Upload
others
View
15
Download
0
Embed Size (px)
Citation preview
Customer Job details Project details Year Status
Powermech Engineering Barwa Affordable Housing - Salwa road LV panels( 70 Nos) & Capacitor bank (70 Nos), SMDB & DB 2018 Completed
Larsen and Toubro – PT & D (Qatar)Qatar Power Transmission Phase 13- substation package
Cont'g No - GTC/735/2015 30 substations (LVAC, LVDC & PDB) 2017 Under Execution
Radiant Engineering Barwa-Integrated Families Housing & Labour Accomodation
for Barwa at Al Wakrah
LV Panels (180 Nos) and Capacitor Bank Panels & Feeder
Pillars2021 Under Execution
National Contracting Co. Qatar Power Transmission System Expansion - Phase 11
LVAC Switchboard - 9 S/S , 100V DC Switchboard - 9 S/S,
Power Distribution Board - 9 Nos, Spares (LVAC Switchboar)
- 2 Pkg & Spares (110V DC Switchboar) - 2 Pkg
2014 Completed
Construction & Reconstruction Eng. Co Rabban Suits MV Panel, C.Bank & Battery charger & Transformers 2012 Completed
National ContractingQatar Power Transmission Phase - 11 (Package - S17 &
S18)
Additional Cost for - 3 Substation, LVAC - 4 Nos, LVDC - 4
Nos. PDB - 4 Nos. & Spare for LVAC & LVDC - 4 Pkg2015 Completed
Redco International GULF WAREHOUSING LV, Capacitors, SMDB,DB 2020 Under Execution
M/s. Panceltica Qatar Isolators & D.Bs Barwa Housing Project 2008 Completed
Mohammed Hayil Barwa Al Khor Panel Boards 2014 Completed
Tiger Engineering Police Training InstituteMV Panel 12 Nos, Capacitor Bank 12 Nos, SMDB 89 Nos. &
DB 9 Nos.2014 Completed
Ramco Trading & Contracting Co. WLL Al-Andalus School ComplexSupply of LV Panel,Capacitor Bank,MCC
Panel,SMDB'S,ATS & DB'S2019 Completed
AL Moayyed Air Conditioning Palace Vendom Mall @ LusailMVP-17, Cap.Bank-10,ATS-5&T&C, SMB-156 Nos. & Spare
Parts for MVP,SMB2017 Completed
Marina Trading & Contracting Al Jasra Tower MVP with CB, SMDB,& MCC 2012 Completed
IBA Trading 2B+G+1 Rest's/Coffee Shop @ MarkiyahMV Panel 13 Nos, Capacictor Bank 11 Nos,125A ATS 1
No,400A ATA 1 No,SMDB 31 Nos & DB 36 Nos.2013 Completed
Doha Switchgear MVPanel, MSB , Capacitor Bank Residential Compound & Facilities 2009 Completed
Al Kahleej Modern Lights W.L.L Wakra Heritage Village MV Panel -22 Nos & Capacitor Bank - 22 Nos. 2014 Completed
Al Khaleej Modern LightsResidential Building 2B+G+10 Typical Floors for Fahad
Abdullah ThaniBusbar Raiser - 1 Lot. 2016 Completed
Best & Bestas KM GTC/735E/2015 Phase-13 SS-10 LVAC,LVDC,PDB 2020 Completed
How united services 3 New Schools @ Wakra MVP,Cpa.Bank,SMB,DB, & LCP 2011 Completed
IBA Trading Markiya Project Dry type Transformer -11 Nos. 2013 Completed
Larsen and Toubro – PT & D (Qatar)
Qatar Power Transmission System Expansion – Phase XIII
– Substations package - Mashaf - 2, Wukair - 8, Rawdat
Egdim - 2
LVAC - 3 No's,LVDC - 3 No's & PDB - 3 No's, Mashaf - 2,
Wukair - 8, Rawdat Egdim - 22018 Completed
Denver Engg. & Cont. MVP, MCC, SMBD, DB & LCP Lulu Mall at Al-Khor 2009 Completed
Al Hamad Engineering Al Mana HotelMV Panel-4 Nos, Capacitor Bank-4 Nos, Busduct-4 &
Transformer -4 Nos.2015 Completed
Doha Switchgear SMB & DB Wakra 2009 Completed
National Contracting companyAl bidda 132/33KV Al Bidda metro substation & Multi car
parkingLVAC LVDC -2 No's & Spares 2018 Completed
Doha switchgear Wakra Mall MVP-10,CB-10,SMB&DB 2010 Completed
Hamad Abdulla Mohd Al MerriStore G+3 Acco. For Hamad Abdulla >M Al Merri @
Industrial AreaPanels , civil concrete works, scaffolding 2017 Completed
Radiant Engineering Enterprises Baladan Farm house plant LVPs & PFCC 2018 Completed
Polaris Trading and Contracting W.L.L Giardino Village Supply of MV Panel & Capacitor Bank Panel 2019 Completed
M/s. Belhasa Projects LLC SMDB,MCC,CP, PLC & SCADA Panels STP for AL BARAHA 2008 Completed
M/s. KBAS Trading MVP, FP, SMB & LCP Truck Park.faci - Baraha proj. 2008 Completed
Gulf Lights Electrical Engineering Constrution of 3 New School Package 5MV Panel 7 Nos, Capacitor Bank 7 Nos, SMDB 36, DB 86 &
LCP 132014 Completed
Major Project Reference Lists- Gulf Switchgears
Page 1 of 16
Customer Job details Project details Year Status
Larsen and Toubro – PT & D (Qatar)
L&T/GTC/956/2019 - Qatar Power Transmission System
Expansion for Facility - E Power Evacuation (Al Baraha
Super - 01)
LVAC,LVDC,PDB 2021 Under Execution
Radiant Engineering mwani fishing works- Al wakrah LV,Capacitor, SIP, MCC, SMDB & DB 2020 Completed
Qatariana Commercial Co. 10 KG in Doha & Villages / Support Buildg Pack 6MV Panel 1 Nos,SMDB,30 Nos,DB 92 Nos,Spare Parts &
Additional Warranty 2 Years2013 Completed
M/s. Arabian Controls ACCP & SMF panels - 7 Schools Doha & Villages Pack.-B 2008 Completed
National Contracting Company LTDGTC/643E/2014 KAHRAMAA Phase 12 - AL Birkat Awamer
& Bu QarnLVAC , LVDC & PDBs 2017 Completed
L&T Design & Construction of primary electrical power
substations @ Al Wakrah GTC/29/20162 Substations (LVAC LVDC & PDB) 2017 Completed
Hamton International Al Andalus School @ Umm Salal MV-12 Nos & PFCC 12 Nos 2017 Completed
L & T Primary Power Subsstation @ Umm Al Houl & Ras Abu
Fontas -S/S P-3 & P4 PKG-05LV AC & DC 2017 Completed
Metito Lusail Development -Pkg-12 MCC Panel - 2 No. 2011 Completed
ABS & Partners Group Labour Camp @ Umm Al Afifi 1600kVA Dry type Tx. - 8 Nos. 2013 Completed
SEF Construction Modification for 10 MV Panel in Ezdan Mall @ Wakrah Modification for 10 Nos,MV Panel & Cap.Bank 4 Nos. 2016 Completed
Larsen and Toubro – PT & D (Qatar)Qatar Power Transmission Phase 13- substation package
Cont'g No - GTC/735/2015 - Al Froosh-1 and Al Saad 2
2 substations Al Froosh-1 and Al Saad 2 (LVAC, LVDC &
PDB)2017 Completed
Larsen and Toubro – PT & D (Qatar)Phase 13 substation package/07 (Asmakh-02 and Lusail
QIN)LVAC,LVDC,PDB 2020 Completed
Doha Switchgear MVP & Cap.Bank-10nos, MSB-42Nos Res. Comp. & Facilities @ wukair 16 2009 Completed
AL Jaber Partners WLLLusail Public Realm Landscape Works for CP-10 C2 @
Contract 4747Parsons / Dorsch 2017 Completed
Doha SwitchgearsGeneral Guard Department Project, Salwa Road, Doha
QatarMV Panel, ATS,MCC,SMDB & DB 2013 Completed
ABS & Partners Group Labour Camp @ Umm Al Afifi MV Panel 8 Nos. & Capacitor Bank 8 Nos. 2013 Completed
Drake & Scull MDB-1 no. NDIA, CP-15 2009 Completed
M/s. Marina Trading MVP - 6 nos Al Baker Tower @ Dafna 2008 Completed
Visual ProjectsZulal destination spa and 5 star family resort, Al Ruwais, Al
ShamalPLC system complete with Probes & Sensors 2018 Completed
Hamton International Al Andalus School @ Umm Salal MCC - 20 Nos 2017 Completed
Hatco Trading & Contracting Precast Factory for Barwa Building Material CompanyMV Panel - 5 Nos, Capacitor Bank - 5 Nos. & REF Test at
Site2015 Completed
Darwish Electro Mechanical MV panels,Capacitor Bank each 5 nos ABM Military College - Ph - II 2009 Completed
New light for Electro Mechanic Al Wukair - 20 MV panel - 8 Nos, Cap. Bank - 8 Nos, SMSB - 26 Nos 2010 Completed
Al Tamez Middle East Qatar Uniiversity Male & Female Class Room
MV Panel - 3 Nos, Capacitor Bank - 3 Nos, ATS Panel - 1
No, MCC Panel - 13 Nos, SMDB - 20 Nos, DB - 47 Nos &
REF Test at Site - 3 Nos.
