Out Connection 2" Camlock Connection

BL-06 Sludge to pump out 2" Camlock Connection

BL-07 Supernatant overflow to sewer/pumpwell DN50 Table 'E' Flange

Notes:Typical installation drawing only. Site specific installation may differ.1.Local plumbing regulations to be checked prior to installation.2.Tanks installed on compacted earth or concrete pad.3.Containers installed on plynths (civil details by others).4.Pump skids installed on concrete pads.5.

Balance Tank

Feed/Mixing Pump Skid

Inlet Screen

BL-03

BL-04

Control Cabinets, Blowers & Pump Room

Manholes for Tank Access

Treated Effluent Pump Skid

Plynth for container support

MBBR Waste Water Treatment Process

BL-05

Solid Waste Bin

BL-02

BL-01

SAF Primary Tank

Class 'A' Tertiary

Filtration & Sterilization

Sludge Tank

Treated Effluent Tank

BL-06

BL-07

15000

9000

4600

2420

6058

12190

2438

2420

2438

2970

Page 3: MAK Water MBBR-0100-A-X-X-X · MAK Water MBBR-0100-A-X-X-X 100m³/day Moving Bed Bioreactor (MBBR) Plant Typical GA Drawing Civil Loads Item Load (kN) MBB Container 700 Class 'A
Page 4: MAK Water MBBR-0100-A-X-X-X · MAK Water MBBR-0100-A-X-X-X 100m³/day Moving Bed Bioreactor (MBBR) Plant Typical GA Drawing Civil Loads Item Load (kN) MBB Container 700 Class 'A