Vet-
Major Capital Projects
2010 to 2014
Engineering & Development Services
Veterans Memorial Bridge
Bell Boulevard East Extension and
Feedermain Phase 1
Dundas Street West CPR Overhead
Rehabilitation
Sidney Street CNR Overhead
Rehabilitation
Moira Street East Reconstruction
and Northeast Feedermain Phase 2
(Olive St. to Elvins St.)
Church Street Retaining Wall
West Riverside Park Illumination
Veterans Memorial Bridge
Bell Blvd. East Extension Feedermain
Engineering & Development Services
Harder Drive Reconstruction (Palmer Rd. to Avondale Rd.)
Cloverleaf Drive Servicing & Reconstruction
Purdy Street Sewer Separation & Reconstruction
Frank Street Sewer Separation & Reconstruction
Chatham Street Sewer Separation & Reconstruction (Victoria St. to Pine St.)
Bongard Crescent Watermain & Road Reconstruction
Wallbridge Crescent Watermain (Moira St. to Harriett St.)
James Street Sanitary Trunk Sewer Relocation
2010 Sidewallk Program, including Cannifton Road North (North of Quinte Sports
& Wellness Centre) Moira Street West (Elgin St. to Tripp Ave.) Dundas Street East
( at Hastings Dr.) and Adam Street ( at Centre St.)
2010 Completed Projects
Engineering & Development Services
Palmer Road Reconstruction (Bridge St. West to Moira St. West) includ-
ing trunk watermain
Avonlough Road Watermain Replacement (Champagne Dr. to Hastings
Park Dr.)
North Front Street Resurfacing (Donald St. to Craig St.)
Moira Street West, turning lane at Palmer Road
College Street East at Cannifton Road Intersection
Improvements
Mary Street Reconstruction
Willard Street Reconstruction
Brock Street Reconstruction
Charles Street Reconstruction
(Victoria Ave. to Pine St.)
Meggisons Bridge Rehabilitation
Palmer Rd. Reconstruction
Charles St. Reconstruction
Meggisons Bridge Rehabilitation
Airport Parkway
Reconstruction
2011 Completed Projects
Engineering & Development Services
Dundas-Palmer Sewage Pumping Station
Reconstruction & Sewer Forcemain
Dundas-Palmer Storm Sewer Extension
(Under C.P. Railway line)
Highway 62 Watermain Extension
(Millennium Pkwy. to 1.8km North)
Lingham Street Sewer Separation & Road
Reconstruction (Pine St. to Emily St.)
Tracey Street at North Front Street
Intersection Improvements
Old Kingston Road Rehabilitation (O’Neill
Drive to Old Hwy 2)
Dundas Street East Watermain Replacement (Front
St. to Foster Ave.)
Haig Road Watermain Extension
Putman (Cannifton) Bridge Rehabilitation (Crossing
the Moira River connecting Cannifton Rd. North to
Maitland Dr.)
Bay Bridge Road CPR Overhead Structure Rehabili-
tation/Replacement Environmental Assessment (EA)
College Street East Extension EA
Cannifton Planning Area Water Pressure Study &
Storage Master Plan EA
Bronk Road Bridge Replacement EA
Jane Forrester Park Pier Reinstatement Project
Dundas-Palmer SPS
Putman Bridge Rehabilitation
2012 Completed Projects
Engineering & Development Services
Harriett Street Sewer Separation & Road Reconstruction
(Wallbridge Cr. to Boswell St.)
Boswell Street Sewer Separation & Road Reconstruction
Hanna Court Sewage Pumping Station Elimination
Old Madoc Road Rehabilitation (Hwy 62 to 1.8km Southerly)
Dundas Street West (Bay Bridge Rd. to Coleman St.) EA
James Street Reconstruction
Sidney Street & Maitland Drive Trunk Watermain
Extension (Sidney St., Cloverleaf Dr. to Maitland Dr.
Maitland Dr., Sidney St. to Hwy 62)
North Park Gardens Reconstruction Phase 1 (North
Park St. to 100m Easterly)
Harriett St. Sewer Separation & Road Reconstruction
Old Madoc Rd. Rehabilitation
James St. Reconstruction
2013 Completed Projects
Engineering & Development Services
Bell Boulevard service extension for 808
Bell Boulevard (by developer)
College Street East Extension & Municipal
Servicing, 600m Easterly
North Park Gardens Reconstruction, North
Park Street to Moira Street East including
new sidewalk on North side
Adam Street Water Booster Station
Improvements
Moira Street West Bridge Rehabilitation
Airport Parkway Traffic Signals at
Elmwood Drive and Mitchell Road, (by CN
Rail)
North Park Gardens Reconstruction
Adam Street Booster Station Improvements
2014
Completed Projects
Moira Street West Bridge Rehabilitation
Design
Sidney Street Watermain Replacement, College
Street to Maple Avenue
Strachan Street Reconstruction and Sewer
Separation
Jones & Reid Streets Watermain Replacement
Grove Street Reconstruction and Sewer
Separation
Haig Road and Station Street Extension EA &
Detailed Design
Coleman Street Reconstruction & Sewer
Separation
Airport Parkway & Elmwood Drive Drainage
Study
Catharine Street Footbridge Replacement EA
Engineering & Development Services
Construction
Black Diamond Road Watermain Extension
Dundas Street West Sanitary Trunk Sewer
Extension
2014 Sidewalk Repair Program including new
sidewalk from Bradgate Road Easterly
Bridge Street Bridge (Lower
Bridge) Rehabilitation
Maitland Drive servicing for
Heritage Park Estates Subdivision
(by developer)
Dundas Street West Sanitary Trunk Sewer Extension
Ongoing Projects 2014
Bridge Street Bridge Rehabilitation
Engineering & Development Services
2014
Design
Ongoing Build Belleville Projects
Construction
North East Feedermain including Yeomans Street
(including Bike Lanes) Lane Avenue and Donald Street
Reconstruction
Downtown Riverside Parking Lot Entranceway
Improvements
Old Highway 2 Rehabilitation, East of Point Anne Road
to City Limits
Bronk Road Rehabilitation Phase 1, Blessington Road to
Thrasher Road
Build Belleville Project Centre—116 Pinnacle Street
Downtown Revitalization and Redevelopment Project,
Design and Consultation
Sidney Street Corridor Improvements, EA &
Preliminary Design
Bronk Road Rehabilitation Phase 2, Thrasher Road to
Scuttlehole Road including Bridge Reconstruction
Grass Boulevard Reconstruction
North East Industrial Park Roads Rehabilitation
Herchimer Avenue South Reconstruction
Mineral Road & Maitland Drive EA & Detailed Design
Farnham Road EA & Preliminary Design
Bay Bridge Road/CPR Overhead Structure Replace-
ment and Dundas Street West Reconstruction, Holden
Street to Coleman Street
Build Belleville Project Centre