2014 Completed
Al Asalah Electrical 2B+G+2 offi Building @ C Ring Road MVP .& Tx., C.B, ATS, SMB, DB & Busduct 2013 Completed
M/s. STELCO, Qatar MVP, SMDB, DBs Muaither Mall (G+1+P) 2008 Completed
Hatco Qatar Smeet Precast Factory MVP-4 Nos.Cap.Bank-4 Nos.With-, SMB &DB 2012 Completed
Gulf Lights Electrical Engineering Houbara Breeding Station MVP 2 Nos. Cap.Banl 2 Nos,SMDB 25 Nos & DB 83 Nos 2013 Completed
Imran Trading & Contracting Commercial Complex for Ezdan Real Estate Company MV Panel 8 Nos. & Capacitor Bank 8 Nos. 2014 Completed
M/s. Gulf Lights 2500A MV Panel - 7 Nos. Mowasalat staff accom. pack.-II 2008 Completed
New Light Electro Mechanic Compund @ Al WukairMVP - 4 Nos.Cap.B-200Kva w/o H-4 Nos.SMB-136Nos.DB-
352Nos.2012 Completed
Doha Switchgear Police Tower 3 Res. Building (B+G+10) MVP, C.Bank,SMB, DB, ATS(4Pole) 2011 Completed
M/s.KBAS Contracting 1600KVA TR - 15Nos. 2007 Completed
Marina Trading & Cont. 2B+G+M+10 Panasonic Show room MV panel - 5 Nos 2010 Completed
Al Khaleej Modern LightsResidential Building 2B+G+10 Typical Floors for Fahad
Abdullah Thani1600KVA Transformer (Dry Type) - 4 Nos. 2015 Completed
Larsen and Toubro – PT & D (Qatar) Hamad Bin Khalifa Medical city Expansion project LVAC, LVDC & PDB 2018 Completed
M/s. Mannai Trading Co. 200A FP's - Ashghal Qatar Primary Routes 2008 Completed
Page 2 of 16
Customer Job details Project details Year Status
Doha Switchgears FBA Mall MVP-4Nos, Cap. Bank-3Nos, SMDB-23Nos & DB-24 Nos. 2013 Completed
M/s. Siemens Ltd T&C Engineers - QPTS Ph.8 GTC/123/2006 Ph.8 expansn 2008 Completed
M/s. Bloom contracting co. MVP,SMB,DB Com'p 4x(B+G+(Building) 2008 Completed
Al Khaleej Modern LightsResidential Building 2B+G+10 Typical Floors for Fahad
Abdullah Thani
MV Panel - 4 Nos, Capacitor Bank - 4 Nos & REF test at
Site - 4 Nos.2015 Completed
Target MEP 35 Villa and 11 Residential Building at Al MarkiyahMV Panel - 4 Nos.Capacitor Bank - 4 Nos, SMDB -57 Nos &
DB - 321 Nos.2015 Completed
Hamton International Al Andalus School @ Umm Salal SMDB/USMDB - 114 Nos & ATS 3 Nos 2017 Completed
ABB Ezdan - 5 LV AC/DC Panal 2010 Completed
ABB Gharafa /Gulf Mall LV AC/DC Panal 2010 Completed
M/s. Al Khor & Dakira Co. 1250A MVP & FPs Labour Accom @ Ras Laff 2008 Completed
Doha Switchgear Wakra - 19 MSB & DB 2010 Completed
M/s. S.B.K Co. MVP-3Nos, SMB, DB 60 Villa Compound (G+1) 2008 Completed
Redco International 12 new departure gates @ D.I.A MVP, C.P, MCC, SMB, DB, LCP & Iso. 2010 Completed
Gulf Lights SMB,DB,Feeder Pillar Mowsalat staff accom. 2009 Completed
Takyeef Al Madaen Hotel @ Al Saad MVPanel, ATS, SMB & DB (Opt. -1) 2010 Completed
Qatar Steel Utility Air Compressor Station Supply & Installation 2015 Completed
New Lights Electrical MV Panel-5 Nos., MSB, DB & Cap. Bank Al wukair 2009 Completed
National Contracting Co.66/11KV Grand Hamad Avenuen (New) Substation and
Multi - Storey Car park Building
LVAC Switchboard - 1 S/S , 100V DC Switchboard - 1 S/S,
Power Distribution Board - 1 No, Spares (LVAC Switchboar) -
1 Lot & Spares (110V DC Switchboard) - 1 Lot.
2014 Completed
Radiant Engineering Enterprises LLC Baladna Dairy Farm ( Phase 2 ) LV Panels & PFCC - 6 No's 2019 Completed
HBK Engineering ServicesOffice Building (4B+G+M+10+PH Floors) &
(4B+G+M+7+PH Floors)
MV Panel 4 Nos, EMV Panel 2 Nos, Capacitor Bank 4 Nos &
ATS Panel 2 Nos.2014 Completed
M/s. Qatariana Comml.Co., MV Panels -8Nos. & SMBs-21Nos 2007 Completed
Elswedy CablesQatar Power TransmissionSystem -Phase 13 (Al Wukair
substation)LVAC & LVDC 2016 Completed
Radiant Engineering Enterprises LLC Mwani port Ruwais LV, Capacitor,SIP & Capacitor 2020 Completed
BEST & BETAS ConsortiumQatar Power Transmission System Phase 13 substation
Package S10 @ Al WukairLVAC LVDC -1 No's & Spares 2018 Completed
Siemens - Qatar CP -06 S/S LV AC & DC Panel 2013 Completed
NCC Substation Phase 13 @ Feriq Al Amir LVAC -1 No's LVDC 1 No's PDBs 2017 Completed
National Contracting companyQatar Power Transmission System Expansion - Phase 12 -
132 / 11KV Al Shalah South SubstationSupply of LVAC,LVDC & PDB 2018 Completed
Gulf Lights Electrical Engineering Houbara Breeding Station Syncronizing Panel 2013 Completed
Doha Switchgear Al Wukair - 19 MV panel-6,C.B- 6, MSB-42 2010 Completed
Marina Trading & Cont'g Proposed Residential complex @ Bu Sidra Al Rayyan MV Panels - 9 No's 2017 Completed
National Contracting Qatar Power Transmission Phase - 11 Additional Cost for LV Service Equipments - 6 Substations 2015 Completed
Qatar International Electrical Co New Orbital Highway Truck (P023) Contrcat 4 MV PFCC ATS SMDB 2018 Completed
K&H Al Mana Al Mana Mall MV Panel, Cap. Bank 2011 Completed
Qatariana Commercial Co. 5 Nos. of Kindergarten MV Panel, Capacitor Bank., SMB & DB 2013 Completed
M/s. HBK Engg Services 2500A MVP-5 & FP-19Nos 100 Villas at Ain Khalid 2007 Completed
SEF Construction Modification of 10 Nos. MCC Panel for Ezdan Mall @
Wakrah10 Nos. MCC Panel ( Variiation order J16/195) 2016 Completed
URBANOM (Urban Operations &
Maintennce
Maintenance and Modification of MVPanel @ Al Rayyan
palace MV Panel Modification 2 Nos.& Generator Servicing 2 Nos. 2017 Completed
NCC Substation Phase 13 @ Bin Dhiram LVAC -1 No's LVDC 1 No's PDBs 2017 Completed
Al Asalah Electrical 2B+G+M+7 Off. Bldg @ Najma MVP, CB, SMB & Bus raiser &Transformer 2 Nos. 2011 Completed
Radiant Engineering mwani fishing works- Al khor LV,Capacitor, SIP, MCC, SMDB & DB 2020 Completed
Advanced Engineering Marina Tower 11 Res (2B+G+1P+20 FloorsMV Panel -1 No, Capacitor Bank - 1 No, SMDB - 25 Nos &
DB - 137 Nos.2015 CompletedPage 3 of 16
Customer Job details Project details Year Status
Hatco Trading & Contracting Pro.Aluminium & Steel Factory at New Ind.AreaMV Panel - 4 Nos, Cap.Bank - 4 Nos, SMDB - 25 Nos & DB -
21 Nos. 2014 Completed
Imran Trading & Contracting Musharab & Ezdan MVP-6 Nos. Cap.bank-6 Nos 2012 Completed
M/s. Denver Engg MV Panels & DBs Waste coll. station at PEARL QATAR 2007 Completed
Orient Electrical QNCC @ Industrial Area MV Panel -4 Nos. & Capacitor Bank - 4 Nos. 2015 Completed
Al Khaleej Modern LightsResidential Building 2B+G+10 Typical Floors for Fahad
Abdullah ThaniSMDB - 34 Nos. & DB - 305 Nos. 2015 Completed
Al Kamal International KDO Residence @ Dafna MV Panels - 3 No's 2017 Completed
Marina Trading & Contracting Co. WLL
Proposed Residential Compound for Mr. Ibrahim Hassan Al
asmakh Regency Group Holding at Bu Sidra, Al Rayyan,
Qatar
Supply of MV Panels 2019 Completed
Larsen and Toubro – PT & D (Qatar)Qatar Power Transmission Phase 13- substation package
Cont'g No - GTC/735/2015 - Khalifa Town South - 1 1 substations Khalifa Town South - 1 (LVAC, LVDC & PDB) 2018 Completed
Larsen and Toubro – PT & D (Qatar)Qatar Power Transmission Phase 13- substation package
Cont'g No - GTC/735/2015 - Daayen - 2 LVAC, LVDC & DB Daayen - 2 2018 Completed
Larsen and Toubro – PT & D (Qatar)Qatar Power Transmission Phase 13- substation package
Cont'g No - GTC/735/2015 - Saliya Camp -1LVAC, LVDC & DB Saliya Camp - 1 2018 Completed
Larsen and Toubro – PT & D (Qatar)Qatar Power Transmission Phase 13- substation package
Cont'g No - GTC/735/2015 - Naeeja - 2 LVAC, LVDC & DB Naeeja - 2 2018 Completed
Larsen and Toubro – PT & D (Qatar) Phase 13 substation package S16/07 (Onaiza Substation) LVAC,LVDC,PDB 2020 Completed
Larsen and Toubro – PT & D (Qatar)Phase 13 substation package S13/07 (Wakrah 4
Substation)LVAC,LVDC,PDB 2021 Under Execution
Larsen and Toubro – PT & D (Qatar)Phase 13 substation package S13/07 (Umm Besher
Substation)LVAC,LVDC,PDB 2021 Under Execution
L&T Naeeja East Substation - Phase 13 Project - LVAC DC LVAC & LVDC 2019 Completed
M/s. Germin Trading & Contracting 2500A MV Panel - 3Nos. Phrma Factory 2016 Completed
Al Imran Trad. & Cont. Co. Al Wukair - 22 (Residential Compound & Facilities) MV panel - 6 Nos, Cap. Bank - 6 Nos 2010 Completed
Al Dhow AL Wakrah Stadium Driver & Control panels , Junction boxes 2018 Completed
Siemens - Qatar QASCO S/S LV AC & DC Panel 2013 Completed
M/s. Marina Trading MVP's Al Athiya Bldg @ Old Salata 2008 Completed
M/s. Darwish MV, SMB & DBs AMB millitary college 2008 Completed
Powermech Engineering Design and Build of El Haraj Market LVP - 6 Nos. & Capacitor Bank Panel - 6 Nos. 2018 Completed
Tarek Multi Energy MOI New Printing Press MVP, Cap.Bank & SMB 2012 Completed
Trags EngineeringHMC Womens Hospital N.I.C.U Temporary Ext. - Rumailah
