17
19/01/2010. Cologne Olivier Robelin – Maintenance Review Board Expert Maintenance Review Board Process (MRB) And Instructions for Continued Airworthiness Scheduled Maintenance Instructions EASA - Certification Directorate/Flight Standards

Maintenance Review Board Process (MRB) And · PDF fileEuropean Aviation Safety Agency. The Maintenance Review Board (MRB) process (with MSG-3 as a tool) is an acceptable means of compliance

Embed Size (px)

Citation preview

Page 1: Maintenance Review Board Process (MRB) And · PDF fileEuropean Aviation Safety Agency. The Maintenance Review Board (MRB) process (with MSG-3 as a tool) is an acceptable means of compliance

19/01/2010. Cologne Olivier Robelin – Maintenance Review Board Expert

Maintenance Review Board Process (MRB)

And Instructions for Continued

AirworthinessScheduled Maintenance Instructions

EASA - Certification Directorate/Flight Standards

Page 2: Maintenance Review Board Process (MRB) And · PDF fileEuropean Aviation Safety Agency. The Maintenance Review Board (MRB) process (with MSG-3 as a tool) is an acceptable means of compliance

European Aviation Safety Agency

The Maintenance Review Board (MRB) process (with MSG-3 as a tool) is an acceptable means of compliance for developing a maintenance program/ scheduled maintenance instructions as part of the compliance with the ICA.

MSG-3 is an analytical methodology, officially recognized (FAA/TCCA/EASA) based on Reliability Centred Maintenance (RCM).

The MSG-3 logic is owned by ATA. MSG-3 is reviewed and updated by a Maintenance Programs Industry Group (MPIG) and approved through the International MRB Policy Board (IMRBPB), AAs.

Introduction

Page 3: Maintenance Review Board Process (MRB) And · PDF fileEuropean Aviation Safety Agency. The Maintenance Review Board (MRB) process (with MSG-3 as a tool) is an acceptable means of compliance

European Aviation Safety Agency

Composition and Process

Manufacturer

Operators

Authorities

MRB process

MRBR

Output

Accepted asAMC for

Certification Specification*

*part of ICA

Starting Basis for

OMPPART-M

Suppliers

Engine manufacturer

Page 4: Maintenance Review Board Process (MRB) And · PDF fileEuropean Aviation Safety Agency. The Maintenance Review Board (MRB) process (with MSG-3 as a tool) is an acceptable means of compliance

European Aviation Safety Agency

S TC EIS

MRBR must be approved for EIS

MRBRrev. 0

MRB process

Certification Process

At TC, compliance is demonstrated through MRB ProcessNot necessarily through MRB- Report

Composition and Process

Page 5: Maintenance Review Board Process (MRB) And · PDF fileEuropean Aviation Safety Agency. The Maintenance Review Board (MRB) process (with MSG-3 as a tool) is an acceptable means of compliance

European Aviation Safety Agency

technical modificationsin-service experience

new regulationsnew variants/models

optimization

MWG + ISCNew or

rev. analysis

S TC EIS

MRBRRev.

AA OPS

Any new inspection requirements which necessitate quick implementation, can use a

Temporary Revision process, allowing TR publication in a very short delay.

OMP rev.

OPS

requir .

OPSReliability

evolution

Cert.limits

AD

MRBRrev. 0

Composition and Process

Page 6: Maintenance Review Board Process (MRB) And · PDF fileEuropean Aviation Safety Agency. The Maintenance Review Board (MRB) process (with MSG-3 as a tool) is an acceptable means of compliance

European Aviation Safety Agency

Output

MaintenanceReviewBoard Report

MRBR Sections:1. System & Powerplant2. Structure3. Zonal & Lightning/Hirf

The Maintenance Review Board Report contains the Minimum Initial ScheduledMaintenance Requirement.The MRB process is a standardized processused as an acceptable means of complianceto develop scheduled maintenanceinstructions ensuring the objectives of an efficient aircraft maintenance program.