Hospital Energy CenterLV Panel - 1 No & Ref Test at Site - 1 No. 2014 Completed
Araco Power CDC Marsa Arabia Syn.panels 2020 Completed
Takyeef Electromechanical Kahramaa Awareness Park MVP,DB,SMDB,Warrenty,Spare Parts & Cap.Bank 2013 Completed
Takyeef Exp. of Al Banush Club (QAFCO) MVPanel, SMB & DB (Opt. -1) 2010 Completed
Al Jaber & Partners
Qatar Foundation - C017/OR17000671 – Street Scape
Feeder Pillars & Control Panels at South Site Wide
Infrastructure
Feeder Pillars with Dimmer controller 2017 Completed
Gulf Lights Diwan Amiri SMB & DB 2010 Completed
Al Tamez Middle East Security complex @ Rayyan ATS MV panel - 2 Nos, SMB - 16 Nos, Cap. Bank - 2 Nos 2010 Completed
AICI CAS Parking Apron Al Udaied Air Base MVP, MCC & SMB 2011 Completed
Darwish Electro Mechanical MCC, FP & LCP ABM Military college 2009 Completed
Strom Construction New Orbital Highway C2-NOH2 8 Way TPN Feeder Pillars - 70 No's 2017 Completed
Gulf Lights Residental Tower (2B+G+M+16 Floors) MVP-1 No.250KVa Cap.bank& SMB-23Nos.& DB-127 Nos. 2012 Completed
Radiant Engineering Hospital-2 MDB.SMDB, DB & Feeder Pillar 2020 Completed
M/s. Doha Switchgear MVP, SMB & DBs 110 VILLAS 2008 Completed
United ElectroMechanical Scouts Overland Camp MVP 2 Nos, SMB 8 Nos, DB 31 Nos,Cap.Bank 2 Nos. 2012 Completed
Larsen and Toubro – PT & D (Qatar) Phase 13 substation package/07 (DNS Remote-02) LVAC,LVDC,PDB 2020 CompletedPage 4 of 16
Customer Job details Project details Year Status
Larsen and Toubro – PT & D (Qatar) Phase 13 substation package S16/07 (Duhail2 Substation) LVAC,LVDC,PDB 2020 Completed
Larsen and Toubro – PT & D (Qatar)Qatar Power Transmission Phase 13- substation package
Cont'g No - GTC/735/2015 - Mesaieed Refinary SubstationLVAC, LVDC & DB Mesaieed Refinary Substation 2019 Completed
Qatar Navigation MV Panel, Feeder Pillar Doha Port 2009 Completed
Al Mawrid Trading Data Centre & Gymnasum for department of MOI MV Panel -2 Nos. Cap.Bank 2- Nos. 2015 Completed
Visual Projects Zulal Destination Spa and Five star resort Control Panels-124 nos 2017 Completed
Gulf Centre ENAYA 3 @ HMC Sync Panel, AHU CPs & MVs modification 2018 Completed
Al Qamra Real Estate Proposed G+1+M Hypermarket MV Panel, Capacitor Bank Panel, SMDB'S & DB'S 2020 Completed
Doha Engineering Works MV Panel - 5 Nos. 100 Villas 2009 Completed
Imran Trading & Contracting Residental Compund @ Al Wukair MV Panel, Cap. Bank & ATS 2012 Completed
Powermech Engineering New El Haraj souq Project B+G+M+2F for Triple A Trading
and Contracting at Al Wakrah MunicipalityDB 2018 Completed
M/s. STELCO, Qatar 1600 KVA Transformer Muaither Mall (G+1+P) 2008 Completed
Inelt Trading & Cont. CP 10 B1 Marina District East, South & North 25 Nos Feeder Pillar 2017 Completed
Radiant Engineering Proposed Fire Station Extension at Wadi Al Sail LV Panel - 2 Nos. 2014 Completed
M/s. ADCC-JV MDB, SMDBs New Labour Camp 2008 Completed
M/s. Al Khaleej 2500A MVPanel - 5Nos. 2007 Completed
M/s. HBK Engg Services MVP & MCC panels B+G+2 BENTLY SHOW ROOM 2008 Completed
Orient Electrical Delta Fabco Factory @ New Ind 2500A MVP -3Nos.250KVA Cap.Bank-3Nos. 2012 Completed
Al Dhow CP08 A-1 & CP08 A-2 FP-23Nos 2019 Completed
Voltage Engineering KM Substation @ Pearl Qatar LVAC-1 LVDC-1 PDB-1 & Spares 2021 Under Execution
Takyeef Electromechanical Al Madean Hotel Modification Work 2013 Completed
Larsen and Toubro – PT & D (Qatar) RAF-1 Substation (132/11kV) Project LVAC, LVDC & DB 2019 Completed
IBA Transformer 1600KVA - 3nos,1000KVA - 1no Office Building near C ring road 2009 Completed
M/s. Gulf Lights 2500A MVP Office Building (2B+G+M+6) 2008 Completed
Marina Trading DB - 226 Nos. Panasonic show room 2009 Completed
M/s. FBJ Enterprises 2500A MV Panel and Feeder Pillars bel air- 61 villa complex, luqta 2007 Completed
M/s. Marina Trading / Shannon Engg MVP - 2nos 2B+G+M+7 Shannon Hotel 2008 Completed
Construction & Reconstruction
EngineeringMixed - Used Offices - Vendome mall
Totalizing Panel - 1 No, MV Panel - 1 No, SMDB - 11 Nos &
DB - 3 Nos.2014 Completed
Takyeef Electromechanical Kahramaa Awareness Park MCC Panel - 8 Nos. 2013 Completed
HBK Engineering Services Labour Camp @ Abu Nakhla 5 No's of LV & PFCC 2019 Completed
Al Moayyed Air Conditioning School Renovation @ Wakra MVP, SMDB, DB, & LRP 2011 Completed
Unicorp - BEMCO QPR Dukhan Road (East contract) @ QF Landscape feeder pillar-42 No's 2019 Completed
Commitment Engg. Works Renovation of office Building 2500A MV Panel -2 Nos.& Cap. Bank 2010 Completed
Royal Qatar Al Rayyan Water Factory MV panel,Cap.bank,SMB & DB 2011 Completed
ITCC QAF E'Shail Communication Network LV PFCC SMDB & DB 2018 Completed
Sinohydro Lusail Development 200A 6Way Feeder Pillar-31 Nos. 2012 Completed
M/s. Al Khaleej - Mathew MVP - 3nos AL JERIYAN FARM 2008 Completed
SEF Construction for Ezdan Mall @ Wakrah SMDB 34 Nos. DB 36 Nos. FTMC Brand 2016 Completed
Advanced Utility Construction&Cont'g AUCC Precast factory @ Al Wakrah LV PFCC SMDB DB MTS MCC 2019 Completed
Polaris Trading & Contracting Al Khor Expressway Package 3 & 4 SLFP - 55 No's 2018 Completed
M/s. Germin Trading MVPanel, Feeder Pillar 60 Nos .Villa Complex 2008 Completed
Nasco Cont. & Trad. MV panels - 4 Nos, Cap. Bank - 4 Nos Water & Bewerage Factory 2010 Completed
Doha Switchgear Awqaf Project 2500A-MVP-2Nos.&SMB-19Nos. 2012 Completed
Takyeef Electromechanical Al Banush Club MV Panel Modification 2013 Completed
Condor Woqod Petrol Station @ Masaieed North2500A MVP - 2Nos,200KVAR cap.Bank-2Nos.SMB,DB&
LCP2012 Completed
Strom Construction NOH2 Street Lighting feeder pillars Feeder Pillars - 50 No's 2017 Completed
NEMCCO Street Lighting Feeder Pillars @ Various projects in Qatar SLFP - 52 No's 2018 Completed
Al Jedara Trading Establishment Al Ahli Clinic @ Wakra MV Panel,Cap.Bank ,1600 KVA Dry Type Transformer 2016 Completed
Drake & Scull NDIA CP -15 MCC & Small Control Panel 2010 Completed
Page 5 of 16
Customer Job details Project details Year Status
M/s. Marina Trading 2500A MV Panel - 2 Nos. Al Ain Hotel (2B+G+14+P.H) 2008 Completed
Al Mana Engineering & Contracting Co EPIC for Primary School in Dukhan Township SMDB & DBs 2018 Completed
K&H Al Mana Muzareb tower Busriser 2010 Completed
Viatech Engineering Private Palace @ Al Rayyan MVP - 2500A -2, Nos. 200A Capacitor 2 2012 Completed
M/s. BEMCO LT Distribution Panels NDIA Utility system CP-13 2007 Completed
M/s. Doha Tech Services MVPs & SMBs - 63 Flats 63 flats (b+g+4) + 129 flats (b+g+5) 2007 Completed
National Contracting Grand Hamad Avenue Additioanl Cost for LVAC Service Equipment - 1 Lot. 2015 Completed
Premium ConstructionProposed 36 (G+1+PH) Villas + Administrative Building at
Al KheesaSMDB - 66 Nos. & DB - 202 Nos. 2015 Completed
Doha SwitchgearStore House, Labors Accommodation & Administration at
Umm Sanim
MV Panel - 2 Nos, Capacitor Bank - 2 Nos., SMDB - 19 Nos,
DB - 39 Nos & REF Test at Site - 2 Nos.2015 Completed
Nasco Cont. & Trading MV Panel, SMB, DB, ATS, Cap. BankPro. Police Station, Civil Defense & Communication Build. @
Zubara2009 Completed
M/s. FBJ Enterprises 2500A MVP, 1600 TR FPs 34 Villa Al Waab-2 2008 Completed
Qatar International Electrical CoConstruction & upgrade of E-Ring road North / south link
(P008-C2)LV Panels 2 No's & DB 12 NO's 2018 Completed
Elite Prime ElectromechanicalModification Workshop G+M & Office For Al Arabia Steel
Factory at Industrial Area
LVP,Capacitor Bank Panel, MCC Panel, SMDB & ATS Panel
& DB2018 Completed
Iberdrola Lighting Feeder Pillar Mesaieed AIPP Project 2009 Completed
Doha switchgear Awqaf project MVP, SMB 2016 Completed
Premium Construction 36 & 28 (G+1+PH Villas +Admin.Bld.+Club
House,Swimming Pool @ Al Kheesa
MV Panel - 3Nos. Cap.Bank - 2 Nos, Feeder Pillar - 18
Nos.& REF Test at Site - 1 No.2016 Completed
IBA Trading Markiyah Project MV Panel Modification at Site & REF Test at Site - 9 Nos. 2015 Completed
Leighton ContractingNew / Relocated Sewage Pumping Station (RAF - B) at
MLPA SouthTotalizing Panel - 1 No, SMDB - 3 Nos & DB - 36 Nos. 2015 Completed
Al Khaleej Modern Lights Wakra Heritage Village Modification in Syn Panel - 2 Nos. 2015 Completed
Macmet Al Khaleej Abu Samra Border Security& customs LV Panel -2 Nos.& Ref Test 2017 Completed
Al Barakat Electrical All LPO 2009 Completed
M/s. Building Engg.& Ser.Trdg SMDB - 20 sets Al Lusaul Car Park 2008 Completed
Belhasa Projects Barwa Al Baraha - Phase -2 MCC Panel & PLC Control Panel 2013 Completed
M/s. Hochtief Construction MDB & DBs Barwa Comml Avenue 2008 Completed
Al Kamal International KDO Residence @ Dafna SMDBs - 46 No's 2018 Completed
Al Dhow Lusail development primary infrastruture construction of
CP08-A1&A2SLFPs with dimmer control panels-17 No's 2019 Completed
M/s. Doha Tech servicesl 2500A MVP-2 Nos, SMB -17 Nos. B+G+7 @ Al Saad 2007 Completed
M/s. Al Roda Engg. MVPANEL - 3 Nos. 3 Different project 2008 Completed
Green top international Al Birkat Awameer substation 2 & 3 ACCP , SDB & PDB Panels 2017 Completed
Powermech Engineering ISF Petrol Station CPC08c at Al Duhail MV Panel, Capacitor Bank, SMDB's & DB's 2018 Completed
Florida Contracting Pro. Warehouse & Office Green House Generator ATS panel 2011 Completed
Metalex Trading G+Mwork Shop+Office Building +Ancillary +Guard Rom @
New Industrial AreaMV Panel -2, 250KVAR Cap. Bank -2, SMB-16,DB-17 & REF 2017 Completed
Powermech Engineering New Al Haraj Souq MCC Panel 2018 Completed
M/s. HBK Engg Services MV Panel Jassim tower 2007 Completed
M/s. Doha Tech servicesl 2500A MV Panel - 3 Nos. Al Sadd Exe. App's (2B+G+7) 2007 Completed
M/s. Al Asalah Electrical Matl MV Panel, TR, SMB & DBs B+G+7 Res.Buldg 2007 Completed
Contraco Mansion 2 (Pearl Qatar) MVPanel, SMB, Cap. Bank & DB 2010 Completed
M/s. Marina Trading MVP - 3nos Fac.Bldg for Qatar Clay Brik 2008 Completed
Al Asalah Electrical Materials 2B+G+M+7 Off. Buil'g @ Najma 2500A MVP, CB, SMB & Busraiser 2010 Completed
Arabian Supply Center Fire Station MuseumModification of MV Panel at Site and Supply of New
Generator Panel2021 Completed
Hatco Trading & Contracting Smeet Precast Factory SMDB - 6 Nos. & DB - 19 Nos. 2014 Completed
Midmac Contracting Company WLL
550 Island - North, South1, South 2 & South 3, 551 Island -
North, South1, South 2 & South 3 CP08-A1 QETAIFAN
ISLANDS SOUTH ROAD LIGHTING
Supply of Electrical Metering Cabinet 2018 Completed
M/s. Qatariana Comml.Co., MV Panels, SMBs & DBs Amiantit Pipe Factory 2007 Completed
Page 6 of 16
Customer Job details Project details Year Status
M/s.Engineered Systems (ESI) MVP, SDB & DBs Dog Kennels for MOI 2008 Completed
Powermech Engineering New El Haraj Souq Project B + G + M + 2F Supply of SMDB'S 2018 Completed
Network Electrical Farm -No.1038@Southwest Mkaines @ Ryyan MVP-3Nos.,100KVAr Cap.bank-3Nos. 2013 Completed
M/s. Medgulf Construction Co. 2500A FORM-4 Panels, MCCs 2007 Completed
SYSCON RIW @ Various Locations SLFPS 8 WAY-18 & 6 WAY-36 No's 2021 Completed
M/s. Nasser S Al Hajri MDBs - 2Nos. QG PROJECT - RAS LAFFAN 2007 Completed
M/s. Doha Technical Services MV Panel -3 Nos. B+G+7Residential Building 2008 Completed
Germin Trading & Cont. MVPanel - 2 Nos 2B+G+3+PH add. Mezz. 2009 Completed
K&H Al Mana Additional &Modification @Al Dueel 2500A MVP-2Nos, 300K.Cap.Bank -2 Nos.W/o Harmonic 2012 Completed
Spectra Arts C/o Viatech Enginering Spectra Arts Glass factory LV Panel,Cap.Bank,MCC,SMB , DB & REF 2017 Completed
Contraco MV Panel, Capacitor Bank,SMB & DB Shk. Ahmed Bin Ali Al Thani Palace @ Al Rayyan 2009 Completed
Al Khaleej Modern Lights Add. Pent House and Swimming Pool MV Panel - 1 No. ATS Panel - 1 No, REF Test - 1 No. &
1600KVA Transformer - 1 No.2014 Completed
Al Khaleej Modern Lights B+G+7- Apartment @ Mansoura2500A MVP-1No.ATS-1No.SMB-2Nos.1600KVA
Transformer2012 Completed
M/s. Tadmur Contracting 2500A MVP-1 No, SMSB, LCP & DBs Qatar Islamic Bank 2007 Completed
M/s. ORBIT Al khaleej MVP,SMDB, Capacitor Bank 2007 Completed
M/s. Marina Trading MVP - 2nos Shanoon Hotel2B+G+M+7 Res.at Nejma 2008 Completed
Takyeef Electromechanical Tadmur Logistics @ Energy City Lusail ECQ 2500A MVP-1No.150Kvar Cap.Bank W/O Harmonic 2012 Completed
Takyeef Electromechanical Kahramaa Awareness Park Add. cost for MV panel 2013 Completed
Consolidated Contractors Group Dukahn Highway St. Lt. Feeder Pillar - 37Nos. 2016 Completed
M/s. New Light Electric Inst. 2500A MV Panel - 2nos B+G+4 Proposed Bldg 2008 Completed
Al Khaleej (Sugadhan) Camel Holding Fascility - Lewania MV Panel - 4 Nos. 2010 Completed
National Cont. & Trading Co. 21 Nos. G+1+P C.H & B+G+2 off. Building MVP,SMB,C.Bank, F.P & DB 2011 Completed
Enarah Electromechanical (Through by
Doha Switchgears)Proposed Lulu Hyper Market MV Panel 2 Nos. Capacitor Bank 2 Nos. 2013 Completed
I B A Trading & Cont. 3B+G+M+7 Shops &Office Building @Old GanimMV Panel - 1 No.,SMB-10Nos, DB-33Nos,.200A ATS,
300KVA Cap.Bank - 1 No & REF Test at Site - 1 No.2016 Completed
Gulf CentreAbu Nakhla General Hospital for Hamad Medical
Corporation at Industrial AreaOffer for Modification of MCC Panels 2018 Completed
Al - Khaleej American Wardrobes Modification From Labor Accommodation to Garage G/F MV panel, SMB,DB,Trans, Cables 2010 Completed
Hxsteel International Engineering Laffan Aluminium Factory @ Ind Area MV Panel 2 Nos. MCC Panel -1 , REF Test 2016 Completed
M/s. Gulf Lights 2500/1600A MVP - 2Nos Catholic Community Centre 2008 Completed
HBK Engineering Services MV Panel - 2 Nos. Pro. Batching Plat Lab. Accom 2009 Completed
UCC Infra Raod Al Kharaityat and izghawa Feeder Pillar 2020 Completed
Contraco Texas A&M Engineering Building GCP 1 No, ATS 5 Nos, SMB 1 No & DB 2013 Completed
Atlas 7 villa complex MV Panel -2 Nos. & Cap. Bank -2 Nos. 2010 Completed
HBK Engineering New Womens Hospital MV Panel -3Nos. 2011 Completed
HBK Contracting HBK Garage St.34 @ Indisrial area MVP-2Nos. 200KVA Cap.Bank W/O-2Nos. SMB,Db &
Isolator Box2013 Completed
AL Dhow Lusail Public Realm Landscape Works for CP-10C2 FP with Dimmer controller - 13 No's 2017 Completed
Al Amoudi Trad. & Cont. Pro. Gypsum Board Factory (G) & Office Building2500A MV panel - 1 No, 300KVAR Cap. Bank (With
Harmonic) - 1 No, Transformer - 1 no2011 Completed
Q-TEC Al Jazeera Studio MV Panel, ATS Control Panel 2010 Completed
Condor Building Contracting QJ131 WAQOOD fuel station @ New Orbital LV PFCC SMDB DB 2019 Completed
HSP Enabling JVNew / Relocated Sewage Pumping Station (RAF - B) at
MLPA SouthMCC Panel - 1 No. & PLC Panel - 1 No. 2015 Completed
I B A Trading & Cont.Accomodation Building 5 Nos.G+1 for Qatar Armed Force
@ Ras Bu Abboud
MV Panel, 300 KVAR Cap.Bank,SMB-10 Nos.DB-43
Nos.REF2017 Completed
M/s. TRAGS 2000A MVP & ATS MV S/s No.4 - HMC Emergency 2008 Completed
Royal Qatar MVP, C.B Panel, SMB & DB Prop. Garments Factory 2009 Completed
Radiant Engineering Mwani fishing Harbor MEP Works Ruwais port Variation Charges 2021 Completed
Jumah Al Hasssan Trading & Cont. MV Panel, Capacitor bank Jassim Al Musallam Center 2010 Completed
Imperial Trad. & Cont. co. DPS - MIS Indian School at Al Wakra MV Panel-2 & Cap.Bank - 2 -Nos.125KVA 2012 CompletedPage 7 of 16
Customer Job details Project details Year Status
Elec QatarB+G+1 Private Villa for Shk-Nasser Bin al Thani @ Abu
Hammour
MV Panel,,Cap.Bank,400A ATS,1000KVA
Transformer/KahramaDocumentation 2016 Completed
Strom Construction Al Shamal 8 Way FP -23 Nos & 6Way FP - 16 Nos.. 2017 Completed
Ramco Trading & Contracting Co.WLL Al Andalus School Complex Busbar modificatino 2019 Completed
Al Jaber Electro Mechanical Co (G+3) Saeed Al Kaabi Camp@Ind. MVP-2Nos.SMB-8Nos. 2012 Completed
AL Mawrid Trading B+G+7 Building Al Doha Al jadeeda MV Panel, Dry Type Transformer 2010 Completed
M/s. Darwish 2500A MVP & SMB-7 Nos. Upgrading of Generaor facilities at MOI 2008 Completed
Wakrah Electrical Farrm 301 @ Umm Salal MVP,Cpa.Bank,& 1600KVA Taransformer 2012 Completed
M/s. Doha Switchgear 2500A MV Panel -2 Nos/ MSB-16 Nos. 68 Villas @ Al Gharaffa 2007 Completed
Al Alia Trading & Contracting Aluminium Extrution FactoryMV panel - 2 Nos, Cap. Bank - 2 Nos, SMB - 5 Nos, DB - 10
Nos2010 Completed
Qatariana Commercial Company Construction of New Kindergartens at ShamalMV Panel - 2 Nos, SMDB - 6 Nos, DB - 20 Nos, Spareparts -
1 Lot & Additional Warranty 2014 Completed
MEP EnterprisesRestoration of Wakrah Heritage Village P-108(Wakara Souk
Waqif)
MV Panel-1No.(28B & Modification of LVP -11 & LVP28A(2
Nos.)2016 Completed
Qatar Power Construction AL Ghanim RIW @ AL Khartiyat 6 way-11,8way-27,kwh- 38 2019 Completed
Radiant Temporay accommodation SMDB & DB 2020 Completed
Hxsteel International Engineering Proposed Ras Laffan Aluminium Factory at New Industrial
AreaMV Panel - 2 Nos, SMDB - 1 No. & REF Test at Site - 2 Nos. 2015 Completed
M/s. Denver Engg 600/500KVAR Capacitor Banks The Pearl Qatar 2008 Completed