Page 7: Maintenance Review Board Process (MRB) And · PDF fileEuropean Aviation Safety Agency. The Maintenance Review Board (MRB) process (with MSG-3 as a tool) is an acceptable means of compliance

European Aviation Safety Agency

ICAOState of design State of operation

(TCH) (OPS)Annex 8 Annex 6„Airworthiness of Aircraft“ „Operation of Aircraft“=> continuing airworthiness => maintenance program maintenance information

(=ICA)ICAO 9760normally issued as MRBR

EASAPart 21A.61 Part M.A. 302

(=>ICA) => Operator’s OMPCS 2X.1529 para “scheduling Information” (EC 2042/2003 and AMC MA.302)Work-Instruction C.I011-01MRBR accepted as AMC

Requirements

Page 8: Maintenance Review Board Process (MRB) And · PDF fileEuropean Aviation Safety Agency. The Maintenance Review Board (MRB) process (with MSG-3 as a tool) is an acceptable means of compliance

European Aviation Safety Agency

AD

ALSALS

MRBR

NAA R

VR

OR

Airworthiness Directives

Inspection Service Bulletins/

Service Information Letters

ISB/ SIL

Vendor/OEMRequirements

/Recommendations

Maintenance Review Board Report

Airworthiness Limitation Section

Competent (National) Airworthiness Authorities

Requirements

OperatorRequirements

MRBR

VR

NR

O.R.

AD

ORReliabilityProgram

NAA Approved Operator’s

Maintenance Program

CatIII/RVSM/ETOPS

Special OPSRequirements

NAA approved OMP

Page 9: Maintenance Review Board Process (MRB) And · PDF fileEuropean Aviation Safety Agency. The Maintenance Review Board (MRB) process (with MSG-3 as a tool) is an acceptable means of compliance

European Aviation Safety Agency

CS2XAp. H/A

H/A2X.1

Y2X.2

Y2X.3Y2X.4

H25.5

CS 2X.1529 Appendix A/H

.1 General

.2 Format

.3 Content

.4 ALS

.5 EWISWhat d

oes the M

RB

proce

ss co

ver in th

e ICA

require

ments 1529?

MRBR covers part of:

Page 10: Maintenance Review Board Process (MRB) And · PDF fileEuropean Aviation Safety Agency. The Maintenance Review Board (MRB) process (with MSG-3 as a tool) is an acceptable means of compliance

European Aviation Safety Agency

(a) Aeroplanemaintenance

manual

(g) Tools

(f) Data relativeto structure

(e) Protective treatments

(d) Details for the

Application of specialinspection

(c) Diagrams of structural accesses

(b) Maintenance instructions

.3Content

(b).4 generalinstructions

(system testing,etc)

(b).1 Schedulinginformation

(b).2 Troubleshooting

(b).3 information& methods

for replacement

CS 2X.1529 Appendix A/HUnder Maintenance

ReviewBoard process

Page 11: Maintenance Review Board Process (MRB) And · PDF fileEuropean Aviation Safety Agency. The Maintenance Review Board (MRB) process (with MSG-3 as a tool) is an acceptable means of compliance

European Aviation Safety Agency

How to demonstrate equivalent minimum maintenance requirement and reach similar safety level of a maintenance program without structured and recognized method (e.g. MSG-3)?

How to support operational requirements and ensure an efficient /cost effective maintenance program without specific tool such as MSG-3?

On which rationale AA can accept initial maintenance program without structured process and recognized methodology?

MRB Conclusions

Page 12: Maintenance Review Board Process (MRB) And · PDF fileEuropean Aviation Safety Agency. The Maintenance Review Board (MRB) process (with MSG-3 as a tool) is an acceptable means of compliance

European Aviation Safety Agency

(a) Aircraftmaintenance

manual

(g) Tools

(f) Data relativeto structure

(e) Protective treatments

(d) Details for the

Application of specialinspection

(c) Diagrams of structural accesses

(b) Maintenance instructions

.3Content

(b).4 generalinstructions

(system testing,etc)

(b).1 Schedulinginformation

(b).2 Troubleshooting

(b).3 information& methods

for replacement

Our understanding is that standardized procedures/processes/guidelines should be developed and

implemented in order to develop, validate and accept documents ensuring continued airworthiness and safety

(1529 requirements).