Imperial Trad. & Cont. co. Birla Public School MV Panel & Cap. Bank 2011 Completed
Germin Trading & Contracting Proposed Barracks (G+2) @ ISF Camp MV Panel & Cap.Bank-2Nos. 2011 Completed
Imperial Trad. & Cont. co. DPS - MIS Indian School at Al Wakra MVP,2 Nos. Cap.bank -2 Nos.100KVAR-W/O 2012 Completed
Al Mawrid Proposed Steel Mesh factory(G+2)Office@Ind MV Panel 2 Nos. 2012 Completed
Qatani Universal ( Habib & Surender)50 Villa Housing Complex @ Al Aziziya for SHK- Ahmed Ali
A.A.Al Thani
MV Panel 2500 A-2 Nos.Cap.bank 200 KvAr-2 Nos. SMB
Type Feeder Pillar-10 Nos.2017 Completed
NEMCCO Street Lighting Feeder Pillars @ Various projects in Qatar SLFPs - 38 No's 2018 Completed
M/s. HBK Engg Services 2500A MV Panel-2Nos. & 630A ATS OWAINA TOWER 2007 Completed
Doha Switchgear Awqaf Project DB 102 Nos. 2012 Completed
Elec QatarB+G+1 Private villa for Shk- Naser Bin Al Thani
@AbuHamour
MVP-1600A,175Kvar Cap.bank,400A -ATS.1000KVA Oil
TX,Kahrama documentation 2017 Completed
Contraco VIP Mension.2 (Parcel-4-ID-04) MV Panel & Cap.Bank Panel 2011 Completed
Technology Electrical 20 Nos. (G+1+Ph.Villa)+ Club House@ Gharafa MVP, MSB, SMSB & Transformer 2011 Completed
Contraco W.L.L Salwa Beach Resort Hotel MV Panel - 1 No. & Feeder Pillar - 4 Nos. 2015 Completed
Wakrah Electric MVP, MSB & Transformer Res. Villa 23Nos.+ C.H 2009 Completed
Qatar International Electrical Industries
CoMANATEQ QEZ 1,2 & 3 for supplying feeder pillars Feeder Pillars 2017 Completed
M/s. Qatariana Commercial Co. 2500A MV Panel -2 Nos. 46 villa Compound @ Al Waab 2007 Completed
M/s. Al Masaood Bergum Distribution Boards - 430 Nos. 2007 Completed
Al Asalah Electrical G+P Private 17 Villa Compound @ Umm Salal 2500A MVP,Feeder Pillar,SMB,DB & Transformer 2011 Completed
M/s. Gulf Lights SMDB, DB, FPs Al Rayyan Municipality 2008 Completed
M/s. MegaTec SMDB&DB 43 villas compound 2007 Completed
Radiant Engineering Prop. Fire Station Ext. at Wadi Al Sail MCC Panel - 5 Nos. 2014 Completed
M/s. S.B.K Co. MVP, FP & MDB 39 Villas complex 2008 Completed
Al Roda Engineering MVPanel, MSB, DB Proposed 50 villa (G+1+P) 2009 Completed
Qatariana Commercial Co. MVPanel , Capacitor Bank Al Faisal Mixing plant & Accom. @ Ind. Area 2009 Completed
HKH General Contractor Proposed Shiekh Hamad Abdulla Al Thani Palace MVP, SMB, DB, Cap. Bank, MCC 2010 Completed
Rabban Ready Mix Upgrading Ex. S/S for Rabban Ready Mix MVP - 2 Nos, Cap. Bank - 2 Nos with Ref Test - 2 Nos. 2014 Completed
Germin Trading & ContractingProposed 2B+G+7 Storey Residential Building at Rawdat Al
Khail
MV Panel - 2 Nos,Capacitor Bank - 2 Nos. & REF Test at
Site2015 Completed
Al Jazeers Engineering Works Al Rayyan Cartoon Factory MVs PFCC & Oil Transformer 2017 Completed
UCC / INFRAROAD PJ022 AL Mearad & southwest Muaither Pack 06 SLFP 8 WAY 200/32A - 48 No's 2021 Completed
M/s. Al Khaleej SMB & DBs 61 Villas at Al Luqta 2007 Completed
Haste Contarcting & Trading MSI Synchronizing Panel - 1 No. 2016 Completed
Page 8 of 16
Customer Job details Project details Year Status
AWQAF 2009 Completed
Germin Trading & Contracting Proposed Barracks (G+2) @ ISF Camp 1600KVA Oil type Tr. 2016 Completed
HBK Engineering 2 Villa B+G+1+PH@ Musherib MVP, SMB & DB 2012 Completed
Radiant Engineering Al Udeid Project (U0835AUFR) SMDB's and DB's 2021 Completed
M/s. DODSAL 400A/160A MDBs - 17 Nos. rasgas onshore (p.no.59) 2008 Completed
Powermech Engineering Affordable Housing Development ( Government Building ) MV, SMDB's and DB's 2020 Completed
Gulf Lights Electrical Engineering Residental Tower @ LusailMCC Panel-3, VFD Starter Panel-6 Nos.& 6KW Dol Starter
Panel-2 Nos.2016 Completed
Khalifa Electro Mechanical Office Building (LG+UG+2 Floors) @ Umm Lokhba1600A ATS MV panel, SMB - 4 no's, 200 KVAR Cap. Bank
(with Harmonic)2011 Completed
Tarek Multi Energy (ltd) MV panel, Cap. Bank, SMB Pro. Fire Station Build. @ Um Ghuwayliah 2009 Completed
K&H Al Mana Qatar Company Factory@ Ind 2500A MVP-1,& 200K.CapBank -1.W/o harmonic 2012 Completed
Torch Al saad Building MV panel, SMB & DB 2013 Completed
Qatari DevelopmentCentral Prison Proposed Cell Block-K for Ministry of Interior
at Salwa
MV Panel - 1 No., Capacitor Bank - 1 No., SMDB - 4 Nos,
DB - 18 Nos. & Ref Test at Site - 1 No.2015 Completed
Qatar Insulation Factory MV panel - 2 Nos. Qatar Insulation Factory 2009 Completed
Gulf Safety Equipment Farm @ Al Ghasan - Al Khor MVPanel -1NO.&Transformer-1600KVAR 2012 Completed
M/s. FBJ Enterprises 1600KVA TR - 2Nos. bel air- 61 villa complex, luqta 2007 Completed
M/s. Gulf Lights 2500A MVP - 2nos Grand Regency Hotel extn 2008 Completed
Seagate MV Panel, SMB & DB Masker Hyper Market / Muaithir Mall 2009 Completed
K & H Al Mana MV Panel - 2 Nos Pro.(G+10) Build. G*2 (300 Apart.) 2009 Completed
Marina Trading & Contracting Al Jasra Twin Tower @ Lusail Additional Cost for MCC Panels J12-027 2012 Completed
Frijins Steel Construction Middle East FME Mesaieed Workshop MV Panel - 2 Nos. 2014 Completed
Orient ElectricalProposed Villa (G+1+PH) 36 Nos + Club House + Guard
Room at Al Junayhat, Al DaayenMV Panel - 2 Nos. & Ref Test at Site - 2 Nos. 2015 Completed
Sheraoo Constructions & Transportions Modification Factory & G+2 Office Building MV, Cap, Isolator, SMDB and DB 2020 Completed
Radiant Engineering Rawdat Al Muhairqa Development Project MV, Cap, SMDB and DB 2020 Completed
AL DHOW CP01E AL Wadi street @ LusailDimmer CPs(6nos)+SL Landscape FPs(4nos)+KM Metering
cabinet 10 no's2021 Completed
IBA Trading 2B+G+1 Rest's/Coffee Shop @ Markiyah Busbar Interconntion - MV Panel 13 Nos. 2015 Completed
Etimaad Qatar LLCEPIC of New LGO Tank (2114FI) & Utilization of LC Tank
(2145FA) for FGO Service at QP RefinaryMCC Panel - 2 Nos. 2015 Completed
M/s. Al moayyed Air conditioning MVP, SMDB & DBs Office Bldg at Muntazah 2008 Completed
Advanced Construction Technologies TAB-C-108-01 Totalising Panel-1No. 2020 Completed
Qatar Steel EF3 Fume Treatment Plant & 02 Jets Upgrade Project
Charges for The Panel (Form 2) - 1 Set, Charges for the
Breakers - 1 Set, Charges for the DOL Starter - 5 Sets,
Charges for Transformer - 1 Lot, Assembly Charges - 1 Lot,
630A 4P 36KA Spare MCCB - 1 Lot, Supply of Cable 2
X4x185Sq mm - 100 Mtr, Local Transportation Chares- 1 Lot
Installation Testing & Commissioning - 1 Lot.
2015 Completed
M/s. HBK Engg Services MV Panels - 2nos Al Khayarin Plastic factory 2008 Completed
Orient ElectricalQuanto Bello Factory for Quanto Bello at New Industrial
AreaLV Panel - 2 No's & Capacitor Bank Panel - 2 No's 2018 Completed
Jumbo Electromech Engg. B+G+3 Typ.@ Old Airport MV Panel, Cap. Bank, SMB & DB 2011 Completed
Takyeef Electromechanical Renault Workshop @ Industrial AreaMV Panel 1 No, Capacitor Bank 1 No, SMDB 3 Nos & DB 12
Nos.2013 Completed
Advanced Engineering & Maintenance
Co.Al Mana Residential Building at Umm Muglina (B+G+7)
MV Panel - 1 No. Capacitor Bank - 1 No, SMDB - 8 Nos. &
DB - 58 Nos.2014 Completed
Takyeef Electromechanical Beach Villa (B+G+1F) BVN55-60 at Pearl Qatar SMDB - 11 No, DB - 22 Nos, MCC - 4 Nos , ATS - 3 Nos & 2
Years Spare Parts - 1 Lot.2014 Completed
Al Kamal International KDO Residence @ Dafna MCC Panel - 16 No's 2018 Completed
Contraco MV Panel - 2Nos. New Labour Accom 2009 Completed
Electro-Mechanical Co WLL-QATAR Al Ebb & Leabaib SLFP 6WAY-31 & 8WAY-7 No's 2020 Completed
Networks Electricals Rehabiliataion of Street Lighting 4 way Feeder pillar - 5Nos. 2011 Completed
Page 9 of 16
Customer Job details Project details Year Status
Kittco Readymix Block Factory MV PANEL -2 Nos. 2011 Completed
Tropical Trading & Cont. Private Villa G+1+P @ Al Mamoura 2500 A MV Panel ,225 KVAR Cap.bank ,MCC,SMB-
4,DB,13,Isolator Panel-102017 Completed
M/s. ADCC-JV SMDBs NDIA / ADCC - JV 2008 Completed
M/s. S.B.K Co. MVPanel,SMB,DB Redesign of ground floor & Pro. Add.(31 villa) 2008 Completed
HBK Engineering Proposed 3 Palaces (B+G+1+P) MV Panel 2 Nos & Capacitor Bank 2 Nos 2013 Completed
Al Mawrid TradingWorkshop Modificationof Qatarian Vehicle Factory @ New
Industrial AreaMV Panel -2, 300KVAR Cap. Bank -2, REF 2017 Completed
M/s. HBK Engg Services 2500A MVP - 2nos B+G+8 Res. Building 2008 Completed
Takyeef Electromechanical Al Banush Club Cap.Bank-4 Nos. 2011 Completed
Technology Electrical & Services B+G+7 Res. Build MV panel, MSB, Transformer 2010 Completed
Al Shams Trading & Contracting 2 Nos. 15 Duplex & 2 Single Villa @ Al Rayyan MV Panel - 2 Nos. & REF Test at Site - 1 No. 2015 Completed