MRB Conclusions

Page 13: Maintenance Review Board Process (MRB) And · PDF fileEuropean Aviation Safety Agency. The Maintenance Review Board (MRB) process (with MSG-3 as a tool) is an acceptable means of compliance

European Aviation Safety Agency

How does the MRB process fit in the approval/acceptance of ICA?

Maintenance Review Board

- How and what parts of the MRB report are integrated in the ICA ?- How do we coordinate the approval/acceptance processes ?- Case of the engine/propellers manufacturers/suppliers in the MRB process- How can a modification impacting the MRB be approved whereas MRB process is not completed thus does not allow to assess the impact?

Page 14: Maintenance Review Board Process (MRB) And · PDF fileEuropean Aviation Safety Agency. The Maintenance Review Board (MRB) process (with MSG-3 as a tool) is an acceptable means of compliance

European Aviation Safety Agency

Appendix

Page 15: Maintenance Review Board Process (MRB) And · PDF fileEuropean Aviation Safety Agency. The Maintenance Review Board (MRB) process (with MSG-3 as a tool) is an acceptable means of compliance

European Aviation Safety Agency

ICAO 9760

ICAO 9760 Volume 1 “Airworthiness Manual, Organization and Procedures”

“6.4.3 Content of the maintenance programme

“6.4.3.4 Annex 6, Part I, 11.3 also contains a recommendation that the maintenance programme be based on maintenance programme information made available by the State of Design or by the organization responsible for the type design. For large aeroplanes, this information is normally issued in the form of a maintenance review board report for the particular aircraft type (refer to Volume II of this manual, Part A, Appendix B to Chapter 2 for details of the maintenance review board process). …”

Page 16: Maintenance Review Board Process (MRB) And · PDF fileEuropean Aviation Safety Agency. The Maintenance Review Board (MRB) process (with MSG-3 as a tool) is an acceptable means of compliance

European Aviation Safety Agency

According to Commission Regulation (EC) N° 2042/2003(M.A302-(c))

(c) The maintenance programme must establish compliance with:

1. instructions for continuing airworthiness issued by type certificate and supplementary type certificate holders and any other organisation that publishes such data in accordance with Part-21, or

2. instructions issued by the competent authority, if they differ from subparagraph 1 or in the absence of specific recommendations, or

3. instructions defined by the owner or the operator and approved by the competent authority if they differ from subparagraphs 1 and 2.

Maintenance Review Board

Page 17: Maintenance Review Board Process (MRB) And · PDF fileEuropean Aviation Safety Agency. The Maintenance Review Board (MRB) process (with MSG-3 as a tool) is an acceptable means of compliance

European Aviation Safety Agency

As a result, and in accordance with AMC M.A.302 (ED 2008/013/R of 12/12/2008):

1. An owner or operator’s maintenance programme should normally be based upon the maintenance review board (MRB) report where applicable, the maintenance planning document (MPD), the relevant chapters of the maintenance manual or any other maintenance data containing information on scheduling. Furthermore, an owner or operator’s maintenance programme should also take into account any maintenance data containing information on scheduling for components.

2. Instructions issued by the competent authority can encompass all types of instructions from a specific task for a particular aircraft to complete recommended maintenance schedules for certain aircraft types that can be used by the owner/operator directly. These instructions may be issued by the competent authority in the following cases:

in the absence of specific recommendations of the Type Certificate Holder.

to provide alternate instructions to those described in the subparagraph 1 above, with the objective of providing flexibility to the operator.

Maintenance Review Board