Commitment Engineering Chalet in Farm,+Club House + Service Bld. @ Al Khor
(Shafallah )EMSB 2 Nos., ATS Panel -2 Nos. 2010 Completed
Al Farraj Electrical MV panel - 3 Nos. FEE04/GSGWR/0-2009-005LPO 2009 Completed
Qatar Flash Trad. & Cont. MVPanel,SMB,DB Villa Compound @ Old Airport 2009 Completed
M/s. A.B.K for electromecanic MVP, SMB, DB 23 Villas Muaither North 2008 Completed
Elec-Qatar Doha College MV Panel, Cabacitor Bank 2009 Completed
Commitment Engg. Works 62 Villas @ Abu Hamour 2500A MVP - 2 Nos, 200kvar-1No. 2010 Completed
M/s. Doha Tech Services MV Panel B+G+8 2007 Completed
Al Radi Trading & Cont. CoPro. Added Second Floor Labour Accommodation & Work
ShopMV panel, Transformer 2010 Completed
Smart Power Electrical & Mechanical
WorksModifaction for Snow Factory @ Inbustrial area MV Panel -with REF 2 Nos ,SMB-6 Nos. Cap.Bank-2 2016 Completed
New Center Trading & Engineering
Services
Replacement of the Electrical Old Low Voltage Panels for
Chiler 5 & 6 in Womens Hospital at HMCChiller Panel - 2 Nos. & Motorized ACB - 2 Nos. 2015 Completed
New Light Electro Mechanic Police Tower (Land2)2B+G+10 BusRaiser - 4 Nos. 2012 Completed
Strom Construction LCC Private Villa in West bay LV & PFCC 2019 Completed
A I C I BPC 111 Building @ Al Udaid Air BaseMV Panel, -1No,Capacitor Bank - 1 No. LCP - 2 Nos, SMB -
1No.,DB - 8 Nos & REF Test - 1 No.2016 Completed
Takyeef MVPanel, SMSB & ATS Qatar Islamic Bank 2009 Completed
How united services Spacemaker factory MV panel, Cap. Bank (300 KVAR with harmonic) 2010 Completed
Florida Contracting Farm House @ Al Shakuth MV Panel - 3 Nos. 2011 Completed
Al Nouras Trading & ContractingConstruction of 10 Cow Shades Buildings, Labour
Accomodation, Masjid, 6 Villas & Office Buildings for OfficeSupply of MV Panel & Capacitor Bank Panel 2016 Completed
Radiant Engg Baladna Modification works SMDB, DB & Feeder Pillar 2020 Completed
Doha Switchgear MVPanel, MSB 38 Villa @ Azizia 2009 Completed
Powermech 37 Villa Compound MV Panel 2011 Completed
Shama Maint. & Services Co.(Wakrah
Electric)Pak. Shama school MV Panel, SMB & Transformer 2010 Completed
United Construction Est. Diwan Amiri(Doha Palace Project, Kitchen Yard Substation 2500A ATS MV Panel 2011 Completed
HBK Engineering Sherton Park MV Panel , Capacitor bank, SMB & DB 2013 Completed
Orient Electrical MV Panel - 2 Nos. Villa compound @ Al South Soudan 2009 Completed
Al Khaleej (Sugadhan) 2000A Mv Panel & 2000A MSB Ibq head office s/s renovation 2009 Completed
Best Building Engg. Services 16 Villa Compound MV panel, FP, Transformer 2010 Completed
Lexus Engg. Printing Press @ Ind. Area MVP, Cap. Bank, SMB & DB 2011 Completed
Royal Qatar MV Panel -2 Nos. 2010 Completed
Commitment Engg MV panel - 2 Nos 45 Villas Compound @ Al Markiyah 2009 Completed
Al Mulla Eng. & Cont. MVP, MSB, DB & Transf'r G+M Gen. Pro. Warehouse 2009 Completed
M/s. Master Engg Services 2500A MVP Carpentory [email protected] 2008 Completed
AL Jaber Engg & HLG NOH3 @ Under Bridge control panels - 44 No's Under Bridge control panels - 44 No's 2017 Completed
M/s. Al Masood Bergum Distribution Board 2016 Completed
Wakrah Electric National Paint co. Staff Accom MV Panel, Capacitor Bank & Transformer 2010 Completed
Page 10 of 16
Customer Job details Project details Year Status
Al Alia Trading & Cont Cable Management Factory MVP,Cap.Bank, 2011 Completed
M/s. FIMCO 1600A MVP + 1000KVA Tr. 2 (G+m) Store & G+3 Lab. 2008 Completed
M/s. Orient Electrical 2500/1600A MVP - 2Nos Proposed Add 3rd flppr for flat complex 2008 Completed
Al Amoudi Trading & Contracting B+G+4 Residential BuildingFox Hill N23 @ LusailMSB - 1 No,100KVA Cap.Bank - 1 No, ATS - No. ,MCC - 1
No, SMB-7 Nos & DB -53Nos.2016 Completed
Al Jaber Electro Mechanical Lusail CP-10B-1 Dorsch Qatar 2017 Completed
Ruby Electromechanical Mowasalat Project @ Al Khor MVP, Cap.Bank, & ATS Panel 2012 Completed
Al Thamer Trading MV Panel & Transformer 26 G+1 Villas + Ancillaries 2009 Completed
Viatech Engineering ABM Military College MV Panel - 2 Nos. 2010 Completed
Larsen and Toubro – PT & D (Qatar)KM PHXI Addendum (Old Airport, Old Airport East and
SED)
SDB - 8 Nos, CCTV DB & ACCESS Control DB - 6 Nos,
Emergency Push Button Panel - 8 Nos, DB - 33 Nos &
Recommended Spare Parts - 1 Lot.
2015 Completed
M/s. Germin Trading 2500A MV Panel - 2Nos Residential Bldg at Najma 2007 Completed
Al Asalah Electrical MV panel, SMB, Transformer B+G+7 Residential Building 2009 Completed
Strom Construction Al Mashaaf 6 Way Feeder Pillar Standard -27 Nos. 2017 Completed
Al Amoudi Trading & Co B+G+7 building @ Najma MVP-1 No.& 1000KVA Tr. -1 No. 2012 Completed
Sinohydro CP 1 Project St. Lighting Feeder Pillar - 14Nos. 2011 Completed
M/s. Al Khaleej MV PANEL - 2 Nos. Khalid Cement Co. 2007 Completed
Wakrah Electric Al - Waab (Al - Khor) MV panel - 2 Nos 2010 Completed
Al Khaleej Modern Lights(Mthew) Farm House MVPanel- 2 Nos. 2011 Completed
Wakrah Electrical Qatar Steel@ Industrial Mv panel, & 600KVAR Cap.Bank W/out Harmonic 2012 Completed
Al Emadi Enterprises Markiyah Project Supply & Installation for 4 Nos ACB -1600 A 2015 Completed
Electomech 37 Villas Complex +Club House +Guard Room For SHK-
Abdulla Soud @Jerian jenaihatMVPanel ,Cap.bank,SMB & REF Test 2016 Completed
HBK Engineering Proposed Palace - 3 at Gharafa MSB - 1 No. 2015 Completed
Strom Construction Infr Bani Hajer PCK 02 Feeder Pillar 2018 Completed
Advanced Engineering Al Mana Mall SMSB, DB & LCP 2011 Completed
M/s. Gulf Lights SMDBs Res,& Comml Bldg complex 2007 Completed
Prominent Proposed Office Build. (2B+G+2)MV panel - 1 No, Cap. Bank - 1 No, SMB - 13 Nos, DB - 15
Nos2010 Completed
Nemcco Ashghal Feeder Pillar 2020 Completed
SEF Construction Modification for 10 MV Panel in Ezdan Mall @ Wakrah ATS Panel1250 A . 2Nos. 2016 Completed
Unicorp / BEMCO Dukhan Highway Expressway Road Feeder Pillars - 19 No's 2017 Completed
M/s. Megatec 2500A MV Panel- 1 No. MEDICAL PLAZA 2007 Completed
M/s. Al Khaleej 2500A MVP 3B-T2 & SMB Qatar Airways 2007 Completed
M/s. Al Roda Engg. MV panels - 2nos 2008 Completed
M/s. S.B.K Co. MVP, SMB 12 Villas Comp.(G+1+PH) 2008 Completed
Rivera Trading & Cont. 2B+G+2 office Bld. @Hilal For Qatar Islamic Bank 2500MVP-1No.& 500KVA Cap.bankW/O Harmonic 2013 Completed
M/s. Doha Technical Services 1600A MVP - 2nos Villa Comp'd (G+1) Villa 2008 Completed
Al Amoudi Trading & Co Proposed B+G+2F Office Building MV Panel, Capacitor Bank, SMB & DB 2013 Completed
ISG - Industrial Servise Group Proposed B+G+M+1 Commercial Center MV panel 1 No & Transformer 1 No. 2014 Completed
Strom Construction LLC Roads and Infrastructure in Al Meared P1 Feeder Pillar - 8Way (25 No's) 2020 Completed
Al Maadeed Sons Trad. & Cont. Shops, Stores, Offices & Jr. Staff & Labour Accom MV panel - 1 No, SMB - 4 No, Transformer - 1 No 2010 Completed
Takyeef Electromechanical Tadmur Logisitics @Energy City Lusail SMDB, DB 2012 Completed
Al Tamez Middle East Qatar Uniiversity Male & Female Class Room Add. Cost for AHU MCC Panels 2014 Completed
Orient Electrical Mowasalat Multipurpose workshop@Abu Hamour 2500A MVP & 450KV Cap.Bank 2011 Completed
Al Bader Group Co. Feeder Pillar -21 Nos. 51 Villas @ Al Gharafa 2009 Completed
Master Engineering MV panel, SMB, DB, Cap. Bank Lycee Francais De Doha 2009 Completed
Gulf CentreAbu Nakhla General Hospital for Hamad Medical
Corporation at Industrial AreaOffer for Modification of MV Panels, SMDB's and DB's 2018 Completed
M/s.Engineered Systems (ESI) 2500A MVP + SMBs 3(B+G+7) Res.Bldg 2008 Completed
NEMCCO LRT @ Exisiting MV panel modification work MV - 4 No's 2017 Completed
National Contracting Company GTC/643G/2014 - Phase-12 - Package-S10, S13 Spares 2021 Completed
M/s. Building Engg.Services 1600A MV Panal - 1 No. Ministry of Interior 2007 Completed
Al Alia Trading & Contracting RLC warehouse 650KVAR Capacitor Bank - 2 Nos. 2010 Completed
Page 11 of 16
Customer Job details Project details Year Status
Commitment Engineering G+2 Labour Accomodation at Industrial AreaMV Panel - 1 No, Capacitor Bank - 1 No, SMDB - 7 Nos, DB -
19 Nos. & REF Test at Site - 1 No.2016 Completed
Takyeef Electromechanical Al Banush Club MCC Panel - 47 nos 2011 Completed
K&H Al Mana ( Al Mana Electronics) G+1 Garage G+2 Accomodation @ Industrial Area 2500A MVP-1 No.350KVA Cap.Bank W/o -1 No. 2012 Completed
M/s. Panceltica Qatar D.Bs with Isolators Barwa Housing Project 2008 Completed
M/s. Doha Switchgear MVP, MSB, SMSBS G+M+1(46Flats+ 40shops) 2008 Completed
Radiant Engineering Co MWANI Port @ AL Dhakira SMDB & DB 2019 Completed
ContracoDuplex Villa Compound + Club & Swimming Pool for HE
Abdullah Khalifa Al Attiya at MamouraMV Panel 1 No, Capacitor Bank 1 No & SMDB 3 Nos. 2013 Completed
M/s. Darwish Mech. & Elec. Co. 2500A MV Panel, SMB & DB development of band unit ( music squandrons) at sailiyah 2007 Completed
M/s. Eard Real Estate co. 2500A MVP + FPs 26 Nos. Villa complex 2008 Completed
M/s. Al Boroug MVP, FP & SMBs 2008 Completed
Condor Building Woqod Petrol Station at Al WajbaMV Panel - 1 No, Capacitor Bank - 1 No, SMDB - 7 Nos, DB -
11 Nos. & LCP - 3 Nos.2014 Completed
Al Jaber & Partners South Side wide Infra : C017 LLSFP, FPs & Spare parts 2018 Completed
M/s. Dodsal Pte Ltd 400A / 250A Socket panel - 6Nos 2007 Completed
Hamton International Al Andalus School @ Umm Salal DB-115 Nos 2017 Completed
Qatar Power Construction HYUNDAI RIW @ AL Bustan 6 way-06,8way-07,kwh- 34,DB-7 2019 Completed
HBK Engineering Services Group office - MV panel MV panel 2010 Completed
Nowr Al -Hidayah For Trad- B+G+M+7 Hotel MV Panel & Bus riser Panel 2010 Completed
Noor Al Hidayah B+G+M+7 Hotel @Umm Ghuwalina MV Panel +Additional &200KVA Cap.bank With Harmonic 2012 Completed
Advanced Engineering(B+G+M+1) Shops & Office Building for Hamad Mohammed
H A Al Mana at Abu HamourMV Panel , SMDB & DBS 2013 Completed
Condor Building Contracting QJ135 WAQOOD fuel station @ Mearad-2 LV PFCC SMDB DB 2019 Completed
Galfar Al MinsadDoha West - DW016 - P01 Roads and Infrastructure in Al
Wajba East Package - 01Feeder Pillar - 25Nos. 2020 Completed
HBK Engineering Medical Commission Building MV Panel with ATS facility @ Site 2012 Completed
H.E.M.C Styro Factory for Styro Project at New Industrial AreaMV Panel - 1 No, Capacitor Bank - 1 No, SMDB - 7 Nos, DB -
10 Nos & REF Test at Site - 1 No.2016 Completed
Macmet Al Khaleej Construction Al Khor Security &Services Complex MV Panel ,300KVAr Cap.Bank,REF Test 2016 Completed
Tri Construct W.L.LRoads and Infrastructure in Al Ebb and Leabaib, Package
05Feeder Pillar - 28Nos. 2020 Completed
Ministry of Economy Doha Port MV panel Replacement 2010 Completed
M/s. SBK Oilfield Services 2500A MVP & SMBs GSQ-768 2008 Completed
Haste Contracting & Trading Mineral Water For Wahat Qatar @ New Industrial Area2500 A MVP, 200 KVA Cap.bank, MCC Panel-1,SMB 5, DB -
42018 Completed
National Industrial Gas Plants Pro. Add. Building @ Ind. Area 2500MVP-1 No.&400kvar C.B-1 No. 2011 Completed
HBKPMV Heavy Machinery Maintenance Yard and Construction
Materials Storage in Manateq Logistic ParkSMDB and DB 2020 Completed
M/s. Al Masood Distribution Boards 8492 GAMA QATAR 2007 Completed
Condor Building Contracting QJ131 WAQOOD fuel station @ AL Hilal LV PFCC SMDB DB 2019 Completed
NemccoConstruction of Link Road Adjacent to Al Khor Express Way
Link Road : 1 East-West and North-South (Interim)Feeder Pillar - 25Nos. 2020 Completed
Ruby Power Electromechnical B+G+3 Hotel Apartment Building @ Old Airport Road2500 A - MVPanel,300 Kvar-Cap Bank, 250 A 4P -ATS
&REF2016 Completed
Siemens W.L.L CP06 Lusail Development Construction Packages Additional Cost for CP - 06 LVAC - 1 Nos. 2015 Completed
Al Sherif Al Sada Trad. & Cont. Pro. B+G+10 Res. Building MV Panel, ATS & Busriser 2010 Completed
HBK Engineering Services Land Mark Extention 2500MV Panel & 300KVAR CB 2010 Completed
Al Khaleej Modern Light (Israr) G+2 Labour Accommodation 1600A MV panel & 1000 KVA Tr. 2011 Completed
Prominent B+G2+Commercial & Admin Buil. MVP, SMDB,DB,& Cap.Bank-200KVA -W/o 2012 Completed
Al Moayyed International Generator control panels Generator control panels - 3 Nos 2018 Completed
Powermech Engineering Design and Build of El Haraj Market DB - 82 Nos. 2019 Completed
Condor Building & Contr Woqod Petrol Station @ Al Muaither MVP, SMDB,DB,LCP&Cpa.Bank 2011 Completed
Alsarh Holding Group Roads and Infrastructure in South of Al Meshaf Feeder Pillar-26Nos. 2020 Completed
Page 12 of 16
Customer Job details Project details Year Status
Takyeef Electromechanical Logistic Village H1A & H2A DB'S - 52 Nos. 2012 Completed
Al Barakat Electrical Battery charger, CT 268 2009 Completed
Mr. Ahmed Khodari Dafna Project MV Panel, ATS & ELCB 2010 Completed
M/s. Doha Switchgear 2500A MVP & FP-6nos 24 Villa @ Al Rayyan 2008 Completed
M/s. Engineering Building Materials
Company2500A MVP - 1No. Wood Factory 2008 Completed
Condor Building Contracting Woqod petrol station @ EGDA - QJ-1114 SMB-9 Nos. & DB -22Nos.,LCP - 4 Nos. 2016 Completed
Simplex Infrastructure LimitedMesaieed Cement Unloading - Conveying - Storage and
Truck Fill Terminal Circulation Water Pump Building SMDB - 2 Nos. & DB 18 Nos. 2014 Completed
Shinbo Qatar Transformer Control Panel - 94 Nos. 2015 Completed
Strom ConstructionAl Bayt stadium ( These panels belongs to another project
not for stadium)LV PFCC SMDB ISOLATOR 2018 Completed
M/s. Hochtief Construction SMB,MDB Barwa Commercial avenue 2008 Completed
Advance Engineering & Maintenance
Company W.L.LAl Mana Twin Towers Podium Renovation MV Panel Modification at Site 2018 Completed
Hamton International Al Andulas School DB 48 Nos. 2017 Completed
M/s. Al Khaleej - Hashem SMB & DBs 34 Villas at Al Waab 2008 Completed
Shaheen Electrical Works MV panel, Cap. Bank Store in Press 2009 Completed
HBK Contracting Co. Pre-cast factory @ Ummsaid 2500A MV panel & Cap. Bank 2010 Completed
How United Qatar Steel Company SMB & DB 2012 Completed
Shinbo Motor Starters 2013 Completed
Qtec Facilities Management W.L.LElectrical Panel Installation of addition chiller at Kahramaa
Awareness Park, Al ThumamaModification of Chiller Panel 2018 Completed
Ramco Trading & Contracting Co.WLL Al Andalus School Complex MCC Variation 2019 Completed
Commitment Engg. Works Renovation Office Building MCC/MCCB 2011 Completed
Smart Power Electrical & Mechanical
WorksPrimary Health Care Corporation Head Quarters
Additional Cost for MV Panel Modification - 2 Nos, ATS
Panel - 2 Nos, SMDB - 2 Nos. & New SMDB - 3 Nos.2016 Completed
Al Boroug MV Panel, Feeder Pillar Compound (20) villa + Utilities 2009 Completed
Strom Construction AZIZIA Phase 4 6 way TPN Feeder Pillars -21 No's 2017 Completed
M/s. TADMUR Contracting 2500A MVP 3B-T2 , SMSB & DBs Stores & Accmodn Buldg, St.70 2007 Completed
Darwish Elcetromechanical & Electrical
Co.Darwish Factory at New Industrial Area MV Panel - 1 No & REF test at Site - 1 No. 2015 Completed
Al Dhow Trading and contracting 339-Feeder Pillars / AD-0968 / B Ring Road SLFPs - 20 No's 2019 Completed
M/s. Star Line Blocks Factory MVPanel Pro. Precast Factory at Industial ST.50 2008 Completed
Traffic Tech (Gulf) W.L.L C Ring Road Expansion Feeder Pillar - 20 Nos. 2014 Completed
Qatar Trading & Contracting Group
(Danway Qatar)
QS001-P01-Roads & Infrastructure in Doha Industrial Area
(Package 01)
Supply and Testing (FAT & REF) of LV Panel (as per KM
requirments)2018 Completed
Elite prime Electromechanical ISO Tank & Pallet Chemicals Storage@ Rasslaffan City MCC -10 Nos. DB- 7 Nos. 2017 Completed
M/s. Darwish Capacitor Bank - 3 Nos. ABM military college 2008 Completed
Orient Electrical MV Panel & Capacitor Bank Al manhal water fac. 2009 Completed
Valence Trading Contracting & Engg Ali Bin Ali Store MV panel, Cap. Bank, SMB, DB 2010 Completed
Peninsular Petrotech EngineeringAdditional of G+1 office build. + G+2 Labour Accom. (Bld. 1
&2) Steel Store + 2 Nos Typ. Open shed (Bld. 1 & 2)
MV panel(2500A), Cap. Bank(250KVAR), MSB - 3 No's. DB -
5 No's2011 Completed
Takyeef Electromechanical SNF facilities Hamad Medical Corporation MVP Modification 2013 Completed
Al Shams Trading & Contracting Additional of 9 Nos. G+2 Labour Accomodation MV Panel 1 No & Capacitor Bank 1 No. 2014 Completed
Specialized Trading & Contracing Al Madar Poly Product MV Panel - 1 No. & REF Test at Site 2014 Completed
IBA Dar Ibn Alarqam school 2500A MVP,250kvar Cap. Bank 2010 Completed
Gulf Lights B+G+M+10 Floors MV panel, Cap. Bank 2010 Completed
SMEET Building @ C ring road MV panel - 2 Nos 2010 Completed
Ruby ElectromechanicalPro.Store+Office (G+MEZZ) & G.Room at Ind.Area - Salwa
RoadMV Panel & Capacitor Bank 2013 Completed
Commitment Engineering Works Proposed Factroy for Al Reef MetalsMV Panel - 1 No., Capacitor Bank - 1 No., ATS panel - 1 No.
& SMDB - 1 No.2015 Completed
Valence Trading Contracting & Engg Ali Bin Ali Store St 02 2500A MV panel, 350 KVAR Cap. Bank 2010 Completed
Page 13 of 16
Customer Job details Project details Year Status
M/s. DODSAL MAIN DISTRIBUTION BOARD Private Villa 2016 Completed
NAKHEEL Lusail CP-10B-1 KWH metering cabinet 2017 Completed
Global Mechanical Engineering QPMC logistic office MV panel, SMB, DB, FP 2010 Completed
SBK Co. Prop. B+G+7 apartments 1600A MVP & Bus raiser 2010 Completed
Orient Star International Doha Drug Store(G+1 Store)@Lnd MV Panel 2012 Completed
Qatar Building Co. Roads and Infrastructure in Al Ebb and Leabaib-Package 2 Feeder Pillar 2021 Completed
Al Dhow AL Janoub stadium @ Al Wakrah Driver control panels - 16 No's 2021 Completed
Bricks Stone Trading & Cont. B+G+7 Building @ Al Saad DB's 76 Nos. 2017 Completed
Q - Tec Group Limited 1600A MVP - 1 No. Barwa site office - Al Khor 2009 Completed
Electron Electromechanical
Proposed Workshop & Office Building & Store Indus for
Mailwaukee Manufacturing Steel Shipping Containers at
New Industrial Area
MV Panel - 1 No, Capacitor Bank - 1 No. & REF Test at Site -
1 No.2015 Completed
Voltage Engineering Lusail Development Construction Package - CP2C Metering Cabinet - 31 Nos. 2015 Completed
Al Khaleej Modern Lights(Mathew) Wakrah Heritage Village Mvpanel Modifaction 5 Nos. 2016 Completed
Strom ConstructionNew Orbital Highway and Truck Route - Project 23 C2 -
Orbital Highway : Salwa Road to North Relief RoadSupply Street Lighting Feeder Pillars and DB's 2018 Completed
Athar Trading Labour Acco.(G+2)and Readymix Factory MV panel, & 250KVAR Cap.Bank 2012 Completed
Golden Engg MV panel, DB Wire Panel Factory 2009 Completed
Advance Construction Technologies /
Bahadir ConstructionUAF Project Supply of SMDB's & DB's 2019 Completed
M/s. Contratco. 2500A MVP 23 Villa (P-207) 2008 Completed
Al Tamez Middle East Male & Female Class Room @ Qatar University Additional Cost for ATS Panel - 1 No. 2015 Completed
Viatech Engineering Umm Garn Villa Sheikh Maryam Villa MV Panel & Capacitor Bank 2014 Completed
Wakrah Electrical Residental Complex @ Al- Meshaf MVPanel, Feeder Pillar 2011 Completed
Doha International Airport DIA Cargo MV Panel Modification 2011 Completed
Qibla Maintanence & Contracting G+MAl Mithalt Factory G+M @ New Industrial area MV Panel, 200 KVAR Cap.Bank,SMB-5 Nos.DB-5 Nos.REF 2017 Completed
Tarek Multi Energy Qatar Grating & Road Barrier Factory MV Panel & SMB 2011 Completed
M/s. Tadmur Contracting 800A Isolator panel - 21 Nos. 7 New Schools 2008 Completed
M/s. Al Asalah Elect.Material 1250A ATS MV Panel- 1 No. Sh.Khalid Bin Hamad 2008 Completed
M/s. Qatariana 2500A MV Panel Off.Bldg (B+G+3) at Al Wakra 2008 Completed
M/s. Orient Star international 1600A ATS Mvpanel Under ground Car parking at shioiukh Mosque 2008 Completed
K&H Al Mana Al Jazeera Petrol sation 2500MVP-1 No.&300kvar C.B-1 No. 2011 Completed
G E M Qatar Plaster MV Panel 2011 Completed
Orient Electrical Delta Doha Plant @ Ind. MV Panel & 300kvar Cap.Bank 2011 Completed
Construction & Reconstruction Eng. Co Al Jasra Tower SMDB Metering Cabinet Installation @ Site 2012 Completed
Alwadi Plus Trading Used Oil Recycling Plat Supply of LV Panel & Capacitor Bank Panel 2018 Completed
Hamad Medical Corporation ENG/RM/1646124/14125A TP 12 Way DB - 10 Nos, & 125A TP 18 Way DB - 10
Nos.2015 Completed
How United Services MVPanel Baker Hughes ORS Facility 2009 Completed
M/s. Doha Switchgear 2500A MVP & SMB-7nos H.H.SH. Nora Khaled Thani Al Thani 2008 Completed
Qatar Islamic Bank 15 Villa (G+1) complex 1600A MV Panel 2010 Completed
Mega E&M Dukhan Highway Feeder Pillar 18 Nos. 2013 Completed
Al Alia Trad. & Cont. SMB, DB, ATS Gen. Information Builging @ Sailiyah 2009 Completed
Orient Electrical Multipurpose Workshop MV Panel 2010 Completed
Germin Trading & Contracting Pro. 2B+G+M off. + Flat Building MV Panel & Cap. Bank 2011 Completed
Ramco Engineering Store & Accom.@ Industrial Area 1600KVA Transformer 2012 Completed
Essa Hightech Trad. Lusail CP-1 Metering Cabinet 2011 Completed
M/s. Germin Trading DB (2B+G+3+PH) Commercial Building 2008 Completed
M/s. Areva Testing Engr/Tech supply 2008 Completed
Condor Building & Contr Woqood Petrol @ Lekhdaira MVP & Cap.Bank 2016 Completed
Al Aysar Trading & Cont. Al Wukair DB with Incomer 2010 CompletedPage 14 of 16
Customer Job details Project details Year Status
Gulf Lights MV panelG+1+PH Villa Complex Kitchen Block Mosque &
Muiltipurpose Hall2009 Completed
QD-SBG Khalifa Avenue Feeder Pillar 2020 Completed
Networks Electrical & Mechanical Dev. Of Al wakra & Al Khor Sports Club MV panel - 1 No, SMB - 3 Nos 2010 Completed
Texas Engineering Algeriyan Embassy MV Panel 2011 Completed
Orient electrical Pro. G+1 Office Bld, & M ez. Aluminium & Plant Factory MV panel-1No,Cap.bank-1 No. 2011 Completed
Bader El Hazek Private Villa @ Al Khaisa/ Al Salal 1600A MVP(ABB)& SMDB- 5 Nos. 2012 Completed
Egyptian Church Additional Multi Purpose Hall MV Panel - 1 No. 2014 Completed
Al Ali Projects Beautification for Acess road to bBeach House Dukhan SMB (LV Distribution Board ) 6 Nos 2016 Completed
Elite Prime Electromechanical Proposed Ground of Workshop Offices (Don Factory) Supply of MV Panel, Capacitor Bank, SMDB'S & DB'S 2018 Completed
Al Boroug Villa @ Al Wakra MV Panel, Feeder Pillar 2010 Completed
SBK Oil Field Al Jaidah Group Chevorelet car yard GCP Panel - 1 No, SMDB - 1 No & DB - 8 Nos. 2015 Completed
Petroserv Ltd Duhail Site Office Temporary Panels 2020 Completed
Surendra Kumar (Qatani Trading)22 Nos. Villa Complex for Shk Marium Jassim Jabur Al
Thani at Al WaabMN Panel 1 No,SMDB 6 Nos. 2013 Completed
Belhasa Projects Barwa Al Baraha - Phase -2 MCC Panel 2013 Completed
M/s. M.H. ALMANA 2500A MV Panel- 1 No. & 200A ATS AL- MANA TOWER @ SHEAM BINN HAMAD 2007 Completed
Germin Trading & Cont. MSB, DB 2B+G+3+PH add. Mezz. 2009 Completed
Benchmark Trading & Engineering
ServicesSpecial Forces Camp at Sailiyah
MV Panel - 1 No, Battery Charger Panel - 1 No. & REF Test
at Site - 1 No.2016 Completed
M/s. Royal Qatar Trading & Con 2500A MVP FOR Mr.Khairi Mohd 2008 Completed
Mohd Bin Jassim Bin Abdul Aziz Al
ThaniLab. Accomt'n & Ready Mix ( Athar Trading) 1600kva Transformer 2016 Completed
Wakrah Electrical Qatar Steel@ Industrial Transformer1600KVA 2012 Completed
Rivera Trading 20 Villa (G+1+PH) Club House Guard Room for SHK- Thani
Abdul Rahman Al Kuwari @ Al Kheesa250 0A MV Panel & Cap.bank-200KVAR 2018 Completed
Doha Switchgear MVPanel, SMB B+G+5 Building 2009 Completed
M/s. Nasser Al Hajri MDBs - 8 sets - PO 68504 PEARL GTL CAMP 2008 Completed
Radiant Engineering Enterprises LLC Baladna Dairy Farm ( Phase 2 ) MVP- 1No, Cap-1No. 2020 Completed
M/s. Al Masaood Bergum MVPANEL,SMB,DB NDIA Airport steering committee 2008 Completed
Condor Building Contracting QJ131 WAQOOD fuel station @ New industrial area LV PFCC SMDB DB 2019 Completed
Al - Khaleej (Firoz) Plant, Store & G+1 Office Bldg. MV panel, Cap. Bank 2010 Completed
Qatani Trading Proosed 25 Nos. (G+1+PH) Villa Complex 1600KVA Transformenr - 1 No. 2014 Completed
Al Widad Trading & Contracting Safa Watar Purifying Factory at New Industrial Area MV Panel 1 No & Capacitor Bank 2014 Completed
Al Amoudi Trading & Co Pro. B+G+2F Office Building @ Ain Khaled Al Rayyan 1600kVA Oil type Transformer 2013 Completed
Makkah Contracting Store & Mezzanine 1600 KVA Oil Type Transformer 1 No. 2014 Completed
Al Mejdaf Trading Con. (Gulf Lights) The Anglican Centre 2500A MV panel 2013 Completed
Condor Building Contracting QJ136 WAQOOD fuel station @ Baaya LV PFCC SMDB DB 2019 Completed
Marina Trading SMB, DB & C. Bank Shannon Hotel 2009 Completed
M/s. National Indl Gas Plants 1600A MVP for New CO2 Plant 2008 Completed
Wakrah Electric MV Panel, Feeder Pillar 22 Villa 2009 Completed
Al Naqi Real Estate 1600KVA Transformer 2011 Completed
How united services CBQ - D Ring Road Branch MSB,ATS Control Panel & DB's 2013 Completed
Al Mawrid Trad. School & Staff Accommodation MV panel 2011 Completed
Jodran Isolated Building Co Add. Penthouse B+G+7 @ Mansoura 1600KVA Ground Mounted Transformer 2012 Completed
Al Boroug 34 Villa Compound Oil Type Transformer 2013 Completed
ABB Ras Gas MCC panel Modification 2013 Completed
HBK Engineering Propsed G+2Accom:+G+M Store &Work Shop@ Ind Area MV Panel,SMB-8Nos.DB21 Nos.& REF Test 2016 Completed
Al Dhow LRT @ Lusail Plaza Infrastructure CP07B 5 Nos of FP with dimmer controller 2018 Completed
Royal Grammar school ( Al Qamra) Royal Grammer school LV, Capacitor & SMDB 2020 Completed
HBK Engineering Services W.L.L Proposed Fit Out Work Lulu Hypermarket BF, GF, MZ & FF
Floor Level Modification of LV Panel, ATS, SMDB'S, DB's 2020 Completed
AL Jaber & Partners RIW-South Package 2 @ SIMASIMA SLFP 6 WAY 20 No's & 8 way 1 Nos 2021 Completed
IBA MV panel-1no & Capacitor Bank-1no Office Building near D ring road 2009 Completed
Page 15 of 16
Customer Job details Project details Year Status
Qatar Airways QR Tower 1Supply & Installation of ACB With Interconnection Busbar - 1
Lot2014 Completed
Takyeef Electromechanical Kahramaa Awareness Park Additional Cost for EMCC - B Panel - 1 No. & SMDB - 1 No. 2014 Completed
Commitment Engg works Pro. Add. School Bldgs. of Qatar Int'l School MV Panel - 1 No. & Capacitor bank 2015 Completed
Royal Qatar MV Panel - 1 No. (B+G+7) Pro.1 No. Hotel Flats Build. 2009 Completed
Electro Mech Trading & Contracting Co.G+M Steel and Alumium Workshop, Show Room, Offices
and AccomodationSupply of SMDB'S & DB'S 2019 Completed
Binthani Qatar Steel MV Panel , SMDB & DB 2013 Completed
Electro Mech Trading & Contracting Co. Proposed G+3 Labour Accommodation Building Supply of MV Panel, Capacitor Bank Panel, SMDB'S & DB'S 2019 Completed
M/s. Nasser Al Hajri MDBs - 9 sets - PO 68502 PEARL GTL CAMP 2008 Completed
Tarek Multi Energy (ltd) Transformer Mesaimeer Police Station 2009 Completed
M/s. Prince Lights 1600A MVP & Cap.Bank ABM Military college 2008 Completed
Al Masaood Bergum DB PO - 2496 2009 Completed
M/s. Doha Tech Services 2500A MV Panel & SMBs 46 Villas Comlex+guard room+Club+House 2007 Completed
M/s. Building Engg.Services 1600A MVP & Feeder Pillars-4Nos Labour acccm.@ Indu. Area 2007 Completed
M/s. HBK Engg Services 2500A MVP Labour acccm.@ Indu. Area 2008 Completed
M/s. Building Engg.& Ser.Trdg MVP-1 No. & FP-3 Nos. Pro. G+1 14 Villa Compound 2008 Completed
Gulf Lights MV panel Villa Compound G+1+P 2009 Completed
Elec - Qatar Lusail Grnd Stand Ext. MVP, SMB & DB 2012 Completed
Specialized Trading & Contracting Co. Al Raha Poly Product factory Cubicle Panel - 1 No. 2015 Completed
Mega E & M Trading & Contracting Roads & infrastructure at Doha Industrial area package 1 6 WAY TPN - 20 No's 2019 Completed
Page 16 of 16